You are on page 1of 248

PETROBEL

EGYPT

SETH OFFSHORE DEVELOPMENT


MONTHLY PROGRESS REPORT
CONTENTS

1.0 EXECUTIVE SUMMARY


1.1
1.2
1.3
1.4
1.5

PROJECT DESCRIPTION.
REPORT PERIOD.
OVERALL PROJECT PROGRESS SUMMARY.
QHSE SUMMARY
AREA OF CONCERN

2.0 ATTACHMENTS

PJC 01-B3274-0908

ATTACHMENT (01)

Planning portion of monthly external progress report

3467-200
Rev.0
06/07/2011

PETROBEL

EGYPT

SETH OFFSHORE DEVELOPMENT


MONTHLY PROGRESS REPORT

PJC 01-B3274-0908

1.0 EXECUTIVE SUMMARY

3467-200
Rev.0
06/07/2011

PETROBEL

EGYPT

SETH OFFSHORE DEVELOPMENT


MONTHLY PROGRESS REPORT

3467-200
Rev.0
06/07/2011

1.1 Project Description


PETROBEL is considering the development of new gas field in the RAS EL BARR concession, in the
west Nile Delta area (Mediterranean Sea).
The gas field SETH is located in water depth 83.3 m in the Mediterranean Sea, 11km west of Denise
A, at about 60km off the Egyptian costs, North East of Damietta and North West of Port Said. The
production shall be delivered to EL-GAMIL plant.
SETH development plan includes D&C of two wells (i.e. SETH West Shallow & SETH West Deep)
plus two future wells (SETH East Shallow & SETH East Deep), with total production flow rate of 4.5
MMSCFD.

Project comprises of the following facilities:


1)

4-legged unmanned platform (namely SETH, in approx. 83 m of water).

2)

Topside facilities (minimum production facilities).

3)

Construction of new dedicated sea line 16x11 km length.

4)

Installation of SSIV close to platform.

The battery limit of this project Subsea Tie-in at Tuna PLEM by installation of new Seth PLEM

Major Scope Contents

Project Management & Control.


Design for Piles, Jacket, Risers, J-tube & Pre drilling template.
Design for Deck and TSF.
Construction of Piles, Jacket, Risers, J-tube & Pre drilling template.
Construction of Deck and TSF.
Construction of Pipeline rigid and Spools.
Procurement Service for Subsea Equipment (PLEM & SSIV).
Load-out & Sea-fastening.
Offshore Hook-up & Commissioning.

PJC 01-B3274-0908

1.2 Report Period:


This progress report covers the Work Performed during June 2011 Till the Cut-Off Date
25, June2011.

PETROBEL

SETH OFFSHORE DEVELOPMENT


MONTHLY PROGRESS REPORT

EGYPT

3467-200
Rev.0
06/07/2011

1.3 Overall Project Progress Summary

Item Description

RW

Planned

Actual

ENPPI

44.83%

5.8%

6.5%

PETROJET

41.56%

18.0%

22.2%

TECNOMARE

13.61%

37.7%

39.5%

Total

100.00%

15.2%

17.5%

1.4 QHSE SUMMARY


Project Quality Plan is issued and in place
Project Scope and Procedures is issued and in place
HSE PLAN for engineering is in place
Project audit schedule is in place (periodical audit)
Review of Quality, HSE management system in suppliers offers is under implementation
1.5 AREA OF CONCERN
A) Engineering Activities
Electrical load trend is showing increase in demand. A technical meeting will be arranged
upon issuing the Electrical Load Analysis Report in order to discuss the possible
solutions.
B) Procurement Activities
Due to some delays of bidders response, and in order to avoid impact of August holidays
with suppliers, it is important to maintain target to place FOCs for critical items before the
end of July.

PJC 01-B3274-0908

C) Construction Activities
None.

PETROBEL

EGYPT

SETH OFFSHORE DEVELOPMENT


MONTHLY PROGRESS REPORT

PJC 01-B3274-0908

2.0 ATTACHEMENTS

3467-200
Rev.0
06/07/2011

PAGE 17 OF 33

PTB

SETH OFFSHORE DEVELOPMENT EPC PROJECT


PLANNING PORTION IN THE MONTHLY PROGRESS REPORT

Egypt

Rev. (0)
Jun 2011

4. Attachments

GFL 003-0405

3467-200

PAGE 18 OF 33

PTB

SETH OFFSHORE DEVELOPMENT EPC PROJECT


PLANNING PORTION IN THE MONTHLY PROGRESS REPORT

Egypt

Rev. (0)
Jun 2011

4.1. PROGRESS SUMMARY TABLES WITH RELEVANT S-CURVES

GFL 003-0405

3467-200

PAGE 19 OF 33

PTB

SETH OFFSHORE DEVELOPMENT EPC PROJECT


PLANNING PORTION IN THE MONTHLY PROGRESS REPORT

Egypt

Rev. (0)
Jun 2011

4.1.1 Overall

GFL 003-0405

3467-200

3467-200, PTB, SETH DEVELOPMENT EPC PROJECT


OVERALL PROGRESS AS OF 25-JUNE-11
ITEM DESCRIPTION

Relative Weight (%)

PLANNED %

ACTUAL %

ENPPI

44.83%

5.8%

6.5%

PETROJET

41.56%

18.0%

22.2%

TECNOMARE

13.61%

37.7%

39.5%

TOTAL

100.00%

15.2%

17.5%

ProjectNo:3467200
PTB,SethDevelopmentEPCProject

ProgressCurve

Overall

Asof: 25Jun11

100

90

Planned%=15.2
Actual%=17.5

80

70

Progress%
ess%

60

50

40

30

20

10

0
Mar/11

Apr/11

May/11

Jun/11

Jul/11

Aug/11

Sep/11

Oct/11

Nov/11

Dec/11

Jan/12

Feb/12

Mar/12

Apr/12

May/12

Jun/12

Jul/12

Time /Date
Planned

Actual

LayoutNo.1
Data'NesSystemRelease2.21

PAGE 20 OF 33

PTB

SETH OFFSHORE DEVELOPMENT EPC PROJECT


PLANNING PORTION IN THE MONTHLY PROGRESS REPORT

Egypt

Rev. (0)
Jun 2011

4.1.2 ENPPI

GFL 003-0405

3467-200

3467-200 PTB, SETH OFFSHORE DEVELOPMENT EPC PROJECT


DELAY ANALYSIS
AS OF 25-JUN-11
Discipline

Process

Pipipng

weighted delay
% from Overall
Project

Delay %

7.9

0.17

4.8

0.17

DELAYED ACTIVITIES
FlamearrestorTER
SafetyequipmentandlifesavingTER
FireFightingpackageTER
InjectionfittingTER
InsulationjointInjectionfittingTER

PLANNED DATE EXPECTED DATE

SuppliersrepliesdelaysonENPPIclarifications
23Jun11

15Jun11

21Jul11

24Jul11

ServicewaterpumpTER

Mechanical

Electrical

Instrumentation

7.2

0.08

5.9

0.11

8.4

0.20

7Jun11

Powersystemstudy
Singlelinediagram
Electricalcablelist
ChokevalveTER
ElectricalhookupDrawing
Hydraulicinstrumentslayouts
H d li i t
t l
t

10Jul11

Purchasing

OverallProject

4.0

0.07

15Jun11

20Jun11

8.4

0.11

0.9

Nouvaoma(oneofthebidder)requesttosubmitISO5199pump
instead of ASME B73.1 as originally request in MR.
insteadofASMEB73.1asoriginallyrequestinMR.
ReceivedfromNouvaOmacompletereplyon1stclarification,
hisreplybasedonISO5199.
Ruhrpumpen(oneofthebidder)submithisreplyon1st
clarification,hisofferbasedonpumpASMEB73.1.
ReceiveacceptancefromPTBonevaluatingbothpumptypes
ISO5199andASMEB73.1

17Jul11

1Aug11

DelayisduetorevisedH&Mbalanceissuedduringthedetailed
engineeringphase
Theofferedvalveshavenoiselevelsexceedingtheenviromental
Th ff d l
h
i l l
di th
i
t l
low
Inprogress
SuppliersrepliesdelaysonENPPIclarifications

13Jun11

Delayinreceivingthecommercialoffersforthefolloowing
commodities:Safetyequipmentandlifesaving;Flame
arrestor;FireFightingpackage;Injectionfitting;Chokevalves
;Electrohydraulicwellheadcontrolpanel;Wingvalves&
Service water pump
Servicewaterpump

Delayinreceivingthetechnicaloffersduetosuppliersresponse
delay

Inprogress

SurvivalModuleTER
Offshore

CAUSE OF DELAY

12Jul11

DelayofissuanceofTERs

23Jun11

26Jul11

Overallprojectprogressisahead(6.52%vs.5.75%)becausethematerialsupplyprogressisahead(1.99%vs.00%)

Project No.:

3467-200

Progress Curve

SETH Offshore EPC Project


Overall

As Of :

25-Jun-11

100
90

Planned % =

5.75

Actual

%=

6.52

1-May11

1-Jun11

80

Progress %

70
60

50
40
30
20
10
0
1-Mar11

1-Apr11

1-Jul-11 1-Aug11

1-Sep- 1-Oct-11 1-Nov11


11

1-Dec- 1-Jan-12 1-Feb11


12

1-Mar12

1-Apr12

1-May12

1-Jun12

1-Jul-12

Time / Date
Actual

Planned

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Summary Report

SETH Offshore EPC Project

As Of :

25-Jun-11

ENPPI
Item Description

Relative
Weight

Planned
%

Actual
%

During
%

W.P.2 DETAILED ENGINEERING

13.05%

38.38

32.60

7.78

W.P.3 PROCUREMENT SERVICES

3.33%

22.29

19.00

7.01

W.P.5 DECK AND TSF SUPPLY &


FABRICATION

81.45%

0.00

1.99

1.99

W.P.9 OFFSHORE HOOK-UP &


COMMISSIONING

2.16%

0.00

0.00

0.00

100.00%

5.75

6.51

2.87

Total

Thursday, June 30, 2011

Layout No. 1
Page 1 of 1

Data'Nes Systems, Release 2.21

Project No.:

3467-200

Progress Curve

SETH Offshore EPC Project


As Of

Work Package

25-Jun-11

W.P.2 DETAILED ENGINEERING


100
90

Planned % =
Actual

38.38

%=

32.60

May-11

Jun-11

80

70

Progress %

60
50
40
30

20
10
0
Mar-11

Apr-11

Jul-11

Aug-11

Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

Apr-12

May-12

Jun-12

Jul-12

Tim e / Date
Actual

Planned

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.:

3467-200

Progress Curve

SETH Offshore EPC Project


As Of

Work Package

25-Jun-11

W.P.3 PROCUREMENT SERVICES


100
90

Planned % =
Actual

22.29

%=

19.27

May-11

Jun-11

80

70

Progress %

60
50
40
30

20
10
0
Mar-11

Apr-11

Jul-11

Aug-11

Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

Apr-12

May-12

Jun-12

Jul-12

Tim e / Date
Actual

Planned

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.:

3467-200

Progress Curve

SETH Offshore EPC Project


As Of

Work Package

25-Jun-11

W.P.5 DECK AND TSF SUPPLY & FABRICATION


100
90

Planned % =
Actual

%=

0.00
1.99

80

70

Progress %

60
50
40
30

20
10
0
Mar-11

Apr-11

May-11

Jun-11

Jul-11

Aug-11

Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

Apr-12

May-12

Jun-12

Jul-12

Tim e / Date
Actual

Planned

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.:

3467-200

Progress Curve

SETH Offshore EPC Project


As Of

Work Package

25-Jun-11

W.P.9 OFFSHORE HOOK-UP & COMMISSIONING


100
90

Planned % =
Actual

%=

0.00
0.00

80

70

Progress %

60
50
40
30

20
10
0
Mar-11

Apr-11

May-11

Jun-11

Jul-11

Aug-11

Sep-11

Oct-11

Nov-11

Dec-11

Jan-12

Feb-12

Mar-12

Apr-12

May-12

Jun-12

Jul-12

Tim e / Date
Actual

Planned

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Summary Report

SETH Offshore EPC Project

As Of :

25-Jun-11

ENPPI
W.P.2 DETAILED ENGINEERING
Item Description

Relative
Weight

Planned
%

Actual
%

During
%

PROCESS TECHNOLOGY DIVISION

16.98%

55.58

47.67

8.06

INSTRUMENTATION & CONTROLS


ENGINEERING DEPARTMENT

17.92%

47.16

38.74

17.79

PIPING ENGINEERING DIVISION

25.94%

28.58

23.76

3.69

ELECTRICAL ENGINEERING DIVISION

14.15%

43.90

38.00

7.97

OFFSHORE ENGINEERING DIVISION

12.74%

17.00

13.00

0.00

MECHANICAL ENGINEERING
DEPARTMENT

8.49%

46.42

39.20

10.11

PRESSURE VESSELS ENGINEERING


DEPARTMENT

3.77%

20.00

20.00

0.00

100.00%

38.38

32.32

7.50

Total

Wednesday, July 06, 2011

Layout No. 1
Page 1 of 4

Data'Nes Systems, Release 2.21

Project No.: 3467-200

Summary Report

SETH Offshore EPC Project

As Of :

25-Jun-11

ENPPI
W.P.3 PROCUREMENT SERVICES
Item Description

Relative
Weight

Planned
%

Actual
%

During
%

FOREIGN PURCHASING DEPARTMENT

39.66%

53.17

44.73

16.83

EXPEDITING DEPART.

39.64%

3.03

3.17

0.84

SUPPLIER QUALITY SRVEILLANCE


DEPART.

10.07%

0.00

0.00

0.00

TRAFFIC & LOGISTICS DEPARTMENT

10.63%

0.00

0.00

0.00

100.00%

22.29

19.00

Total

Wednesday, July 06, 2011

7.01

Layout No. 1
Page 2 of 4

Data'Nes Systems, Release 2.21

Project No.: 3467-200

Summary Report

SETH Offshore EPC Project

As Of :

25-Jun-11

ENPPI
W.P.5 DECK AND TSF SUPPLY & FABRICATION
Item Description

METERIAL SUPPLY

Total

Relative
Weight

Planned
%

Actual
%

During
%

100.00%

0.00

1.99

1.99

100.00%

0.00

1.99

1.99

Wednesday, July 06, 2011

Layout No. 1
Page 3 of 4

Data'Nes Systems, Release 2.21

Project No.: 3467-200

Summary Report

SETH Offshore EPC Project

As Of :

25-Jun-11

ENPPI
W.P.9 OFFSHORE HOOK-UP & COMMISSIONING
Item Description

COMMISSIONING

Total

Relative
Weight

Planned
%

Actual
%

During
%

100.00%

0.00

0.00

0.00

100.00%

0.00

0.00

0.00

Wednesday, July 06, 2011

Layout No. 1
Page 4 of 4

Data'Nes Systems, Release 2.21

PAGE 21 OF 33

PTB

SETH OFFSHORE DEVELOPMENT EPC PROJECT


PLANNING PORTION IN THE MONTHLY PROGRESS REPORT

Egypt

Rev. (0)
Jun 2011

4.1.3 TECNOMARE

GFL 003-0405

3467-200

OVERALL PROGRESS
100,00
80,00
90,00
70,00
80,00

60,00

70,00

% Progress Cumulative

60,00

50,00

40,00
40,00
30,00
30,00
20,00
20,00

10,00

10,00

0,00

0,00

May Jun-11
11

Jul11

Aug
-11

Sep Oct- Nov


-11
11
-11

Dec Jan- Feb Mar- Apr- May Jun-11


12
-12
12
12
-12
12

Jul12

Aug
-12

Sep Oct- Nov


-12
12
-12

% Monthly Planned

33,89 3,83 1,66 1,70 7,75 5,14 22,10 1,13 7,71 0,45 0,50 1,54 0,25 11,37 0,00 0,00 0,99

% Monthly Actual

33,89 5,57

% Forecast Monthly
% Cumulative Planned 33,89 37,72 39,38 41,07 48,82 53,96 76,07 77,20 84,91 85,36 85,86 87,40 87,64 99,01 99,01 99,01 100,0
% Cumulative Actual
% Forecast Cumulative

33,89 39,46

Dec
-12

% Progress M
Monthly

50,00

1.1.1 - PROJECT SERVICES


100,00
80,00
90,00
70,00
80,00

60,00

70,00

% Progress Cumulative

60,00

50,00

40,00
40,00
30,00
30,00
20,00
20,00

10,00

10,00

0,00

0,00

May Jun-11
11

Jul11

Aug
-11

Sep Oct- Nov


-11
11
-11

Dec Jan- Feb Mar- Apr- May Jun-11


12
-12
12
12
-12
12

Jul12

Aug
-12

Sep Oct- Nov


-12
12
-12

% Monthly Planned

33,89 3,83 1,66 1,70 7,75 5,14 22,10 1,13 7,71 0,45 0,50 1,54 0,25 11,37 0,00 0,00 0,99

% Monthly Actual

33,89 5,57

% Forecast Monthly
% Cumulative Planned 33,89 37,72 39,38 41,07 48,82 53,96 76,07 77,20 84,91 85,36 85,86 87,40 87,64 99,01 99,01 99,01 100,0
% Cumulative Actual
% Forecast Cumulative

33,89 39,46

Dec
-12

% Progress M
Monthly

50,00

1.2 - DETAILED ENGINEERING


100,00
80,00
90,00
70,00
80,00

60,00

70,00

% Progress Cumulative

60,00

50,00

40,00
40,00
30,00
30,00
20,00
20,00

10,00

10,00

0,00

0,00

May Jun-11
11

Jul11

Aug
-11

Sep Oct- Nov


-11
11
-11

Dec Jan- Feb Mar- Apr- May Jun-11


12
-12
12
12
-12
12

Jul12

Aug
-12

Sep Oct- Nov


-12
12
-12

% Monthly Planned

40,05 9,34 3,64 1,42 10,80 11,69 3,48 2,27 0,79 0,29 1,16 0,00 0,58 12,18 0,00 0,00 2,31

