§. S. LOOTAH CONT. CO.
FOUNDATION DIVISION
P.O. Box : 26025, Dubai, UAE.
RAKER PILE DESIGN
‘Tower locations - 2/20
LOOP IN AND OUT $3- SILA 400kV OHL BARAKAH S/S & NEW 400kV OHL.
BARAKAH S/S - RUWAIS G/S, NEW 400kV OHL BARAKAH S/S-RUWAIS G/S”
TRANSCO CONTRACT - N 13411
CLIENT : M/s TRANSCO
CONSULTANT : M/S PARSONS BRINCKERHOFF
MAIN CONTRACTOR : M/s KEC INTL. LTD
FOUNDATION CONTRACTOR : M/s 8. S. LOOTAH FOUNDATIONS,
Deseipiion Approved
Tnitial_[Signanre
30/04/2015 SUBMISSION
[Document Ret: CDiP-7003392015 [initial cD Tien [fob No. P-700S.S. LOOTAH CONT. CO.
FOUNDATION DIVISION
P.O. Box : 26025, Dubai - U. A. E.
Tel : 2673525, Fax : 2672696
PROJECT:
CLIENT:
CONSULTANT:
MAIN CONTRACTOR:
DESIGN FORMULA:
f (total uplift due to friction) =
FOR SAND:
Qs (uplift in sand)
Where
FOR ROCK:
Qsr (uplift in rock)
Where
Qup (Net uplift required)
W = weight of concrete
REFERENCES:
Ks *y*si2*tan®* Act If
Coefficient of earth pressure of the shaft
‘otal depth of sand from NGL.
ie circumference
Frictional length in sand
kin resistance in rock = 0.1 * que
Min, unconfined compressive strength along
with pile shaft in rock.
ile circumference
jock embeded length
OY gLEAL OLS gd Gu yu IS
lial wy) pd
sal Zusall LLYN = yea TATE cigs
TVA USL Avr ye cL
: LOOP IN AND OUT $3- SILA- 400kV OHL TO BARAKAH S/S
: Mis TRANSCO.
WS PARSONS BRINCKERHOFF
Ms KEC INTL. LTD
1 "Pile Design & Construction Practice” by TOMLINSON (Ch. 4)
2."B.S, 8004-1986 for Foundations"
HEA TWYANN gs tts
La #1 FTE Haj Lall ase isla sslind@eim.ae : j4,55I¥1 sa!)
Email: ssiind@eim.ae Sharjah Office Tel.: 06-5313646 Dubai Workshop Tel.: 04-2672891S.S. LOOTAH CONT. CO. OY gL Bel) Lag yu yu As pai
FOUNDATION DIVISION oll wy) ad
PO. Box : 26025, Dubai - U. A. E. Banal Gesell LA yas TIVO: ue
Tel : 2673525, Fax : 2672696 AVIAN GSLG / Fwyere asl
PROJECT: : LOOP IN AND OUT S3- SILA- 400kV OHL TO BARAKAH S/S
CLIENT: : Mls TRANSCO :
CONSULTANT: M/S PARSONS BRINCKERHOFF
MAIN CONTRACTOR: : Mls KEC INTL. LTD
ULTIMATE LOADS FOR RAKER PILE: AT TYPE
TOWER TYPE ATG
[ULT.LOADS ON TOWER LEG: kN,
COMPRESSION: 3227
TRANSVERSE SHEAR Ht 83,
LONGITUDINAL SHEAR “HI 49
RESULTANT H-SHEAR iH o
[UPLIFT = 2657
ITRANSVERSE SHEAR -Ht 82.
