_________________Stevil Corporation

Steel Structure PEB, PFB and LGSFH from A 2 Z


Client: Mr. Adnan
Project: PEB 103x193

BO
Q
PEB size

103'x1
93'

Element

Lengt
h

Column1
Rafter 1
Rafter 2
Nut Bolts
End Wall
Cols
End Wall
Rft.
GI Purlin
P.P Roof
Sheet

Total

Quant
ity

Weight
Kg

6100
6100
9688

14
14
14

5518
5646
7530
850

10360

10

4586

15400
1448

4
320

2675
11880
13545

55000

Fabrication & Erection with Material @170/Kg = 55000x170 =


9350000.00 = 470.00 /Sq.ft
Note:1. Before Starting work we strongly recommended, testing of soil, Foundation
designing and steel structure analysis. Which cost
= 300,000.00
2. Foundation Column and Plinth Beams with Flooring (without reinforcement)
will be @250.00 per Sq.ft in normal condition. Final rate will be settled after
designing. So
For area 19880 Sft, the cost will be 19880x250
= 4970000.00

Now Total Cost civil and steel work will be


= 14620000.00

Signature:
Amjad Pervaz
For Stevil Corporation
Cell: 0322-2710019

_______________________