% Monthly Actual

40,05 11,60

% Forecast Monthly
% Cumulative Planned 40,05 49,39 53,03 54,45 65,25 76,94 80,42 82,69 83,48 83,77 84,93 84,93 85,51 97,69 97,69 97,69 100,0
% Cumulative Actual
% Forecast Cumulative

40,05 51,65

Dec
-12

% Progress M
Monthly

50,00

1.2.1.Deck
100,00
80,00
90,00
70,00
80,00

60,00

70,00

% Progress Cumulative

60,00

50,00

40,00
40,00
30,00
30,00
20,00
20,00

10,00

10,00

0,00

0,00

May Jun-11
11

Jul11

Aug
-11

Sep Oct- Nov


-11
11
-11

Dec Jan- Feb Mar- Apr- May Jun-11


12
-12
12
12
-12
12

% Monthly Planned

49,82 13,11 5,10 2,00 2,35 16,40 4,88 3,19 1,11 0,41 1,63

% Monthly Actual

49,82 16,28

% Forecast Monthly
% Cumulative Planned 49,82 62,93 68,03 70,03 72,38 88,78 93,66 96,85 97,96 98,37 100,0
% Cumulative Actual
% Forecast Cumulative

49,82 66,10

Jul12

Aug
-12

Sep Oct- Nov


-12
12
-12

Dec
-12

% Progress M
Monthly

50,00

1.2.2 - SSIV/PLEM (TECHNICAL FOLLOW-UP)


100,00
80,00
90,00
70,00
80,00

60,00

70,00

% Progress Cumulative

60,00

50,00

40,00
40,00
30,00
30,00
20,00
20,00

10,00

10,00

0,00

0,00

May Jun-11
11

Jul11

Aug
-11

Sep Oct- Nov


-11
11
-11

% Monthly Planned

20,00 0,00 0,00 0,00 80,00

% Monthly Actual

20,00 0,00

% Forecast Monthly
% Cumulative Planned 20,00 20,00 20,00 20,00 100,0
% Cumulative Actual
% Forecast Cumulative

20,00 20,00

Dec Jan- Feb Mar- Apr- May Jun-11


12
-12
12
12
-12
12

Jul12

Aug
-12

Sep Oct- Nov


-12
12
-12

Dec
-12

% Progress M
Monthly

50,00

1.2.8 - AS BUILT DOSSIER


100,00
80,00
90,00
70,00
80,00

60,00

70,00

% Progress Cumulative

60,00

50,00

40,00
40,00
30,00
30,00
20,00
20,00

10,00

10,00

0,00

0,00

May Jun-11
11
% Monthly Planned
% Monthly Actual

Jul11

Aug
-11

Sep Oct- Nov


-11
11
-11

Dec Jan- Feb Mar- Apr- May Jun-11


12
-12
12
12
-12
12

Jul12

Aug
-12

Sep Oct- Nov


-12
12
-12

20,00 0,00 0,00 0,00 80,00


0,00 0,00

% Forecast Monthly
% Cumulative Planned
% Cumulative Actual
% Forecast Cumulative

20,00 20,00 20,00 20,00 100,0


0,00 0,00

Dec
-12

% Progress M
Monthly

50,00

1.2.9 - CERTIFICATION (ASSISTANCE)


100,00
80,00
90,00
70,00
80,00

60,00

70,00

% Progress Cumulative

60,00

50,00

40,00
40,00
30,00
30,00
20,00
20,00

10,00

10,00

0,00

0,00

May Jun-11
11
% Monthly Planned
% Monthly Actual

Jul11

Aug
-11

Sep Oct- Nov


-11
11
-11

Dec Jan- Feb Mar- Apr- May Jun-11


12
-12
12
12
-12
12

20,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 80,00
0,00 0,00

% Forecast Monthly
% Cumulative Planned
% Cumulative Actual
% Forecast Cumulative

20,00 20,00 20,00 20,00 20,00 20,00 20,00 20,00 20,00 100,0
0,00 0,00

Jul12

Aug
-12

Sep Oct- Nov


-12
12
-12

Dec
-12

% Progress M
Monthly

50,00

1.2.10 - TECHNICAL FOLLOW-ON FOR T&I CONTRACTS


100,00
80,00
90,00
70,00
80,00

60,00

70,00

% Progress Cumulative

60,00

50,00

40,00
40,00
30,00
30,00
20,00
20,00

10,00

10,00

0,00

0,00

May Jun-11
11

Jul11

Aug
-11

Sep Oct- Nov


-11
11
-11

Dec Jan- Feb Mar- Apr- May Jun-11


12
-12
12
12
-12
12

% Monthly Planned

20,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 80,00

% Monthly Actual

20,00 0,00

% Forecast Monthly
% Cumulative Planned 20,00 20,00 20,00 20,00 20,00 20,00 20,00 20,00 20,00 20,00 20,00 20,00 20,00 100,0
% Cumulative Actual
% Forecast Cumulative

20,00 20,00

Jul12

Aug
-12

Sep Oct- Nov


-12
12
-12

Dec
-12

% Progress M
Monthly

50,00

1.3 - PROCUREMENT SERVICES


100,00
80,00
90,00
70,00
80,00

60,00

70,00

% Progress Cumulative

60,00

50,00

40,00
40,00
30,00
30,00
20,00
20,00

10,00

10,00

0,00

0,00

May Jun-11
11

Jul11

Aug
-11

Sep Oct- Nov


-11
11
-11

Dec Jan- Feb Mar- Apr- May Jun-11


12
-12
12
12
-12
12

% Monthly Planned

32,01 4,20 5,99 21,77 8,44 8,89 0,00 10,27 6,43

% Monthly Actual

32,01 5,06

% Forecast Monthly
% Cumulative Planned 32,01 36,21 42,60 63,58 74,42 83,30 83,30 93,57 100,0
% Cumulative Actual
% Forecast Cumulative

32,01 37,07

Jul12

Aug
-12

Sep Oct- Nov


-12
12
-12

Dec
-12

% Progress M
Monthly

50,00

1.3.3 - PROCUREMENT SERVICES - PLEM/SSIV


100,00
80,00
90,00
70,00
80,00

60,00

70,00

% Progress Cumulative

60,00

50,00

40,00
40,00
30,00
30,00
20,00
20,00

10,00

10,00

0,00

0,00

May Jun-11
11

Jul11

Aug
-11

Sep Oct- Nov


-11
11
-11

% Monthly Planned

20,00 6,00 16,00 48,00 10,00

% Monthly Actual

20,00 6,66

% Forecast Monthly
% Cumulative Planned 20,00 26,00 42,00 90,00 100,0
% Cumulative Actual
% Forecast Cumulative

20,00 26,66

Dec Jan- Feb Mar- Apr- May Jun-11


12
-12
12
12
-12
12

Jul12

Aug
-12

Sep Oct- Nov


-12
12
-12

Dec
-12

% Progress M
Monthly

50,00

1.3.6 - PROCUREMENT SERVICES - PLC/RTU


100,00
80,00
90,00
70,00
80,00

60,00

70,00

% Progress Cumulative

60,00

50,00

40,00
40,00
30,00
30,00
20,00
20,00

10,00

10,00

0,00

0,00

May Jun-11
11

Jul11

Aug
-11

Sep Oct- Nov


-11
11
-11

Dec Jan- Feb Mar- Apr- May Jun-11


12
-12
12
12
-12
12

% Monthly Planned

40,00 3,00 0,00 3,00 11,40 14,80 0,00 17,10 10,70

% Monthly Actual

40,00 4,00

% Forecast Monthly
% Cumulative Planned 40,00 43,00 43,00 46,00 57,40 72,20 72,20 89,30 100,0
% Cumulative Actual
% Forecast Cumulative

40,00 44,00

Jul12

Aug
-12

Sep Oct- Nov


-12
12
-12

Dec
-12

% Progress M
Monthly

50,00

1.4.9 Grout Seals and Schock Cells


100,00
80,00
90,00
70,00
80,00

60,00

70,00

% Progress Cumulative

60,00

50,00

40,00
40,00
30,00
30,00
20,00
20,00

10,00

10,00

0,00

0,00

May Jun-11
11

Jul11

Aug
-11

Sep Oct- Nov


-11
11
-11

% Monthly Planned

23,33 11,67 0,00 0,00 65,00

% Monthly Actual

23,33 11,67

% Forecast Monthly
% Cumulative Planned 23,33 35,00 35,00 35,00 100,0
% Cumulative Actual
% Forecast Cumulative

23,33 35,00

Dec Jan- Feb Mar- Apr- May Jun-11


12
-12
12
12
-12
12

Jul12

Aug
-12

Sep Oct- Nov


-12
12
-12

Dec
-12

% Progress M
Monthly

50,00

1.5.17 Other Instrumentation - PLC/RTU & instrumentation bulks


100,00
80,00
90,00
70,00
80,00

60,00

70,00

% Progress Cumulative

60,00

50,00

40,00
40,00
30,00
30,00
20,00
20,00

10,00

10,00

0,00

0,00

May Jun-11
11

Jul11

Aug
-11

Sep Oct- Nov


-11
11
-11

Dec Jan- Feb Mar- Apr- May Jun-11


12
-12
12
12
-12
12

% Monthly Planned

35,00 0,00 0,00 0,00 0,00 0,00 50,00 0,00 15,00

% Monthly Actual

35,00 0,00

% Forecast Monthly
% Cumulative Planned 35,00 35,00 35,00 35,00 35,00 35,00 85,00 85,00 100,0
% Cumulative Actual
% Forecast Cumulative

35,00 35,00

Jul12

Aug
-12

Sep Oct- Nov


-12
12
-12

Dec
-12

% Progress M
Monthly

50,00

1.8.1.3 - HOOCK-UP, COMMISSIONING ACTIVITIES AND START UP


100,00
80,00
90,00
70,00
80,00

60,00

70,00

% Progress Cumulative

60,00

50,00

40,00
40,00
30,00
30,00
20,00
20,00

10,00

10,00

0,00

0,00

May Jun-11
11
% Monthly Planned
% Monthly Actual

Jul11

Aug
-11

Sep Oct- Nov


-11
11
-11

Dec Jan- Feb Mar- Apr- May Jun-11


12
-12
12
12
-12
12
20,00 0,00 80,00

0,00 0,00

% Forecast Monthly
% Cumulative Planned
% Cumulative Actual
% Forecast Cumulative

20,00 20,00 100,0


0,00 0,00

Jul12

Aug
-12

Sep Oct- Nov


-12
12
-12

Dec
-12

% Progress M
Monthly

50,00

PAGE 22 OF 33

PTB

SETH OFFSHORE DEVELOPMENT EPC PROJECT


PLANNING PORTION IN THE MONTHLY PROGRESS REPORT

Egypt

Rev. (0)
Jun 2011

4.1.4 PETROJET

GFL 003-0405

3467-200

SETHDEVELOPM,ENTPROJECT
OVERALLLEVELI
MONTH

25Mar11

25Apr11 25May11

25Jun11

25Jul11

25Aug11

25Sep11

25Oct11

25Nov11

25Dec11

25Jan12

25Feb12

25Mar12

24.33%

27.71%

34.62%

41.43%

48.66%

56.35%

64.58%

73.87%

82.79%

PLAN%

0.00%

2.31%

9.71%

18.00%

ACT%

0.00%

4.51%

14.27%

22.34%

25Apr12 25May12
88.50%

93.61%

25Jun12

31Jul12

97.39%

100.00%

100.00%
90.00%
80.00%

As of Date : 25-06-2011
Plan
: 18.00 %
Actual
: 22.23 %

70.00%
60.00%
50.00%
40.00%
30.00%
20.00%
10.00%
0.00%

% PLAN

% ACT

1/9

PROJECTMANAGEMENT
WP1
MONTH

25Mar11

25Apr11 25May11

PLAN%

0.00%

6.00%

ACT%

0.00%

6.00%

25Jun11

25Jul11

25Aug11

25Sep11

25Oct11

25Nov11

25Dec11

25Jan12

25Feb12

25Mar12

12.00%

18.00%

24.00%

30.00%

36.00%

42.00%

48.00%

54.00%

60.00%

66.00%

72.00%

12.00%

18.00%

25Apr12 25May12
78.00%

84.00%

25Jun12

31Jul12

90.00%

100.00%

100.00%
90.00%
80.00%

As of Date : 25-06-2011
Plan
: 18.00 %
Actual
: 18.00
22.23 %

70.00%
60.00%
50.00%
40.00%
30.00%
20.00%
10.00%
0.00%

% PLAN

% ACT

2/9

PROCUREMENTSERVICES
WP3
MONTH

25Mar11

25Jun11

25Jul11

25Aug11

25Sep11

25Oct11

25Nov11

25Dec11

25Jan12

25Feb12

25Mar12

PLAN%

0.00%

25Apr11 25May11
6.00%

12.00%

18.00%

24.00%

30.00%

36.00%

42.00%

48.00%

54.00%

60.00%

66.00%

72.00%

ACT%

0.00%

6.00%

12.00%

18.00%

25Apr12 25May12
78.00%

84.00%

25Jun12

31Jul12

90.00%

100.00%

100.00%
90.00%
80.00%

As of Date : 25-06-2011
Plan
: 18.00 %
Actual
: 18.00
22.23 %

70.00%
60.00%
50.00%
40.00%
30.00%
20.00%
10.00%
0.00%

% PLAN

% ACT

3/9

SUBSTRUCTURE(P.D.T,PILESANDJACKET)FABRICATION
WP4
MONTH

25Mar11

25Jun11

25Jul11

25Aug11

25Sep11

25Oct11

25Nov11

25Dec11

25Jan12

25Feb12

25Mar12

PLAN%

0.00%

25Apr11 25May11
9.95%

23.30%

32.53%

42.05%

47.86%

58.92%

68.59%

77.98%

84.58%

89.46%

97.26%

100.00%

ACT%

0.00%

10.00%

30.66%

44.27%

25Apr12 25May12
100.00%

100.00%

25Jun12

31Jul12

100.00%

100.00%

100.00%
90.00%
80.00%

As of Date : 25-06-2011
Plan
: 32.53
18.00 %
Actual
: 44.27
22.23 %

70.00%
60.00%
50.00%
40.00%
30.00%
20.00%
10.00%
0.00%

% PLAN

% ACT

4/9

DECK&TSFMATERIAL/EQUIPMENTSUPPLYANDFABRICATION
WP5
MONTH

25Mar11

25Jun11

25Jul11

25Aug11

25Sep11

25Oct11

25Nov11

25Dec11

25Jan12

25Feb12

25Mar12

PLAN%

0.00%

25Apr11 25May11
1.11%

2.12%

15.01%

22.13%

24.22%

31.58%

39.16%

48.50%

61.08%

76.63%

92.21%

96.99%

ACT%

0.00%

2.12%

10.00%

16.82%

25Apr12 25May12
99.69%

100.00%

25Jun12

31Jul12

100.00%

100.00%

100.00%
90.00%
80.00%

As of Date : 25-06-2011
Plan
: 15.01
18.00 %
Actual
: 16.82
22.23 %

70.00%
60.00%
50.00%
40.00%
30.00%
20.00%
10.00%
0.00%

% PLAN

% ACT

5/9

PIPELINESPOOLSFABRICATION
WP6
MONTH

25Mar11

25Jun11

25Jul11

25Aug11

25Sep11

25Oct11

25Nov11

25Dec11

25Jan12

25Feb12

25Mar12

PLAN%

0.00%

25Apr11 25May11
0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

3.09%

56.69%

ACT%

0.00%

2.12%

10.00%

16.82%

25Apr12 25May12
100.00%

100.00%

25Jun12

31Jul12

100.00%

100.00%

100.00%
90.00%
80.00%

As of Date : 25-06-2011
Plan
: 00.00 %
Actual
: 00.00 %

70.00%
60.00%
50.00%
40.00%
30.00%
20.00%
10.00%
0.00%
25Jan12

25Feb12

% PLAN

25Mar12

25Apr12

% ACT

6/9

LOADOUTANDSEAFASTENING
WP8
MONTH

25Mar11

PLAN%

0.00%

25Apr11 25May11
0.00%

0.00%

25Jun11

25Jul11

25Aug11

25Sep11

25Oct11

25Nov11

25Dec11

25Jan12

25Feb12

25Mar12

0.00%

0.00%

0.00%

0.00%

3.06%

3.06%

3.06%

3.06%

3.06%

40.73%

25Apr12 25May12
68.56%

100.00%

25Jun12

31Jul12

100.00%

100.00%

ACT%

100.00%
90.00%
80.00%

As of Date : 25-06-2011
Plan
: 00.00 %
Actual
: 00.00 %

70.00%
60.00%
50.00%
40.00%
30.00%
20.00%
10.00%
0.00%
25Sep11

25Oct11

25Nov11

25Dec11

25Jan12

% PLAN

25Feb12

25Mar12

25Apr12

25May12

25Jun12

% ACT

7/9

OFFSHOREHOOKUPANDCOMMISSIONING
WP9
MONTH

25Mar11

PLAN%

0.00%

25Apr11 25May11
0.00%

0.00%

25Jun11

25Jul11

25Aug11

25Sep11

25Oct11

25Nov11

25Dec11

25Jan12

25Feb12

25Mar12

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

25Apr12 25May12
0.00%

50.00%

25Jun12

31Jul12

100.00%

100.00%

ACT%

100.00%
90.00%
80.00%

As of Date : 25-06-2011
Plan
: 00.00 %
Actual
: 00.00 %

70.00%
60.00%
50.00%
40.00%
30.00%
20.00%
10.00%
0.00%
25Apr12

25May12

% PLAN

25Jun12

% ACT

8/9

CRASHINGCOST
MONTH

25Mar11

PLAN%

0.00%

25Apr11 25May11
0.00%

0.00%

25Jun11

25Jul11

25Aug11

25Sep11

25Oct11

25Nov11

25Dec11

25Jan12

25Feb12

25Mar12

0.00%

0.00%

0.00%

0.00%

0.00%

10.00%

30.00%

50.00%

70.00%

90.00%

25Apr12 25May12
100.00%

25Jun12

31Jul12

100.00%

ACT%

100.00%
90.00%
80.00%

As of Date : 25-06-2011
Plan
: 00.00 %
Actual
: 00.00 %

70.00%
60.00%
50.00%
40.00%
30.00%
20.00%
10.00%
0.00%
25Oct11

25Nov11

25Dec11

25Jan12

% PLAN

25Feb12

25Mar12

25Apr12

25May12

% ACT

9/9

PAGE 23 OF 33

PTB

SETH OFFSHORE DEVELOPMENT EPC PROJECT


PLANNING PORTION IN THE MONTHLY PROGRESS REPORT

Egypt

Rev. (0)
Jun 2011

4.2. CONTROL SHEETS

GFL 003-0405

3467-200

PAGE 24 OF 33

PTB

SETH OFFSHORE DEVELOPMENT EPC PROJECT


PLANNING PORTION IN THE MONTHLY PROGRESS REPORT

Egypt

Rev. (0)
Jun 2011

4.2.1 ENPPI

GFL 003-0405

3467-200

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

9.44%

70.00%

70.00%

4.17%

70.00%

70.00%

1.39%

70.00%

70.00%

0.56%

70.00%

70.00%

0.56%

70.00%

70.00%

0.56%

70.00%

70.00%

0.56%

70.00%

70.00%

0.56%

70.00%

70.00%

ENPPI
W.P.2 DETAILED ENGINEERING
PROCESS TECHNOLOGY DIVISION
DRAWING
Process flow diagram

