You are on page 1of 78

No.

OD at Pipe Ends
(mm)

PIPE INFORMATION

PROJECT
NAME
Nom. OD
(in)

Nom. ID
(in)

Nom. T
(mm)

Kg

Nom. L
(mm)

Pipe Spec.

Min.

Max.

Min.

Max.

-0.005*OD

+0.005*OD

-0.8

1.5

API

663.3

656.7

621.0

623.3

API

672.7

666.1

621.0

623.3

Tolerence
31-Dec-99

NCS2

1-Jan-00

NCS3

660.0
669.4

621.8
621.8

19.1
23.8

3622.4
4546.9

12000
12000

ID at Pipe Ends
(mm)

OD at Pipe Body
(mm)

Thickness
(mm)

Out-ofRoundness at
Pipe Ends ID
(mm)
Max.

Out-ofStraighne Squaren
Roundness at
ss
ess
Pipe Body
(mm)
(mm)
(mm)
Max.

Max.

Max.

Pipe ends
(degree)

Min.

Max.

Root face
(mm)

Min.

Max.

Pipe Weight
(kg)

Min.

Max.

Min.

Max.

Min.

-0.005*OD

+0.005*OD

-0.5

0.75

663.3

656.7

18.6

19.9

3.0

6.7

12.0

1.5

30.0

35.0

0.8

2.4

3496

672.7

666.1

23.3

24.6

3.0

6.6

12.0

1.5

30.0

35.0

0.8

2.4

4420

126.8

Pipe Weight
(kg)

Length
(mm)

Radial ofset
(mm)

Missaliment
(mm)

Hight Bead
Inside
(mm)

Hight Bead
Outside
(mm)

Weld
reinforcement
Inside
(mm)

Weld
reinforcement
Outside
(mm)

Max.

Max.

Max.

Max.

Max.

Max.

Max.

Min.

Max.

362.2

-200

200

3985

11800

12200

1.0

4.0

3.0

3.0

0.5

0.5

4909

11800

12200

1.2

4.0

3.0

3.0

0.5

0.5

Dent
(mm)

Leak

Lamination
(mm)

Hard Spot
(HV10)

Crack

Sweats

Arc Burns

Undercut
(mm)

Max.

Max.

Max.

Max.

4.0

Un-acceptable

Un-acceptable

345

Un-acceptable

Un-acceptable

Un-acceptable

1.0

Un-acceptable

Un-acceptable

0.2

Residual mgnetism
(Gauge)

Marking

Max.

20
20

PLATE DE-TAKING CONTROL SHEET


Err:504
Note

Accept

TOTAL OF ACCEPTED PIPE

(Pipe)

30-Dec-99

Reject

TOTAL OF REJECTED PIPE

(Pipe)

30-Dec-99

TOTAL OF INSPECTED PIPE

(Pipe)

30-Dec-99

PERCENT OF ACCEPTED PIPE

PERCENT OF REJECTED PIPE

PIPE INFORMATION
No.

Heat No.

Plate No.

Pipe No.

Item No.

Product Spec.

Pipe Designed
Outside Diameter
(mm)

Wall Thickness
(mm)

Length
(mm)

Original

1'st Repair

2'nd Repair

Final evaluated

Inspec. Date

Inspec. Date

Inspec. Date

A of R

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Thickness

Act.

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Effectied
Date:

CONTROL SHEET

Current
Date:

504

23-Sep-15

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

Thickness

Width

Evaluated

Act.

Length

Evaluated

Act.

Evaluated

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

Err:508

VISUAL INSPECTION CONTROL SHEET


Err:504
Note

Accept

Bead high

TOTAL OF ACCEPTED PIPE

(Pipe)

Heat No.

21-Jan-00

Reject

Misagliment

TOTAL OF REJECTED PIPE

(Pipe)

8-Jan-00

16-Feb-00

Undercut

Others

TOTAL OF INSPECTED PIPE

(Pipe)

10-Mar-00

10-Mar-00

Prosity

PERCENT OF ACCEPTED PIPE

87%

31%

Lack of fusion

PERCENT OF REJECTED PIPE

13%

69%

Final evaluated

Original

PIPE INFORMATION
No.

1-Mar-00

Plate No.

Pipe No.

Item No.

Product Spec.

Record No.

Pipe Designed

(A or R)

Outside Diameter
(mm)

Wall Thickness
(mm)

Length
(mm)

Inspec. Date

Evaluated

9-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

VT Still not done


A

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

VT Still not done

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

1-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

15-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

VT Still not done

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

12-Apr-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

VT Still not done

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

21-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

VT Still not done

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

VT Still not done

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

VT Still not done

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

VT Still not done

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

VT Still not done

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

19-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

VT Still not done

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

23-Feb-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

1-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

VT Still not done

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

12-Apr-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

15-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

1-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

11-Apr-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

20-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

VT Still not done

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

7-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

VT Still not done

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

30-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

19-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

19-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

20-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

7-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

7-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

7-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

VT Still not done

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

23-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

16-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

VT Still not done

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

14-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

14-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

11-Apr-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

15-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

19-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

VT Still not done

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

19-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

14-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

15-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

VT Still not done

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

30-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

30-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

12-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

14-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

VT Still not done

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

9-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

15-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

16-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

VT Still not done

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

9-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

VT Still not done

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

VT Still not done

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

14-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

9-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

9-Apr-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

7-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

VT Still not done

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

VT Still not done

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

VT Still not done

Type of Defect

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

VT Still not done

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

8-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

22-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

VT Still not done

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

8-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

19-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

12-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

1-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

11-Apr-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

22-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

19-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

9-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

12-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

19-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

VT Still not done

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

5-Apr-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

14-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

1-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

8-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

VT Still not done

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

VT Still not done

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

8-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

24-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

15-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

VT Still not done

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

2-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

7-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

22-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

12-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

9-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

9-Mar-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

12-Apr-12

###

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

5-Mar-12

Effectied
Date:

