Work
TNST
Roof Drawing
Wall Framing
Staircase
Awning
Action
Rev. 3 Submitted to MES (2 drawing as per comment)
Rev. 1 Submitted to MES,
Drawing received partially from TNST
Drawing received, will have discussion with TNST & CJ
Hong Leong
Rebar Crushing
DTS / PCB Drawings
CSC
As-built Piling Data & ECC drawing
CAST IN ITEM
Roof Frame Cast-in item
Revise Cast-in drawing
As-Built Drawing
KKL As-built
CBP As-Built
Target
Approval
9/10/2015
9/10/2015
9/10/2015
9/10/2015
9/18/2015
9/18/2015
9/10/2015
9/10/2015
9/16/2015
9/16/2015
9/4/2015
9/9/2015
9/3/2015
9/9/2015
9/18/2015
9/18/2015