Start

03-Apr-11

06-Apr-11

Design

10-Apr-11

21-Apr-11

Final

19-Sep-11

20
50
20-Sep-11

30

Utility flow diagram

Start

06-Apr-11

03-Apr-11

Design

13-Apr-11

10-Apr-11

Final

26-Sep-11

20
50
27-Sep-11

30

Cause & Effect Chart

Start

09-May-11

25-Apr-11

Design

16-May-11

23-Jun-11

Construction

19-Sep-11

20
50
20-Sep-11

30

Process block diagram

Start

07-Jun-11

12-Jun-11

Design

14-Jun-11

20-Jun-11

Construction

26-Sep-11

20
50
27-Sep-11

30

Below Cellar deck Escape Route, safety and lifesaving equipment layout

Start

31-May-11

12-May-11

Design

07-Jun-11

17-May-11

Construction

03-Oct-11

20
50
04-Oct-11

30

Helideck - Escape way, safety and lifesaving equipment layout

Start

31-May-11

12-May-11

Design

07-Jun-11

17-May-11

Construction

20
50
04-Oct-11

03-Oct-11

30

Below Cellar deck - Firefighting System layout

Start

05-May-11

03-May-11

Design

12-May-11

08-May-11

Construction

20
50
27-Sep-11

26-Sep-11

30

Cellar Deck - Firefighting System layout

Start

05-May-11

03-May-11

Design

12-May-11

08-May-11

Construction

26-Sep-11

20
50
27-Sep-11

30

* Weights of Activities are calculated relative to (PROCESS TECHNOLOGY DIVISION)


Tuesday, July 05, 2011

Page 1 of 59

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

0.56%

70.00%

70.00%

0.56%

70.00%

70.00%

0.56%

70.00%

70.00%

0.56%

70.00%

70.00%

0.56%

70.00%

70.00%

0.56%

70.00%

70.00%

ENPPI
W.P.2 DETAILED ENGINEERING
PROCESS TECHNOLOGY DIVISION
DRAWING
Main deck - Firefighting System layout

Start

05-May-11

03-May-11

Design

12-May-11

08-May-11

Construction

26-Sep-11

20
50
27-Sep-11

30

Helideck - Firefighting System layout

Start

05-May-11

03-May-11

Design

12-May-11

08-May-11

Construction

26-Sep-11

20
50
27-Sep-11

30

Below Cellar deck - Safety signs layout

Start

31-May-11

09-May-11

Design

07-Jun-11

16-May-11

Construction

03-Oct-11

20
50
04-Oct-11

30

Cellar deck - Safety signs layout

Start

31-May-11

09-May-11

Design

07-Jun-11

16-May-11

Construction

03-Oct-11

20
50
04-Oct-11

30

Main deck - Safety signs layout

Start

31-May-11

09-May-11

Design

07-Jun-11

16-May-11

Construction

03-Oct-11

20
50
04-Oct-11

30

Helideck - Safety signs layout

Start

31-May-11

09-May-11

Design

07-Jun-11

16-May-11

Construction

20
50
04-Oct-11

03-Oct-11

30

21.11%

70.00%

70.00%

REPORTS / TECHNICAL LIST


Basis of design

Start

10-Apr-11

08-Apr-11

Design

12-Apr-11

12-Apr-11

Final

11-Jun-11

03-Apr-11

04-Apr-11

10-Apr-11

11-Apr-11

Final

19-Sep-11

1.94%

70.00%

70.00%

50

20
50
20-Sep-11

30

* Weights of Activities are calculated relative to (PROCESS TECHNOLOGY DIVISION)


Tuesday, July 05, 2011

70.00%

30

Heat & Material balance report

Design

100.00%

20

07-Jul-11

Start

1.94%

Page 2 of 59

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

1.94%

70.00%

70.00%

1.94%

70.00%

20.00%

1.94%

0.00%

0.00%

1.94%

20.00%

70.00%

1.94%

70.00%

70.00%

2.50%

0.00%

0.00%

1.94%

70.00%

70.00%

ENPPI
W.P.2 DETAILED ENGINEERING
PROCESS TECHNOLOGY DIVISION
REPORTS / TECHNICAL LIST
Project master equipment list

Start

08-May-11

03-May-11

Design

15-May-11

10-May-11

Construction

15-Sep-11

20
50
18-Sep-11

30

Process & Utilities report


20

Start

05-Jun-11

Design

12-Jun-11

24-Jun-11
12-Jul-11

50

Final

19-Sep-11

20-Sep-11

30

Blow down reprot

Start

03-Jul-11

26-Jul-11

Design

10-Jul-11

01-Aug-11

20
50

Final

29-Sep-11

02-Oct-11

30

Utilities load summary

Start

19-Jun-11

16-Jun-11

Design

26-Jun-11

23-Jun-11

Final

25-Sep-11

20
50
26-Sep-11

30

Hazardous Area classification report

Start

26-Apr-11

10-May-11

Design

04-May-11

16-May-11

Construction

26-Sep-11

20
50
27-Sep-11

30

Hazop report

Start

21-Jul-11

25-Aug-11

20

Final

04-Aug-11

12-Sep-11

80

HSE philosophy

Start

20-Apr-11

10-May-11

Design

27-Apr-11

16-May-11

Final

09-Oct-11

20
50
10-Oct-11

30

18.06%

50.62%

47.38%

MRQ
Chemical injection package MRQ

1.67%

Start

03-Apr-11

01-Apr-11

20

For inquiry

06-Apr-11

03-Apr-11

80

* Weights of Activities are calculated relative to (PROCESS TECHNOLOGY DIVISION)


Tuesday, July 05, 2011

Page 3 of 59

100.00%

100.00%

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

1.67%

100.00%

100.00%

1.67%

100.00%

100.00%

1.67%

100.00%

100.00%

1.67%

100.00%

100.00%

ENPPI
W.P.2 DETAILED ENGINEERING
PROCESS TECHNOLOGY DIVISION
MRQ
Flame arrestor MRQ

Start

20-Apr-11

15-Apr-11

20

For inquiry

27-Apr-11

19-Apr-11

80

Vent stack package MRQ

Start

02-May-11

25-Apr-11

20

For inquiry

09-May-11

28-Apr-11

80

Fire Fighting package MRQ

Start

06-Apr-11

01-Apr-11

20

For inquiry

12-Apr-11

03-Apr-11

80

Safety equipment and life saving MRQ

Start
For inquiry

03-Apr-11
12-Apr-11

01-Apr-11

20

03-Apr-11

80

8.33%

100.00%

100.00%

TER
Chemical injection package TER

Start

08-May-11

18-Apr-11

20

Finish

19-Jun-11

01-Jun-11

80

Flame arrestor TER

Start

26-May-11

Finish

23-Jun-11

06-Jun-11

Finish

04-Jul-11

21-Jul-11

11-May-11

Finish

09-Jun-11

Finish

08-May-11
12-Jun-11

3.06%

100.00%

20.00%

3.06%

20.00%

20.00%

3.06%

100.00%

20.00%

3.06%

100.00%

20.00%

20

01-Jun-11
26-Jul-11

80

20

26-Apr-11
05-Jul-11

80

Safety equipment and life saving TER

Start

100.00%

80

Fire Fighting package TER

Start

100.00%

20

02-Jun-11

Vent stack package TER

Start

3.06%

20

05-Apr-11
07-Jul-11

80

15.28%

* Weights of Activities are calculated relative to (PROCESS TECHNOLOGY DIVISION)


Tuesday, July 05, 2011

Page 4 of 59

84.00%

36.00%

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

ENPPI
W.P.2 DETAILED ENGINEERING
PROCESS TECHNOLOGY DIVISION
MRP
Chemical injection package MRP

Start

10-Jul-11

03-Jul-11

20

For Purchase

17-Jul-11

07-Jul-11

80

Flame arrestor MRP

Start

21-Jul-11

07-Aug-11

20

For Purchase

28-Jul-11

09-Aug-11

80

Vent stack package MRP

Start

03-Aug-11

21-Aug-11

20

For Purchase

10-Aug-11

22-Aug-11

80

Fire Fighting package MRP

Start
For Purchase

05-Jul-11

20-Jul-11

20

11-Jul-11

21-Jul-11

80

Safety equipment and life saving MRP

Start
For Purchase

10-Jul-11

07-Aug-11

20

17-Jul-11

11-Aug-11

80

0.83%

0.00%

0.00%

0.83%

0.00%

0.00%

0.83%

0.00%

0.00%

0.83%

0.00%

0.00%

0.83%

0.00%

0.00%

4.17%

0.00%

0.00%

VENDOR PRINTS REVIEW


Chemical injection package

Start

25-Jul-11

25-Jul-11

20

Finish

25-Dec-11

14-Dec-11

80

Flame arrestor

Start

07-Aug-11

04-Sep-11

20

Finish

07-Dec-11

01-Jan-12

80

Vent stack package

Start

23-Aug-11

20-Sep-11

20

Finish

26-Dec-11

17-Jan-12

80

Fire Fighting package

Start
Finish

20-Jul-11

07-Aug-11

20

19-Dec-11

02-Jan-12

80

Safety signs,miscellaneous safety and life saving equipment package

Start
Finish

25-Jul-11

21-Aug-11

20

24-Nov-11

21-Dec-11

80

* Weights of Activities are calculated relative to (PROCESS TECHNOLOGY DIVISION)


Tuesday, July 05, 2011

Page 5 of 59

5.28%

0.00%

0.00%

2.78%

0.00%

0.00%

2.78%

0.00%

0.00%

3.89%

0.00%

0.00%

3.33%

0.00%

0.00%

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

18.06%

0.00%

0.00%

ENPPI
W.P.2 DETAILED ENGINEERING
PROCESS TECHNOLOGY DIVISION
VENDOR PRINTS REVIEW

P&ID's
Symbols for P & ID instrumentation

Start

10-Apr-11

14-Apr-11

20

Design

17-Apr-11

21-Apr-11

50

Construction

12-Sep-11

13-Sep-11

10-Apr-11

14-Apr-11

Design

17-Apr-11

21-Apr-11

Construction

12-Sep-11

14-Apr-11

Design

17-Apr-11

21-Apr-11

Construction

12-Sep-11

14-Apr-11

Design

17-Apr-11

21-Apr-11

Construction

12-Sep-11

10-Apr-11

14-Apr-11

17-Apr-11

21-Apr-11

Construction

12-Sep-11

10-Apr-11

14-Apr-11

17-Apr-11

21-Apr-11

Construction

12-Sep-11

10-Apr-11

14-Apr-11

17-Apr-11

21-Apr-11

Construction

12-Sep-11

10-Apr-11

14-Apr-11

17-Apr-11

21-Apr-11

Construction

12-Sep-11

70.00%

0.83%

70.00%

70.00%

0.69%

70.00%

70.00%

0.69%

70.00%

70.00%

20
50
30

20
50
30

20
50
13-Sep-11

30

* Weights of Activities are calculated relative to (PROCESS TECHNOLOGY DIVISION)


Tuesday, July 05, 2011

70.00%

30

Unit 0230 - Blow-down system

Design

0.83%

50

13-Sep-11

Start

70.00%

20

Unit 0190 - Delivery system

Design

70.00%

50

13-Sep-11

Start

0.69%

30

Unit 0130 - Manifold

Design

70.00%

20

13-Sep-11

Start

70.00%

30

Unit 0120 - Chemical injection system (Corrosion inhibitor)

Design

0.69%

50

13-Sep-11

Start

70.00%

20

13-Sep-11

10-Apr-11

70.00%

30

Unit 0120 -Chem. Injec. Sys. (Hydrate inhibitor skid)

Start

0.69%

50
13-Sep-11

10-Apr-11

70.00%

20

Unit 0120 - Chemical injection system (Methanol skid)

Start

70.00%

30

Unit 0100 - Single completion wellhead DW001

Start

0.69%

Page 6 of 59

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

0.83%

70.00%

70.00%

0.69%

70.00%

70.00%

0.69%

70.00%

70.00%

0.83%

70.00%

70.00%

0.83%

70.00%

70.00%

0.83%

70.00%

70.00%

0.83%

70.00%

70.00%

0.83%

70.00%

70.00%

ENPPI
W.P.2 DETAILED ENGINEERING
PROCESS TECHNOLOGY DIVISION
P&ID's
Unit 0300 -Test Multiphase Meter

Start

10-Apr-11

14-Apr-11

Design

17-Apr-11

21-Apr-11

Construction

12-Sep-11

20
50
13-Sep-11

30

Unit 0420 -Fuel Gas system

Start

10-Apr-11

14-Apr-11

Design

17-Apr-11

21-Apr-11

Construction

12-Sep-11

20
50
13-Sep-11

30

Unit 0420 -Fuel Gas system

Start

10-Apr-11

14-Apr-11

Design

17-Apr-11

21-Apr-11

Construction

12-Sep-11

20
50
13-Sep-11

30

Unit 0470- Main Power Generation Package

Start

10-Apr-11

14-Apr-11

Design

17-Apr-11

21-Apr-11

Construction

12-Sep-11

20
50
13-Sep-11

30

Unit 0430- Diesel Fuel system

Start

10-Apr-11

14-Apr-11

Design

17-Apr-11

21-Apr-11

Construction

12-Sep-11

20
50
13-Sep-11

30

Unit 0480- Diesel Electrical Generation Package

Start

10-Apr-11

14-Apr-11

Design

17-Apr-11

21-Apr-11

Construction

20
50
13-Sep-11

12-Sep-11

30

Unit 0730- Dry Firefighting system

Start

10-Apr-11

14-Apr-11

Design

17-Apr-11

21-Apr-11

Construction

20
50
13-Sep-11

12-Sep-11

30

Unit 0540- Open Drain system

Start

10-Apr-11

14-Apr-11

Design

17-Apr-11

21-Apr-11

Construction

12-Sep-11

20
50
13-Sep-11

30

* Weights of Activities are calculated relative to (PROCESS TECHNOLOGY DIVISION)


Tuesday, July 05, 2011

Page 7 of 59

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

0.69%

70.00%

70.00%

0.69%

70.00%

70.00%

0.69%

70.00%

70.00%

0.69%

70.00%

70.00%

ENPPI
W.P.2 DETAILED ENGINEERING
PROCESS TECHNOLOGY DIVISION
P&ID's
Unit 0730- Helideck Foam Firefighting system

Start

10-Apr-11

14-Apr-11

Design

17-Apr-11

21-Apr-11

Construction

12-Sep-11

20
50
13-Sep-11

30

Unit 0520- Service water system

Start

10-Apr-11

14-Apr-11

Design

17-Apr-11

21-Apr-11

Construction

12-Sep-11

20
50
13-Sep-11

30

Unit 0570- Sanitary Discharge treatment package

Start

10-Apr-11

14-Apr-11

Design

17-Apr-11

21-Apr-11

Construction

12-Sep-11

20
50
13-Sep-11

30

TUTU Panel & SSIV

Start

10-Apr-11

14-Apr-11

Design

17-Apr-11

21-Apr-11

Construction

12-Sep-11

20
50
13-Sep-11

30

15.00%

Total

PROCESS TECHNOLOGY DIVISION

100.00%

* Weights of Activities are calculated relative to (PROCESS TECHNOLOGY DIVISION)


Tuesday, July 05, 2011

Page 8 of 59

70.00%
55.58%

70.00%
47.67%

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

3.16%

70.00%

70.00%

1.58%

70.00%

70.00%

1.58%

70.00%

70.00%

1.58%

70.00%

0.00%

1.84%

70.00%

70.00%

1.32%

70.00%

0.00%

2.37%

70.00%

70.00%

1.32%

70.00%

0.00%

ENPPI
W.P.2 DETAILED ENGINEERING
INSTRUMENTATION & CONTROLS ENGINEERING DEPARTMENT
DRAWING
Interconnecting Wiring Diagram

