You are on page 1of 194

DISEO HIDRULICO

CARGA REQUERIDA

V
g

=
=

0.69 m/s
9.81 m/s2
0.038

DIMENSIONAMIENTO DE LA CANASTILLA

Dc
Ac
D canastilla
At
L
N ranuras

=
=
=
=
=
=

3 pulg
0.005 m
0.1524 m
0.01 m
0.2286

TUBERA DE REBOSE Y LIMPIA

=
=
0.4572

Q
S
D

=
=
=

93.24 LPS
1.0%
10 PULG

CONSTRUCCIN DE CAPTACIN
CAMARA HMEDA

CAMARA SECA

EXCAVACIN

0.0762 m
6 PULG

0.254 m

CALCULO DE LA DISTANCIA ENTRE EL


PUNTO DE AFLORAMIENTO Y LA CMARA
HMEDA (L)

h
g

=
=

0.4
9.81

m
m/s2

2.24

m/s

se recomieda de 0.4 a 0.5 m

dicho valor es mayor q la velocidad recomendada 0.6 m/s por lo q


V

0.6

m/s

PERDIDA DE CARGA

h0
Hf

=
=

0.03
0.37

m
m

1.23

ANCHO DE LA PANTALL (b)

ANCHO DE LA PANTALL (b)


CALCULO DEL DIMETRO DE LA TUBERA DE ENTRADA (D)

Qmax
Cd
h
A

=
=
=
=

0.09324
0.8
0.4
0.015

D
D

=
=

0.1375
13.75

m3/s
de 0.6 a 0.8

m
m2

m
cm

si dicho valor es mayor q el dimetro recomendado (menor o igual a 2") usar 2"
D
D
D

=
=
=

2
0.0508
5.08

pulg
m
cm

CALCULO DEL NMERO DE ORIFICIOS (NA)

NA

8.326186527

asumindose
NA

CALCULO DEL ANCHO DE LA PANTALLA (b)

pulg

82

pulg

ALTURA DE LA CMARA HMEDA (Ht)

A
D
E
B

=
=
=
=

10
3
30
3.81

Q req
V

=
=

0.06993
2

0.30

Ht

76.81

cm

1.00

cm
cm
cm
cm

para la sedimentacin de la aren


mnimo
de 10 a 30 cm

m3/s
m/s
recomendado mnimo 30 cm

se asume
Ht

DIMENIONAMIENTO DE LA CANASTILLA

A salida
Dc
Dc
Dc
Dcanast

=
=
=
=
=

0.035
1.3
1.5
0.0381
3

m2
pulg
pulg
m
pulg

L
L

=
=

0.11
0.23

m
m

L asumido

20

cm

AREA DE LA RANUMRA (Ar)


Ar
Ar

=
=

Ac

At

35
0.000035

0.001140094 m2
0.00228

NUMERO DE RANURAS

N ranuras

mm2
m2

65

REBOSE Y LIMPIEZA

m2

hf
Q

=
=

0.03
93.24
8

m/m
l/s
pulg

RESUMEN

1.23

b
D orificio
NA
A
D
H
B
E
Ht

=
=
=
=
=
=
=
=
=

2
0.0508
8
0.1
0.03
0.30
0.0381
0.30
1.00

m
m
und
m
m
m
m
m
m

de 1% a 1.5%

Dc
D canast
L

=
=
=

0.0381
0.0762
0.2

m
m
m

0.2032

DISEO ESTRUCTURAL
Ys

u
Yc
f

=
=
=
=
=
=

1.92
30
0.42
2.4
140
1

tn/m3

tn/m3
kg/cm2
kg/cm2

EMPUJE DEL SUELO SOBRE EL MURO (P)

h
Cah

=
=

0.4981
0.333

79.31

kg

MOMENTO DE VUELCO

0.17

Mo

13.48

kg-m

MOMENTO DE ESTABILIZACIN (Mr) Y EL PESO (W)