N CONTROL SHEET

Current
Date:

504

23-Sep-15

13-Feb-00

31-Dec-99

31-Dec-99

30-Dec-99

14-Feb-00

31-Dec-99

98%

100%

2%

0%

1'st Repair

2'nd Repair

Inspec. Date

Evaluate

20-Mar-12

10-Apr-12

10-Apr-12

1-Mar-12

13-Apr-12

26-Mar-12

10-Apr-12

20-Mar-12

20-Mar-12

10-Apr-12

16-Mar-12

3-Apr-12

16-Mar-12

27-Mar-12

26-Mar-12

20-Mar-12

10-Apr-12

12-Apr-12

13-Apr-12

21-Mar-12

20-Mar-12

9-Apr-12

12-Apr-12

10-Apr-12

22-Mar-12

14-Mar-12

14-Mar-12

10-Apr-12

Type of Defect

Inspec. Date

Evaluated

11-Apr-12

Type of Defect

29-Mar-12

24-Mar-12

14-Mar-12

9-Apr-12

12-Apr-12

28-Feb-12

22-Mar-12

14-Mar-12

3-Apr-12

26-Mar-12

1-Mar-12

14-Mar-12

20-Mar-12

14-Mar-12

29-Mar-12

11-Apr-12

26-Mar-12

20-Mar-12

PROJECT : Providing Steel Pipe for Nhat Truong Vinh Company


No

Plate Spec.

Pipe No.

Heat No.

Plate No.

ASTM A36B

NTV715A0001-1

5503586

R57404610

ASTM A36B

NTV715A0001-2

5503586

R57404610

ASTM A36B

NTV715A0002-1

5503586

R57404610

ASTM A36B

NTV715A0002-2

5503586

R57404610

ASTM A36B

NTV715A0003-1

5503586

R57404610

PVP-WI-08-02-01/1 Rev 0

14 of 78

A4(210x297)

PROJECT : Providing Steel Pipe for Nhat Truong Vinh Company


No

Plate Spec.

Pipe No.

Heat No.

Plate No.

ASTM A36B

NTV715A0003-2

5503586

R57404610

ASTM A36B

NTV715A0004-1

5503586

R57404610

ASTM A36B

NTV715A0004-2

5503586

R57404610

ASTM A36B

NTV715A0005-1

5503586

R57404610

10

ASTM A36B

NTV715A0005-2

5503586

R57404610

PVP-WI-08-02-01/1 Rev 0

15 of 78

A4(210x297)

PROJECT : Providing Steel Pipe for Nhat Truong Vinh Company


No

Plate Spec.

Pipe No.

Heat No.

Plate No.

11

ASTM A36B

NTV715A0006-1

5503586

R57404610

12

ASTM A36B

NTV715A0006-2

5503586

R57404610

13

ASTM A36B

NTV715A0007-1

5503586

R57404610

14

ASTM A36B

NTV715A0007-2

5503586

R57404610

15

ASTM A36B

NTV715A0008

5503586

R57404610

PVP-WI-08-02-01/1 Rev 0

16 of 78

A4(210x297)

PROJECT : Providing Steel Pipe for Nhat Truong Vinh Company


No

PVP-WI-08-02-01/1 Rev 0

Plate Spec.

Pipe No.

17 of 78

Heat No.

Plate No.

A4(210x297)

PIPE LIST
CLIENT : Nhat Truong Vinh Company

PIPE DESI

Plate certificate No.

Item No.

Product Spec.

Outside Diameter
(mm)

RGS1408-316

PV PIPE STANDARD

508.0

RGS1408-316

PV PIPE STANDARD

508.0

RGS1408-316

PV PIPE STANDARD

508.0

RGS1408-316

PV PIPE STANDARD

508.0

RGS1408-316

PV PIPE STANDARD

508.0

PVP-WI-08-02-01/1 Rev 0

18 of 78

A4(210x297)

PIPE LIST
CLIENT : Nhat Truong Vinh Company

PIPE DESI

Plate certificate No.

Item No.

Product Spec.

Outside Diameter
(mm)

RGS1408-316

PV PIPE STANDARD

508.0

RGS1408-316

PV PIPE STANDARD

508.0

RGS1408-316

PV PIPE STANDARD

508.0

RGS1408-316

PV PIPE STANDARD

508.0

RGS1408-316

PV PIPE STANDARD

508.0

PVP-WI-08-02-01/1 Rev 0

19 of 78

A4(210x297)

PIPE LIST
CLIENT : Nhat Truong Vinh Company

PIPE DESI

Plate certificate No.

Item No.

Product Spec.

Outside Diameter
(mm)

RGS1408-316

PV PIPE STANDARD

508.0

RGS1408-316

PV PIPE STANDARD

508.0

RGS1408-316

PV PIPE STANDARD

610.0

RGS1408-316

PV PIPE STANDARD

610.0

RGS1408-316

PV PIPE STANDARD

610.0

PVP-WI-08-02-01/1 Rev 0

20 of 78

A4(210x297)

PIPE LIST
CLIENT : Nhat Truong Vinh Company
Plate certificate No.

PVP-WI-08-02-01/1 Rev 0

Item No.

Product Spec.

