REQUEST FOR INSPECTION

Client:

Contractor:

Project:

Contract No.

RFI No.

Location:

Date:

Description of inspection:

INSPECTION DATE

INSPECTION TIME

LOCATION/AREA

Ref. DOCs / DWGs

The above mentioned work activity has been final inspected and accepted.
CONSTRUCTION

QA/QC

OTHER

Name

Name

Name

Date

Date

Date

Signature

Signature

Signature

Received by
CONSTRUCTION
Name:

Date &
Time:

Name:

Date &
Time:

Signature:

QA-QC
Signature:

RFI Acceptance & Inspection Result


ACCEPTED

REJECTED
A) Work is not ready at the inspection time.

See comments
attached

B) Result of inspection is not acceptable. New RFI


shall be issued.
C) See comments attached.

QA-QC
Name

Date &
Time

Signature