LONGITUDINAL SHEAR ‘HI 50,
RESULTANT H-SHEAR :Hr O71
SEA YWYAAN gs Shy BL OV OV TNE G5, Se asta sslind @eim.ao 5,851 ll
Email :sslind@eim.ae Sharjah Office Tel.: 08-5313646 Dubai Workshop Tel.: 04-2672891S.S. LOOTAH CONT. CO. oY glLGa oLigt Gu yu as ut
FOUNDATION DIVISION oll! a
P.O. Box : 26025, Dubai - U. A. E Banka Uggall SLL ya TUTE ue
Tel : 2673525, Fax : 2672696 TAYE QSL VP Te La
LOOP IN AND OUT S3-SILA- AODKV OHL TO BARAKAH SiS
!ile TRANSCO
Iii PARSONS BRINCKERHOFF
MAN CONTRACTOR: $l KEC INTL. LTD
‘SUMMARY FOR RAKER PILE - 24/201 LOG
Tota
Tower | Pile | Pia Head Pile Length | ct
TowerLoc. | Tower Type |PiloType| Incl. | Dis, Ext. Above] fine tey |FrOMN.GL | CPnetwe® | Malin Reinforcement
(Gea) | ri [Pa ‘m)
2020 ‘ATs (Tey | RAKER | 12 | 1200) 075 | 0.50 23.05 ‘18T32mm
ee Ww”
SEA TAWTANN: gas Meigg Gils #1 OFVPIEN: 5 Lidl LS. Gala sslind @oim.ae - 35 25191 a all
Email: sstind@eim.ae_ Sharjah Office Tel.: 065313646 Dubai Workshop Tel.: 04-2672891S.S. LOOTAH CONT. CO. OY gL Ga ola Ga yu AS at
FOUNDATION DIVISION oll wy! a
P.O. Box : 26025, Dubai - UA. E. Baal ig all OLLYI = ges TYE oe
Tel : 2673525, Fax : 2672696 PAVIA: SUG vere sla
Paoaicl {oor AD OUT 8A OM TOBARALA
7 sermanaco
‘ous PARSON DRNCKERIOT
tagucoxrascron, fiver.
SEA YAWYAAN: gaa igg Gila 91 OF VELEN 25, LEII aS. isla sslind@eim,ae : s,35I9 all
Email: ssiind@eim.ae Sharjah Office Tel. 06-5313646 Dubai Workshop Tel.: 04-2672891S.S. LOOTAH CONT. CO. OY gL Ga oLagt Gu pw Ast
FOUNDATION DIVISION oll wy) a
P.O. Box : 26025, Dubai- U. A. E. Hint iggall LLY = ges VO gs
Tel : 2673525, Fax : 2672696 TAY SUE TV Te la
Taoiieh Loop ou 45 oo To BRN 8s
fuext tus asco
ssa, ft aon menenn?
“ee ro
(ee mere aS) +c
at noc oh ne ent a ett
onda ae
isiesr a: |
SEAT AVTANY gos Ugg tale N= OT VTTEN GLI 2S sla Sslind @eim.ae : js 86091 esa
Email :ssiind@eim.ae Sharjah Office Tel.: 06-5313646 Dubai Workshop Tel.: 04-2672891S.S. LOOTAH CONT. CO. OY gL Bal oLGg) Gu yu dS ub
FOUNDATION DIVISION oll) a
P.O. Box : 26025, Dubai - U. A. E. Bans AN SLLYH gas TT2 nce
Tel : 2673525, Fax : 2672696 TATA GS Tete al
paoues LOOP IN AND OUT S3- SILA. 400KV OHL TO BARAKAH S'S
Suet: ig TRANSCO
‘CONSULTANT: INS PARSONS BRINCKERHOFF
MAIN CONTRACTOR: fs KEC WL, LTD
Teves: AD
Boren No Bisa
Tower ype: vee (ey
Pit ype AKER
[Dept of ie om oxsing so
investigating ve, 20
Water table rom exatng 237
investigating eve ast
‘Top ants neglected
200
400.
2.00) 2
9.00, 3
ae =| avg SPT 42
7800. |
"7.00. a
16.00. 2 ‘aug sPTa8
18.00 3
20.00 Ee]
21.00 a
JUGS valu selected for design
notes: faz:
PILE HAS BEEN DESIGNED FOR 1200MM DIA. SINCE THE PILE
LENGTH WAS 25MTS IN CASE OF 10004M DA,
SEA VAVTANN : pas Mdegy tala #1 OV VINEN LE ss sla sslind@eim.ae : 25 59191 a all
Email :ssiind@eim.ae Sharjah Office Tel.: 065313646 Dubai Workshop Tel.: 04-2672891S.S. LOOTAH CONT. CO. OY gL Ba ola Gu yu Ast
FOUNDATION DIVISION oli wy) a
PO. Box : 26025, Dubai - U. A. E. Raadall ayall LLY yes UNO ue
Tol: 2673525, Fox: 2672606 wey esta rwrere: ae
ose iceman ema on
sae sores:
ies SE meconere
aon Soc
ae ae
ae ae
Sean
Sate =
SS ——————
eae
aye: & 8
—
eens Beemer go
ressrmey ewe | te tae 2B
i i z
im] a 3
i is 3
1 err Tea
Irn ton Anite) gs
oro 7
javerae wet erty