W
W1
W2
W3
Wt

W (kg)
225.96
200.00
49.81
475.77

X (m)
0.3766
0.6532
0.7282

Mr (kg/m)
85.10
130.64
36.27
252.01

0.501

POR VUELCO

Cdv

18.70

MAXIMA CARGA UNITARIA

0.75

P1

0.00057

kg/cm2

P2

0.126

kg/cm2

POR DESLIZAMIENTO

199.82

CHEQUEO

2.52

kg

RE EL
CMARA

comieda de 0.4 a 0.5 m

r o igual a 2") usar 2"

A (Ht)

la sedimentacin de la aren

mendado mnimo 30 cm

ASTILLA

0.10

TAPA METALICA

0.10

TAPA METALICA

1.00

0.20

0.30

0.60

0.2
0.10

0.60
0.6

0.2

0.15

0.60

0.10

0.60

0.10

2.00

0.40

0.10

CAMARA SECA

0.10

CAMARA HUMEDA

0.10

GRAVA

0.0508

0.03

0.0508

CAPA
IMPERMEABLE

CONCRETO
0.4981
0.0381
1.23

0.15

0.3

0.15

0.10

GRAVA

0.10

PLANILLA DE METRADOS - ACERO


PROYECTO

CONTRATO

Item
01.00.00

DESCRIP.

Diam.

Detalle

ACERO fy = 4200
PANTALLADE PROTECCION Y TECHO
PANTALLA
ACERO LONGITUDINAL

3/8 "

0.08

ACERO TRANSVERSAL

3/8 "

0.15

TECHO
ACERO LONGITUDINAL Y

3/8 "

ACERO LONGITUDINAL X

3/8 "

MURO
ACERO LONGITUDINAL

1/4 "

ACERO TRANSVERSAL

1/4 "

TAPA DE CONCRETO
ACERO LONGITUDINAL Y

1/4 "

ACERO LONGITUDINAL X

1/4 "

RADOS - ACERO ESTRUCTURAL

Detalle

Longitud

# Veces

# elemen.
Estruc.

Peso (Kg)

Total (Kg)
48.70
29.21

1.73

0.560

4.84

1.40

0.560

4.70

12.95

12.95

0.994

12.87

12.12

12.12

0.560

6.79

1.65

1.25

17.07
1.52

0.560

7.66

2.40

0.560

9.41

1.52

2.40

2.42
0.52

0.52

0.994

1.55

0.52

0.52

0.560

0.87

CALCULO DE LA DISTANCIA ENTRE EL


PUNTO DE AFLORAMIENTO Y LA CMARA
HMEDA (L)

h
g

=
=

0.4
9.81

m
m/s2

2.24

m/s

se recomieda de 0.4 a 0.5 m

dicho valor es mayor q la velocidad recomendada 0.6 m/s por lo q


V

0.6

m/s

PERDIDA DE CARGA

h0
Hf

=
=

0.03
0.37

m
m

1.23

ANCHO DE LA PANTALL (b)

ANCHO DE LA PANTALL (b)


CALCULO DEL DIMETRO DE LA TUBERA DE ENTRADA (D)

Qmax
Cd
h
A

=
=
=
=

0.01
0.8
0.4
0.002

m3/s

D
D

=
=

0.045
4.5

m
cm

de 0.6 a 0.8

m
m2

si dicho valor es mayor q el dimetro recomendado (menor o igual a 2") usar 2"
D
D
D

=
=
=

2
0.0508
5.08

pulg
m
cm

CALCULO DEL NMERO DE ORIFICIOS (NA)

NA

1.784689069

asumindose
NA

CALCULO DEL ANCHO DE LA PANTALLA (b)

pulg

34

pulg

0.8636

ALTURA DE LA CMARA HMEDA (Ht)

A
D
E
B

=
=
=
=

10
3
30
3.81

Q req
V

=
=

0.0075
1.5

H
H

=
=

0.20
0.30

m
m

Ht

76.81

cm

1.00

cm
cm
cm
cm

para la sedimentacin de la aren


mnimo
de 10 a 30 cm

m3/s
m/s
recomendado mnimo 30 cm

se asume
Ht

DIMENIONAMIENTO DE LA CANASTILLA

A salida
Dc
Dc
Dc
Dcanast

=
=
=
=
=

0.005
0.5
1.5
0.0381
3

m2
pulg
pulg
m
pulg

L
L

=
=

0.11
0.23

m
m

L asumido

20

cm

AREA DE LA RANUMRA (Ar)


