PACKER TEST

Depths below ground level to:


a. Top of test section:
b. Bottom of test section:
c. Center of test section :
d. Initial ground water level:
Gauge height above ground level:
Test Record
1st Period
Time
Gauge
Flowmeter
Pressure PSI Water Take
9
1st Period
Time
Gauge
Flowmeter
Pressure PSI Water Take
19
1st Period
Time
Gauge
Flowmeter
Pressure PSI Water Take
28
1st Period
Time
Gauge
Flowmeter
Pressure PSI Water Take
19
1st Period
Time
Gauge
Flowmeter
Pressure PSI Water Take
9
Q Flow
gallon/min

Period
1st
2nd
3rd
4th
5th

ft
55.77
65.61
16.69
13.64
1.48

1.80
3.14
4.91
2.35
1.35

Date:
Elevation (ft):
Weather:
Pressure:
Packer type:
Rock type:

min
ft3
lit

min
ft3
lit

min
ft3
lit

min
ft3
lit

min
ft3
lit

Location:
Bore hole No.
Sheet:
Operator:
Test No.
Dia of hole:
5

Flow (gallon/min)

10

10
32

Gauge Pressure
Friction Head Loss (ft)
(PSI)
Head (ft)
Pipe work
Extra Pipe
9
20.79
19
43.89
28
64.68
19
43.89
9
20.79
Result
Forward
Reverse
Average

1
40
Head (ft)

Forward

Muhammad Umar Farooq (2015-MS-CEH-04)

60

80
Backward

100

Average Flow q
3.14
70
gallon/min

15

Average Flow q
4.91
105
gallon/min

15

Average Flow q
2.35
50
gallon/min

15

Average Flow q
1.35
30
gallon/min

55

30

15

120

55

20

10

Average Flow q
1.80
32
gallon/min

72

110

10

15
36

72

10
55

Graph Between Head & Flow

0.25

Total Head (m)


-

35.91
59.01
79.80
59.01
35.91
Slope
0.071
0.081
0.076

Lugeon

35
40
38

PACKER TEST
Depths below ground level to:
a. Top of test section:
b. Bottom of test section:
c. Center of test section :
d. Initial ground water level:
Gauge height above ground level:
Test Record
1st Period
Time
Gauge
Flowmeter
Pressure Bar Water Take
3
1st Period
Time
Gauge
Flowmeter
Pressure Bar Water Take
6
1st Period
Time
Gauge
Flowmeter
Pressure Bar Water Take
10
1st Period
Time
Gauge
Flowmeter
Pressure Bar Water Take
6
1st Period
Time
Gauge
Flowmeter
Pressure Bar Water Take
3

100
101.5
100.75
0
0.18

Q Flow
litre/min
343.69
358.89
367.21
327.65
321.62

Period
1st
2nd
3rd
4th
5th

Date:
Elevation (m):
Weather:
Pressure:
Packer type:
Rock type:

min
m3
m3

min
m3
m3

min
m3
m3

min
m3
m3

min
m3
m3

Location:
Bore hole No.
Sheet:
Operator:
Test No.
Dia of hole:
5
1.2756

10
1.3016

15

1.250

5
1.3423

10
1.3516

15

1.3286

5
1.3735

10
1.3826

15

1.362

5
1.2247

10
1.2326

15

1.217

5
1.2042

10
1.2087

15

1.2

Gauge Pressure
Friction Head Loss (m)
(Bar)
Head (m)
Pipe work
Extra Pipe
3
30
6
60
10
100
6
60
3
30
Result
Forward
Reverse
Average

Graph Between Head & Flow

370

Flow (litre/min)

360
350
340
330
320
310

20

40

60
Head (ft)

Forward

Muhammad Umar Farooq (2015-MS-CEH-04)

80
Backward

100

120

1.3282

Average Flow q
343.69
litre/min

1.3608

Average Flow q
358.89
litre/min

1.3901

Average Flow q
367.21
litre/min

1.2404

Average Flow q
327.65
litre/min

1.2114

Average Flow q
321.62
litre/min

Total Head (m)


-

30.18
60.18
100.18
60.18
30.18
Slope
0.329
0.670
0.499

Lugeon

22
45
33