Professional Documents
Culture Documents
PROJECT NAME
OWNER
Main Contractor
PILE DETAILS
DATE
of Boring & Concrete
CASING FIXED ON
Pile Dia
Platform Level
Cut Off Level
Toe Level
Rock Level
Top of Cage
Casting Level
Bored Length
Concreted Length
OD 750
(mm)
(m)
(m)
(m)
(m)
(m)
(m)
(m)
(m)
( mm )
( TBM )
(m)
REINFORECEMENT DETAIL
Length
(m)
Main Bars
Dia
No
Dia
STANDING TIME
OBSTRUCTION TIME
REMARKS:
Technibuild
DATE
Start
INCLINATION : NA
DATE OF PILE
COMPLETED
CO - ORDINATES
E:
N:
BORING TIME
Finish
TREMIE
YES
NO
CONCRETE TIME
Start
Finish
RIG
CRANE
Concrete Details
Depth Below Platform Lvl(m)
0
No of Cubes
2
Cement
4
Grade
6
Slump
mm
8
Volume Poured
m3
10
Theo. Volume
M3
12
Overbreak
%
14
G.Water Level
(TBM)
16
BENTONITE
TESTS
18
20
Viscosity
22
24
Density
26
28
30
Spirals
Sand Content %
32
Pitch
34
PH
36
38
40
42
44
46
48
50
52
54
MAIN CONTRACTOR
DATE:
PILE NO.
CLIENT
DATE: