Professional Documents
Culture Documents
ELP-1
m
LP-1
e
d
j
a
c
k
m
m
g
f
f
g
h
f
h
g
h
LIGHTING LAYOUT
SCALE
GENERAL NOTES
1:50
ALL WORKS SHALL COMPLY WITH THE PROVISIONS OF THE LATEST EDITION OF THE PHILIPPINE ELECTRICAL CODE, WITH THE RULES
AND REGULATIONS OF THE NATIONAL AND LOCAL AUTHORITIES CONCERNED WITH ENFORCEMENT OF THE ELECTRICAL LAWS AND
ORDINANCES AND WITH THE RULES AND REGULATION OF THE UTILITY COMPANIES CONCERNED.
LP-7
LP-6
S
2. SERVICE ENTRANCE SHALL BE IN RIGID STEEL CONDUIT (RSC) "MATSUSHITA" OR APPROVED EQUAL.
3. BRANCH CIRCUIT WIRING SHALL BE DONE IN SCHEDULE RIGID STEEL CONDUIT WHERE TYPE THHN WIRES AREA
USED. ALL BRANCH CIRCUIT SHALL BE PROVIDED WITH GREEN INSULATED GROUND WIRES.
LP
MTS
ELP
LP-3
ABOVE
CEILING
LP-5
LP-4
8. ALL MATERIALS TO BE USED SHALL BE NEW AND OF APPROVED TYPE FOR THE LOCALTION AND PURPOSED
=
=
c. RANGE OUTLET
=
=
POWER LAYOUT
SCALE
1:50
LEGEND
ELECTRICAL PANELBOARD
11 WATTS PINLIGHT
AT ELECTRICAL ROOM\
NORMAL POWER (VERIFY)
EXACT LOCATION)
EMERGENCY POWER
AT ELECTRICAL
505
2.19
1000
4.35
1000
4.35
1000
4.35
1000
4.35
1000
4.35
1000
4.35
1000
4.35
DO
IT = 2.19AMPERES
USE: 2-5.5mm 2THHN, 1-2.0mm 2
MAIN: 20AT, 50AF,2PCB,240V,10KAIC, B.O.
COUNTERTOP OUTLET
LP
(50/44.00A)
ELP
LOAD COMPUTATION
SCALE
MTS
N.T.S.
47.36 AMPS)
CONSULTANT
Mobile No. 0917-8282013
Tel. No. 242-0933
PRC NO.
PTR NO.
DATE ISSUED
08071979
TIN NO.
8744552 PLACE
06-09-10
PROJECT
REVISIONS:
DESIGNED
LOCATION
ARCHITECT
PRESIDENTIAL DECREE NO. 49
ARCHITECT ENGINEERING
Section 25 (4)
SHEET CONTENTS:
DRAWN
ANDREW CHENG
CA ARCHITECT
N.T.S.
187-299-017
MANILA
J.J.DUFF
UNIT 222 SECOND FLR.SM CITY GEN. SAN., GENERAL SANTOS, PHILIPPINES
OWNER
CHECKED
APPROVAL
DATE
VICINITY MAP
LOCATION MAP
GENERAL NOTES
LEGEND
SINGLE LINE DIAGRAM
LOAD COMPUTATION
ELECTRICAL LAYOUTS
SHEET NO.
E
1