21 of 78

PIPE DESI
Outside Diameter
(mm)

A4(210x297)

PIPE DESIGNED

PLATE SIZE (WIDE GAS CUTTING)

Wall Thickness
(mm)

Length
(mm)

5.8

6,000

5.8

6,000

5.8

6,000

5.8

6,000

5.8

6,000

PVP-WI-08-02-01/1 Rev 0

W
(mm)

T
(mm)

L
(mm)

Weight
(kg)

2,000

5.8

12,036

1,096

2,000

5.8

12,036

1,096

2,000

5.8

12,036

1,096

22 of 78

A4(210x297)

PIPE DESIGNED

PLATE SIZE (WIDE GAS CUTTING)

Wall Thickness
(mm)

Length
(mm)

5.8

6,000

5.8

6,000

5.8

6,000

5.8

6,000

5.8

PVP-WI-08-02-01/1 Rev 0

W
(mm)
2,000

T
(mm)
5.8

L
(mm)
12,036

Weight
(kg)
1,096

2,000

5.8

12,036

1,096

2,000

5.8

12,036

1,096

6,000

23 of 78

A4(210x297)

PIPE DESIGNED

PLATE SIZE (WIDE GAS CUTTING)

Wall Thickness
(mm)

Length
(mm)

5.8

6,000

5.8

6,000

5.8

6,000

5.8

6,000

5.8

6,000

PVP-WI-08-02-01/1 Rev 0

W
(mm)

T
(mm)

L
(mm)

Weight
(kg)

2,000

5.8

12,036

1,096

2,000

5.8

12,036

1,096

2,000

5.8

8,000

728

Prepaired

Reviewed
24 of 78

Approved
A4(210x297)

PIPE DESIGNED
Wall Thickness
(mm)

PVP-WI-08-02-01/1 Rev 0

PLATE SIZE (WIDE GAS CUTTING)


Length
(mm)

W
(mm)

25 of 78

T
(mm)

L
(mm)

Weight
(kg)

A4(210x297)

No :NTV7-PL-001
Date:6/10/2015
Rev :0

ATE SIZE (WIDE GAS CUTTING)

PVP-WI-08-02-01/1 Rev 0

Remark
PCS

26 of 78

A4(210x297)

No :NTV7-PL-001
Date:6/10/2015
Rev :0

ATE SIZE (WIDE GAS CUTTING)

PVP-WI-08-02-01/1 Rev 0

Remark
PCS

27 of 78

A4(210x297)

No :NTV7-PL-001
Date:6/10/2015
Rev :0

ATE SIZE (WIDE GAS CUTTING)

PVP-WI-08-02-01/1 Rev 0

Remark
PCS

Approved
28 of 78

A4(210x297)

No :NTV7-PL-001
Date:6/10/2015
Rev :0

ATE SIZE (WIDE GAS CUTTING)

PVP-WI-08-02-01/1 Rev 0

Remark
PCS

29 of 78

A4(210x297)

INSPECTION CERTIFICATE EN 10204 3.1


(Manufacturer's Certificate)
Client:
P.O No.:
Project Name:
Description of Products:
Pipe Spec.:
Manufacture Procedure Spec.:
Material Spec.:
Item No.

Pipe No.

Diameter

Thickness

Length

Q'ty

Weight

(mm)

(mm)

(mm)

(pcs)

(kg)

Heat No.

* Attached Reports are parts of this Inspection Certificate:


Report name
1.

Dimensional Report

2.

Nondestructive Test

Report no.

Visual Report (100%)


UT (100%)

PVP-QP-08-02-06 Rev.0

Petrovietnam Steel Pipe Joint Stock Company

A4 (210X297mm)

RT (100%)
MT (100%)
3.

Production Test Report

4.

Hydrostatic Test Report

We certify, that above mentioned items have been delivered in accordance with terms of order.

___________________
QC Manager

PVP-QP-08-02-06 Rev.0

___________________
TQ Manager

Petrovietnam Steel Pipe Joint Stock Company

____________________
Third party

A4 (210X297mm)

INSPECTION CERTIFICATE EN 10204 3.1


(Manufacturer's Certificate)
Item No.

Pipe No.

Diameter

Thickness

Length

Q'ty

Weight

(mm)

(mm)

(mm)

(pcs)

(kg)

Heat No.

31-Dec-99
31-Dec-99
31-Dec-99
31-Dec-99
31-Dec-99
31-Dec-99
31-Dec-99
31-Dec-99

We certify, that above mentioned items have been delivered in accordance with terms of order.

__________________
QC Manager

PVP-QP-08-02-06 Rev.0

___________________
TQ Manager

Petrovietnam Steel Pipe Joint Stock Company

_____________________
Third party

A4 (210X297mm)

Certificate No.

Page
1 of 2

Plate No.

PVP-QP-08-02-06 Rev.0

Plate
Certificate No.

Petrovietnam Steel Pipe Joint Stock Company

A4 (210X297mm)

th terms of order.

____________________
Client

PVP-QP-08-02-06 Rev.0

Petrovietnam Steel Pipe Joint Stock Company

A4 (210X297mm)

Certificate No.

Page
2 of 2
Plate No.

Plate
Certificate No.

_____________________
Client

PVP-QP-08-02-06 Rev.0

Petrovietnam Steel Pipe Joint Stock Company

A4 (210X297mm)

Abbreviation:
CVN: Charpy V Notch Impact test
DWTT: Drop Weight Tear Test
CTOD: Crack Tip opening Displament

No.

Items

Material Spec.

Heat No

Plate No.

Pipe No.

Pipe Spec.

###

31-Dec-99

ASTM A36B

20-Apr-68

R57404610

Err:509

PV PIPE STANDARD

1-Jan-00

31-Dec-99

ASTM A36B

20-Apr-68

R57404610

Err:509

PV PIPE STANDARD

2-Jan-00

31-Dec-99

ASTM A36B

20-Apr-68

R57404610

Err:509

PV PIPE STANDARD

3-Jan-00

31-Dec-99

ASTM A36B

20-Apr-68

R57404610

Err:509

PV PIPE STANDARD

4-Jan-00

31-Dec-99

ASTM A36B

20-Apr-68

R57404610

Err:509

PV PIPE STANDARD

10-Jan-00 31-Dec-99

ASTM A36B

20-Apr-68

R57404610

Err:509

PV PIPE STANDARD

11-Jan-00 31-Dec-99

ASTM A36B

20-Apr-68

R57404610

Err:509

PV PIPE STANDARD

12-Jan-00

1-Jan-00

ASTM A36B

20-Apr-68

R57404610

Err:509

PV PIPE STANDARD

13-Jan-00

1-Jan-00

ASTM A36B

20-Apr-68

R57404610

Err:509

PV PIPE STANDARD

14-Jan-00

1-Jan-00

ASTM A36B

20-Apr-68

R57404610

Err:509

PV PIPE STANDARD

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

PVP-WI-07-05-01 Rev 0.