Start

26-May-11

04-May-11

Design

02-Jun-11

11-May-11

Construction

14-Nov-11

20
50
15-Nov-11

30

Mechanical-Hook-up Drawing

Start

19-May-11

20-Apr-11

Design

26-May-11

27-Apr-11

Construction

10-Nov-11

20
50
13-Nov-11

30

Hydraulic hook-up Drawings

Start

19-May-11

20-Apr-11

Design

26-May-11

27-Apr-11

Construction

10-Nov-11

20
50
13-Nov-11

30

Electrical hook-up Drawing

Start

19-May-11

12-Jul-11

20

Design

26-May-11

19-Jul-11

50

Construction

10-Nov-11

13-Nov-11

30

Electrical instruments layout

Start

05-May-11

10-May-11

Design

12-May-11

16-May-11

Construction

25-Oct-11

20
50
26-Oct-11

30

Hydraulic instruments layouts

Start

05-May-11

06-Jul-11

Design

12-May-11

13-Jul-11

50

25-Oct-11

26-Oct-11

30

Construction

20

Electrical instrument cable routing layout

Start

12-May-11

07-Jun-11

Design

19-May-11

14-Jun-11

Construction

01-Nov-11

20
50
02-Nov-11

30

Hydraulic instruments Tube Routing layouts

Start

12-May-11

05-Jul-11

20

Design

19-May-11

12-Jul-11

50

01-Nov-11

02-Nov-11

30

Construction

14.74%

* Weights of Activities are calculated relative to (INSTRUMENTATION & CONTROLS ENGINEERING DEPARTM
Tuesday, July 05, 2011

Page 9 of 59

70.00%

50.00%

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

2.11%

70.00%

70.00%

2.11%

70.00%

70.00%

ENPPI
W.P.2 DETAILED ENGINEERING
INSTRUMENTATION & CONTROLS ENGINEERING DEPARTMENT
REPORTS / TECHNICAL LIST
Instrument Index

Start

26-Apr-11

10-May-11

Design

04-May-11

16-May-11

Construction

21-Sep-11

20
50
22-Sep-11

30

Instrument cable list

Start

26-May-11

07-Jun-11

Design

02-Jun-11

15-Jun-11

Construction

25-Oct-11

20
50
26-Oct-11

30

4.21%

70.00%

70.00%

MRQ
Multiphase flow meter MRQ

Start

03-Apr-11

07-Apr-11

20

For inquiry

10-Apr-11

10-Apr-11

80

Electro Hydraulic Well Head panel MRQ

Start
For inquiry

04-Apr-11
12-Apr-11

01-Apr-11

20

03-Apr-11

80

Choke valve MRQ

Start
For inquiry

06-Apr-11
13-Apr-11

01-Apr-11

20

03-Apr-11

80

HIPPS System MRQ

Start

31-Mar-11

01-Apr-11

20

For inquiry

07-Apr-11

03-Apr-11

80

Wing valve MRQ

Start

06-Apr-11

01-Apr-11

20

For inquiry

13-Apr-11

03-Apr-11

80

Loose Instrument MRQ

Start

18-May-11

01-Jun-11

20

For inquiry

25-May-11

06-Jun-11

80

Sand & Corrosion probes MRQ

Start

25-May-11

20-Jun-11

20

For inquiry

01-Jun-11

26-Jun-11

80

* Weights of Activities are calculated relative to (INSTRUMENTATION & CONTROLS ENGINEERING DEPARTM
Tuesday, July 05, 2011

Page 10 of 59

1.05%

100.00%

100.00%

1.05%

100.00%

100.00%

1.05%

100.00%

100.00%

1.05%

100.00%

100.00%

1.05%

100.00%

100.00%

0.92%

100.00%

100.00%

0.92%

100.00%

20.00%

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

0.92%

100.00%

100.00%

0.92%

100.00%

100.00%

0.92%

100.00%

100.00%

0.92%

100.00%

20.00%

ENPPI
W.P.2 DETAILED ENGINEERING
INSTRUMENTATION & CONTROLS ENGINEERING DEPARTMENT
MRQ
Instrument & Mechanical bulk materialMRQ

Start

26-May-11

01-May-11

20

For inquiry

02-Jun-11

03-May-11

80

Instrument cable and cable glandsMRQ

Start

16-May-11

15-Jun-11

20

For inquiry

23-May-11

22-Jun-11

80

Inst. Junction Box MRQ

Start

02-Jun-11

01-Jun-11

20

For inquiry

09-Jun-11

06-Jun-11

80

Instrument cable trays MRQ

Start

24-May-11

19-Jun-11

20

For inquiry

31-May-11

26-Jun-11

80

10.79%

100.00%

86.34%

TER
Multiphase flow meter TER

Start

15-May-11

28-Apr-11

20

Finish

12-Jun-11

25-May-11

80

Electro Hydraulic Well Head panel TER

Start

15-May-11

10-Apr-11

20

Finish

02-Jun-11

16-Jun-11

80

Choke valve TER

Start

18-May-11

Finish

12-Jun-11

05-Jul-11

03-May-11

10-Apr-11

20

Finish

31-May-11

09-Jun-11

80

Wing valve TER

Finish

08-Jun-11

02-May-11

20

15-Jun-11

80

Loose Instrument TER

Start
Finish

12-Jun-11
26-Jun-11

3.95%

100.00%

100.00%

2.63%

100.00%

20.00%

5.00%

100.00%

100.00%

2.63%

100.00%

100.00%

1.84%

20.00%

20.00%

20

20-Jun-11
24-Jul-11

80

* Weights of Activities are calculated relative to (INSTRUMENTATION & CONTROLS ENGINEERING DEPARTM
Tuesday, July 05, 2011

100.00%

80

Start

16-May-11

100.00%

20

26-Apr-11

HIPPS System TER

Start

3.95%

Page 11 of 59

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

2.11%

20.00%

0.00%

2.11%

20.00%

20.00%

2.11%

100.00%

0.00%

2.11%

20.00%

20.00%

2.11%

20.00%

0.00%

ENPPI
W.P.2 DETAILED ENGINEERING
INSTRUMENTATION & CONTROLS ENGINEERING DEPARTMENT
TER
Sand & Corrosion probes TER

Start

16-Jun-11

11-Jul-11

20

Finish

07-Jul-11

04-Aug-11

80

Instrument & Mechanical bulk material TER

Start

19-Jun-11

Finish

03-Jul-11

20

26-May-11
14-Jul-11

80

Instrument cable and cable glandsTER

Start

06-Jun-11

10-Jul-11

20

Finish

20-Jun-11

01-Aug-11

80

Inst. Junction Box TER

Start
Finish

23-Jun-11

20

21-Jun-11
21-Jul-11

07-Jul-11

80

Instrument cable trays TER

Start
Finish

14-Jun-11

03-Jul-11

20

28-Jun-11

28-Jul-11

80

30.53%

73.10%

56.55%

1.05%

0.00%

100.00%

1.05%

0.00%

0.00%

1.05%

0.00%

0.00%

1.05%

0.00%

0.00%

1.05%

0.00%

0.00%

MRP
Multiphase flow meter MRP

Start

10-Jul-11

16-Jun-11

20

For Purchase

17-Jul-11

23-Jun-11

80

Electro Hydraulic Well Head panel MRP

Start

04-Jul-11

13-Jul-11

20

For Purchase

11-Jul-11

14-Jul-11

80

Choke valve MRP

Start

05-Jul-11

27-Jul-11

20

For Purchase

12-Jul-11

02-Aug-11

80

HIPPS System MRP

Start
For Purchase

28-Jun-11

07-Jul-11

20

05-Jul-11

13-Jul-11

80

Wing valve MRP

Start
For Purchase

06-Jul-11

24-Jul-11

20

13-Jul-11

28-Jul-11

80

* Weights of Activities are calculated relative to (INSTRUMENTATION & CONTROLS ENGINEERING DEPARTM
Tuesday, July 05, 2011

Page 12 of 59

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

ENPPI
W.P.2 DETAILED ENGINEERING
INSTRUMENTATION & CONTROLS ENGINEERING DEPARTMENT
MRP
Loose Instrument MRP

Start

17-Jul-11

18-Aug-11

20

For Purchase

24-Jul-11

21-Aug-11

80

Sand & Corrosion probes MRP

Start

01-Aug-11

04-Sep-11

20

For Purchase

08-Aug-11

06-Sep-11

80

Instrument & Mechanical bulk material MRP

Start

24-Jul-11

07-Aug-11

20

For Purchase

31-Jul-11

11-Aug-11

80

Instrument cable and cable glands MRP

Start
For Purchase

11-Jul-11

23-Aug-11

20

18-Jul-11

25-Aug-11

80

Inst. Junction Box MRP

Start
For Purchase

28-Jul-11

17-Aug-11

20

04-Aug-11

18-Aug-11

80

Instrument cable trays MRP

Start

14-Jul-11

24-Aug-11

20

For Purchase

21-Jul-11

25-Aug-11

80

1.05%

0.00%

0.00%

1.05%

0.00%

0.00%

0.79%

0.00%

0.00%

0.79%

0.00%

0.00%

0.79%

0.00%

0.00%

0.79%

0.00%

0.00%

10.53%

0.00%

10.00%

VENDOR PRINTS REVIEW


Instrument & Mechanical bulk material Vendor prints review

Start

08-Aug-11

21-Aug-11

20

Finish

24-Nov-11

07-Dec-11

80

Junction boxes Vendor prints review

Start

14-Aug-11

28-Aug-11

20

Finish

30-Nov-11

14-Dec-11

80

HIPPS Vendor prints review

Start
Finish

13-Jul-11

24-Jul-11

20

22-Feb-12

01-Mar-12

80

Choke valves Vendor prints review

Start
Finish

20-Jul-11

11-Aug-11

20

21-Nov-11

13-Dec-11

80

* Weights of Activities are calculated relative to (INSTRUMENTATION & CONTROLS ENGINEERING DEPARTM
Tuesday, July 05, 2011

Page 13 of 59

0.79%

0.00%

0.00%

1.32%

0.00%

0.00%

3.95%

0.00%

0.00%

3.16%

0.00%

0.00%

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

ENPPI
W.P.2 DETAILED ENGINEERING
INSTRUMENTATION & CONTROLS ENGINEERING DEPARTMENT
VENDOR PRINTS REVIEW
Loose instrument Vendor prints review

Start

01-Aug-11

04-Sep-11

20

Finish

17-Nov-11

18-Dec-11

80

Instrument cable trays Vendor prints review

Start

31-Jul-11

04-Sep-11

20

Finish

15-Nov-11

18-Dec-11

80

Electro hydraulic wellhead control panel Vendor prints review

Start

25-Jul-11

21-Jul-11

20

Finish

24-Nov-11

21-Nov-11

80

Wing valves Vendor prints review

Start
Finish

21-Jul-11

07-Aug-11

20

22-Nov-11

07-Dec-11

80

Instrument cable and cable glands Vendor prints review

Start
Finish

26-Jul-11

28-Aug-11

20

28-Nov-11

28-Dec-11

80

Sand & Corrosion probes Vendor prints review

Start

16-Aug-11

14-Sep-11

20

Finish

05-Dec-11

28-Dec-11

80

Multi phase flow meter Vendor prints review

Start

25-Jul-11

20-Jul-11

20

Finish

25-Dec-11

07-Dec-11

80

Actuated valves Vendor prints review

Total

Start

04-May-11

Finish

10-Jan-12

0.00%

0.00%

1.05%

0.00%

0.00%

3.42%

0.00%

0.00%

3.16%

0.00%

0.00%

1.05%

0.00%

0.00%

1.84%

0.00%

0.00%

3.68%

0.00%

0.00%

3.95%

20.00%

20.00%

20

04-May-11
01-Mar-12

80

29.21%

2.70%

2.70%

100.00%

47.16%

38.74%

INSTRUMENTATION & CONTROLS ENGI

* Weights of Activities are calculated relative to (INSTRUMENTATION & CONTROLS ENGINEERING DEPARTM
Tuesday, July 05, 2011

1.84%

Page 14 of 59

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

1.82%

70.00%

70.00%

1.82%

70.00%

70.00%

1.64%

70.00%

70.00%

1.64%

70.00%

70.00%

1.64%

70.00%

70.00%

1.27%

0.00%

0.00%

1.27%

0.00%

0.00%

0.73%

0.00%

0.00%

0.73%

0.00%

0.00%

ENPPI
W.P.2 DETAILED ENGINEERING
PIPING ENGINEERING DIVISION
DRAWING
Heli deck plot plan

Start

17-Apr-11

01-Apr-11

Design

24-Apr-11

03-Apr-11

Construction

19-Sep-11

20
50
20-Sep-11

30

Main deck plot plan

Start

17-Apr-11

01-Apr-11

Design

24-Apr-11

03-Apr-11

Construction

19-Sep-11

20
50
20-Sep-11

30

Cellar deck plot plan

Start

17-Apr-11

01-Apr-11

Design

24-Apr-11

03-Apr-11

Construction

19-Sep-11

20
50
20-Sep-11

30

Below cellar deck plot plan

Start

17-Apr-11

01-Apr-11

Design

24-Apr-11

03-Apr-11

Construction

19-Sep-11

20
50
20-Sep-11

30

Vent boom plot plan

Start

17-Apr-11

01-Apr-11

Design

24-Apr-11

03-Apr-11

Construction

19-Sep-11

20
50
20-Sep-11

30

Looking west elevation

Start

31-Oct-11

02-Nov-11

20

Construction

28-Nov-11

29-Nov-11

80

Looking north elevation

Start

31-Oct-11

02-Nov-11

20

Construction

28-Nov-11

29-Nov-11

80

Helideck piping support plan

Start

12-Dec-11

14-Dec-11

20

Construction

19-Dec-11

20-Dec-11

80

Main deck piping support plan

Start

12-Dec-11

14-Dec-11

20

Construction

19-Dec-11

20-Dec-11

80

* Weights of Activities are calculated relative to (PIPING ENGINEERING DIVISION)


Tuesday, July 05, 2011

Page 15 of 59

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

ENPPI
W.P.2 DETAILED ENGINEERING
PIPING ENGINEERING DIVISION
DRAWING
Cellar deck piping support plan

Start

12-Dec-11

14-Dec-11

20

Construction

19-Dec-11

20-Dec-11

80

Below cellar piping support plan

Start

12-Dec-11

14-Dec-11

20

Construction

19-Dec-11

20-Dec-11

80

Vent boom piping support plan

Start

12-Dec-11

14-Dec-11

20

Construction

19-Dec-11

20-Dec-11

80

Helideck piping support location

Start
Construction

19-Dec-11

21-Dec-11

20

26-Dec-11

27-Dec-11

80

Main deck piping support location

Start
Construction

19-Dec-11

21-Dec-11

20

26-Dec-11

27-Dec-11

80

Cellar deck piping support location

Start

19-Dec-11

21-Dec-11

20

Construction

26-Dec-11

27-Dec-11

80

Below cellar piping support location

Start

19-Dec-11

21-Dec-11

20

Construction

26-Dec-11

27-Dec-11

80

Vent boom piping support location

Start

19-Dec-11

21-Dec-11

20

Construction

26-Dec-11

27-Dec-11

80

Helideck piping penetration location

Start

26-Dec-11

28-Dec-11

20

Construction

02-Jan-12

03-Jan-12

80

Main deck piping penetration location

Start

26-Dec-11

28-Dec-11

20

Construction

02-Jan-12

03-Jan-12

80

* Weights of Activities are calculated relative to (PIPING ENGINEERING DIVISION)


Tuesday, July 05, 2011

Page 16 of 59

0.73%

0.00%

0.00%

0.73%

0.00%

0.00%

0.73%

0.00%

0.00%

0.73%

0.00%

0.00%

0.73%

0.00%

0.00%

0.73%

0.00%

0.00%

0.73%

0.00%

0.00%

0.73%

0.00%

0.00%

0.73%

0.00%

0.00%

0.73%

0.00%

0.00%

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

ENPPI
W.P.2 DETAILED ENGINEERING
PIPING ENGINEERING DIVISION
DRAWING
Cellar deck piping penetration location

Start

26-Dec-11

28-Dec-11

20

Construction

02-Jan-12

03-Jan-12

80

Below cellar piping penetration location

Start

26-Dec-11

28-Dec-11

20

Construction

02-Jan-12

03-Jan-12

80

Vent boom piping penetration location

Start

26-Dec-11

28-Dec-11

20

Construction

02-Jan-12

03-Jan-12

80

Hydrotest maps

Start
Construction

22-Nov-11

24-Nov-11

20

04-Dec-11

05-Dec-11

80

0.73%

0.00%

0.00%

0.73%

0.00%

0.00%

0.73%

0.00%

0.00%

1.82%

0.00%

0.00%

23.82%

25.11%

25.11%

REPORTS / TECHNICAL LIST


Line designation table

4.55%

Start

12-May-11

23-May-11

20

Design

19-May-11

01-Jun-11

50

Final

19-Sep-11

20-Sep-11

70.00%

70.00%

30

4.55%

70.00%

70.00%

MRQ
Piping bulk MRQ

Start

31-Mar-11

01-Apr-11

20

For inquiry

07-Apr-11

03-Apr-11

80

Insulation joint MRQ

Start

13-Apr-11

01-Apr-11

20

For inquiry

20-Apr-11

11-Apr-11

80

Injection fitting MRQ

Start
For inquiry

28-Jul-11
30-Nov-11

08-Apr-11

20

13-Apr-11

80

2.73%

100.00%

100.00%

1.82%

100.00%

100.00%

1.82%

0.00%

100.00%

71.43%

100.00%

6.36%

* Weights of Activities are calculated relative to (PIPING ENGINEERING DIVISION)