Ar
Ar

=
=

Ac

At

35
0.000035

0.001140094 m2
0.00228

NUMERO DE RANURAS

N ranuras

mm2
m2

65

REBOSE Y LIMPIEZA

m2

hf
Q

=
=

0.03
10
4

m/m
l/s
pulg

RESUMEN

1.23

b
D orificio
NA
A
D
H
B

=
=
=
=
=
=
=

0.86
0.0508
2
0.1
0.03
0.30
0.0381

m
m
und
m
m
m
m

de 1% a 1.5%

E
Ht

=
=

0.30
1.00

m
m

Dc
D canast
L

=
=
=

0.0381
0.0762
0.2

m
m
m

0.1016

DISEO ESTRUCTURAL
Ys

u
Yc

=
=
=
=

1.92
30
0.42
2.4

tn/m3

tn/m3

=
=

140
1

kg/cm2
kg/cm2

EMPUJE DEL SUELO SOBRE EL MURO (P)

h
Cah

=
=

0.4981
0.333

79.31

kg

MOMENTO DE VUELCO

0.17

Mo

13.48

kg-m

MOMENTO DE ESTABILIZACIN (Mr) Y EL PESO (W)

W
W1
W2
W3
Wt

W (kg)
84.41
86.36
21.51
192.28

X (m)
0.3258
0.5516
0.6266

Mr (kg/m)
27.50
47.64
13.48
88.62

0.391

POR VUELCO

Cdv

6.57

MAXIMA CARGA UNITARIA

0.65

P1

0.01179

m
kg/cm2

P2

0.047

kg/cm2

kg

POR DESLIZAMIENTO

80.76

CHEQUEO

1.02

RE EL
CMARA

comieda de 0.4 a 0.5 m

r o igual a 2") usar 2"

A (Ht)

la sedimentacin de la aren

mendado mnimo 30 cm

ASTILLA

0.10

TAPA METALICA

0.10

TAPA METALICA

1.00

0.10

0.30

0.60

0.2
0.10

0.50
0.2

0.6

0.15

0.50

0.10

0.60

0.10

0.86

0.40

0.10

CAMARA SECA
0.10

CAMARA HUMEDA

0.10

GRAVA

0.0508

0.0508

0.03

CAPA
IMPERMEABLE

CONCRETO
0.4981
0.0381
1.23

0.15

0.3

0.15

0.10

GRAVA

0.10

CALCULO DE LA DISTANCIA ENTRE EL


PUNTO DE AFLORAMIENTO Y LA CMARA
HMEDA (L)

h
g

=
=

0.4
9.81

m
m/s2

2.24

m/s

se recomieda de 0.4 a 0.5 m

dicho valor es mayor q la velocidad recomendada 0.6 m/s por lo q


V

0.6

m/s

PERDIDA DE CARGA

h0
Hf

=
=

0.03
0.37

m
m

1.23

ANCHO DE LA PANTALL (b)

ANCHO DE LA PANTALL (b)


CALCULO DEL DIMETRO DE LA TUBERA DE ENTRADA (D)

Qmax
Cd
h
A

=
=
=
=

0.038
0.8
0.4
0.006

m3/s

D
D

=
=

0.0878
8.78

m
cm

de 0.6 a 0.8

m
m2

si dicho valor es mayor q el dimetro recomendado (menor o igual a 2") usar 2"
D
D
D

=
=
=

2
0.0508
5.08

pulg
m
cm

CALCULO DEL NMERO DE ORIFICIOS (NA)

NA

3.987181474

asumindose
NA

CALCULO DEL ANCHO DE LA PANTALLA (b)

pulg

50

pulg

1.27

ALTURA DE LA CMARA HMEDA (Ht)

