You are on page 1of 6

part of Aker

Te Giac Trang (TGT) Riser Project


Mid Water Arch Jacket (MWAJ) Detail Design
for NKT Flexibles
Meeting 19.05.10

2008 Aker Solutions

Deliverables

Slide 2

2008 Aker Solutions

part of Aker

Design Briefs
Language

: English

Analyses Code Check

: API RP 2A WSD

Transportation Criteria

: Noble Denton

Analyses Units

: Metric (kg, m, s, kN, C)

Drafting Units

: Metric (kg, mm, C)

Tubular & Plate Sizes

: Imperial converted to metric

Steel Material

: High Strength (Fy ~ 350 N/mm2)

Drawings Size

: A3

Slide 3

2008 Aker Solutions

part of Aker

Software
Structural Analyses

: SACS (EDI)

Finite Element Analyses

: Strand 7 (Strand7)

Pile Driveability

: GRLWEAP

Miscellaneous

: Excel (MS), MathCAD

3D Modelling

: BOCAD (BSI)

2D Drafting

: AutoCAD (Auto Desk)

Reports

: Word (MS)

Slide 4

2008 Aker Solutions

part of Aker

Concept 1 4 piles

Slide 5

2008 Aker Solutions

part of Aker

Concept 1 4 piles

Slide 6

2008 Aker Solutions

part of Aker

You might also like