Tuesday, July 05, 2011

Page 17 of 59

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

3.64%

100.00%

100.00%

2.73%

100.00%

0.00%

2.73%

100.00%

20.00%

ENPPI
W.P.2 DETAILED ENGINEERING
PIPING ENGINEERING DIVISION
TER
Piping bulk TER

Start

10-May-11

26-Apr-11

20

Finish

31-May-11

17-May-11

80

Injection fitting TER

Start

25-May-11

04-Jul-11

20

Finish

15-Jun-11

24-Jul-11

80

Insulation joint Injection fitting TER

Start

19-May-11

Finish

09-Jun-11

20

02-Jun-11
21-Jul-11

80

9.09%

100.00%

46.00%

MRP
Piping bulk MRP

Start

19-Jun-11

05-Jul-11

20

For Purchase

26-Jun-11

07-Jul-11

80

Insulation Joint MRP

Start

10-Jul-11

14-Aug-11

20

For Purchase

17-Jul-11

16-Aug-11

80

Injection fitting MRP

Start

13-Jul-11

18-Aug-11

20

For Purchase

20-Jul-11

21-Aug-11

80

1.82%

20.00%

0.00%

1.45%

0.00%

0.00%

1.45%

0.00%

0.00%

4.73%

7.69%

0.00%

VENDOR PRINTS REVIEW


Piping bulk Vendor prints review

Start
Finish

04-Jul-11

20-Jul-11

20

04-Dec-11

07-Dec-11

80

Insulation Joint Vendor prints review

Start
Finish

25-Jul-11

06-Sep-11

20

24-Nov-11

03-Jan-12

80

Injection fitting Vendor prints review

Start

28-Jul-11

06-Sep-11

20

Finish

30-Nov-11

03-Jan-12

80

* Weights of Activities are calculated relative to (PIPING ENGINEERING DIVISION)


Tuesday, July 05, 2011

Page 18 of 59

3.64%

0.00%

0.00%

2.73%

0.00%

0.00%

2.73%

0.00%

0.00%

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

4.36%

20.00%

Actual
Progress%

ENPPI
W.P.2 DETAILED ENGINEERING
PIPING ENGINEERING DIVISION
VENDOR PRINTS REVIEW
Production Manifold Vendor prints review

Start

04-May-11

Finish

24-Jan-12

20.00%

20

20-Jun-11
15-Mar-12

80

13.45%

6.49%

6.49%

GA's
Helideck piping plan GA

13-Sep-11

18-Sep-11

20

Design

25-Sep-11

27-Sep-11

50

Construction

28-Nov-11

29-Nov-11

30

Start

Below helideck piping plan GA

13-Sep-11

18-Sep-11

20

Design

25-Sep-11

27-Sep-11

50

Construction

28-Nov-11

29-Nov-11

30

Start

Main deck piping plan GA

13-Sep-11

18-Sep-11

20

Design

25-Sep-11

27-Sep-11

50

Construction

28-Nov-11

29-Nov-11

30

Start

Below main deck piping plan GA

Start

13-Sep-11

18-Sep-11

20

Design

25-Sep-11

27-Sep-11

50

Construction

28-Nov-11

29-Nov-11

30

Celler deck piping plan GA

Start

13-Sep-11

18-Sep-11

20

Design

25-Sep-11

27-Sep-11

50

Construction

28-Nov-11

29-Nov-11

30

Below celler deck piping plan GA

Start

13-Sep-11

18-Sep-11

20

Design

25-Sep-11

27-Sep-11

50

Construction

28-Nov-11

29-Nov-11

30

Vent boom piping plan GA

Start

13-Sep-11

18-Sep-11

20

Design

25-Sep-11

27-Sep-11

50

Construction

28-Nov-11

29-Nov-11

30

2.55%

0.00%

0.00%

2.55%

0.00%

0.00%

2.55%

0.00%

0.00%

2.55%

0.00%

0.00%

2.55%

0.00%

0.00%

2.18%

0.00%

0.00%

2.18%

0.00%

0.00%

17.09%
* Weights of Activities are calculated relative to (PIPING ENGINEERING DIVISION)
Tuesday, July 05, 2011

Page 19 of 59

0.00%

0.00%
Layout No. 1

Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

ENPPI
W.P.2 DETAILED ENGINEERING
PIPING ENGINEERING DIVISION
ISO's
Piping isometric drawings package

16.36%

Start

27-Oct-11

31-Oct-11

20

Final

16-Nov-11

17-Nov-11

80

16.36%

0.00%

0.00%

0.00%

0.00%

Specification
Piping material classes

4.55%

Start

16-May-11

17-May-11

20

Design

23-May-11

22-May-11

50

Final

13-Jun-11

14-Jul-11

PIPING ENGINEERING DIVISION

100.00%

* Weights of Activities are calculated relative to (PIPING ENGINEERING DIVISION)


Tuesday, July 05, 2011

70.00%

30

4.55%

Total

100.00%

Page 20 of 59

100.00%

70.00%

28.58%

23.76%

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

1.67%

70.00%

70.00%

1.67%

70.00%

70.00%

1.33%

70.00%

70.00%

1.33%

70.00%

70.00%

1.00%

70.00%

70.00%

1.33%

70.00%

70.00%

1.33%

70.00%

70.00%

1.33%

70.00%

70.00%

ENPPI
W.P.2 DETAILED ENGINEERING
ELECTRICAL ENGINEERING DIVISION
DRAWING
Helideck lighting & navigational aids layout

Start

24-Apr-11

20-Apr-11

Design

02-May-11

26-Apr-11

Construction

19-Oct-11

20
50
17-Nov-11

30

Main deck lighting & navigational aids layout

Start

24-Apr-11

20-Apr-11

Design

02-May-11

26-Apr-11

Construction

19-Oct-11

20
50
17-Nov-11

30

Cellar deck lighting layout

Start

24-Apr-11

20-Apr-11

Design

02-May-11

26-Apr-11

Construction

19-Oct-11

20
50
17-Nov-11

30

Below cellar deck lighting layout

Start

24-Apr-11

20-Apr-11

Design

02-May-11

26-Apr-11

Construction

19-Oct-11

20
50
17-Nov-11

30

Vent boom lighting layout

Start

24-Apr-11

20-Apr-11

Design

02-May-11

26-Apr-11

Construction

19-Oct-11

20
50
17-Nov-11

30

Helideck hazard area classification layout

Start

10-May-11

10-May-11

Design

17-May-11

16-May-11

Construction

20
50
12-Oct-11

11-Oct-11

30

Main deck hazard area classification layout

Start

10-May-11

10-May-11

Design

17-May-11

16-May-11

Construction

20
50
12-Oct-11

11-Oct-11

30

Cellar deck hazard area classification layout

Start

10-May-11

10-May-11

Design

17-May-11

16-May-11

Construction

11-Oct-11

20
50
12-Oct-11

30

* Weights of Activities are calculated relative to (ELECTRICAL ENGINEERING DIVISION)


Tuesday, July 05, 2011

Page 21 of 59

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

1.33%

70.00%

70.00%

1.33%

70.00%

70.00%

1.00%

70.00%

70.00%

1.00%

70.00%

70.00%

1.00%

70.00%

70.00%

1.00%

70.00%

70.00%

0.83%

70.00%

70.00%

0.83%

70.00%

70.00%

ENPPI
W.P.2 DETAILED ENGINEERING
ELECTRICAL ENGINEERING DIVISION
DRAWING
Below cellar deck hazard area classification layout

Start

10-May-11

13-May-11

Design

17-May-11

19-May-11

Construction

11-Oct-11

20
50
12-Oct-11

30

Vent boom hazard area classification layout

Start

10-May-11

10-May-11

Design

17-May-11

19-May-11

Construction

11-Oct-11

20
50
12-Oct-11

30

Helideck earthing layout

Start

10-May-11

10-May-11

Design

17-May-11

16-May-11

Construction

29-Sep-11

20
50
02-Oct-11

30

Main deck earthing layout

Start

10-May-11

10-May-11

Design

17-May-11

16-May-11

Construction

29-Sep-11

20
50
02-Oct-11

30

Cellar deck earthing layout

Start

10-May-11

10-May-11

Design

17-May-11

16-May-11

Construction

29-Sep-11

20
50
02-Oct-11

30

Below cellar deck earthing layout

Start

10-May-11

10-May-11

Design

17-May-11

16-May-11

Construction

20
50
02-Oct-11

29-Sep-11

30

Helideck cable routing layout

Start

19-May-11

15-Jun-11

Design

26-May-11

23-Jun-11

Construction

20
50
04-Oct-11

03-Oct-11

30

Main deck cable routing layout

Start

19-May-11

15-Jun-11

Design

26-May-11

23-Jun-11

Construction

03-Oct-11

20
50
04-Oct-11

30

* Weights of Activities are calculated relative to (ELECTRICAL ENGINEERING DIVISION)


Tuesday, July 05, 2011

Page 22 of 59

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

0.83%

70.00%

70.00%

0.83%

70.00%

70.00%

0.83%

0.00%

0.00%

2.00%

70.00%

0.00%

1.67%

0.00%

0.00%

2.33%

70.00%

70.00%

1.00%

20.00%

0.00%

ENPPI
W.P.2 DETAILED ENGINEERING
ELECTRICAL ENGINEERING DIVISION
DRAWING
Cellar deck cable routing layout

Start

19-May-11

15-Jun-11

Design

26-May-11

23-Jun-11

Construction

03-Oct-11

20
50
04-Oct-11

30

Below cellar deck cable routing layout

Start

19-May-11

15-Jun-11

Design

26-May-11

23-Jun-11

Construction

03-Oct-11

20
50
04-Oct-11

30

Lighting block diagram

Start

21-Oct-11

01-Nov-11

20

Construction

26-Oct-11

24-Nov-11

80

Single line diagram

Start

23-May-11

14-Jul-11

Design

30-May-11

21-Jul-11

20
50

Construction

18-Oct-11

19-Oct-11

30

E&I module equipment layout

Start

03-Jul-11

08-Sep-11

Design

03-Jul-11

08-Sep-11

20
50

Construction

25-Nov-11

29-Jan-12

30

Interconnection & wiring diagram

Start

17-Jun-11

03-May-11

Design

24-Jun-11

11-May-11

Construction

04-Oct-11

20
50
05-Oct-11

30

Cable sections

Start

22-Jun-11

26-Jul-11

Design

29-Jun-11

21-Aug-11

20
50

Construction

04-Oct-11

05-Oct-11

30

28.83%

62.20%

56.65%

REPORTS / TECHNICAL LIST


Electrical cable list

1.33%

Start

08-Jun-11

10-Jul-11

Design

15-Jun-11

17-Jul-11

50

Construction

03-Oct-11

04-Oct-11

30

0.00%

20

* Weights of Activities are calculated relative to (ELECTRICAL ENGINEERING DIVISION)


Tuesday, July 05, 2011

70.00%

Page 23 of 59

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

2.33%

70.00%

Actual
Progress%

ENPPI
W.P.2 DETAILED ENGINEERING
ELECTRICAL ENGINEERING DIVISION
REPORTS / TECHNICAL LIST
Power system study

Start

15-May-11

30-Jun-11

Design

24-May-11

14-Jul-11

50

Final

09-Oct-11

10-Oct-11

30

0.00%

20

3.67%

70.00%

0.00%

MRQ
Electrical cable trays MRQ

Start

24-Apr-11

01-Apr-11

20

For inquiry

02-May-11

03-Apr-11

80

Electrical cables MRQ

Start
For inquiry

02-May-11
09-May-11

01-Apr-11

20

03-Apr-11

80

Navigational aids system MRQ

Start
For inquiry

09-May-11
16-May-11

24-Apr-11

20

27-Apr-11

80

Lighting material MRQ

Start

26-May-11

15-Jun-11

20

For inquiry

02-Jun-11

22-Jun-11

80

Earthing material MRQ

Start

30-May-11

29-May-11

20

For inquiry

06-Jun-11

20-Jun-11

80

2.00%

100.00%

100.00%

2.00%

100.00%

100.00%

2.00%

100.00%

100.00%

2.00%

100.00%

100.00%

2.00%

100.00%

100.00%

10.00%

100.00%

100.00%

TER
Navigational aids system TER

Start

30-May-11

Finish

27-Jun-11

20.00%

20.00%

4.33%

100.00%

100.00%

4.33%

100.00%

100.00%

20

16-May-11
10-Jul-11

80

Electrical cables TER

Start

23-May-11

05-Apr-11

20

Finish

20-Jun-11

10-Apr-11

80

Electrical cable trays TER

Start

22-May-11

05-Apr-11

20

Finish

19-Jun-11

10-Apr-11

80

* Weights of Activities are calculated relative to (ELECTRICAL ENGINEERING DIVISION)


Tuesday, July 05, 2011

8.33%

Page 24 of 59

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

4.33%

20.00%

0.00%

4.33%

20.00%

0.00%

ENPPI
W.P.2 DETAILED ENGINEERING
ELECTRICAL ENGINEERING DIVISION
TER
Lighting material TER

Start

08-Jun-11

10-Jul-11

20

Finish

06-Jul-11

04-Aug-11

80

Earthing material TER

Start

20-Jun-11

10-Jul-11

20

Finish

18-Jul-11

04-Aug-11

80

25.67%

47.01%

40.26%

MRP
Electrical cables MRP

Start

13-Jul-11

10-Jul-11

20

For Purchase

20-Jul-11

14-Jul-11

80

Navigational aids system MRP

Start

19-Jul-11

07-Aug-11

20

For Purchase

26-Jul-11

08-Aug-11

80

Electrical Cable trays MRP

Start

10-Jul-11

30-Jun-11

20

For Purchase

17-Jul-11

30-Jun-11

80

Lighting material MRP

Start

27-Jul-11

28-Aug-11

20

For Purchase

01-Aug-11

04-Sep-11

80

Earthing material MRP

Start

08-Aug-11

28-Aug-11

20

For Purchase

15-Aug-11

06-Sep-11

80

2.00%

0.00%

0.00%

2.00%

0.00%

0.00%

2.00%

0.00%

0.00%

2.00%

0.00%

0.00%

2.00%

0.00%

0.00%

10.00%

0.00%

0.00%

VENDOR PRINTS REVIEW


Earthing Vendor prints review

Start
Finish

23-Aug-11

11-Sep-11

20

28-Nov-11

11-Dec-11

80

Lighting material Vendor prints review

Start

11-Aug-11

11-Sep-11

20

Finish

14-Dec-11

08-Jan-12

80

* Weights of Activities are calculated relative to (ELECTRICAL ENGINEERING DIVISION)


Tuesday, July 05, 2011

Page 25 of 59

2.67%

0.00%

0.00%

2.50%

0.00%

0.00%

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

ENPPI
W.P.2 DETAILED ENGINEERING
ELECTRICAL ENGINEERING DIVISION
VENDOR PRINTS REVIEW
Electrical Cable trays Vendor prints review

Start

25-Jul-11

18-Jul-11

20

Finish

24-Nov-11

02-Nov-11

80

Electrical Cables Vendor prints review

Start

01-Aug-11

21-Jul-11

20

Finish

04-Dec-11

21-Nov-11

80

Navigation aids system Vendor prints review

Start

02-Aug-11

16-Aug-11

20

Finish

05-Dec-11

18-Dec-11

80

E&I Module Vendor prints review

Start
Finish

Total

04-May-11
24-Jan-12

0.00%

0.00%

2.50%

0.00%

0.00%

5.00%

0.00%

0.00%

6.67%

20.00%

20.00%

20

03-May-11
29-Mar-12

80

ELECTRICAL ENGINEERING DIVISION

* Weights of Activities are calculated relative to (ELECTRICAL ENGINEERING DIVISION)


Tuesday, July 05, 2011

2.50%

Page 26 of 59

21.83%

6.11%

6.11%

100.00%

43.90%

38.00%

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

ENPPI
W.P.2 DETAILED ENGINEERING
OFFSHORE ENGINEERING DIVISION
DRAWING
Cable trays supports for deck plan at el. +9700 T.O.S.

Start

28-Jun-11

03-Jul-11

20

Design

05-Jul-11

10-Jul-11

50

Construction

01-Dec-11

01-Dec-11

30

Cable trays supports for cellar deck plan at el. +13500 T.O.S.

Start

28-Jun-11

03-Jul-11

20

Design

05-Jul-11

10-Jul-11

50

Construction

01-Dec-11

01-Dec-11

30

Cable trays supports for mezzanine deck plan at el. +16000 T.O.S.

Start

28-Jun-11

03-Jul-11

20

Design

05-Jul-11

10-Jul-11

50

Construction

01-Dec-11

01-Dec-11

30

Cable trays supports for main deck plan at el. +20500 T.O.S.

Start

28-Jun-11

03-Jul-11

20

Design

05-Jul-11

10-Jul-11

50

Construction

01-Dec-11

01-Dec-11

30

Cable trays supports for Helideck plan at el. +26500 T.O.S.