A
D
E
B

=
=
=
=

10
3
30
3.81

Q req
V

=
=

0.0285
1.5

H
H

=
=

0.20
0.30

m
m

Ht

76.81

cm

1.00

cm
cm
cm
cm

para la sedimentacin de la aren


mnimo
de 10 a 30 cm

m3/s
m/s
recomendado mnimo 30 cm

se asume
Ht

DIMENIONAMIENTO DE LA CANASTILLA

A salida
Dc
Dc
Dc
Dcanast

=
=
=
=
=

0.019
1
1.5
0.0381
3

m2
pulg
pulg
m
pulg

L
L

=
=

0.11
0.23

m
m

L asumido

20

cm

AREA DE LA RANUMRA (Ar)


Ar
Ar

=
=

Ac

At

35
0.000035

0.001140094 m2
0.00228

NUMERO DE RANURAS

N ranuras

mm2
m2

65

REBOSE Y LIMPIEZA

m2

hf
Q

=
=

0.03
38
6

m/m
l/s
pulg

RESUMEN

1.23

b
D orificio
NA
A
D
H
B

=
=
=
=
=
=
=

1.27
0.0508
4
0.1
0.03
0.30
0.0381

m
m
und
m
m
m
m

de 1% a 1.5%

E
Ht

=
=

0.30
1.00

m
m

Dc
D canast
L

=
=
=

0.0381
0.0762
0.2

m
m
m

0.1524

DISEO ESTRUCTURAL
Ys

u
Yc

=
=
=
=

1.92
30
0.42
2.4

tn/m3

tn/m3

=
=

140
1

kg/cm2
kg/cm2

EMPUJE DEL SUELO SOBRE EL MURO (P)

h
Cah

=
=

0.4981
0.333

79.31

kg

MOMENTO DE VUELCO

0.17

Mo

13.48

kg-m

MOMENTO DE ESTABILIZACIN (Mr) Y EL PESO (W)

W
W1
W2
W3
Wt

W (kg)
133.81
127.00
31.63
292.44

X (m)
0.3512
0.6024
0.6774

Mr (kg/m)
46.99
76.50
21.43
144.92

0.449

POR VUELCO

Cdv

10.75

MAXIMA CARGA UNITARIA

0.70

P1

0.00685

m
kg/cm2

P2

0.076

kg/cm2

POR DESLIZAMIENTO

122.82

CHEQUEO

1.55

kg

RE EL
CMARA

comieda de 0.4 a 0.5 m

r o igual a 2") usar 2"

A (Ht)

la sedimentacin de la aren

mendado mnimo 30 cm

ASTILLA

0.10

TAPA METALICA

0.10

TAPA METALICA

1.00

0.15

0.30

0.60

0.2
0.10

0.55
0.2

0.6

0.15

0.55

0.10

0.60

0.10

1.27

0.40

0.10

CAMARA SECA
0.10

CAMARA HUMEDA

0.10

GRAVA

0.0508

0.0508

0.03

CAPA
IMPERMEABLE

CONCRETO
0.4981
0.0381
1.23

0.15

0.3

0.15

0.10

GRAVA

0.10

CALCULO DE LA DISTANCIA ENTRE EL


PUNTO DE AFLORAMIENTO Y LA CMARA
HMEDA (L)

h
g

=
=

0.4
9.81

m
m/s2

2.24

m/s

se recomieda de 0.4 a 0.5 m

dicho valor es mayor q la velocidad recomendada 0.6 m/s por lo q


V

0.6

m/s

PERDIDA DE CARGA

h0
Hf

=
=

0.03
0.37

m
m

1.23

ANCHO DE LA PANTALL (b)

ANCHO DE LA PANTALL (b)


CALCULO DEL DIMETRO DE LA TUBERA DE ENTRADA (D)

Qmax
Cd
h
A

=
=
=
=

0.016
0.8
0.4
0.003

m3/s

D
D

=
=

0.057
5.7

m
cm

de 0.6 a 0.8

m
m2

si dicho valor es mayor q el dimetro recomendado (menor o igual a 2") usar 2"
D
D
D

=
=
=

2
0.0508
5.08

pulg
m
cm

CALCULO DEL NMERO DE ORIFICIOS (NA)

