SELECTED PROJECT

EXPERIENCE

INTERNATIONAL
PROJECTS AND
INSTALLATION

REV 4, 12 Jan 2011

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE

ARAR CITY -North Border


Region, KSA
Centralized STP with Water ReUse.
Using SBR system with
Membrane
Bio-reactor
(MBR) Technology
Ultimate Capacity of 50,000
m3/day

RAFHA CITY
Centralized STP with Water ReUse.
Using SBR system with
Membrane Bio-reactor (MBR)
Technology
Ultimate Capacity of 25,000
m3/day

TURAIF CITY

Centralized STP with Water Re-Use.


Using SBR system with Membrane
Bio-reactor (MBR) Technology
Ultimate Capacity of 16,000 m3/day

REV 4, 12 Jan 2011

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE
ABERDEEN BEEF PLANT
South Dakota, U.S.A.

Meat Processing Plant


Using Dynamic SBR
Capacity: 8,000 m3/day

REV 4, 12 Jan 2011

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE
RD TUNA CANNERS LTD.,
Papua New Guinea

Tuna Cannery Plant


Using Dynamic SBR system with
Dissolved Air Flotation Technology
Capacity: 2,000 m3/day

REV 4, 12 Jan 2011

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE

Sewage
Treatment
Plant
INSTALLATIONS

REV 4,

12 Jan 2011

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE
SUBIC WATER & SEWERAGE
CO., INC.
Subic Bay Free Port Zone, Olongapo City

REV 4, 12 Jan 2011

INDUSTRY:

Water & Wastewater Concession

SYSTEM:

Sewage Treatment Plant Using


BAUER Dynamic
SBR System

CAPACITY:

5,000 cubic meters / day

INFLUENT:

BOD at 281mg/L
COD at 539 mg/L

AFTER
TREATMENT

BOD at 5 mg/L
COD at 14 mg/L

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE

SUBIC WATER & SEWERAGE CO., INC.


Subic Bay Free Port Zone, Olongapo City

INDUSTRY:

Water & Wastewater


Concession

SYSTEM:

Sewage Treatment Plant


Using BAUER Dynamic
SBR System

CAPACITY:

2,500 cubic meters / day

INFLUENT:

BOD at 124 mg/L


COD at 374 mg/L

AFTER
TREATMENT

BOD at 4 mg/L
COD at 30 mg/L

MAYNILAD WATER SERVICE INC. GRANT


MWSS Compound, Katipunan Road, Balara, Quezon City

BAUER International Philippines


Incorporated Regalia Park Tower Cubao,
Q.C. Philippines,1109 P.O Box 10154
Q.C

INDUSTRY:

Water Concessionaire

SYSTEM:

Sewage Treatment Plant


Using BAUER Dynamic
SBR System

CAPACITY:

621 cubic meters / day

INFLUENT:

BOD at 35 mg/L
COD at 55 mg/L

AFTER
TREATMENT

BOD at 10 mg/L
COD at 17 mg/L

10/11/15

SELECTED PROJECT
EXPERIENCE
MAYNILAD WATER SERVICE INC. LEGAL
MWSS Compound, Katipunan Road, Balara, Quezon City
INDUSTRY:

Water Concessionaire

SYSTEM:

Sewage Treatment Plant


Using BAUER Dynamic
SBR System

CAPACITY:

409 cubic meters / day

INFLUENT:

BOD at 35 mg/L
COD at 66 mg/L

AFTER
TREATMENT

BOD at 10 mg/L
COD at 17 mg/L

MAYNILAD WATER SERVICE INC. PALTOK


MWSS Compound, Katipunan Road, Balara, Quezon City
INDUSTRY:

Water Concessionaire

SYSTEM:

Sewage Treatment Plant


Using BAUER Dynamic
SBR System

CAPACITY:

4,900 cubic meters / day

INFLUENT:

BOD at 92 mg/L
COD at 124 mg/L

AFTER
TREATMENT

BOD at 5 mg/L
COD at 35 mg/L

BAUER International Philippines


Incorporated Regalia Park Tower Cubao,
Q.C. Philippines,1109 P.O Box 10154 Q.C

10/11/15

SELECTED PROJECT
EXPERIENCE
SMOKEY MOUNTAIN STP 1
&2
NHA Philippine Government Project
INDUSTRY:

Government Mass Housing Project

SYSTEM:

Centralized Sewage Treatment


Plant Using Cascade Technology

CAPACITY:

2 x 2,100 cubic meters / day

INFLUENT:

BOD at 300 mg/L


COD at 600 mg/L

AFTER
TREATMENT

BOD at <50 mg/L


COD at <100 mg/L

FORT BONIFACIO
GLOBAL CITY
Residential / Commercial Makati City
INDUSTRY:

Residential / Commercial

SYSTEM:

Centralized Sewage Treatment


Plant using Chemical and
Biological Treatment Process

CAPACITY:

5,000 cubic meters / day

REV 4, 12 Jan 2011

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE

STA. LUCIA EAST


SHOPPING MALL
Shopping Mall Cainta Rizal

INDUSTRY:

Shopping Mall

SYSTEM:

Sewage Treatment Plant using


Cascade Technology

CAPACITY:

1,200 cubic meters / day

INFLUENT:

BOD at 506 mg/L


COD at 800 mg/L

AFTER
TREATMENT

BOD at 31mg/L
COD at 80 mg/L

INDUSTRY:

Resort / Lifestyle Community

SYSTEM:

Sewage Treatment Plant using


BAUER Dynamic SBR System

CAPACITY:

350 cubic meters / day

INFLUENT:

BOD at 180 mg/L


COD at 360 mg/L

AFTER
TREATMENT

BOD at 12 mg/L
COD at 22 mg/L

TERRAZAS DE PUNTA
FUEGO
Resort Batangas City

REV 4, 12 Jan 2011

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE
LINDEN SUITES
Condominium Pasig City
INDUSTRY:

Condominium

SYSTEM:

Sewage Treatment Plant using


Extended Aeration System

CAPACITY:

380 cubic meters / day

INFLUENT:

BOD at 250 mg/L


COD at mg/L

AFTER
TREATMENT

BOD at <10mg/L
COD at 54 mg/L

CAMP JOHN HAY


Condominium / Hotel Baguio City
INDUSTRY:

Condominium / Hotel

SYSTEM:

Sewage Treatment Plant using


BAUER Dynamic SBR System

CAPACITY:

300 cubic meters / day

INFLUENT:

BOD at 500 mg/L


COD at 750 mg/L

AFTER
TREATMENT

BOD at <50 mg/L


COD at <100 mg/L

REV 4, 12 Jan 2011

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE

WATCH TOWER
BIBLE SOCIETY
Religious Printing Institution
Roosevelt Ave., Quezon City

INDUSTRY:

Printing

SYSTEM:

Sewage Treatment Plant


Using Cascade
Technology

CAPACITY:

280 cubic meters / day

INFLUENT:

BOD at 542 mg/L

AFTER
TREATMENT

BOD at 16.8 mg/L

EMERALD
MANSIONS
INDUSTRY:

RESIDENTIAL
CONDOMINIUM

SYSTEM:

Chemical Treatment and use


of Dissolved Air Flotation
Equipment

CAPACITY:

240 cubic meters / day

AFTER
TREATMENT

BOD at 6 mg/L
COD at 8 mg/L

REV 4, 12 Jan 2011

STP Upgrading using DAF


System

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE
METRO LUCENA
MALL
Shopping Mall Lucena City

INDUSTRY:

Shopping / Leisure Mall

SYSTEM:

Sewage Treatment Plant using


BAUER Dynamic SBR System

CAPACITY:

235 cubic meters / day

INFLUENT:

BOD at 481 mg/L


COD at 807 mg/L

AFTER
TREATMENT

BOD at 6 mg/L
COD at 13 mg/L

DAVAO DOCTORS
HOSPITAL
Hospital
Davao
INDUSTRY:
Hospital
Services

City

SYSTEM:

Sewage Treatment Plant using


Extended Aeration System

CAPACITY:

250cubic meters / day

INFLUENT:

BOD at 372 mg/L


COD at 425 mg/L

AFTER
TREATMENT

BOD at 6 mg/L
COD at <50 mg/L

REV 4, 12 Jan 2011

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE
DELA SALLE HOSPITAL
Hospital Dasmarias Cavite

BROCHURE

INDUSTRY:

Hospital Services

SYSTEM:

Sewage Treatment Plant using


Extended Aeration System

CAPACITY:

180 cubic meters / day

INFLUENT:

BOD at 94.6 mg/L


COD at 227 mg/L

AFTER
TREATMENT

BOD at 9.8 mg/L


COD at 23.6 mg/L

BENGUET
GEN.HOSPITAL
INDUSTRY:

Hospital Services

SYSTEM:

Sewage Treatment Plant


using Extended Aeration
System

CAPACITY:

160 cubic meters / day

INFLUENT:

BOD at 300mg/L
COD at 600 mg/L

AFTER
TREATMEN
T

BOD at < 50mg/L


COD at <100 mg/L

REV 4, 12 Jan 2011

Hospital La Trinidad, Benguet

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE

KAWAYAN COVE

Resort Nasugbu, Batangas City


INDUSTRY:

Resort / Lifestyle Community

SYSTEM:

Sewage Treatment Plant using


BAUER Dynamic SBR System

CAPACITY:

100 cubic meters / day

INFLUENT:

BOD at 180 mg/L


COD at 360 mg/L

AFTER
TREATMENT

BOD at 2 mg/L
COD at 8 mg/L

MAGSAYSAY
TRAINING CENTER
Institute Cavite City
INDUSTRY:

Educational Institution

SYSTEM:

Sewage Treatment Plant


using Bauer Dynamic SBR
System

CAPACITY:

100 cubic meters / day

INFLUENT:

BOD at 250 mg/L


COD at 500 mg/L

AFTER
TREATMENT

BOD at 15 mg/L
COD at 28 mg/L

REV 4, 12 Jan 2011

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE

PACIFIC CENTER

STP Upgrading using DAF System


INDUSTRY:

OFFICE CONDOMINIUM

SYSTEM:

Chemical Treatment and


use of Dissolved Air
Flotation Equipment

CAPACITY:

100 cubic meters / day

INFLUENT:

BOD at 250 mg/L


COD at 500 mg/L

AFTER
TREATMENT

BOD at 18 mg/L
COD at 23 mg/L

ORTIGAS BUILDING
INDUSTRY:

Office and Commercial


Building

SYSTEM:

Sewage Treatment Plant


using BAUER Dynamic SBR
System

CAPACITY:

99 cubic meters / day

INFLUENT:

BOD at 300 mg/L


COD at 500 mg/L

AFTER
TREATMENT

BOD at 3 mg/L
COD at 71 mg/L

REV 4, 12 Jan 2011

Office Building Ortigas, Pasig


City

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE
DLSU E. YUCHENGCO
BLDG.
University Taft Avenue, Manila

INDUSTRY:

University

SYSTEM:

Sewage Treatment Plant


using BAUER Dynamic SBR
System

CAPACITY:

85 cubic meters / day

INFLUENT:

BOD at 250 mg/L


COD at 400 mg/L

AFTER
TREATMENT

BOD at 6 mg/L
COD at 19 mg/L

VIRRA MALL
Paranaque, Metro Manila
INDUSTRY:

Shopping Center

SYSTEM:

Sewage Treatment Plant using


BAUER Dynamic SBR System

CAPACITY:

60 cubic meters / day

INFLUENT:

BOD at 300 mg/L


COD at 500 mg/L

AFTER
TREATMENT

BOD at 17 mg/L
COD at 20 mg/L

REV 4, 01 Jan 2011

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE
ASEANA SHELL
Paranaque, Metro Manila
INDUSTRY:

Gas Station with Commercial


Area

SYSTEM:

Sewage Treatment Plant using


BAUER Dynamic SBR System

CAPACITY:

60 cubic meters / day

INFLUENT:

BOD at 300 mg/L


COD at 500 mg/L

AFTER
TREATMENT

BOD at 17 mg/L
COD at 22 mg/L

NEW ILOILO
AIRPORT
Cabatuan, Iloilo
INDUSTRY:

Air Port

SYSTEM:

Supply and Installation of


Mechanical Equipment

CAPACITY:

cubic meters / day

REV 4, 12 Jan 2011

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE

Waste
Water
Treatment
Plant
INSTALLATIONS

REV 4, 12 Jan 2011

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE
KIMBERLY CLARK
PHILIPPINES
Paper Industry San Pedro Laguna
INDUSTRY:

Paper Manufacturing

SYSTEM:

Wastewater Treatment Plant


using Extended Aeration
System

CAPACITY:

10,000 cubic meters / day

INFLUENT:

BOD at 61mg/L
COD at 60 mg/L

AFTER
TREATMENT

BOD at 1 mg/L
COD at 44 mg/L

RC COLA
Bo. Calulut, Mexico, Pampanga
INDUSTRY:

Beverage Plant

SYSTEM:

Wastewater Treatment Plant


using BAUER Dynamic SBR

CAPACITY:

940 cubic meters / day

INFLUENT:

BOD at 878 mg/L


COD at 1,568 mg/L

AFTER
TREATMENT

BOD at 14 mg/L
COD at 84 mg/L

REV 4, 12 Jan 2011

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE
MONTEREY MEAT
PLANT
Dasmarinas, Cavite

INDUSTRY:

Slaughter House & Meat


Processing

SYSTEM:

Wastewater Treatment Plant


using BAUER Dynamic SBR
in combination with DAF
System

CAPACITY:

720 cubic meters / day

INFLUENT:

BOD at 2,500 mg/L


COD at 3,900 mg/L

AFTER
TREATMENT

BOD at 3 mg/L
COD at 65 mg/L

COCO DAVAO
INC.
INDUSTRY:

Coconut Processing

SYSTEM:

Waste Water Treatment


Plant
Combination BAUER
Dynamic SBR & DAF
Systems

CAPACITY:

610 cubic meters / day

INFLUENT:

BOD at 4,500-5,000mg/L
COD at 9,000-10,000mg/L

AFTER
TREATMENT

BOD at <100 mg/L


COD at < 200 mg/L

REV 4, 01 Jan 2011

Desiccated Coconut Plant in


Sta. Cruz, Davao

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE
MONDE NISSIN
CORPORATION
Food Processing Sta. Rosa Laguna

INDUSTRY:

Food Processing

SYSTEM:

Wastewater Treatment Plant using


Extended Aeration System with
Centrifuge Decanter

CAPACITY:

500 cubic meters / day

INFLUENT:

BOD at 539 mg/L


COD at 955 mg/L

AFTER
TREATMENT

BOD at 20 mg/L
COD at 49 mg/L

FIRST FARMERS HOLDING


CORP.

Los Hermanas, Talisay, Negros Occidental


INDUSTRY:

Sugar Mill & Refinery

SYSTEM:

Wastewater Treatment Plant


Using Combination of
Chemical Treatment with
DAF & BAUER Dynamic SBR
System

CAPACITY:

333 cubic meters / day

INFLUENT:

BOD at mg/L
COD at mg/L

AFTER
TREATMENT

BOD at mg/L
COD at mg/L

REV 4, 12 Jan 2011

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE
MONDE NISSIN
CORPORATION
Casuntingan, Mandaue City, Cebu
INDUSTRY:

Food Processing

SYSTEM:

Wastewater Treatment Plant using


Extended Aeration System with
Centrifuge Decanter

CAPACITY:

300 cubic meters / day

SAN MIGUEL PET


RECYCLING PLANT
San Fernando, Pampanga Plant

INDUSTRY:

Pet Recycling Plant

SYSTEM:

Wastewater Treatment Plant using


BAUER Dynamic SBR in
combination with Plate Clarifier
System

CAPACITY:

200 cubic meters / day

INFLUENT:

BOD at 153 mg/L


COD at 946 mg/L

AFTER
TREATMENT

BOD at 4 mg/L
COD at 16 mg/L

REV 4, 12 Jan 2011

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE
UNIVERSAL ROBINA CORPORATION
Pampanga Plant
INDUSTRY:

Food Processing Plant

SYSTEM:

Wastewater Treatment Plant using


Extended Aeration System

CAPACITY:

200 cubic meters / day

INFLUENT:

BOD at 687 mg/L


COD at 1,237 mg/L

AFTER
TREATMENT

BOD at 13 mg/L
COD at 45 mg/L

AVON PRODUCTS MFG.,


INC.
INDUSTRY:

Cosmetics Manufacturing

SYSTEM:

Wastewater Treatment
Plant Using Combination
of Chemical Treatment with
DAF & BAUER Dynamic
SBR System

CAPACITY:

180 cubic meters / day

INFLUENT:

BOD at 4,245.17 mg/L


COD at 14,691.55 mg/L

AFTER
TREATMENT

BOD at <100 mg/L


COD at <50 mg/L

REV 4, 12 Jan 2011

Calamba Laguna

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE

WRIGLEY
PHILIPPINES INC.
Brgy. Inarawan, Antipolo City

INDUSTRY:

Candy Factory

SYSTEM:

Wastewater Treatment Plant using


BAUER Dynamic SBR

CAPACITY:

170 cubic meters / day

INFLUENT:

BOD at mg/L 13,100


COD at mg/L 30,000

AFTER
TREATMENT

BOD at mg/L <30


COD at mg/L <100

MONDE M. Y SAN CORP.