Start

28-Jun-11

03-Jul-11

20

Design

05-Jul-11

10-Jul-11

50

Construction

01-Dec-11

01-Dec-11

30

10.00%

0.00%

0.00%

10.00%

0.00%

0.00%

10.00%

0.00%

0.00%

10.00%

0.00%

0.00%

10.00%

0.00%

0.00%

50.00%

0.00%

0.00%

MRQ
Survival module MRQ

10.00%

Start

24-Apr-11

01-Apr-11

20

For inquiry

28-Apr-11

03-Apr-11

80

10.00%

100.00%

100.00%

100.00%

100.00%

TER
Survival module TER

Start
Finish

15.00%

01-Jun-11
28-Jun-11

20.00%

20

22-May-11
03-Jul-11

80

15.00%

* Weights of Activities are calculated relative to (OFFSHORE ENGINEERING DIVISION)


Tuesday, July 05, 2011

20.00%

Page 27 of 59

20.00%

20.00%

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

ENPPI
W.P.2 DETAILED ENGINEERING
OFFSHORE ENGINEERING DIVISION
MRP
Survival module MRP

5.00%

Start

20-Jul-11

25-Jul-11

20

For Purchase

26-Jul-11

31-Jul-11

80

5.00%

0.00%

0.00%

0.00%

0.00%

VENDOR PRINTS REVIEW


Survival module vendor prints review

Start
Finish

20.00%

31-Mar-11

04-Aug-11

20

26-Jun-11

20-Sep-11

80

20.00%

Total

OFFSHORE ENGINEERING DIVISION

100.00%

* Weights of Activities are calculated relative to (OFFSHORE ENGINEERING DIVISION)


Tuesday, July 05, 2011

Page 28 of 59

20.00%

20.00%
17.00%

0.00%

0.00%
13.00%

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

6.00%

70.00%

Actual
Progress%

ENPPI
W.P.2 DETAILED ENGINEERING
MECHANICAL ENGINEERING DEPARTMENT
DRAWING
Material selection guide

Start

03-Jun-11

10-May-11

Design

18-Jun-11

17-May-11

Construction

19-Sep-11

70.00%

20
50
20-Sep-11

30

6.00%

70.00%

70.00%

REPORTS / TECHNICAL LIST


Motor load list

10-Apr-11

20

19-Apr-11

14-Apr-11

30

21-Jul-11

23-Jun-11

Start

04-Apr-11

1st issue
2nd issue
Final

22-Sep-11

02-May-11

02-Jul-11

09-May-11

09-Jun-11

Final

08-Jun-11

70.00%

7.78%

100.00%

50.00%

30

Maintenance and handling study

Design

50.00%

20
25-Sep-11

Start

6.67%

20
50
26-Jul-11

30

14.44%

76.92%

59.23%

MRQ
Mono rail MRQ

Start

21-Jul-11

21-Aug-11

20

For inquiry

28-Jul-11

25-Aug-11

80

Turret crane MRQ

Start
For inquiry

06-Apr-11
13-Apr-11

01-Apr-11

20

03-Apr-11

80

Service water pump MRQ

Start
For inquiry

18-Apr-11
25-Apr-11

01-Apr-11

20

03-Apr-11

80

4.33%

0.00%

0.00%

4.00%

100.00%

100.00%

4.00%

100.00%

100.00%

12.33%

64.86%

64.86%

TER
Turret crane TER

10.00%

Start

15-May-11

10-Apr-11

20

Finish

12-Jun-11

04-May-11

80

* Weights of Activities are calculated relative to (MECHANICAL ENGINEERING DEPARTMENT)


Tuesday, July 05, 2011

Page 29 of 59

100.00%

100.00%

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

ENPPI
W.P.2 DETAILED ENGINEERING
MECHANICAL ENGINEERING DEPARTMENT
TER
Service water pump TER

Start

17-May-11

Finish

07-Jun-11

10.00%

100.00%

20.00%

5.56%

0.00%

0.00%

20

28-Apr-11
03-Jul-11

80

Monorail crane TER

Start

11-Aug-11

14-Sep-11

20

Finish

06-Sep-11

04-Oct-11

80

25.56%

78.26%

46.96%

3.33%

0.00%

100.00%

3.33%

0.00%

0.00%

3.33%

0.00%

0.00%

MRP
Turret crane MRP

Start

04-Jul-11

16-Jun-11

20

For Purchase

11-Jul-11

16-Jun-11

80

Service water pump MRP

Start

11-Jul-11

26-Jul-11

20

For Purchase

18-Jul-11

28-Jul-11

80

Monorail crane MRP

Start

04-Oct-11

03-Nov-11

20

For Purchase

10-Oct-11

13-Nov-11

80

10.00%

0.00%

33.33%

VENDOR PRINTS REVIEW


Service water pump Vendor prints review

Start

26-Jul-11

14-Aug-11

20

Finish

28-Nov-11

14-Dec-11

80

Turret crane crane Vendor prints review

Start
Finish

19-Jul-11

13-Jul-11

20

19-Dec-11

07-Dec-11

80

Micro Turbine Vendor prints review

Start
Finish

04-May-11

15-Mar-12

04-May-11

Finish

24-Jan-12

7.78%

0.00%

0.00%

7.78%

20.00%

20.00%

7.78%

20.00%

20.00%

20

15-Jun-11
29-Mar-12

80

* Weights of Activities are calculated relative to (MECHANICAL ENGINEERING DEPARTMENT)


Tuesday, July 05, 2011

0.00%

80

Emergency GeneratorVendor prints review

Start

0.00%

20

24-May-11

24-Jan-12

4.44%

Page 30 of 59

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

ENPPI
W.P.2 DETAILED ENGINEERING
MECHANICAL ENGINEERING DEPARTMENT
VENDOR PRINTS REVIEW
Monorail crane Vendor prints review

Total

3.89%

Start

04-Oct-11

03-Nov-11

20

Finish

01-Feb-12

01-Mar-12

80

MECHANICAL ENGINEERING DEPARTME

* Weights of Activities are calculated relative to (MECHANICAL ENGINEERING DEPARTMENT)


Tuesday, July 05, 2011

Page 31 of 59

0.00%

0.00%

31.67%

9.82%

9.82%

100.00%

46.42%

39.20%

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

ENPPI
W.P.2 DETAILED ENGINEERING
PRESSURE VESSELS ENGINEERING DEPARTMENT
VENDOR PRINTS REVIEW
Pressure vessels

100.00%

Start

10-May-11

Finish

16-Jan-12

16-Jan-12

80

PRESSURE VESSELS ENGINEERING DE

* Weights of Activities are calculated relative to (PRESSURE VESSELS ENGINEERING DEPARTMENT)


Tuesday, July 05, 2011

20.00%

20

10-May-11

100.00%

Total

20.00%

Page 32 of 59

100.00%

20.00%
20.00%

20.00%
20.00%

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

3.26%

60.00%

40.00%

3.26%

60.00%

40.00%

4.19%

60.00%

70.00%

3.49%

60.00%

40.00%

3.26%

40.00%

40.00%

ENPPI
W.P.3 PROCUREMENT SERVICES
FOREIGN PURCHASING DEPARTMENT
COMMODITIES ONE BY ONE
Safety equipment and life saving

RFQ

12-Apr-11

03-Apr-11

Tech. offers open

26-Apr-11

05-Apr-11

Comm. offers open

12-Jun-11

Bid tab

20
20
17-Jul-11

20

26-Jun-11

24-Jul-11

10

F.O.C.

10-Jul-11

04-Aug-11

20

P.O.

24-Jul-11

18-Aug-11

10

Flame arrestor

RFQ

27-Apr-11

21-Apr-11

20

Tech. offers open

19-May-11

02-Jun-11

20

Comm. offers open

23-Jun-11

26-Jul-11

20

Bid tab

07-Jul-11

02-Aug-11

10

F.O.C.

21-Jul-11

07-Aug-11

20

P.O.

04-Aug-11

11-Aug-11

10

Chemical injection package

RFQ

06-Apr-11

03-Apr-11

20

Tech. offers open

27-Apr-11

18-Apr-11

20

Comm. offers open

19-Jun-11

12-Jun-11

20

Bid tab

03-Jul-11

16-Jun-11

10

F.O.C.

10-Jul-11

30-Jun-11

20

P.O.

24-Jul-11

10-Jul-11

10

Fire Fighting package

RFQ

20

13-Apr-11

03-Apr-11

Tech. offers open

26-Apr-11

26-Apr-11

Comm. offers open

14-Jun-11

10-Jul-11

20

Bid tab

28-Jun-11

14-Jul-11

10

F.O.C.

04-Jul-11

20-Jul-11

20

18-Jul-11

24-Jul-11

10

P.O.

20

Vent stack tips

RFQ

09-May-11

09-May-11

20

01-Jun-11

20

Tech. offers open

06-Jun-11

Comm. offers open

06-Jul-11

02-Aug-11

20

Bid tab

20-Jul-11

10-Aug-11

10

F.O.C.

03-Aug-11

21-Aug-11

20

P.O.

17-Aug-11

24-Aug-11

10

* Weights of Activities are calculated relative to (FOREIGN PURCHASING DEPARTMENT)


Tuesday, July 05, 2011

Page 33 of 59

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

3.73%

90.00%

90.00%

3.26%

60.00%

40.00%

3.26%

60.00%

20.00%

3.49%

40.00%

20.00%

3.49%

40.00%

20.00%

ENPPI
W.P.3 PROCUREMENT SERVICES
FOREIGN PURCHASING DEPARTMENT
COMMODITIES ONE BY ONE
Piping bulk

RFQ

07-Apr-11

03-Apr-11

20

Tech. offers open

28-Apr-11

05-Apr-11

20

Comm. offers open 30-May-11

12-Jun-11

20

Bid tab

13-Jun-11

15-Jun-11

10

F.O.C.

19-Jun-11

22-Jun-11

20

P.O.

03-Jul-11

07-Jul-11

10

Insulation Joint

RFQ

20-Apr-11

11-Apr-11

20

Tech. offers open

19-May-11

30-May-11

20

Comm. offers open

12-Jun-11

27-Jul-11

20

Bid tab

26-Jun-11

04-Aug-11

10

F.O.C.

10-Jul-11

14-Aug-11

20

P.O.

24-Jul-11

17-Aug-11

10

Injection fitting
20

RFQ

24-Apr-11

Tech. offers open

23-May-11

13-Apr-11
04-Jul-11

20

Comm. offers open

15-Jun-11

01-Aug-11

20

Bid tab

29-Jun-11

08-Aug-11

10

F.O.C.

13-Jul-11

18-Aug-11

20

P.O.

27-Jul-11

23-Aug-11

10

Earthing material
20

RFQ

06-Jun-11

Tech. offers open

20-Jun-11

07-Jul-11

20

Comm. offers open

18-Jul-11

10-Aug-11

20

Bid tab

01-Aug-11

21-Aug-11

10

F.O.C.

08-Aug-11

25-Aug-11

20

24-Aug-11

15-Sep-11

10

P.O.

21-Jun-11

Lighting material

RFQ

25-May-11

20

22-Jun-11

Tech. offers open

08-Jun-11

07-Jul-11

20

Comm. offers open

06-Jul-11

10-Aug-11

20

Bid tab

20-Jul-11

21-Aug-11

10

F.O.C.

27-Jul-11

25-Aug-11

20

P.O.

22-Aug-11

13-Sep-11

10

* Weights of Activities are calculated relative to (FOREIGN PURCHASING DEPARTMENT)


Tuesday, July 05, 2011

Page 34 of 59

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

3.73%

60.00%

90.00%

3.49%

60.00%

70.00%

3.49%

40.00%

40.00%

3.49%

40.00%

40.00%

3.49%

40.00%

40.00%

ENPPI
W.P.3 PROCUREMENT SERVICES
FOREIGN PURCHASING DEPARTMENT
COMMODITIES ONE BY ONE
Electrical Cable trays

RFQ

02-May-11

03-Apr-11

20

Tech. offers open

16-May-11

05-Apr-11

20

Comm. offers open

19-Jun-11

15-May-11

20

Bid tab

03-Jul-11

20-May-11

10

F.O.C.

10-Jul-11

30-May-11

20

P.O.

24-Jul-11

07-Jul-11

10

Electrical Cables

RFQ

09-May-11

03-Apr-11

20

Tech. offers open

23-May-11

05-Apr-11

20

Comm. offers open

22-Jun-11

07-Jun-11

20

Bid tab

06-Jul-11

15-Jun-11

F.O.C.

13-Jul-11

03-Jul-11

20

P.O.

27-Jul-11

10-Jul-11

10

10

Navigation aids system


20

RFQ

16-May-11

28-Apr-11

Tech. offers open

30-May-11

16-May-11

Comm. offers open

27-Jun-11

17-Jul-11

20

Bid tab

11-Jul-11

26-Jul-11

10

F.O.C.

18-Jul-11

01-Aug-11

20

P.O.

02-Aug-11

10-Aug-11

10

20

Instrument & Mechanical bulk material

RFQ

05-Jun-11

04-May-11

Tech. offers open

19-Jun-11

26-May-11

Comm. offers open

03-Jul-11

20
20
21-Jul-11

20

Bid tab

17-Jul-11

31-Jul-11

10

F.O.C.

24-Jul-11

04-Aug-11

20

07-Aug-11

18-Aug-11

10

P.O.

Inst. Junction Box

RFQ

09-Jun-11

07-Jun-11

Tech. offers open

23-Jun-11

20-Jun-11

20
20

Comm. offers open

07-Jul-11

27-Jul-11

20

Bid tab

21-Jul-11

07-Aug-11

10

F.O.C.

28-Jul-11

17-Aug-11

20

P.O.

11-Aug-11

21-Aug-11

10

* Weights of Activities are calculated relative to (FOREIGN PURCHASING DEPARTMENT)


Tuesday, July 05, 2011

Page 35 of 59

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

4.19%

70.00%

70.00%

3.73%

60.00%

40.00%

3.45%

40.00%

40.00%

3.49%

40.00%

0.00%

3.54%

70.00%

40.00%

ENPPI
W.P.3 PROCUREMENT SERVICES
FOREIGN PURCHASING DEPARTMENT
COMMODITIES ONE BY ONE
HIPPS

RFQ

07-Apr-11

03-Apr-11

20

Tech. offers open

28-Apr-11

05-Apr-11

20

Comm. offers open 31-May-11

16-Jun-11

20

Bid tab

23-Jun-11

14-Jun-11

10

F.O.C.

28-Jun-11

06-Jul-11

P.O.

12-Jul-11

14-Jul-11

20
10

Choke valves

RFQ

13-Apr-11

03-Apr-11

20

Tech. offers open

12-May-11

26-Apr-11

20

Comm. offers open

14-Jun-11

12-Jul-11

20

Bid tab

28-Jun-11

20-Jul-11

10

F.O.C.

05-Jul-11

26-Jul-11

20

P.O.

19-Jul-11

09-Aug-11

10

Loose instrument
20

RFQ

29-May-11

07-Jun-11

Tech. offers open

12-Jun-11

20-Jun-11

Comm. offers open

26-Jun-11

01-Aug-11

20

Bid tab

10-Jul-11

10-Aug-11

10

F.O.C.

17-Jul-11

21-Aug-11

20

P.O.

31-Jul-11

25-Aug-11

10

20

Instrument cable trays

RFQ

31-May-11

20

27-Jun-11

Tech. offers open

14-Jun-11

04-Jul-11

20

Comm. offers open

30-Jun-11

07-Aug-11

20

Bid tab

14-Jul-11

16-Aug-11

10

F.O.C.

14-Jul-11

24-Aug-11

20

28-Jul-11

29-Aug-11

10

P.O.

Electro hydraulic wellhead control panel

RFQ

14-Apr-11

05-Apr-11

Tech. offers open

15-May-11

05-Apr-11

20
20

Comm. offers open

06-Jun-11

30-Jun-11

20

Bid tab

20-Jun-11

06-Jul-11

10

F.O.C.

04-Jul-11

12-Jul-11

20

P.O.

14-Jul-11

18-Jul-11

10

* Weights of Activities are calculated relative to (FOREIGN PURCHASING DEPARTMENT)


Tuesday, July 05, 2011

Page 36 of 59

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

3.54%

70.00%

40.00%

3.49%

60.00%

20.00%

3.49%

40.00%

0.00%

3.73%

60.00%

90.00%

3.49%

60.00%

40.00%

ENPPI
W.P.3 PROCUREMENT SERVICES
FOREIGN PURCHASING DEPARTMENT
COMMODITIES ONE BY ONE
Wing valves
20

RFQ

13-Apr-11

03-Apr-11

Tech. offers open

12-May-11

02-May-11

Comm. offers open

08-Jun-11

03-Jul-11

20

Bid tab

22-Jun-11

10-Jul-11

10

F.O.C.

06-Jul-11

21-Jul-11

20

P.O.

20-Jul-11

04-Aug-11

10

20

Instrument cable and cable glands

RFQ

23-May-11

20

23-Jun-11

Tech. offers open

06-Jun-11

07-Jul-11

20

Comm. offers open

20-Jun-11

07-Aug-11

20

Bid tab

04-Jul-11

16-Aug-11

10

F.O.C.

11-Jul-11

23-Aug-11

20

P.O.

25-Jul-11

28-Aug-11

10

Sand & Corrosion probes


20

RFQ

02-Jun-11

Tech. offers open

16-Jun-11

10-Jul-11

20

Comm. offers open

11-Jul-11

11-Aug-11

20

25-Jul-11

23-Aug-11

10

F.O.C.

01-Aug-11

29-Aug-11

20

P.O.

15-Aug-11

11-Sep-11

10

Bid tab

27-Jun-11

Multi phase flow meter

10-Apr-11

20

09-May-11

28-Apr-11

20

12-Jun-11

09-Jun-11

20

Bid tab

26-Jun-11

13-Jun-11

10

F.O.C.

10-Jul-11

16-Jun-11

RFQ

10-Apr-11

Tech. offers open


Comm. offers open

P.O.

20
03-Jul-11

24-Jul-11

10

Service water pump

RFQ

25-Apr-11

03-Apr-11

Tech. offers open

17-May-11

28-Apr-11

20
20

Comm. offers open

13-Jun-11

10-Jul-11

20

Bid tab

27-Jun-11

18-Jul-11

10

F.O.C.

11-Jul-11

25-Jul-11

20

P.O.

25-Jul-11

02-Aug-11

10

* Weights of Activities are calculated relative to (FOREIGN PURCHASING DEPARTMENT)


Tuesday, July 05, 2011

Page 37 of 59

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

4.19%

60.00%

100.00%

3.49%

0.00%

0.00%

3.73%

40.00%

40.00%

ENPPI
W.P.3 PROCUREMENT SERVICES
FOREIGN PURCHASING DEPARTMENT
COMMODITIES ONE BY ONE
Turret crane crane

RFQ

13-Apr-11

03-Apr-11

20

Tech. offers open

12-May-11

10-Apr-11

20

Comm. offers open

12-Jun-11

11-May-11

20

Bid tab

26-Jun-11

03-May-11

10

F.O.C.

10-Jul-11

29-May-11

20

P.O.

18-Jul-11

21-Jun-11

10

Monorail crane

28-Jul-11

28-Jul-11

20

Tech. offers open

11-Aug-11

11-Aug-11

20

Comm. offers open

06-Sep-11

06-Sep-11

20

Bid tab

20-Sep-11

20-Sep-11

10

F.O.C.

04-Oct-11

04-Oct-11

20

P.O.

17-Oct-11

17-Oct-11

10

RFQ

Survival module
20

RFQ

02-May-11

03-Apr-11

Tech. offers open

31-May-11

22-May-11

Comm. offers open

29-Jun-11

10-Jul-11

20

Bid tab

13-Jul-11

18-Jul-11

10

20

F.O.C.

19-Jul-11

24-Jul-11

20

P.O.