NA

2.258990018

asumindose
NA

CALCULO DEL ANCHO DE LA PANTALLA (b)

pulg

34

pulg

0.86

ALTURA DE LA CMARA HMEDA (Ht)

A
D
E
B

=
=
=
=

10
3
30
3.81

Q req
V

=
=

0.012
1.5

H
H

=
=

0.20
0.30

m
m

Ht

76.81

cm

1.00

cm
cm
cm
cm

para la sedimentacin de la aren


mnimo
de 10 a 30 cm

m3/s
m/s
recomendado mnimo 30 cm

se asume
Ht

DIMENIONAMIENTO DE LA CANASTILLA

A salida
Dc
Dc
Dc
Dcanast

=
=
=
=
=

0.008
0.6
1.5
0.0381
3

m2
pulg
pulg
m
pulg

L
L

=
=

0.11
0.23

m
m

L asumido

20

cm

AREA DE LA RANUMRA (Ar)


Ar
Ar

=
=

Ac

At

35
0.000035

0.001140094 m2
0.00228

NUMERO DE RANURAS

N ranuras

mm2
m2

65

REBOSE Y LIMPIEZA

m2

hf
Q

=
=

0.03
16
4

m/m
l/s
pulg

RESUMEN

1.23

b
D orificio
NA
A
D
H
B

=
=
=
=
=
=
=

0.86
0.0508
2
0.1
0.03
0.30
0.0381

m
m
und
m
m
m
m

de 1% a 1.5%

E
Ht

=
=

0.30
1.00

m
m

Dc
D canast
L

=
=
=

0.0381
0.0762
0.2

m
m
m

0.1016

DISEO ESTRUCTURAL
Ys

u
Yc

=
=
=
=

1.92
30
0.42
2.4

tn/m3

tn/m3

=
=

140
1

kg/cm2
kg/cm2

EMPUJE DEL SUELO SOBRE EL MURO (P)

h
Cah

=
=

0.4981
0.333

79.31

kg

MOMENTO DE VUELCO

0.17

Mo

13.48

kg-m

MOMENTO DE ESTABILIZACIN (Mr) Y EL PESO (W)

W
W1
W2
W3
Wt

W (kg)
84.41
86.36
21.51
192.28

X (m)
0.3258
0.5516
0.6266

Mr (kg/m)
27.50
47.64
13.48
88.62

0.391

POR VUELCO

Cdv

6.57

MAXIMA CARGA UNITARIA

0.65

P1

0.01179

m
kg/cm2

P2

0.047

kg/cm2

kg

POR DESLIZAMIENTO

80.76

CHEQUEO

1.00

RE EL
CMARA

comieda de 0.4 a 0.5 m

r o igual a 2") usar 2"

A (Ht)

la sedimentacin de la aren

mendado mnimo 30 cm

ASTILLA

0.10

TAPA METALICA

0.10

TAPA METALICA

1.00

0.10

0.30

0.60

0.2
0.10

0.50
0.2

0.6

0.15

0.50

0.10

0.60

0.10

0.86

0.40

0.10

CAMARA SECA
0.10

CAMARA HUMEDA

0.10

GRAVA

0.0508

0.0508

0.03

CAPA
IMPERMEABLE

CONCRETO
0.4981
0.0381
1.23

0.15

0.3

0.15

0.10

GRAVA

0.10

CALCULO DE LA DISTANCIA ENTRE EL


PUNTO DE AFLORAMIENTO Y LA CMARA
HMEDA (L)

h
g

=
=

0.4
9.81

m
m/s2

2.24

m/s

se recomieda de 0.4 a 0.5 m

dicho valor es mayor q la velocidad recomendada 0.6 m/s por lo q


V

0.6

m/s

PERDIDA DE CARGA

h0
Hf

=
=

0.03
0.37

m
m

1.23

ANCHO DE LA PANTALL (b)

ANCHO DE LA PANTALL (b)


CALCULO DEL DIMETRO DE LA TUBERA DE ENTRADA (D)