Cng ty C phn san xut ng thep Du khi Vit Nam

Test Purpose

Step

Cutting
date:

Getting
result date:

(WPST, MPST, PRDT)

(BP, BE, FN)

(dd/mm/yyyy)

(dd/mm/yyyy)

A4 (210297mm)

Abbreviation:
CVN: Charpy V Notch Impact test
DWTT: Drop Weight Tear Test
CTOD: Crack Tip opening Displament

No.

Items

Material Spec.

Heat No

Plate No.

Pipe No.

Pipe Spec.

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

PVP-WI-07-05-01 Rev 0.

Cng ty C phn san xut ng thep Du khi Vit Nam

Test Purpose

Step

Cutting
date:

Getting
result date:

(WPST, MPST, PRDT)

(BP, BE, FN)

(dd/mm/yyyy)

(dd/mm/yyyy)

A4 (210297mm)

Abbreviation:
CVN: Charpy V Notch Impact test
DWTT: Drop Weight Tear Test
CTOD: Crack Tip opening Displament

No.

Items

Material Spec.

Heat No

Plate No.

Pipe No.

Pipe Spec.

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

PVP-WI-07-05-01 Rev 0.

Cng ty C phn san xut ng thep Du khi Vit Nam

Test Purpose

Step

Cutting
date:

Getting
result date:

(WPST, MPST, PRDT)

(BP, BE, FN)

(dd/mm/yyyy)

(dd/mm/yyyy)

A4 (210297mm)

Abbreviation:
CVN: Charpy V Notch Impact test
DWTT: Drop Weight Tear Test
CTOD: Crack Tip opening Displament

No.

Items

Material Spec.

Heat No

Plate No.

Pipe No.

Pipe Spec.

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

PVP-WI-07-05-01 Rev 0.

Cng ty C phn san xut ng thep Du khi Vit Nam

Test Purpose

Step

Cutting
date:

Getting
result date:

(WPST, MPST, PRDT)

(BP, BE, FN)

(dd/mm/yyyy)

(dd/mm/yyyy)

A4 (210297mm)

Abbreviation:
CVN: Charpy V Notch Impact test
DWTT: Drop Weight Tear Test
CTOD: Crack Tip opening Displament

No.

Items

Material Spec.

Heat No

Plate No.

Pipe No.

Pipe Spec.

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

PVP-WI-07-05-01 Rev 0.

Cng ty C phn san xut ng thep Du khi Vit Nam

Test Purpose

Step

Cutting
date:

Getting
result date:

(WPST, MPST, PRDT)

(BP, BE, FN)

(dd/mm/yyyy)

(dd/mm/yyyy)

A4 (210297mm)

Abbreviation:
CVN: Charpy V Notch Impact test
DWTT: Drop Weight Tear Test
CTOD: Crack Tip opening Displament

No.

Items

Material Spec.

Heat No

Plate No.

Pipe No.

Pipe Spec.

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

Err:509

PVP-WI-07-05-01 Rev 0.

Cng ty C phn san xut ng thep Du khi Vit Nam

Test Purpose

Step

Cutting
date:

Getting
result date:

(WPST, MPST, PRDT)

(BP, BE, FN)

(dd/mm/yyyy)

(dd/mm/yyyy)

A4 (210297mm)

Abbreviation:
CVN: Charpy V Notch Impact test
DWTT: Drop Weight Tear Test
CTOD: Crack Tip opening Displament

No.

Err:509

Items

Err:509

PVP-WI-07-05-01 Rev 0.

Material Spec.

Err:509

Heat No

Err:509

Plate No.

Err:509

Pipe No.

Err:509

Pipe Spec.

Test Purpose

Step

Cutting
date:

Getting
result date:

(WPST, MPST, PRDT)

(BP, BE, FN)

(dd/mm/yyyy)

(dd/mm/yyyy)

Err:509

Cng ty C phn san xut ng thep Du khi Vit Nam

A4 (210297mm)

HIC: Hydrogen Induced Cracking

WPST: Test for qualified the Welding Procudure Specification

BM: Base Metal

BP: Before Production

MPST: Test for qualified the Manufacturing Procedure Specification

BE: Before Expantion (after finished inside and outside welding)

PRDT: Production Test

Coupon size
(DxLxT)

Chamical analysis

Coupon No.

(OD x L x T) mm

Tensile

FL: Fusion Line


CVN
(1 set: 3 ea)

Bend

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

11-Jan-00

30-Dec-99

30-Dec-99

11-Jan-00

30-Dec-99

30-Dec-99

30-Dec-99

BM

WM

BM T

BM L

WM

AII-WM

Side

Root

Face

WM

BM

FL

FL+1

FL+2

FL+3

FL+4

406.4 x150 x 15.9

BK16I13A0003-1

###

###

610 x150 x 25.4

BK16I13A0017 -1

###

###

PVP-WI-07-05-01 Rev 0.

WM: Weld Metal

Cng ty C phn san xut ng thep Du khi Vit Nam

A4 (210297mm)

HIC: Hydrogen Induced Cracking

WPST: Test for qualified the Welding Procudure Specification

BM: Base Metal

BP: Before Production

MPST: Test for qualified the Manufacturing Procedure Specification

BE: Before Expantion (after finished inside and outside welding)

PRDT: Production Test

Coupon size
(DxLxT)

Chamical analysis

Coupon No.

