Professional Documents
Culture Documents
Proyecto:
L (m)= 1.00
B (m)= 1.00
q adm.(t/m2)= 10.00
H (m)= 0.60
D (m)= 0.13
h (m)= 0.20
hcadena(m)= 0.00
Rec (m)= 0.05
Cimentacion
Fecha: 16/10/2015
fc (kg/cm2)= 200
fy (kg/cm2)= 4200
f*c (kg/cm2)= 160
fc (kg/cm2)= 136
con (t/m3)= 2.40
FR= 0.90
= 0.85
= 0.27
Friccin suelo
WR (t)= 0.56
W (t)= 11.16
MA (t-m)= 0.50
e (m)=MA/W= 0.04
B=B-2e= 0.91
AT (m2)= 0.91
Excede al permisible en un 23 %
2
= 0.00176
mn= 0.00236
mx= 0.01619
V CR (t)= 7.59
Peralte aceptable.
Diseo
En direccin B:
diseo= 0.00236
Varilla #= 3
a0 (cm2)= 0.71
As (cm2)= 4.71
S (cm)= 15.0
En direccin longitudinal:
diseo= 0.00236
Varilla #= 3
a0 (cm2)= 0.71
As (cm2)= 4.71
S (cm)= 15.0