Qmax
Cd
h
A

=
=
=
=

0.041
0.8
0.4
0.007

m3/s

D
D

=
=

0.0912
9.12

m
cm

de 0.6 a 0.8

m
m2

si dicho valor es mayor q el dimetro recomendado (menor o igual a 2") usar 2"
D
D
D

=
=
=

2
0.0508
5.08

pulg
m
cm

CALCULO DEL NMERO DE ORIFICIOS (NA)

NA

4.223014446

asumindose
NA

CALCULO DEL ANCHO DE LA PANTALLA (b)

pulg

50

pulg

1.27

ALTURA DE LA CMARA HMEDA (Ht)

A
D
E
B

=
=
=
=

10
3
30
3.81

Q req
V

=
=

0.03075
1.5

H
H

=
=

0.20
0.30

m
m

Ht

76.81

cm

1.00

cm
cm
cm
cm

para la sedimentacin de la aren


mnimo
de 10 a 30 cm

m3/s
m/s
recomendado mnimo 30 cm

se asume
Ht

DIMENIONAMIENTO DE LA CANASTILLA

A salida
Dc
Dc
Dc
Dcanast

=
=
=
=
=

0.021
1
1.5
0.0381
3

m2
pulg
pulg
m
pulg

L
L

=
=

0.11
0.23

m
m

L asumido

20

cm

AREA DE LA RANUMRA (Ar)


Ar
Ar

=
=

Ac

At

35
0.000035

0.001140094 m2
0.00228

NUMERO DE RANURAS

N ranuras

mm2
m2

65

REBOSE Y LIMPIEZA

m2

hf
Q

=
=

0.03
41
6

m/m
l/s
pulg

RESUMEN

1.23

b
D orificio
NA
A
D
H
B

=
=
=
=
=
=
=

1.27
0.0508
4
0.1
0.03
0.30
0.0381

m
m
und
m
m
m
m

de 1% a 1.5%

E
Ht

=
=

0.30
1.00

m
m

Dc
D canast
L

=
=
=

0.0381
0.0762
0.2

m
m
m

0.1524

DISEO ESTRUCTURAL
Ys

u
Yc

=
=
=
=

1.92
30
0.42
2.4

tn/m3

tn/m3

=
=

140
1

kg/cm2
kg/cm2

EMPUJE DEL SUELO SOBRE EL MURO (P)

h
Cah

=
=

0.4981
0.333

79.31

kg

MOMENTO DE VUELCO

0.17

Mo

13.48

kg-m

MOMENTO DE ESTABILIZACIN (Mr) Y EL PESO (W)

W
W1
W2
W3
Wt

W (kg)
133.81
127.00
31.63
292.44

X (m)
0.3512
0.6024
0.6774

Mr (kg/m)
46.99
76.50
21.43
144.92

0.449

POR VUELCO

Cdv

10.75

MAXIMA CARGA UNITARIA

0.70

P1

0.00685

m
kg/cm2

P2

0.076

kg/cm2

POR DESLIZAMIENTO

122.82

CHEQUEO

1.55

kg

RE EL
CMARA

comieda de 0.4 a 0.5 m

r o igual a 2") usar 2"

A (Ht)

la sedimentacin de la aren

mendado mnimo 30 cm

ASTILLA

0.10

TAPA METALICA

0.10

TAPA METALICA

1.00

0.15

0.30

0.60

0.2
0.10

0.55
0.2

0.6

0.15

0.55

0.10

0.60

0.10

1.27

0.40

0.10

CAMARA SECA
0.10

CAMARA HUMEDA

0.10

GRAVA

0.0508

0.0508

0.03

CAPA
IMPERMEABLE

CONCRETO
0.4981
0.0381
1.23

0.15

0.3

0.15

0.10

GRAVA

0.10

CALCULO DE LA DISTANCIA ENTRE EL


PUNTO DE AFLORAMIENTO Y LA CMARA
HMEDA (L)

h
g

=
=

0.4
9.81

m
m/s2

2.24

m/s

se recomieda de 0.4 a 0.5 m

dicho valor es mayor q la velocidad recomendada 0.6 m/s por lo q


V

0.6

m/s

PERDIDA DE CARGA

h0
Hf

=
=

0.03
0.37

m
m

1.23

ANCHO DE LA PANTALL (b)