(OD x L x T) mm

Tensile

FL: Fusion Line


CVN
(1 set: 3 ea)

Bend

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

11-Jan-00

30-Dec-99

30-Dec-99

11-Jan-00

30-Dec-99

30-Dec-99

30-Dec-99

BM

WM

BM T

BM L

WM

AII-WM

Side

Root

Face

WM

BM

FL

FL+1

FL+2

FL+3

FL+4

406 x150 x 14.3

BK16I13A0025 -1

###

###

508 x150 x 12.7

BK16I13A0035 -1

###

###

564 x150 x 16

BK16I13A0041 -1

###

###

610 x150 x 19.1

BK16I13A0043 -1

###

###

PVP-WI-07-05-01 Rev 0.

WM: Weld Metal

Cng ty C phn san xut ng thep Du khi Vit Nam

A4 (210297mm)

HIC: Hydrogen Induced Cracking

WPST: Test for qualified the Welding Procudure Specification

BM: Base Metal

BP: Before Production

MPST: Test for qualified the Manufacturing Procedure Specification

BE: Before Expantion (after finished inside and outside welding)

PRDT: Production Test

Coupon size
(DxLxT)

Chamical analysis

Coupon No.

(OD x L x T) mm

660 x150 x 15.9

PVP-WI-07-05-01 Rev 0.

Tensile

WM: Weld Metal


FL: Fusion Line

CVN
(1 set: 3 ea)

Bend

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

11-Jan-00

30-Dec-99

30-Dec-99

11-Jan-00

30-Dec-99

30-Dec-99

30-Dec-99

BM

WM

BM T

BM L

WM

AII-WM

Side

Root

Face

WM

BM

FL

FL+1

FL+2

FL+3

FL+4

BK16I13A0048 -1

###

Cng ty C phn san xut ng thep Du khi Vit Nam

###

A4 (210297mm)

HIC: Hydrogen Induced Cracking

WPST: Test for qualified the Welding Procudure Specification

BM: Base Metal

BP: Before Production

MPST: Test for qualified the Manufacturing Procedure Specification

BE: Before Expantion (after finished inside and outside welding)

PRDT: Production Test

Coupon size
(DxLxT)
(OD x L x T) mm

PVP-WI-07-05-01 Rev 0.

Chamical analysis

Coupon No.

Tensile

WM: Weld Metal


FL: Fusion Line

CVN
(1 set: 3 ea)

Bend

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

11-Jan-00

30-Dec-99

30-Dec-99

11-Jan-00

30-Dec-99

30-Dec-99

30-Dec-99

BM

WM

BM T

BM L

WM

AII-WM

Side

Root

Face

WM

BM

FL

FL+1

FL+2

FL+3

FL+4

Cng ty C phn san xut ng thep Du khi Vit Nam

A4 (210297mm)

HIC: Hydrogen Induced Cracking

WPST: Test for qualified the Welding Procudure Specification

BM: Base Metal

BP: Before Production

MPST: Test for qualified the Manufacturing Procedure Specification

BE: Before Expantion (after finished inside and outside welding)

PRDT: Production Test

Coupon size
(DxLxT)

Chamical analysis

Coupon No.

(OD x L x T) mm

711 x150 x 15.9

PVP-WI-07-05-01 Rev 0.

Tensile

WM: Weld Metal


FL: Fusion Line

CVN
(1 set: 3 ea)

Bend

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

11-Jan-00

30-Dec-99

30-Dec-99

11-Jan-00

30-Dec-99

30-Dec-99

30-Dec-99

BM

WM

BM T

BM L

WM

AII-WM

Side

Root

Face

WM

BM

FL

FL+1

FL+2

FL+3

FL+4

BK16I13A0077 -1

###

Cng ty C phn san xut ng thep Du khi Vit Nam

###

A4 (210297mm)

HIC: Hydrogen Induced Cracking

WPST: Test for qualified the Welding Procudure Specification

BM: Base Metal

BP: Before Production

MPST: Test for qualified the Manufacturing Procedure Specification

BE: Before Expantion (after finished inside and outside welding)

PRDT: Production Test

Coupon size
(DxLxT)
(OD x L x T) mm

PVP-WI-07-05-01 Rev 0.

Chamical analysis

Coupon No.

Tensile

WM: Weld Metal


FL: Fusion Line

CVN
(1 set: 3 ea)

Bend

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

11-Jan-00

30-Dec-99

30-Dec-99

11-Jan-00

30-Dec-99

30-Dec-99

30-Dec-99

BM

WM

BM T

BM L

WM

AII-WM

Side

Root

Face

WM

BM

FL

FL+1

FL+2

FL+3

FL+4

Cng ty C phn san xut ng thep Du khi Vit Nam

A4 (210297mm)

HIC: Hydrogen Induced Cracking

WPST: Test for qualified the Welding Procudure Specification

BM: Base Metal

BP: Before Production

MPST: Test for qualified the Manufacturing Procedure Specification

BE: Before Expantion (after finished inside and outside welding)

PRDT: Production Test

Coupon size
(DxLxT)
(OD x L x T) mm

PVP-WI-07-05-01 Rev 0.

Chamical analysis

Coupon No.

Tensile

WM: Weld Metal


FL: Fusion Line

CVN
(1 set: 3 ea)

Bend

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

11-Jan-00

30-Dec-99

30-Dec-99

11-Jan-00

30-Dec-99

30-Dec-99

30-Dec-99

BM

WM

BM T

BM L

WM

AII-WM

Side

Root

Face

WM

BM

FL

FL+1

FL+2

FL+3

FL+4

Cng ty C phn san xut ng thep Du khi Vit Nam

A4 (210297mm)

Base Metal

T: Transversal

Done

Weld Metal

L: Longitudinal

Still not done

Fusion Line

-: Not Required

Reject pipe

CVN
(1 set: 3 ea)

PVP-WI-07-05-01 Rev 0.