Cainta, Rizal
INDUSTRY:

Food Processing

SYSTEM:

Wastewater Treatment Plant using


Bauer Dynamic SBR System

CAPACITY:

150 cubic meters / day

INFLUENT:

BOD at 945 mg/L


COD at 1,166 mg/L

AFTER
TREATMENT

BOD at 20 mg/L
COD at 30 mg/L

REV 4, 01 Jan 2011

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE

RUBLOU
SLAUGHTERHOUSE

Slaughter House Installation in Cainta, Rizal


INDUSTRY:

Slaughterhouse / Abattoir

SYSTEM:

Waste Water Treatment Plant


Combination BAUER Dynamic SBR
& DAF Systems

CAPACITY:

100 cubic meters / day

INFLUENT:

BOD at 2,000 mg/L


COD at 4,500 mg/L

AFTER
TREATMENT

BOD at <6 mg/L


COD at <38 mg/L

SPLASH MANUFACTURING
CORP.
INDUSTRY:

Cosmetics Manufacturing

SYSTEM:

Wastewater Treatment Plant using


BAUER Dynamic SBR System with
Dissolved Air Floatation and
Chemical Treatment

CAPACITY:

80 cubic meters / day

INFLUENT:

BOD at 3,910 mg/L


COD at 11,110 mg/L

AFTER
TREATMENT

BOD at 50 mg/L
COD at 100 mg/L

REV 4, 12 Jan 2011

Cosmetics Manufacturing
Valenzuela City

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE
METROLAB INDUSTRIES
SARA LEE
Cosmetics Manufacturing
Gen. Trias Cavite

INDUSTRY:

Cosmetics Manufacturing

SYSTEM:

Wastewater Treatment Plant


using Extended Aeration System
with Dissolved Air Floatation and
Chemical Treatment

CAPACITY:

60 cubic meters / day

INFLUENT:

BOD at 1,250-3,500 mg/L


COD at 40,000- 60,000 mg/L

AFTER
TREATMENT

BOD at <500 mg/L


COD at <200 mg/L

MIASCOR
CATERING
INDUSTRY:

Catering Service

SYSTEM:

Wastewater Treatment Plant


using BAUER Dynamic SBR
System

CAPACITY:

60 cubic meters / day

INFLUENT:

BOD at 870 mg/L


COD at 1,387 mg/L

AFTER
TREATMENT

BOD at 22 mg/L
COD at 41mg/L

REV 4, 12 Jan 2011

Catering Service Paraaque


City

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE
RDL PHARMACEUTICAL
LAB.
Davao City

INDUSTRY:

Cosmetics Manufacturing

SYSTEM:

Wastewater Treatment Plant using


BAUER Dynamic SBR System
with Dissolved Air Floatation and
Chemical Treatment

CAPACITY:

48 cubic meters / day

INFLUENT:

BOD at 1,532 mg/L


COD at 4,780 mg/L

AFTER
TREATMENT

BOD at <50 mg/L


COD at 100 mg/L

LAGUNA LAKE
DEVELOPMENT
AUTHORITY
INDUSTRY:

Government Regulatory Agency

SYSTEM:

Wastewater Treatment Plant using


combination of Chemical Pretreatment and BAUER Dynamic
SBR System

CAPACITY:

7.5 cubic meters / day

INFLUENT:

BOD at 1,700 mg/L


COD at mg/L

AFTER
TREATMENT

BOD at <50 mg/L


COD at 100 mg/L

REV 4, 12 Jan 2011

Government Institution Shaw Blvd.,


Pasig City

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE
MULTI MIX
INTERNATIONAL MFG.
Canlubang, Laguna
INDUSTRY:

Chemical Processing Plant

SYSTEM:

Wastewater Treatment Plant using


BAUER Dynamic SBR System
with Dissolved Air Floatation and
Chemical Treatment

CAPACITY:

5 cubic meters / day

INFLUENT:

BOD at 4,204 mg/L


COD at 64,540.42 mg/L

AFTER
TREATMENT

BOD at 26mg/L
COD at 36mg/L

LAPANDAY BOX
PLANT
INDUSTRY:

Corrugated Box &


Lithography Plant

SYSTEM:

Wastewater Treatment Plant


using a Combination of
Chemical Treatment & BAUER
Dynamic SBR System

CAPACITY:

5 cubic meters / day

REV 4, 12 Jan 2011

Mandug, Davao City

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE
CHARTER CHEMICALS AND
COATING CORP.
Mercedes Ave., Pasig City

INDUSTRY:

Coating Industry

SYSTEM:

Design, Supply and Installation of


Wastewater Treatment Plant

CAPACITY:

4 cubic meters / day

REV 4, 12 Jan 2011

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE

REVERSE
OSMOSIS
(MEMBRANE)

INSTALLATIONS

REV 4, 12 Jan 2011

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE
TWO SEASONS RESORT
Coron, Palawan

INDUSTRY:

Hotel & Resort

SYSTEM:

Desalination Plant

CAPACITY:

80 m3/day

INFLUENT:

TDS = 35173 mg/L


TSS = <0.5 mg/L

AFTER
TREATMENT

TDS = 274
TSS = ND

BAUER International Philippines


Incorporated Regalia Park Tower
Cubao, Q.C. Philippines,1109 P.O
Box 10154 Q.C

10/11/15

SELECTED PROJECT
EXPERIENCE
BIG FISH FOODS CORPORATION
Brgy. Recodo, Zamboanga City, Philippines

INDUSTRY:

Canning Manufacturing
Plant

SYSTEM:

Design, Engineering,
Electromechanical Supply,
Installation &
Commissioning of R.O
Water Treatment Facility

CAPACITY:

500 m3/day

BAUER International Philippines


Incorporated Regalia Park Tower
Cubao, Q.C. Philippines,1109 P.O
Box 10154 Q.C

10/11/15

SELECTED PROJECT
EXPERIENCE
LAGUNA WATER TREATMENT
ALUNSOD
Brgy. Balibago, Sta. Rosa Laguna
INDUSTRY:

Water Service Provider

SYSTEM:

Supply & Installation of


Iron & Manganese Filter
using DMI-65 Media

CAPACITY:

4MLD

INFLUENT:

Iron = 0.31 ppm


Manganese = 0.35ppm

AFTER
TREATMENT

Iron = 0.04
Manganese = 0.06

MARRECO
Cebu City

SYSTEM:

Brackish Water Reverse


Osmosis Unit

CAPACITY:

1300 m3/day

BAUER International Philippines


Incorporated Regalia Park Tower
Cubao, Q.C. Philippines,1109 P.O
Box 10154 Q.C

10/11/15

SELECTED PROJECT
EXPERIENCE

MANILA WATER COMPANY


Jala Jala, Rizal Installation

INDUSTRY:

Potable Water Utilities

SYSTEM:

Design & Construction Water


Treatment Plant using Deepwell
Water. Brackish Water Reverse
Osmosis System

CAPACITY:

1,000 cubic meters / day

INFLUENT:

Deepwell Water

AFTER
TREATMENT

Drinking Water in compliance with


Philippine Standards for Drinking
Water
Influent

TDS

INDUSTRY:

Potable Water Utilities

SYSTEM:

Design & Construction of Water


Treatment Plant using Deepwell
Water using Brackish Water
Reverse Osmosis System

CAPACITY:

5,704 cubic meters / day

INFLUENT:

Deepwell Water

AFTER
TREATMENT

Drinking Water in compliance


with Philippine Standards for
Drinking Water

TDS

Influent

Effluent

1191

487

Chloride

359

145

ph

6.75

REV 4, 12 Jan 2011

Effluent

1,000

50

Color

32

ph

7.1

7.3

MANILA WATER
COMPANY
Taguig, Metro Manila Installation

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE

AMANPULO
RESORT

Design & Construction of SEAWATER


Desalination Plant

INDUSTRY:

Resort and Leisures

SYSTEM:

Desalination Plant (Seawater


Reverse Osmosis System) with
Seawater Intake System

CAPACITY:

200 cubic meters / day


Influent

Effluent

TDS

35106

279

Chloride

19380

160

7.8

6.08

pH

UNIVERSAL ROBINA
CORPORATION
Batangas and Laguna Plants
INDUSTRY:

Beverage

SYSTEM:

Brackish Water Reverse


Osmosis System

CAPACITY:

720 cubic meters / day

REV 4, 12 Jan 2011

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C. P
hilippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE

UNIVERSAL ROBINA
CORP.
CAGAYAN DE ORO

INDUSTRY:

Food and Beverage Factory

SYSTEM:

Reverse Osmosis System


Complete With Water
Filtration, Softening and
Chlorination System

CAPACITY:

2 X 1, 200 m3/day

EDSA
SHANGRI-LA

Ortigas Center, Pasig City


INDUSTRY:

HOTEL

SYSTEM:

Cooling Tower Make-up,


Flushing of Comfort Rooms
and Plant Irrigation
Commercial and Domestic
Waste

CAPACITY:

700 m3/day

TOLMAN MFG INC.