ANCHO DE LA PANTALL (b)


CALCULO DEL DIMETRO DE LA TUBERA DE ENTRADA (D)

Qmax
Cd
h
A

=
=
=
=

0.02
0.8
0.4
0.003

D
D

=
=

0.0637
6.37

m3/s
de 0.6 a 0.8

m
m2

m
cm

si dicho valor es mayor q el dimetro recomendado (menor o igual a 2") usar 2"
D
D
D

=
=
=

2
0.0508
5.08

pulg
m
cm

CALCULO DEL NMERO DE ORIFICIOS (NA)

NA

2.57235802

asumindose
NA

CALCULO DEL ANCHO DE LA PANTALLA (b)

pulg

42

pulg

1.07

ALTURA DE LA CMARA HMEDA (Ht)

A
D
E
B

=
=
=
=

10
3
30
3.81

Q req
V

=
=

0.015
1.5

H
H

=
=

0.20
0.30

m
m

Ht

76.81

cm

1.00

cm
cm
cm
cm

para la sedimentacin de la aren


mnimo
de 10 a 30 cm

m3/s
m/s
recomendado mnimo 30 cm

se asume
Ht

DIMENIONAMIENTO DE LA CANASTILLA

A salida
Dc
Dc
Dc
Dcanast

=
=
=
=
=

0.010
0.7
1.5
0.0381
3

m2
pulg
pulg
m
pulg

L
L

=
=

0.11
0.23

m
m

L asumido

20

cm

AREA DE LA RANUMRA (Ar)


Ar
Ar

=
=

Ac

At

35
0.000035

0.001140094 m2
0.00228

NUMERO DE RANURAS

N ranuras

mm2
m2

65

REBOSE Y LIMPIEZA

m2

hf
Q

=
=

0.03
20
5

m/m
l/s
pulg

RESUMEN

1.23

b
D orificio
NA
A
D
H
B

=
=
=
=
=
=
=

1.07
0.0508
3
0.1
0.03
0.30
0.0381

m
m
und
m
m
m
m

de 1% a 1.5%

E
Ht

=
=

0.30
1.00

m
m

Dc
D canast
L

=
=
=

0.0381
0.0762
0.2

m
m
m

0.127

DISEO ESTRUCTURAL
Ys

u
Yc

=
=
=
=

1.92
30
0.42
2.4

tn/m3

tn/m3

=
=

140
1

kg/cm2
kg/cm2

EMPUJE DEL SUELO SOBRE EL MURO (P)

h
Cah

=
=

0.4981
0.333

79.31

kg

MOMENTO DE VUELCO

0.17

Mo

13.48

kg-m

MOMENTO DE ESTABILIZACIN (Mr) Y EL PESO (W)

W
W1
W2
W3
Wt

W (kg)
108.33
106.68
26.57
241.58

X (m)
0.3385
0.577
0.652

Mr (kg/m)
36.67
61.55
17.32
115.54

0.422

POR VUELCO

Cdv

8.57

MAXIMA CARGA UNITARIA

0.68

P1

0.00928

m
kg/cm2

P2

0.062

kg/cm2

POR DESLIZAMIENTO

101.46

CHEQUEO

1.28

kg

RE EL
CMARA

comieda de 0.4 a 0.5 m

r o igual a 2") usar 2"

A (Ht)

la sedimentacin de la aren

mendado mnimo 30 cm

ASTILLA

0.10

TAPA METALICA

0.10

TAPA METALICA

1.00

0.13

0.30

0.60

0.2
0.10

0.53
0.2

0.6

0.15

0.53

0.10

0.60

0.10

1.07

0.40

0.10

CAMARA SECA
0.10

CAMARA HUMEDA

0.10

GRAVA

0.0508

0.0508

0.03

CAPA
IMPERMEABLE

CONCRETO
0.4981
0.0381
1.23

0.15

0.3

0.15

0.10

GRAVA

0.10

HOJA DE ME
OBRA:
PROVINCIA:

PARTIDA
01.00.00
01.01.00
01.01.01
01.01.02
01.02.00
01.02.01
01.02.02
01.02.03
01.02.04

01.03.00

01.04.00

01.05.00

01.06.00
01.06.00

HOJA DE METRADOS

CREACIN DEL SISTEMA DE BOMBEO E IMPULSIN DE AGUA PARA RIEGO PRESURIZADO DE LOS SE
PROVINCIA DE ABANCAY, REGIN DE APURMAC

ABANCAY
ESPECIFICACIONES
CAPTACIN 01 - LUCMOS
TRABAJOS PRELIMINARES
LIMPIEZA DEL TERRENO
TRAZO Y REPLANTEO
MOVIMIENTO DE TIERRAS
EXCAVACION MANUAL EN TERRENO NORMAL
REFINE NIVELACIN Y COMPACTACIN MANUAL
ELIMINACIN DE MATERIAL EXCEDENTE
RELLENO CON MATERIAL DE CANTERA
Piedra Chica
Grava
Gravilla
OBRAS DE CONCRETO SIMPLE
CONCRETO fc = 100 kg/cm2
Concreto para Solado e = 10 cm
Cmara Hmeda
Cmara Seca
Concreto para relleno
CONCRETO fc = 140 kg/cm2
Losa de Fondo
Cmara Hmeda
Cmara Seca
Muros
Muro Frontal
Muro Lateral
Dentelln
OBRAS DE CONCRETO ARMADO
CONCRETO fc = 210 kg/cm2
Muro Frontal
Muro Lateral
Losa Superior
Dentelln
ENCOFRADO Y DESENCOFRADO DE ESTRUCTURAS
MUROS CAMARA SECA
MUROS CAMARA HUMEDA
PANTALLADE PROTECCIN
LOSA DE FONDO

LOSA SUPERIOR
ACERO DE REFUERZO
ACERO F'y = 4,200 kg/cm
ACCESORIOS
COMPUERTA METALICA
CANASTILLA DE BRONCE
TUBERIA DE 2"
TUBERA DE 1 1/2"
CODOS
VALVULAS
UNIONES

METRADOS

ESURIZADO DE LOS SECTORES DE RUMI RUMI Y LA UNION DEL DISTRITO DE CURAHUASI


DISTRITO:

CURAHUASI

DIMENSIONES
LARGO
ANCHO
ALTO

UND

N VEC.

PARCIAL

TOTAL

m2
m2

1
1

3.56
3.56

3.78
3.78

13.46
13.46

13.46
13.46

m3
m2

1
1

3.56
3.56

3.78
3.78

1.93

25.97
13.46

25.97
13.46

m3
m3
m3
m3
m3

Esponjamiento 25%

1.25

32.46

1
1
1

AREA
AREA
AREA

0.49
0.64
0.74

0.35
0.75
1.04

2.14
0.71
1.17
1.41

m3
m3
m3
m3

0.89
1
1
1

2.20
0.80
2.20

0.60
0.70
AREA

0.10
0.10
0.32

0.13
0.06
0.70
0.60

m3
m3
m3
m3
m3
m3
m3

1
1

2.20
0.80

0.60
0.85

0.15
0.15

0.20
0.10

1
1
1

2.00
0.60
2.00

0.10
0.10
0.15

1.00
0.60
0.20

0.20
0.04
0.06

m3
m3
m3
m3
m3

1.27
1
2
1
1

2.20
1.36
AREA
2.20

m2
m2
m2
m2

2
2
4
2

4.00
8.20
3.46
11.40

0.10
0.10
3.30
0.15

1.00
2.09
0.10
0.45

0.22
0.57
0.33
0.15

0.60
1.00
3.46
0.15

4.80
16.40
47.89
3.42

4.80
16.40
47.89
3.42

m2

AREA

3.30

6.60

kg
und
und
ml
ml
und
und
und

6.60
48.70

2
1
8
1
1
2
2

0.1
1.20

2.00
1.00
0.80
1.20
1.00
2.00
2.00

2.00
1.00
0.80
1.20
1.00
2.00
2.00

You might also like