Macro &
Hardness

DWTT
(1 set: 2 ea)

Micrographic

CTOD
(1 set: 3 ea)

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

FL+5

WM

BM T90

WM, BM

BM

WM

HAZ

BM

WM

BM

WM

SSCC

Cng ty C phn san xut ng thep Du khi Vit Nam

HIC

A4 (210297mm)

Base Metal

T: Transversal

Done

Weld Metal

L: Longitudinal

Still not done

Fusion Line

-: Not Required

Reject pipe

CVN
(1 set: 3 ea)

PVP-WI-07-05-01 Rev 0.

Macro &
Hardness

DWTT
(1 set: 2 ea)

Micrographic

CTOD
(1 set: 3 ea)

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

FL+5

WM

BM T90

WM, BM

BM

WM

HAZ

BM

WM

BM

WM

SSCC

Cng ty C phn san xut ng thep Du khi Vit Nam

HIC

A4 (210297mm)

Base Metal

T: Transversal

Done

Weld Metal

L: Longitudinal

Still not done

Fusion Line

-: Not Required

Reject pipe

CVN
(1 set: 3 ea)

PVP-WI-07-05-01 Rev 0.

Macro &
Hardness

DWTT
(1 set: 2 ea)

Micrographic

CTOD
(1 set: 3 ea)

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

FL+5

WM

BM T90

WM, BM

BM

WM

HAZ

BM

WM

BM

WM

SSCC

Cng ty C phn san xut ng thep Du khi Vit Nam

HIC

A4 (210297mm)

Base Metal

T: Transversal

Done

Weld Metal

L: Longitudinal

Still not done

Fusion Line

-: Not Required

Reject pipe

CVN
(1 set: 3 ea)

PVP-WI-07-05-01 Rev 0.

Macro &
Hardness

DWTT
(1 set: 2 ea)

Micrographic

CTOD
(1 set: 3 ea)

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

FL+5

WM

BM T90

WM, BM

BM

WM

HAZ

BM

WM

BM

WM

SSCC

Cng ty C phn san xut ng thep Du khi Vit Nam

HIC

A4 (210297mm)

Base Metal

T: Transversal

Done

Weld Metal

L: Longitudinal

Still not done

Fusion Line

-: Not Required

Reject pipe

CVN
(1 set: 3 ea)

PVP-WI-07-05-01 Rev 0.

Macro &
Hardness

DWTT
(1 set: 2 ea)

Micrographic

CTOD
(1 set: 3 ea)

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

FL+5

WM

BM T90

WM, BM

BM

WM

HAZ

BM

WM

BM

WM

SSCC

Cng ty C phn san xut ng thep Du khi Vit Nam

HIC

A4 (210297mm)

Base Metal

T: Transversal

Done

Weld Metal

L: Longitudinal

Still not done

Fusion Line

-: Not Required

Reject pipe

CVN
(1 set: 3 ea)

PVP-WI-07-05-01 Rev 0.

Macro &
Hardness

DWTT
(1 set: 2 ea)

Micrographic

CTOD
(1 set: 3 ea)

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

FL+5

WM

BM T90

WM, BM

BM

WM

HAZ

BM

WM

BM

WM

SSCC

Cng ty C phn san xut ng thep Du khi Vit Nam

HIC

A4 (210297mm)

Base Metal

T: Transversal

Done

Weld Metal

L: Longitudinal

Still not done

Fusion Line

-: Not Required

Reject pipe

CVN
(1 set: 3 ea)

PVP-WI-07-05-01 Rev 0.

Macro &
Hardness

DWTT
(1 set: 2 ea)

Micrographic

CTOD
(1 set: 3 ea)

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

30-Dec-99

FL+5

WM

BM T90

WM, BM

BM

WM

HAZ

BM

WM

BM

WM

SSCC

Cng ty C phn san xut ng thep Du khi Vit Nam

HIC

A4 (210297mm)

DIMENSION REPORT
Project Name:

###

OD #REF!

OD or ID
of Pipe Ends
(mm)
OD ID

Items

Min.

x
Max.

OD
of Pipe Body
(mm)
Min.

Max.

Out of
Roundness
of Pipe Body
(mm)

Out of
Roundness
of Pipe Ends
(mm)

Max.

Max.

T #REF!

L #REF!

Circumference
(mm)

Tolerance

Wall Thickness
(mm)

Length
(mm)

Straightness
(mm)

Min.

Max.

Min.

Max.

18.6

19.9

11800

12200

Max.

Pipe ends
(degree)

Min.

Max.

12

30

35

621.0

623.3

663.3

656.7

6.7

3.0

No.

Pipe No.

Nom.

Top

End

Nom.

Actual

Actual

Top/End which is
larger

Nom.

Top

End

Body

Nom.

Top

End

Nom.

90

Top

End

###

Err:504

#REF!

#REF!

#REF!

#REF!

#REF!

Err:504

Err:504

#REF!

Err:504

Err:504

Err:504

#REF!

Err:504

Err:504

#REF!

Err:504

Err:504

Err:504

Err:504

Err:504

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

PVP-QP-08-02-04 Rev.2

Petrovietnam Steel Pipe Joint Stock Company

A4 (297x210)

DIMENSION REPORT
Project Name:

###

OD #REF!

OD or ID
of Pipe Ends
(mm)
OD ID

Items

Min.

x
Max.

OD
of Pipe Body
(mm)
Min.

Max.

Out of
Roundness
of Pipe Body
(mm)

Out of
Roundness
of Pipe Ends
(mm)

Max.

Max.

T #REF!
Circumference
(mm)

Tolerance

No.

Pipe No.

L #REF!
Wall Thickness
(mm)

Length
(mm)

Straightness
(mm)

Min.

Max.

Min.

Max.

18.6

19.9

11800

12200

Max.

Top

End

Nom.

Pipe ends
(degree)

Min.

Max.

12

30

35

90

Top

End

Nom.

621.0

623.3

663.3

656.7

6.7

3.0

Top

End

Nom.

Actual

Actual

Top/End which is
larger

Nom.

