Task -01
For the measurement quantity surveyor using by following stationeries this are called as
surveyor’s stationeries.
(1) Query sheet
Size- A4
Use- Some dimensions are not including on plan that time asking question for architecture
we use this sheet,
Modal-
BCAS Page 1
MEASUREMENT OF BUILDING WORK (A)
QUERY ANSWER
(2)Dimension sheet
Size- A4
Use- Get measurement
Modal-
9mm 14mm 15mm 16mm 55mm 14mm 15mm 16mm 56mm
T D S Dis T D S Des
b.
b. – Binding margin
T – Timesing column
D – Dimension column
S – Squaring column
Des – Description column
MEASUREMENT PROCEDURES
BCAS Page 2
MEASUREMENT OF BUILDING WORK (A)
Description
1.00
500m
0.50
Bk.Wall
1000mm
12mm Spacing
3000m
mm
Fr. Wk
125m
125m
T D S (2).Waste calculation or method of reaching dimensions
0.13
0.13
3.00 Description
225 112.
300
250
200
450
2/225
2000
2500
112.5
External
5062.5 length
2/225 450
3000
(3).Order of dimension
BCAS Page 3
MEASUREMENT OF BUILDING WORK (A)
All dimensions are entering in meters with two decimals in dimension column. Dimension is
entered in following order.
• Horizontal length
• Horizontal width or breadth
T D S • Vertical height or depth
L
Description
W L-Length
W-Width/breadth
H-Height/Depth
02-Number
H
02
T D S (4).Timsing
2/½/ 5.25
Description
2.10 11.025
2100
210
0
5250
5250
Area = ½ ×
5.25×2.10
(5).Grouping of dimension
BCAS Page 4
MEASUREMENT OF BUILDING WORK (A)
T D S
Description
Disposal
10000 load
1000
10.00 850
1.00 &
1000 A1 A2
150
1500 2000
Bk.Wall
T D S (6).Alternative of dimension
XXX -
Description
XXX
1.00 -
XXX
1.50 NIL
1.50 BK.Wall. NIL
XXX
1.50 -
2.00 3.00
4.50
BCAS Page 5
MEASUREMENT OF BUILDING WORK (A)
T D S
Description
π/ 1.50
1.50 xxx
150 r r=1500
A A=πr2
2000
A= ½ ×A×H
½/ 2.00
2000
1.50 3.00
200 150
r=225
4000
½/ 6.00
V=πr2h
A=½×(A+B)×H
1.50 9.00
Task-01
π/ 0.23
1.3Indentify and describe the major part of a bill of
0.23 quantities (P3)
2.00 2.05 After entering Abstract sheet next we use bill page so BOQ
has major 5patrs these are follows 1). Preliminaries
BCAS Page 6
MEASUREMENT OF BUILDING WORK (A)
Not specific to work section Specific to work section
This items not specific to work section but This items are specific to work sections on
that has cost. the work time only after working these are
removed or finished so that has cost such
Eg:- 1.Tendering process as,
2.Contractual requirements for 1.Water for work
insurances
2.Supervision
3.Site facilities for the employer’s
3. Temporary work.
representative and payments to
• Temporary road
the local • Hats / office
• Electric supply
Authorities.
4. Scaffolding.
There would be a number of sectional trade bills in accordance with the scope, or complexity
of the project. All the measured work in according with the SMM7 will be inserted in to
sectional trade bills, such as,
*Bill No.3F-Masenry
3).Preambles.
Preambles are clauses usually inserted at the head of each work section bills, and principally
contained descriptions, together with another relevant information of which the contractor
should be aware in pricing. Inserting the preamble in the BOQ the length of the work
descriptions are reduced and the specifications is not necessary if they provide the
information. Another procedure is to combine all preamble clauses in a separate bill,
following preliminaries.
Functions of preambles
۩
Specify quality of materials.
۩
Specify the standard of the workmanship required .
BCAS Page 7
MEASUREMENT OF BUILDING WORK (A)
۩
Assist in pricing measured work.
۩
Repetition of same information item by item will be avoided and hence the work
4).Money provision.
There are two types of money provisions that are inserted in to a BOQ
The term “Prime cost sum” (PC sum) is a sum provided in the bill of quantities for works or
services to be executed by a nominated subcontractor, or for materials or goods to be
obtained from a nominated supplier such sums are exclusive of any profit required by the
main contractor and provision is made for its addition following the Pc sum general and
special attendance by the main contractor on nominated subcontractors is provided as an
item in the preliminaries bill. These can be entered either as fixed or time related charges.