Carmelray Canlubang, Calamba
Laguna
INDUSTRY:

FOOD PROCESSING
INDUSTRY

SYSTEM:

ACTIVATED CARBON
FILTER AND REVERSE
OSMOSIS SYSTEM

CAPACITY:

32 m3/hr Soft water and 2.3


m3/hr RO Water

REV 4, 12 Jan 2011

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE

CONVENTIONAL
WATER
TREATMENT
INSTALLATIONS

REV 4, 01 Jan
2011

BAUER International Philippines


Incorporated Regalia Park Tower
Cubao, Q.C. Philippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE
MANILA WATER
COMPANY
INDUSTRY:
Design
& Construction
Water Treatment
San Rafael
and SanofIsidro
Plant using
River Water
Installation
SYSTEM:

Water Concessionaire
Compact Water Treatment System
using Laminar Principle with
combination of Chemical Treatment

CAPACITY:

10,000 cubic meters / day

INFLUENT:

River Water

AFTER
TREATMENT

Drinking Water in compliance with


Philippine Standards for Drinking
Water
Influent

Effluent

Color

150

<5

Turbidity

143

<5

ASAHI GLASS
PHILIPPINES

Glass Plant Mfg. Pasig City


INDUSTRY:

Glass Plant Manufacturing

SYSTEM:

Water Recycling System

CAPACITY:

640 cubic meters / day

INFLUENT:

BOD at mg/L
COD at mg/L

AFTER
TREATMENT

BOD at 8mg/L
COD at mg/L

REV 4, 12 Jan 2011

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C. P
hilippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE
SUBIC WATER
MABAYUAN
INDUSTRY:
Design & Construction of Water Treatment
Plant
SYSTEM:

CAPACITY:

Water Concessionaire
Design, Construction, Supply and
Installation of Mabayuan New
Filtration and Dewatering Plant
19,000 cubic meters / day

SAN MIGUEL PET


RECYCLING PLANT
San Fernando, Pampanga Plant

INDUSTRY:

Pet Recycling Plant

SYSTEM:

Wastewater Treatment Plant using


BAUER Dynamic SBR in
combination with Plate Clarifier
System

CAPACITY:

200 cubic meters / day

INFLUENT:

BOD at 153 mg/L


COD at 946 mg/L

AFTER
TREATMENT

BOD at 4 mg/L
COD at 16 mg/L

REV 4, 12 Jan 2011

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C. P
hilippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE
DOLE
PHILIPPINES INC.
Polomolok, South Cotobato

INDUSTRY:

Cigarette Manufacturing

INDUSTRY:

Fruit Processing Plant

SYSTEM:

Water Treatment of Surface Water


using Automated Chemical
Treatment and Multimedia
Filtration System

CAPACITY:

1,200 gpm Water Treatment


System to Produce Potable Water
with 1 NTU Quality

PHILIP MORRIS
PHIL., INC.
STO. TOMAS, BATANGAS

SYSTEM:

Maintenance, Treatment, Testing,


Chemical and Waste
Management of Water Treatment
System

CAPACITY:

106,000 Gallons per day

REV 4, 01 Jan 2011

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C. P
hilippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE

IRON & MANGANESE


REMOVAL
INSTALLATIONS

REV 4, 01 Jan
2011

BAUER International Philippines


Incorporated Regalia Park Tower
Cubao, Q.C. Philippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE
CLARKWATER DEEPWELL
39
Clark Freeport Zone, Pampanga

REV 4, 01 Jan 2011

INDUSTRY:

Water Service Provider

SYSTEM:

Iron & Manganese Removal on


Deepwell Water using DMI-65
Filtration System

CAPACITY:

2,160 m3/day

INFLUENT:

Iron (0.58-1.52) mg/L


Manganese (0.8-1.3) mg/L

EFFLUENT:

Iron (0.05-0.30) mg/L


Manganese (0.05-0.10) mg/L

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C. P
hilippines,1109
P.O Box 10154 Q.C

SELECTED PROJECT
EXPERIENCE
LAGUNA WATER
GOLDEN CITY
Sta. Rosa, Laguna

REV 4, 01 Jan 2011

INDUSTRY:

Water Service Provider

SYSTEM:

Iron & Manganese Removal on


Water using DMI-65 Filtration
System

CAPACITY:

720 m3/day

INFLUENT:

Iron (0.53-0.70) mg/L


Manganese (0.30-1.72) mg/L

EFFLUENT:

Iron (0) mg/L


Manganese (0.07) mg/L

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C. P
hilippines,1109
P.O Box 10154 Q.C

CORPORATE
DOCUMENTS

PERMITS, LICENSES
&

CERTIFICATES

REV 4, 12 Jan 2011

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

CERTIFICATE &
MEMBERSHIP
SEC
CERTIFICATE
OF
INCORPORATI
ON

REV 4, 12 Jan 2011

BIR
CERTIFICATE
OF
REGISTRATIO
N

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

PERMITS &
LICENSES

PCAB LICENSE

REV 4, 12 Jan 2011

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

PERMITS &
LICENSES
MAYORS
PERMIT

BAUER International
BAUERPhilippines
International Philippines Incorporated
Regalia Park
Park Tower
Cubao, Q.C.
Incorporated Regalia
Tower
Philippines,1109
Cubao, Q.C. Philippines,1109
P.O Box 10154 Q.CP.O
REV 4, 12 Jan 2011
Box 10154 Q.C

10/11/15

PERMITS &
LICENSES
PhilGEPS
REGISTRATIO
N

REV 4, 12 Jan 2011

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

PERMITS &
LICENSES

PDEA
LICENSE

BAUER International Philippines


Incorporated Regalia Park Tower
Cubao, Q.C. Philippines,1109 P.O
Box 10154 Q.C

10/11/15

CERTIFICATE &
MEMBERSHIP
SSS
CERTIFICATE
OF
MEMBERSHIP

PHIL HEALTH
REGISTRATION

REV 4, 12 Jan 2011

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

CERTIFICATE OF
ACCREDITATION
MAYNILAD WATER
(Certificate of Accreditation
as SUPPLIER)

MAYNILAD WATER
(Certificate of Accreditation
as CONTRACTOR)

REV 4, 12 Jan 2011

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

CERTIFICATE OF
ACCREDITATION
SUBIC WATER &
SEWERAGE CO. INC.
(Certificate of
Accreditation)

BUREAU OF
CUSTOMS
(Certificate of
Accreditation)

REV 4, 12 Jan 2011

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

CERTIFICATE OF
ACCREDITATION
DUN & BRADSTREET
PHILS.INC.

MANILA WATER 2013

BAUER International Philippines


Incorporated Regalia Park Tower
Cubao, Q.C. Philippines,1109 P.O
Box 10154 Q.C

10/11/15

CERTIFICATE OF
ACCREDITATION
DUN & BRADSTREET
PHILS.INC.

AYALA LAND

REV 4, 12 Jan 2011

MANILA
WATER

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

CERTIFICATE OF
ACCREDITATION
DUN & BRADSTREET
PHILS.INC.

PMFTC

REV 4, 12 Jan 2011

SAN MIGUEL

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

CERTIFICATES
MAYNILAD
LINC

(Certificate of
Completion)

DOLE
(Certificate of
Attendance)

REV 4, 12 Jan 2011

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

CERTIFICATES
PHILIPPINE NATIONAL RED CROSS
CERTIFICATE
CERTIFICATE OF
ATTENDANCE

FIRST AID
TRAINING
STANDARD

REV 4, 12 Jan 2011

BASIC LIFE
SUPPORT

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C

CERTIFICATES

MONDE NISSIN
(Certificate of Recognition)

LEIGHTON
(Certificate of Recognition)

REV 4, 01 Jan
2011

BAUER International Philippines


Incorporated Regalia Park Tower
Cubao, Q.C. Philippines,1109
P.O Box 10154 Q.C

CERTIFICATES
CERTIFICATES OF SAFETY
OFFICER:

REV 4, 12 Jan 2011

BAUER International Philippines Incorporated


Regalia Park Tower Cubao, Q.C.
Philippines,1109
P.O Box 10154 Q.C