You are on page 1of 1

STUDENT RISK ASSESSMENT

Date
6/10/2014

Location: Media Studies


Dance Studio

HAZARDS
Hazard
Regardless of control measures
If there has been rain outside or if
there are any liquids on the floor
then this can cause people to slip.

There are large mirrors in the


dance studio which are made of
glass so if there is an incident and
they break the glass could be very
harmful to the people present in
the room.

*1
Sf = staff
St = students
Cr = contractors
Cl = cleaners
V = visitors

Task being assessed: Students filming/taking photos in college

Persons
at risk
*1
St

General Risk assessment


DEGREE OF RISK
Worst
Probability
Risk
outcome
Rating
*2
*3
A-E
NR
Ps
E

St

Maj, F

D = people with disabilities


X = young/inexperienced
L = lone workers
W = women of child-bearing
age

CONTROL MEASURES
Existing control measures taken
against the risk
If possible, make sure that everyone
is wearing suitable footwear i.e. no
heels or sandals.

Student Name:
Aman Qureshi
ACTION PLAN
What further control
measures are required when
and by whom
The immediate members of
staff to contact in the case of an
emergency when present in the
dance studio would be the
Physical Education department
as a first port of call.
In case of an emergency to do
with the mirrors contact staff
immediately.

Make sure that every member of


the crew is paying attention to their
acts in an out of class environment
and that there is no inappropriate
behaviour that could possibly lead
to the breaking of the mirrors. Also,
make sure that the area that you are
filming in is at a safe distance from
the mirrors as possible just to avoid
any incident that could be fatal.
*2 This is without control measures
*3 This is with control measures in place
F = fatal
Fr = frequent/likely/could occur repeatedly/expected
Maj = major injury or permanent disability
Pr = probable/not surprised/might occur often
Min = minor injury
Ps = possible/could occur sometime
NR = non-reportable
R = remote/unlikely but conceivable
U = unlikely/improbable such that likelihood is almost zero

You might also like