Top

End

Body

Nom.

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

###

#REF!

#REF!

#REF!

#REF!

#REF!

Abbreviation

PVP-QP-08-02-04 Rev.2

Petrovietnam Steel Pipe Joint Stock Company

A4 (297x210)

DIMENSION REPORT
Project Name:

###

OD #REF!

OD or ID
of Pipe Ends
(mm)
OD ID

Items

Min.

x
Max.

OD
of Pipe Body
(mm)
Min.

Max.

Out of
Roundness
of Pipe Body
(mm)

Out of
Roundness
of Pipe Ends
(mm)

Max.

Max.

T #REF!
Circumference
(mm)

Tolerance

No.

Pipe No.

L #REF!
Wall Thickness
(mm)

Straightness
(mm)

Min.

Max.

Min.

Max.

18.6

19.9

11800

12200

Max.

Top

End

Nom.

Pipe ends
(degree)

Min.

Max.

12

30

35

90

Top

End

Nom.

621.0

623.3

663.3

656.7

6.7

3.0

Top

End

Nom.

Actual

Actual

Top/End which is
larger

Nom.

Top

End

Body

Nom.

Accepted

Top

Welding starting point

End

Welding Finishing Point


Wall Thickness and Diameter
Check Point

PVP-QP-08-02-04 Rev.2

Length
(mm)

Petrovietnam Steel Pipe Joint Stock Company

NA
R

Not Applicable
Rejected

___________
QC Manager

A4 (297x210)

Certificate No.:

ON REPORT

Page:

Root face
(mm)

PVP-QP-08-02-04 Rev.2

Square-ness
(mm)

Min.

Max.

Err:509

Err:509

Max.

Top

End

Err:504

Err:504

Weld
Reinforcement
(mm)

Radial Offset
(mm)

Max.

Max.

1.5

3.0

3.0

Max.

1.0

Top

End

Inside

Outside

Top

Err:504

Err:504

Err:504

Err:504

Err:504

Weld
Reinforcement
Removal
(mm)
150*0.5
mm

100*0.5
mm

End

Outside

Inside

Err:504

Err:504

Err:504

Petrovietnam Steel Pipe Joint Stock Company

A4 (297x210)

Certificate No.:

ON REPORT

Page:

Root face
(mm)

PVP-QP-08-02-04 Rev.2

Square-ness
(mm)

Min.

Max.

Err:509

Err:509

Max.

Top

End

Top

Weld
Reinforcement
(mm)

Radial Offset
(mm)

Max.

Max.

1.5

3.0

3.0

Max.

1.0

End

Inside

Outside

Top

End

Petrovietnam Steel Pipe Joint Stock Company

Weld
Reinforcement
Removal
(mm)
150*0.5
mm

100*0.5
mm

Outside

Inside

A4 (297x210)

Certificate No.:

ON REPORT

Page:

Root face
(mm)

PVP-QP-08-02-04 Rev.2

Square-ness
(mm)

Min.

Max.

Err:509

Err:509

Max.

Top

End

Top

Weld
Reinforcement
(mm)

Weld
Reinforcement
Removal
(mm)

Radial Offset
(mm)

Max.

Max.

1.5

3.0

3.0

Max.

1.0

End

Inside

Outside

Top

End

150*0.5
mm

100*0.5
mm

Outside

Inside

___________

___________

___________

___________

QC Manager

TQ Manager

Third party

Client

Petrovietnam Steel Pipe Joint Stock Company

A4 (297x210)

Certificate No

VISUAL REPORT

Project Name:

Item

#REF!

#REF!

T #REF!

Dent
(mm)

Hard Spots
(HV10)

Max.

Max.

Tolerance

No.

Pipe No.

###

Err:504

Page No.:

345

Err:504

Err:504

L #REF!

Cracks

Arc Burns

Un-acceptable

Un-acceptable

Undercut
(mm)

Marking

Other Defects

NA

NA

Err:504

Err:504

Max.
1.0

Err:504

Err:504

Err:504

1-Jan-00

No

2-Jan-00

No

3-Jan-00

No

4-Jan-00

No

5-Jan-00

No

6-Jan-00

No

7-Jan-00

No

8-Jan-00

No

9-Jan-00

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

PVP-QP-08-02-07 Rev.0

Petrovietnam Steel Pipe Joint Stock Company

A4 (297x210)

Item

Dent
(mm)

Hard Spots
(HV10)

Max.

Max.

Tolerance
4
No.

Cracks

Arc Burns

Un-acceptable

Un-acceptable

Undercut
(mm)

Marking

Other Defects

NA

NA

Max.

345

1.0

Pipe No.

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

1-Feb-00

No

2-Feb-00

No

3-Feb-00

No

4-Feb-00

No

5-Feb-00

No

6-Feb-00

No

7-Feb-00

No

8-Feb-00

No

9-Feb-00

No

###

No

###

No

PVP-QP-08-02-07 Rev.0

Petrovietnam Steel Pipe Joint Stock Company

A4 (297x210)

Item

Dent
(mm)

Hard Spots
(HV10)

Max.

Max.

Tolerance
4
No.

Cracks

Arc Burns

Un-acceptable

Un-acceptable

Undercut
(mm)

Marking

Other Defects

NA

NA

Max.

345

1.0

Pipe No.

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

1-Mar-00

No

2-Mar-00

No

3-Mar-00

No

4-Mar-00

No

5-Mar-00

No

6-Mar-00

No

7-Mar-00

No

8-Mar-00

No

PVP-QP-08-02-07 Rev.0

Petrovietnam Steel Pipe Joint Stock Company

A4 (297x210)

Item

Dent
(mm)

Hard Spots
(HV10)

Max.

Max.

Tolerance
4
No.

Cracks

Arc Burns

Un-acceptable

Un-acceptable

Undercut
(mm)

Marking

Other Defects

NA

NA

Max.

345

1.0

Pipe No.

