You are on page 1of 2

ME0061 - Industrial Engineering Exam

Part A
Answer All Questions
1. Mention any four advantages of work study.
2. Name some rating techniqes .
3. Mention the use of string diagram.
4. What are the advantages of good plant layout?
5. Define the term Ergonomics.
6. Define the term Productivity.
7. What is Optimum Batch size?
8. What is ment by simplification in process planning?
9. What are the methods used for merit rating of an employee?
10. What is Fringe Benefits?
Part B
Answer either (a) or (b) from each question
11.(a) Explain the contributions of Gilberth to scientific management.
OR
(b) i. Describe the steps for taking Time Study.(8)
ii. What are the various allowances considered in Time Study? (8)

12.(a) State and explain the various important factors considered in plant location.
OR
(b) i. Describe any two types of layout. (10)
ii. What are the basic differences between flow process chart, flow diagram, and
string diagram. (6)

13.(a) Explain factors affecting productivety.


OR

(b) i. What is motivation? Explain why it is very essential in modern industries.(8)


ii. Describe supervision its effect on performance of industrial employees. (8)

14.(a) i. Explain group technology concept in manufacturing. (8)


ii. Discuss the concept and utility of ABC Analysis. (8)
OR
(b) i. Explain Value Engineering (8)
ii. Describe the objectives and functions of production planning. (8)

15.(a) i. Describe the components of wages of an industrial employee. (8)


ii. Discuss any two methods of incentive payment. (8)
OR
(b) i. Explain why merit rating is necessary. (4)
ii. Describe the various methods of job evaluation.(12)

You might also like