You are on page 1of 15

Technical Contract Condition

non-project-specific

9-06 KKS Identification System for Power Plants


Establishments for combined-cycle power plants (GUD) according to the Guidelines for KKS Application

Title:

Project Code

UAS/DCC

Contents Code

Document No.

ZEN000

0913

Handling:

For internal use only

Doc. Type Key

&ADB029
No. of Pages:

Serial No.

000002
3

UNID
Doc. Ident. No.

420 322 614


Appendices:

First Issue Document Review

Department:

PG IT13

Department:

PG W713

Author:

sgd. Ernst

Reviewed by:

sgd. Wank

Date:

2002-04-29

Date:

2002-04-30

Department:

PG IT1

Released by:

sgd. Dr. Reinecke

Date:

2002-04-30

Document Issues
Document index
-a

Pre.

= Prepared by

Siemens
9-06_Fr_KKS_for_CCPP

Date of issue
2002-04-29
2008-03-06

Rev.

Description of document / page number if appropriate


First issue

Pre.

Rev.

---

---

---

Implementation of new DCC

Ern

---

---

= Reviewed by

Rel.

Rel.

= Released by

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization of its contents and
communication thereof to others without express authorization are prohibited. Offenders will be held liable for payment of damages. All rights created by patent grant or registration of a utility model or design patent are reserved.

You might also like