9-Mar-00

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

1-Apr-00

No

2-Apr-00

No

PVP-QP-08-02-07 Rev.0

Petrovietnam Steel Pipe Joint Stock Company

A4 (297x210)

Item

Dent
(mm)

Hard Spots
(HV10)

Max.

Max.

Tolerance
4
No.

Cracks

Arc Burns

Un-acceptable

Un-acceptable

Undercut
(mm)

Marking

Other Defects

NA

NA

Max.

345

1.0

Pipe No.

3-Apr-00

No

4-Apr-00

No

5-Apr-00

No

6-Apr-00

No

7-Apr-00

No

8-Apr-00

No

9-Apr-00

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

PVP-QP-08-02-07 Rev.0

Petrovietnam Steel Pipe Joint Stock Company

A4 (297x210)

Item

Dent
(mm)

Hard Spots
(HV10)

Max.

Max.

Tolerance
4
No.

Cracks

Arc Burns

Un-acceptable

Un-acceptable

Undercut
(mm)

Marking

Other Defects

NA

NA

Max.

345

1.0

Pipe No.

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

###

No

PVP-QP-08-02-07 Rev.0

Petrovietnam Steel Pipe Joint Stock Company

A4 (297x210)

Certificate No.:

Page No.:

Result

NA

A or R
Err:504
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A

PVP-QP-08-02-07 Rev.0

Petrovietnam Steel Pipe Joint Stock Company

A4 (297x210)

Result

NA

A or R
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A

PVP-QP-08-02-07 Rev.0

Petrovietnam Steel Pipe Joint Stock Company

A4 (297x210)

Result

NA

A or R
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A

PVP-QP-08-02-07 Rev.0

Petrovietnam Steel Pipe Joint Stock Company

A4 (297x210)

Result

NA

A or R
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A

PVP-QP-08-02-07 Rev.0

Petrovietnam Steel Pipe Joint Stock Company

A4 (297x210)

Result

NA

A or R
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A

PVP-QP-08-02-07 Rev.0

Petrovietnam Steel Pipe Joint Stock Company

A4 (297x210)

Result

NA

A or R
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A
A

PVP-QP-08-02-07 Rev.0

Petrovietnam Steel Pipe Joint Stock Company

A4 (297x210)

NO

OD
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
10.00

T
406.40
406.40
711.00
610.00
610.00
508.00
457.00
406.40
406.40
406.40

L
19.10 12000.00
15.90 12000.00
15.90 12000.00
15.90 12000.00
10.30 12000.00
12.70 12000.00
14.30 12000.00
15.90 12000.00
14.30 12000.00
12.70 12000.00

2189.05
1837.35
3270.53
2795.32
1827.87
1861.43
1873.35
1837.35
1659.23
1479.60

10.00
14.00
16.00
12.00
8.00
12.00
16.00
24.00
20.00
12.00

21890.47
25722.93
52328.55
33543.80
14622.97
22337.14
29973.67
44096.46
33184.65
17755.16

13.00
16.00
17.00
12.00
6.00
0.00
0.00
0.00
0.00
0.00

28457.62 406.4x19.1x12000
29397.64 406.4x15.9x12000
55599.09 711x15.9x12000
33543.80 610x15.9x12000
10967.23 610x10.3x12000
0.00 508x12.7x12000
0.00 457x14.3x12000
0.00 406.4x15.9x12000
0.00 406.4x14.3x12000
0.00 406.4x12.7x12000

120.00
168.00
192.00
144.00
96.00
144.00
192.00
288.00
240.00
144.00
1728.00

1 -1
1 -2
2 -1
2 -2
3 -1
3 -2
4 -1
4 -2
5 -1
5 -2
6 -1
6 -2
7 -1
7 -2
8 -1
8 -2
9 -1
9 -2
10 -1
10 -2
11 -1
11 -2
12 -1
12 -2
13 -1
13 -2
14 -1
14 -2
15 -1
15 -2
16 -1
16 -2
17 -1
17 -2
18 -1
18 -2
19 -1
19 -2
20 -1
20 -2
21 -1
21 -2
22 -1
22 -2
23 -1

1-1
1-2
2-1
2.33333333333333-2
2.83333333333333-1
3.33333333333333-2
3.83333333333333-1
4.33333333333333-2
4.83333333333333-1
5.33333333333333-2
5.83333333333333-1
6.33333333333333-2
6.83333333333333-1
7.33333333333333-2
7.83333333333333-1
8.33333333333333-2
8.83333333333333-1
9.33333333333333-2
9.83333333333333-1
10.3333333333333-2
10.8333333333333-1
11.3333333333333-2
11.8333333333333-1
12.3333333333333-2
12.8333333333333-1
13.3333333333333-2
13.8333333333333-1
14.3333333333333-2
14.8333333333333-1
15.3333333333333-2
15.8333333333333-1
16.3333333333333-2
16.8333333333333-1
17.3333333333333-2
17.8333333333333-1
18.3333333333333-2
18.8333333333333-1
19.3333333333333-2
19.8333333333333-1
20.3333333333333-2
20.8333333333333-1
21.3333333333333-2
21.8333333333333-1
22.3333333333333-2
22.8333333333333-1

23 -2
24 -1
24 -2
25 -1
25 -2
26 -1
26 -2
27 -1
27 -2
28 -1
28 -2
29 -1
29 -2
30 -1
30 -2
31 -1
31 -2
32 -1
32 -2

23.3333333333333-2
23.8333333333333-1
24.3333333333333-2
24.8333333333333-1
25.3333333333333-2
25.8333333333333-1
26.3333333333333-2
26.8333333333333-1
27.3333333333333-2
27.8333333333333-1
28.3333333333333-2
28.8333333333333-1
29.3333333333333-2
29.8333333333333-1
30.3333333333333-2
30.8333333333333-1
31.3333333333333-2
31.8333333333333-1
32.3333333333333-2

You might also like