Professional Documents
Culture Documents
corporator Budget for sanction As per instructions have inspected the site
and along with Dy.GM (Engg) and have proposed 100 mm dia Water line
The Estimate costing Rs_____
Is prepared duly adopting Division proposed SSR Rates and has been put
up for approval
Early sanction of the Estimate is solicted
Manager(Engg
CB Section