2. Provisional Sums
Where the work cannot be descried and given in accordance with SMM (SL) rules, It shall
be given as a provisional sum and identified as for either defined or undefined work. In
defined work items a description and indication of the amount of work. Can be given and the
contractor will be deemed to have made due allowance in programming, planning and
pricing the preliminaries. Whore these details cannot be supplied the work is classified as
undefined and the contractor will be deemed not to have made any allowance in
programming, planning and pricing the preliminaries. Work by local authorities and statutory
undertaking are the subject of provisional sums.
BCAS Page 8
MEASUREMENT OF BUILDING WORK (A)
Works. This sum is to be expanded the
5).General summary.
There general summary is to provide monetary collection at the end of each group of work
sections such as D-Ground works, F-Masonry the total of which are then trans tarred to the
final summary.
1. General summary.
D-Ground work Rs($) Cts(P)
E-In-suit concrete
F-Masonry
G-Creasing timber
H-Covering
2. Final summary.
Rs($) Cts(P)
1.Preliminaries /General condition
3. Measred work.
4. Contingencies.
BCAS Page 9
MEASUREMENT OF BUILDING WORK (A)
Bill No:-1
A50-Nominated suppliers
Preambles.
Nominated suppliers
1.
15 % for main contractor’s profit Pc
sum
Sum
2. %
15
BCAS Page 10
MEASUREMENT OF BUILDING WORK (A)
BCAS Page 11
MEASUREMENT OF BUILDING WORK (A)
Bill No:-2
Preambles.
SITE PREPARATION
Girth 600-1500
Girth 1500-3000
Girth >3000
BCAS Page 12
MEASUREMENT OF BUILDING WORK (A)
1. 5
EXCAVATION
2. 2
150mm top soil
88
M2
9. Item
10. 62
I
M2
BCAS Page 13
MEASUREMENT OF BUILDING WORK (A)
FILLING TO EXCAVATION
BCAS Page 14
MEASUREMENT OF BUILDING WORK (A)
SURFACE TREATMENT
13. Compacting bottoms of excavation M2 56
a.b.d
14. M2 88
Trimming sides of cuttings
BCAS Page 15
MEASUREMENT OF BUILDING WORK (A)
Bill No:-3
E10-Mixing/Curing/Curing in-situ
concrete
Preambles.
1. Mechanical or manually
BCAS Page 16
MEASUREMENT OF BUILDING WORK (A)
ISOLATED FOUNDATIONS
Foundations a.b.d
5.
M3 02
Preambles.
SIDES OF FOUNDATIONS
BCAS Page 17
MEASUREMENT OF BUILDING WORK (A)
3. Soffits of landings a.b.d M2 18
7. M2 40
M2 11
Preambles.
BAR
BCAS Page 18
MEASUREMENT OF BUILDING WORK (A)
BCAS Page 19
MEASUREMENT OF BUILDING WORK (A)
Bill No:-4
Preambles.
WALLS
.
225mm thick wall dpc to 1st floor
a.b.d
1. 112.5mm thick wall a.b.d m2 130
2. m2 04
Preambles.
BCAS Page 20
MEASUREMENT OF BUILDING WORK (A)
WALLS
1. m2 48
Preambles.
1. Preambles. m2 27
BCAS Page 21
MEASUREMENT OF BUILDING WORK (A)
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT
LINTELS
BCAS Page 22
MEASUREMENT OF BUILDING WORK (A)
BCAS Page 23
MEASUREMENT OF BUILDING WORK (A)
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT
Bill No:-5
G20- Carpentry/Timber
framing/First fixing
Preambles.
PLATE
BCAS Page 24
MEASUREMENT OF BUILDING WORK (A)
BCAS Page 25
MEASUREMENT OF BUILDING WORK (A)
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT
Bill No:-7
Preambles.
DPM a.b.d
1. m2 71
BCAS Page 26
MEASUREMENT OF BUILDING WORK (A)
BCAS Page 27
MEASUREMENT OF BUILDING WORK (A)
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT
Bill No:-8
Preambles.
CEILLING
BCAS Page 28
MEASUREMENT OF BUILDING WORK (A)
BCAS Page 29
MEASUREMENT OF BUILDING WORK (A)
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT
Bill No:-9
Preambles.
4. Nr 02
Preambles.
BCAS Page 30
MEASUREMENT OF BUILDING WORK (A)
BCAS Page 31
MEASUREMENT OF BUILDING WORK (A)
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT
Preambles.
BCAS Page 32
MEASUREMENT OF BUILDING WORK (A)
BCAS Page 33
MEASUREMENT OF BUILDING WORK (A)
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT
Bill No:-10
M20-Plastered / Rendered /
Roughcast Coatings.
Preambles.
WALLS
1. m2 203
Preambles.