02-Aug-11

07-Aug-11

10

100.00%

Total

FOREIGN PURCHASING DEPARTMENT

100.00%

* Weights of Activities are calculated relative to (FOREIGN PURCHASING DEPARTMENT)


Tuesday, July 05, 2011

Page 38 of 59

53.17%
53.17%

44.73%
44.73%

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

ENPPI
W.P.3 PROCUREMENT SERVICES
EXPEDITING DEPART.
COMMODITIES ONE BY ONE
Safety equipment and life saving

Start

10-Jul-11

04-Aug-11

10

Receiv. Supp. Key

29-Aug-11

25-Sep-11

20

Place Main Mat. S/

18-Sep-11

17-Oct-11

10

Receiv. Main Mat.s

17-Nov-11

13-Dec-11

20

07-Dec-11

01-Jan-12

40

Fabrication Finish

Flame arrestor

Start

21-Jul-11

11-Aug-11

10

Receiv. Supp. Key

09-Sep-11

10-Oct-11

20

Place Main Mat. S/

29-Sep-11

26-Oct-11

10

Receiv. Main Mat.s

29-Oct-11

27-Nov-11

20

Fabrication Finish

28-Nov-11

26-Dec-11

40

Chemical injection package

Start

10-Jul-11

05-Jul-11

Receiv. Supp. Key

18-Sep-11

11-Sep-11

20

Place Main Mat. S/

23-Sep-11

14-Sep-11

10

Receiv. Main Mat.s

27-Nov-11

20-Nov-11

20

Fabrication Finish

06-Jan-12

27-Dec-11

40

Start

05-Jul-11

20-Jul-11

Receiv. Supp. Key

03-Sep-11

19-Sep-11

20

Place Main Mat. S/

23-Sep-11

09-Oct-11

10

Receiv. Main Mat.s

12-Nov-11

24-Nov-11

20

Fabrication Finish

31-Dec-11

04-Jan-12

40

Start

08-Aug-11

05-Sep-11

10

Receiv. Supp. Key

07-Oct-11

06-Nov-11

20

Place Main Mat. S/

27-Oct-11

24-Nov-11

10

Fabrication Finish

06-Dec-11

02-Jan-12

40

Receiv. Main Mat.s

06-Dec-11

03-Jan-12

20

Piping bulk

19-Jun-11
05-Jan-12

1.86%

0.00%

0.00%

4.66%

0.00%

0.00%

3.73%

0.00%

0.00%

1.86%

0.00%

0.00%

3.50%

20.00%

0.00%

20

26-Jun-11
10-Jan-12

80

Layout No. 1

* Weights of Activities are calculated relative to (EXPEDITING DEPART.)


Tuesday, July 05, 2011

0.00%

10

Vent stack tips

Fabrication Finish

0.00%

10

Fire Fighting package

Start

1.86%

Page 39 of 59

Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

ENPPI
W.P.3 PROCUREMENT SERVICES
EXPEDITING DEPART.
COMMODITIES ONE BY ONE
Insulation Joint

Start

10-Jul-11

22-Aug-11

10

Receiv. Supp. Key

08-Sep-11

23-Oct-11

20

Place Main Mat. S/

18-Sep-11

31-Oct-11

10

Receiv. Main Mat.s

18-Oct-11

30-Nov-11

20

07-Dec-11

18-Jan-12

40

Fabrication Finish

Injection fitting

Start

13-Jul-11

18-Aug-11

10

Receiv. Supp. Key

11-Sep-11

23-Oct-11

20

Place Main Mat. S/

21-Sep-11

31-Oct-11

10

Receiv. Main Mat.s

21-Oct-11

30-Nov-11

20

Fabrication Finish

10-Dec-11

18-Jan-12

40

Earthing material

Start

08-Aug-11

25-Aug-11

20

Fabrication Finish

26-Dec-11

26-Dec-11

80

Lighting material

Start

27-Jul-11

24-Aug-11

20

Fabrication Finish

14-Dec-11

23-Dec-11

80

Electrical Cable trays

Start
Fabrication Finish

10-Jul-11

06-Jul-11

20

18-Oct-11

02-Oct-11

80

Electrical Cables

Start
Fabrication Finish

17-Jul-11

06-Jul-11

20

04-Dec-11

22-Nov-11

80

Navigation aids system

Start

18-Jul-11

01-Aug-11

10

Receiv. Supp. Key

16-Sep-11

27-Sep-11

20

Place Main Mat. S/

06-Oct-11

20-Oct-11

10

Receiv. Main Mat.s

26-Oct-11

09-Nov-11

20

Fabrication Finish

05-Dec-11

18-Dec-11

40

Instrument & Mechanical bulk material

Start

24-Jul-11

04-Aug-11

20

Fabrication Finish

01-Nov-11

05-Nov-11

80

0.00%

0.00%

1.86%

0.00%

0.00%

1.86%

0.00%

0.00%

2.33%

0.00%

0.00%

1.86%

0.00%

0.00%

2.33%

0.00%

0.00%

3.73%

0.00%

0.00%

1.86%

0.00%

0.00%

Layout No. 1

* Weights of Activities are calculated relative to (EXPEDITING DEPART.)


Tuesday, July 05, 2011

1.86%

Page 40 of 59

Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

ENPPI
W.P.3 PROCUREMENT SERVICES
EXPEDITING DEPART.
COMMODITIES ONE BY ONE
Inst. Junction Box

Start

28-Jul-11

17-Aug-11

20

Finish

05-Nov-11

09-Nov-11

80

HIPPS

28-Jun-11

07-Jul-11

10

Receiv. Supp. Key

26-Oct-11

06-Nov-11

20

Place Main Mat. S/

15-Nov-11

24-Nov-11

10

Receiv. Main Mat.s

24-Jan-12

02-Feb-12

20

Fabrication Finish

24-Mar-12

17-Mar-12

40

Start

Choke valves

Start

05-Jul-11

27-Jul-11

Receiv. Supp. Key

02-Nov-11

24-Nov-11

20

Place Main Mat. S/

22-Nov-11

14-Dec-11

10

Receiv. Main Mat.s

31-Jan-12

22-Feb-12

20

Fabrication Finish

31-Mar-12

21-Apr-12

40

Start

17-Jul-11

15-Aug-11

20

Fabrication Finish

13-Jan-12

20-Feb-12

80

Instrument cable trays

Fabrication Finish

14-Jul-11

24-Aug-11

20

22-Oct-11

18-Nov-11

80

Electro hydraulic wellhead control panel

10-Jul-11

12-Jul-11

10

Receiv. Supp. Key

08-Oct-11

04-Oct-11

20

Place Main Mat. S/

07-Nov-11

03-Nov-11

10

Receiv. Main Mat.s

17-Dec-11

13-Dec-11

20

Fabrication Finish

06-Jan-12

01-Jan-12

40

Start

Wing valves

Start

06-Jul-11

24-Jul-11

10

Receiv. Supp. Key

04-Oct-11

20-Oct-11

20

Place Main Mat. S/

03-Nov-11

21-Nov-11

10

Receiv. Main Mat.s

13-Dec-11

29-Dec-11

20

Fabrication Finish

01-Apr-12

16-Apr-12

40

Instrument cable and cable glands

Start

11-Jul-11

14-Aug-11

20

Fabrication Finish

28-Nov-11

08-Nov-11

80

0.00%

4.66%

0.00%

0.00%

3.73%

0.00%

0.00%

1.86%

0.00%

0.00%

1.86%

0.00%

0.00%

3.73%

0.00%

0.00%

3.26%

0.00%

0.00%

1.86%

0.00%

0.00%

Layout No. 1

* Weights of Activities are calculated relative to (EXPEDITING DEPART.)


Tuesday, July 05, 2011

0.00%

10

Loose instrument

Start

1.86%

Page 41 of 59

Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

ENPPI
W.P.3 PROCUREMENT SERVICES
EXPEDITING DEPART.
COMMODITIES ONE BY ONE
Sand & Corrosion probes

Start

01-Aug-11

30-Aug-11

10

Receiv. Supp. Key

30-Sep-11

27-Oct-11

20

Place Main Mat. S/

30-Oct-11

28-Nov-11

10

Receiv. Main Mat.s

09-Dec-11

07-Jan-12

20

Fabrication Finish

29-Dec-11

08-Jan-12

40

Multi phase flow meter

10-Jul-11

Receiv. Supp. Key

28-Sep-11

12-Sep-11

20

Place Main Mat. S/

08-Oct-11

20-Sep-11

10

Receiv. Main Mat.s

27-Nov-11

09-Nov-11

20

Fabrication Finish

06-Jan-12

21-Dec-11

40

20-Jun-11

Service water pump

Start

11-Jul-11

28-Jul-11

10

Receiv. Supp. Key

19-Sep-11

06-Oct-11

20

Place Main Mat. S/

09-Oct-11

26-Oct-11

10

Receiv. Main Mat.s

18-Nov-11

05-Dec-11

20

Fabrication Finish

28-Nov-11

14-Dec-11

40

Turret crane crane

10-Jul-11

Receiv. Supp. Key

01-Nov-11

Place Main Mat. S/

0.00%

3.73%

0.00%

10.00%

3.26%

0.00%

0.00%

4.66%

0.00%

10.00%

1.86%

0.00%

0.00%

3.26%

0.00%

0.00%

10

21-Jun-11
27-Sep-11

20

11-Nov-11

09-Oct-11

10

Receiv. Main Mat.s

20-Jan-12

18-Dec-11

20

Fabrication Finish

29-Feb-12

19-Feb-12

40

Monorail crane

Start

04-Oct-11

04-Oct-11

10

Receiv. Supp. Key

13-Dec-11

13-Dec-11

20

Place Main Mat. S/

23-Dec-11

23-Dec-11

10

Receiv. Main Mat.s

12-Jan-12

12-Jan-12

20

Fabrication Finish

01-Feb-12

01-Feb-12

40

Survival module

Start

11-Jul-11

28-Jul-11

10

Receiv. Supp. Key

09-Oct-11

26-Oct-11

20

Place Main Mat. S/

29-Oct-11

15-Nov-11

10

Fabrication Finish

28-Nov-11

14-Dec-11

40

Receiv. Main Mat.s

08-Dec-11

25-Dec-11

20

Layout No. 1

* Weights of Activities are calculated relative to (EXPEDITING DEPART.)


Tuesday, July 05, 2011

0.00%

10

Start

Start

1.86%

Page 42 of 59

Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

4.66%

10.00%

10.00%

4.66%

10.00%

10.00%

4.66%

10.00%

10.00%

4.66%

10.00%

10.00%

4.66%

10.00%

10.00%

ENPPI
W.P.3 PROCUREMENT SERVICES
EXPEDITING DEPART.
COMMODITIES ONE BY ONE
Production Manifold
10

Start

19-Apr-11

Receiv. Supp. Key

17-Aug-11

17-Aug-11

20

Place Main Mat. S/

27-Aug-11

27-Aug-11

10

Receiv. Main Mat.s

15-Nov-11

15-Nov-11

20

15-Dec-11

15-Dec-11

40

Fabrication Finish

24-May-11

E&I Module
10

Start

19-Apr-11

Receiv. Supp. Key

17-Aug-11

03-May-11
07-Sep-11

20

Place Main Mat. S/

27-Aug-11

27-Aug-11

10

Receiv. Main Mat.s

15-Nov-11

15-Nov-11

20

Fabrication Finish

15-Dec-11

15-Dec-11

40

Actuated valves
10

Start

19-Apr-11

19-Apr-11

Receiv. Supp. Key

17-Aug-11

05-Sep-11

20

Place Main Mat. S/

06-Sep-11

06-Sep-11

10

Receiv. Main Mat.s

15-Nov-11

15-Nov-11

20

Fabrication Finish

15-Dec-11

15-Dec-11

40

Emergency Generator
10

Start

19-Apr-11

Receiv. Supp. Key

17-Aug-11

23-May-11
03-Sep-11

20

Place Main Mat. S/

06-Sep-11

06-Sep-11

10

Receiv. Main Mat.s

15-Nov-11

15-Nov-11

20

Fabrication Finish

15-Dec-11

15-Dec-11

40

Micro Turbine
10

Start

19-Apr-11

03-May-11

Place Main Mat. S/

16-Sep-11

16-Sep-11

10

Receiv. Supp. Key

16-Sep-11

16-Sep-11

20

Receiv. Main Mat.s

25-Nov-11

25-Nov-11

20

Fabrication Finish

15-Dec-11

15-Dec-11

40

100.00%

Total

EXPEDITING DEPART.

100.00%

3.03%

3.17%
3.17%

Layout No. 1

* Weights of Activities are calculated relative to (EXPEDITING DEPART.)


Tuesday, July 05, 2011

3.03%

Page 43 of 59

Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

ENPPI
W.P.3 PROCUREMENT SERVICES
SUPPLIER QUALITY SRVEILLANCE DEPART.
COMMODITIES ONE BY ONE
Safety equipment and life saving

NFI

30-Nov-11

25-Dec-11

20

RFS

07-Dec-11

01-Jan-12

80

Flame arrestor

NFI

21-Nov-11

19-Dec-11

20

RFS

28-Nov-11

26-Dec-11

80

Chemical injection package

NFI

30-Dec-11

20-Dec-11

20

RFS

06-Jan-12

27-Dec-11

80

Fire Fighting package

NFI
RFS

24-Dec-11

28-Dec-11

20

31-Dec-11

04-Jan-12

80

Vent stack tips

NFI
RFS

29-Nov-11

26-Dec-11

20

06-Dec-11

02-Jan-12

80

Piping bulk

NFI

29-Dec-11

03-Jan-12

20

RFS

05-Jan-12

10-Jan-12

80

Insulation Joint

NFI

30-Nov-11

11-Jan-12

20

RFS

07-Dec-11

18-Jan-12

80

Injection fitting

NFI

03-Dec-11

11-Jan-12

20

RFS

10-Dec-11

18-Jan-12

80

Earthing material

NFI

19-Dec-11

19-Dec-11

20

RFS

26-Dec-11

26-Dec-11

80

Lighting material

NFI

07-Dec-11

16-Dec-11

20

RFS

14-Dec-11

23-Dec-11

80

* Weights of Activities are calculated relative to (SUPPLIER QUALITY SRVEILLANCE DEPART.)


Tuesday, July 05, 2011

Page 44 of 59

2.75%

0.00%

0.00%

2.75%

0.00%

0.00%

4.59%

0.00%

0.00%

3.67%

0.00%

0.00%

2.75%

0.00%

0.00%

4.59%

0.00%

0.00%

1.83%

0.00%

0.00%

1.83%

0.00%

0.00%

1.83%

0.00%

0.00%

1.83%

0.00%

0.00%

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

ENPPI
W.P.3 PROCUREMENT SERVICES
SUPPLIER QUALITY SRVEILLANCE DEPART.
COMMODITIES ONE BY ONE
Electrical Cable trays

NFI

11-Oct-11

25-Sep-11

20

RFS

18-Oct-11

02-Oct-11

80

Electrical Cables

NFI

27-Nov-11

15-Nov-11

20

RFS

04-Dec-11

22-Nov-11

80

Navigation aids system

NFI

28-Nov-11

11-Dec-11

20

RFS

05-Dec-11

18-Dec-11

80

Instrument & Mechanical bulk material

NFI
RFS

25-Oct-11

25-Oct-11

20

01-Nov-11

03-Nov-11

80

Inst. Junction Box

NFI
RFS

29-Oct-11

02-Nov-11

20

05-Nov-11

09-Nov-11

80

HIPPS

NFI

17-Mar-12

10-Mar-12

20

RFS

24-Mar-12

17-Mar-12

80

Choke valves

NFI

24-Mar-12

14-Apr-12

20

RFS

31-Mar-12

21-Apr-12

80

Loose instrument

NFI

06-Jan-12

04-Jan-12

20

RFS

13-Jan-12

10-Jan-12

80

Instrument cable trays

NFI

15-Oct-11

08-Nov-11

20

RFS

22-Oct-11

18-Nov-11

80

Electro hydraulic wellhead control panel

NFI

30-Dec-11

25-Dec-11

20

RFS

06-Jan-12

01-Jan-12

80

* Weights of Activities are calculated relative to (SUPPLIER QUALITY SRVEILLANCE DEPART.)


Tuesday, July 05, 2011

Page 45 of 59

1.83%

0.00%

0.00%

1.83%

0.00%

0.00%

2.75%

0.00%

0.00%

1.83%

0.00%

0.00%

1.83%

0.00%

0.00%

4.59%

0.00%

0.00%

3.67%

0.00%

0.00%

1.83%

0.00%

0.00%

1.83%

0.00%

0.00%

3.67%

0.00%

0.00%

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

ENPPI
W.P.3 PROCUREMENT SERVICES
SUPPLIER QUALITY SRVEILLANCE DEPART.
COMMODITIES ONE BY ONE
Wing valves

NFI

25-Mar-12

09-Apr-12

20

RFS

01-Apr-12

16-Apr-12

80

Instrument cable and cable glands

NFI

21-Nov-11

15-Nov-11

20

RFS

28-Nov-11

11-Dec-11

80

Sand & Corrosion probes

NFI

22-Dec-11

01-Jan-12

20

RFS

29-Dec-11

08-Jan-12

80

Multi phase flow meter

NFI
RFS

30-Dec-11

14-Dec-11

20

06-Jan-12

21-Dec-11

80

Service water pump

NFI
RFS

21-Nov-11

07-Dec-11

20

28-Nov-11

14-Dec-11

80

Turret crane crane

NFI

22-Feb-12

12-Feb-12

20

RFS

29-Feb-12

19-Feb-12

80

Monorail crane

NFI

25-Jan-12

25-Jan-12

20

RFS

01-Feb-12

01-Feb-12

80

Survival module

NFI

19-Dec-11

26-Dec-11

20

RFS

26-Dec-11

29-Dec-11

80

Production Manifold

NFI

08-Dec-11

08-Dec-11

20

RFS

15-Dec-11

15-Dec-11

80

E&I Module

NFI

08-Dec-11

08-Dec-11

20

RFS

15-Dec-11

15-Dec-11

80

* Weights of Activities are calculated relative to (SUPPLIER QUALITY SRVEILLANCE DEPART.)


Tuesday, July 05, 2011

Page 46 of 59

3.67%

0.00%

0.00%

1.83%

0.00%

0.00%

1.83%

0.00%

0.00%

3.67%

0.00%

0.00%

2.75%

0.00%

0.00%

4.59%

0.00%

0.00%

2.75%

0.00%

0.00%

3.67%

0.00%

0.00%

2.75%

0.00%

0.00%

4.59%

0.00%

0.00%

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

ENPPI
W.P.3 PROCUREMENT SERVICES
SUPPLIER QUALITY SRVEILLANCE DEPART.
COMMODITIES ONE BY ONE
Actuated valves

NFI

08-Dec-11

08-Dec-11

20

RFS

15-Dec-11

15-Dec-11

80

Emergency Generator

NFI

08-Dec-11

08-Dec-11

20

RFS

15-Dec-11

15-Dec-11

80

Micro Turbine

NFI

08-Dec-11

08-Dec-11

20

RFS

15-Dec-11

15-Dec-11

80

4.59%

0.00%

0.00%

4.59%

0.00%

0.00%

4.59%

0.00%

0.00%

100.00%

Total

SUPPLIER QUALITY SRVEILLANCE DEP

* Weights of Activities are calculated relative to (SUPPLIER QUALITY SRVEILLANCE DEPART.)


Tuesday, July 05, 2011

Page 47 of 59

100.00%

0.00%
0.00%

0.00%
0.00%

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

ENPPI
W.P.3 PROCUREMENT SERVICES
TRAFFIC & LOGISTICS DEPARTMENT
COMMODITIES ONE BY ONE
Safety equipment and life saving

Mat. Deliv.to Dest. P 07-Dec-11

02-Jan-12

20

Mat. Deliv.to Ship. P 28-Dec-11

22-Jan-12

30

Customs Cleared

08-Jan-12

02-Feb-12

30

Material At Site

11-Jan-12

05-Feb-12

20

Flame arrestor

Mat. Deliv.to Dest. P 28-Nov-11

27-Dec-11

20

Mat. Deliv.to Ship. P 19-Dec-11

16-Jan-12

30

Customs Cleared

30-Dec-11

27-Jan-12

30

02-Jan-12

30-Jan-12

20

Material At Site

Chemical injection package

Mat. Deliv.to Dest. P 06-Jan-12

28-Dec-11

20

Mat. Deliv.to Ship. P 27-Jan-12

17-Jan-12

30

Customs Cleared

07-Feb-12

28-Jan-12

30

Material At Site

10-Feb-12

31-Jan-12

20

Fire Fighting package


05-Jan-12

20

Mat. Deliv.to Ship. P 21-Jan-12

25-Jan-12

30

Customs Cleared

01-Feb-12

05-Feb-12

30

Material At Site

04-Feb-12

08-Feb-12

20

Mat. Deliv.to Dest. P 01-Jan-12

Vent stack tips

Mat. Deliv.to Dest. P 06-Dec-11

03-Jan-12

20

Mat. Deliv.to Ship. P 27-Dec-11

23-Jan-12

30

Customs Cleared

07-Jan-12

03-Feb-12

30

Material At Site

10-Jan-12

06-Feb-12

20

Piping bulk 3rd batch

Mat. Deliv.to Dest. P 05-Jan-12

11-Jan-12

20

Mat. Deliv.to Ship. P 26-Jan-12

31-Jan-12

30

Customs Cleared

06-Feb-12

11-Feb-12

30

09-Feb-12

14-Feb-12

20

Material At Site

Insulation Joint

Mat. Deliv.to Dest. P 07-Dec-11

19-Jan-12

20

Mat. Deliv.to Ship. P 28-Dec-11

08-Feb-12

30

Customs Cleared

08-Jan-12

19-Feb-12

30

Material At Site

11-Jan-12

22-Feb-12

20

* Weights of Activities are calculated relative to (TRAFFIC & LOGISTICS DEPARTMENT)


Tuesday, July 05, 2011

Page 48 of 59

3.48%

0.00%

0.00%

3.48%

0.00%

0.00%

4.35%

0.00%

0.00%

4.35%

0.00%

0.00%

2.61%

0.00%

0.00%

1.74%

0.00%

0.00%

1.74%

0.00%

0.00%

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

ENPPI
W.P.3 PROCUREMENT SERVICES
TRAFFIC & LOGISTICS DEPARTMENT
COMMODITIES ONE BY ONE
Injection fitting

Mat. Deliv.to Dest. P 10-Dec-11

19-Jan-12

20

Mat. Deliv.to Ship. P 31-Dec-11

08-Feb-12

30

Customs Cleared

11-Jan-12

19-Feb-12

30

Material At Site

14-Jan-12

22-Feb-12

20

Earthing material

Mat. Deliv.to Dest. P 26-Dec-11

28-Dec-11

20

Mat. Deliv.to Ship. P 24-Jan-12

22-Jan-12

30

Customs Cleared

11-Feb-12

12-Feb-12

30

14-Feb-12

14-Feb-12

20

Material At Site

Lighting material

Mat. Deliv.to Dest. P 14-Dec-11

26-Dec-11

20

Mat. Deliv.to Ship. P 04-Jan-12

13-Jan-12

30

Customs Cleared

15-Jan-12

23-Dec-12

30

Material At Site

18-Jan-12

27-Jan-12

20

Electrical Cable trays


03-Oct-11

20

Mat. Deliv.to Ship. P 08-Nov-11

23-Oct-11

30

Customs Cleared

19-Nov-11

03-Nov-11

30

Material At Site

22-Nov-11

06-Nov-11

20

Mat. Deliv.to Dest. P 18-Oct-11

Electrical Cables

Mat. Deliv.to Dest. P 04-Dec-11

23-Nov-11

20

Mat. Deliv.to Ship. P 25-Dec-11

13-Dec-11

30

Customs Cleared

05-Jan-12

22-Dec-11

30

Material At Site

08-Jan-12

27-Dec-11

20

Navigation aids system

Mat. Deliv.to Dest. P 05-Dec-11

19-Dec-11

20

Mat. Deliv.to Ship. P 26-Dec-11

08-Jan-12

30

Customs Cleared

06-Jan-12

19-Jan-12

30

09-Jan-12

22-Jan-12

20

Material At Site

Instrument & Mechanical bulk material

Mat. Deliv.to Dest. P 01-Nov-11

03-Nov-11

Mat. Deliv.to Ship. P 22-Nov-11

23-Nov-11

30

Customs Cleared

03-Dec-11

07-Dec-11

30

Material At Site

06-Dec-11

07-Dec-11

20

0.00%

0.00%

1.74%

0.00%

0.00%

1.74%

0.00%

0.00%

1.74%

0.00%

0.00%

1.74%

0.00%

0.00%

3.48%

0.00%

0.00%

1.74%

0.00%

0.00%

20

* Weights of Activities are calculated relative to (TRAFFIC & LOGISTICS DEPARTMENT)


Tuesday, July 05, 2011

1.74%

Page 49 of 59

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

ENPPI
W.P.3 PROCUREMENT SERVICES
TRAFFIC & LOGISTICS DEPARTMENT
COMMODITIES ONE BY ONE
Inst. Junction Box

Mat. Deliv.to Dest. P 05-Nov-11

10-Nov-11

Mat. Deliv.to Ship. P 26-Nov-11

30-Nov-11

30

Customs Cleared

07-Dec-11

11-Dec-11

30

Material At Site

10-Dec-11

14-Dec-11

20

Mat. Deliv.to Dest. P 24-Mar-12

18-Mar-12

20

Mat. Deliv.to Ship. P 14-Apr-12

07-Apr-12

30

Customs Cleared

25-Apr-12

18-Apr-12

30

28-Apr-12

21-Apr-12

20

Choke valves
01-May-12

Mat. Deliv.to Ship. P 31-Mar-12

22-May-12

30

Customs Cleared

18-Apr-12

08-Jun-12

30

Material At Site

21-Apr-12

11-Jun-12

20

Loose instrument

Mat. Deliv.to Dest. P 13-Jan-12

10-Jan-12

20

Mat. Deliv.to Ship. P 10-Feb-12

06-Feb-12

30

Customs Cleared

21-Feb-12

18-Feb-12

30

Material At Site

24-Feb-12

20-Feb-12

20

Instrument cable trays

Mat. Deliv.to Dest. P 22-Oct-11

18-Nov-11

Mat. Deliv.to Ship. P 29-Oct-11

17-Nov-11

30

Customs Cleared

09-Nov-11

04-Dec-11

30

Material At Site

12-Nov-11

04-Nov-11

20

4.35%

0.00%

0.00%

3.48%

0.00%

0.00%

1.74%

0.00%

0.00%

1.74%

0.00%

0.00%

3.48%

0.00%

0.00%

2.61%

0.00%

0.00%

20

Electro hydraulic wellhead control panel

Mat. Deliv.to Dest. P 06-Jan-12

02-Jan-12

20

Mat. Deliv.to Ship. P 27-Jan-12

22-Jan-12

30

Customs Cleared

08-Feb-12

02-Feb-12

30

11-Feb-12

05-Feb-12

20

Wing valves

Mat. Deliv.to Dest. P 01-Apr-12

17-Apr-12

20

Mat. Deliv.to Ship. P 22-Apr-12

07-May-12

30

Customs Cleared

03-May-12

18-May-12

30

Material At Site

06-May-12

21-May-12

20

* Weights of Activities are calculated relative to (TRAFFIC & LOGISTICS DEPARTMENT)


Tuesday, July 05, 2011

0.00%

20

Mat. Deliv.to Dest. P 10-Mar-12

Material At Site

0.00%

20

HIPPS

Material At Site

1.74%

Page 50 of 59

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

ENPPI
W.P.3 PROCUREMENT SERVICES
TRAFFIC & LOGISTICS DEPARTMENT
COMMODITIES ONE BY ONE
Instrument cable and cable glands

Mat. Deliv.to Dest. P 28-Nov-11

25-Nov-11

20

Mat. Deliv.to Ship. P 19-Dec-11

17-Dec-11

30

Customs Cleared

30-Dec-11

11-Jan-12

30

Material At Site

02-Jan-12

13-Jan-12

20

Sand & Corrosion probes

Mat. Deliv.to Dest. P 29-Dec-11

09-Jan-12

20

Mat. Deliv.to Ship. P 19-Jan-12

28-Jan-12

30

Customs Cleared

30-Jan-12

09-Feb-12

30

02-Feb-12

11-Feb-12

20

Material At Site

Multi phase flow meter

Mat. Deliv.to Dest. P 06-Jan-12

22-Dec-11

20

Mat. Deliv.to Ship. P 27-Jan-12

11-Jan-12

30

Customs Cleared

07-Feb-12

22-Jan-12

30

Material At Site

10-Feb-12

25-Jan-12

20

Service water pump

Mat. Deliv.to Dest. P 28-Nov-11

15-Dec-11

20

Mat. Deliv.to Ship. P 19-Dec-11

04-Jan-12

30

Customs Cleared

01-Jan-12

17-Jan-12

30

Material At Site

04-Jan-12

20-Jan-12

20

Turret crane crane

Mat. Deliv.to Dest. P 29-Feb-12

20-Feb-12

20

Mat. Deliv.to Ship. P 14-Mar-12

04-Mar-12

30

Customs Cleared

25-Mar-12

15-Mar-12

30

Material At Site

28-Mar-12

18-Mar-12

20

Monorail crane

Mat. Deliv.to Dest. P 01-Feb-12

01-Feb-12

Mat. Deliv.to Ship. P 22-Feb-12

22-Feb-12

30

Customs Cleared

04-Mar-12

04-Mar-12

30

Material At Site

07-Mar-12

07-Mar-12

20

0.00%

0.00%

1.74%

0.00%

0.00%

3.48%

0.00%

0.00%

2.61%

0.00%

0.00%

4.35%

0.00%

0.00%

2.61%

0.00%

0.00%

3.48%

0.00%

0.00%

20

Survival module

Mat. Deliv.to Dest. P 27-Dec-11

01-Jan-12

20

Mat. Deliv.to Ship. P 16-Jan-12

21-Jan-12

30

Customs Cleared

27-Jan-12

01-Feb-12

30

Material At Site

30-Jan-12

04-Feb-12

20

* Weights of Activities are calculated relative to (TRAFFIC & LOGISTICS DEPARTMENT)


Tuesday, July 05, 2011

1.74%

Page 51 of 59

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

ENPPI
W.P.3 PROCUREMENT SERVICES
TRAFFIC & LOGISTICS DEPARTMENT
COMMODITIES ONE BY ONE
Piping bulk 1st batch

Mat. Deliv.to Dest. P 09-Oct-11

10-Oct-11

20

Mat. Deliv.to Ship. P 30-Oct-11

30-Oct-11

30

Customs Cleared

10-Nov-11

10-Nov-11

30

Material At Site

13-Nov-11

13-Nov-11

20

Piping bulk 2nd batch

Mat. Deliv.to Dest. P 16-Nov-11

22-Nov-11

20

Mat. Deliv.to Ship. P 07-Dec-11

12-Dec-11

30

Customs Cleared

18-Dec-11

21-Dec-11

30

21-Dec-11

26-Dec-11

20

Material At Site

Micro Turbine

26-Dec-11

26-Dec-11

30

29-Dec-11

29-Dec-11

20

Mat. Deliv.to Dest. P 29-Dec-11

29-Dec-11

20

Mat. Deliv.to Ship. P 26-Jan-12

26-Jan-12

30

Customs Cleared
Material At Site

Emergency Generator

26-Dec-11

26-Dec-11

30

Mat. Deliv.to Dest. P 29-Dec-11

29-Dec-11

20

Material At Site

29-Dec-11

29-Dec-11

20

Mat. Deliv.to Ship. P 26-Jan-12

26-Jan-12

30

Customs Cleared

E&I Module

Mat. Deliv.to Dest. P 15-Dec-11

15-Dec-11

20

Mat. Deliv.to Ship. P 12-Jan-12

12-Jan-12

30

Customs Cleared

23-Jan-12

23-Jan-12

30

Material At Site

26-Jan-12

26-Jan-12

20

Production Manifold

Mat. Deliv.to Dest. P 15-Dec-11

15-Dec-11

20

Mat. Deliv.to Ship. P 12-Jan-12

12-Jan-12

30

Customs Cleared

23-Jan-12

23-Jan-12

30

26-Jan-12

26-Jan-12

20

Material At Site

Actuated valves

Mat. Deliv.to Dest. P 15-Dec-11

15-Dec-11

20

Mat. Deliv.to Ship. P 12-Jan-12

12-Jan-12

30

Customs Cleared

23-Jan-12

23-Jan-12

30

Material At Site

26-Jan-12

26-Jan-12

20

1.74%

0.00%

0.00%

1.74%

0.00%

0.00%

4.35%

0.00%

0.00%

4.35%

0.00%

0.00%

4.35%

0.00%

0.00%

4.35%

0.00%

0.00%

4.35%

0.00%

0.00%

100.00%

* Weights of Activities are calculated relative to (TRAFFIC & LOGISTICS DEPARTMENT)


Tuesday, July 05, 2011

Page 52 of 59

0.00%

0.00%

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

ENPPI
W.P.3 PROCUREMENT SERVICES
TRAFFIC & LOGISTICS DEPARTMENT
Total

TRAFFIC & LOGISTICS DEPARTMENT

100.00%

* Weights of Activities are calculated relative to (TRAFFIC & LOGISTICS DEPARTMENT)


Tuesday, July 05, 2011

Page 53 of 59

0.00%

0.00%

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

ENPPI
W.P.5 DECK AND TSF SUPPLY & FABRICATION
METERIAL SUPPLY
COMMODITIES ONE BY ONE
Safety equipment and life saving

P.O.

24-Jul-11

18-Aug-11

15

Receiv. Supp. Key

29-Aug-11

26-Sep-11

20

Place Main Mat. S/

18-Sep-11

16-Oct-11

15

RFS

07-Dec-11

01-Jan-12

35

11-Jan-12

05-Feb-12

15

Material At Site

Flame arrestor

P.O.

04-Aug-11

11-Aug-11

15

Receiv. Supp. Key

09-Sep-11

10-Oct-11

20

Place Main Mat. S/

29-Sep-11

26-Oct-11

15

RFS

28-Nov-11

26-Dec-11

35

Material At Site

02-Jan-12

30-Jan-12

15

Chemical injection package

P.O.

24-Jul-11

10-Jul-11

Receiv. Supp. Key

18-Sep-11

11-Sep-11

20

Place Main Mat. S/

23-Sep-11

14-Sep-11

15

RFS

06-Jan-12

27-Dec-11

35

Material At Site

10-Feb-12

31-Jan-12

15

0.00%

0.00%

0.17%

0.00%

0.00%

9.06%

0.00%

0.00%

1.94%

0.00%

0.00%

1.30%

0.00%

0.00%

3.48%

0.00%

0.00%

15

Fire Fighting package

P.O.

18-Jul-11

24-Jul-11

Receiv. Supp. Key

03-Sep-11

19-Sep-11

20

Place Main Mat. S/

23-Sep-11

09-Oct-11

15

RFS

31-Dec-11

04-Jan-12

35

Material At Site

04-Feb-12

08-Feb-12

15

15

Vent stack tips

P.O.

17-Aug-11

24-Aug-11

15

Receiv. Supp. Key

07-Oct-11

06-Nov-11

20

Place Main Mat. S/

27-Oct-11

24-Nov-11

15

RFS

06-Dec-11

02-Jan-12

35

Material At Site

10-Jan-12

06-Feb-12

15

Piping bulk 3rd batch

P.O.

03-Jul-11

07-Jul-11

Place Main Mat. S/

26-Oct-11

02-Nov-11

15

RFS

05-Jan-12

11-Jan-12

35

Material At Site

09-Feb-12

14-Feb-12

15

35

Layout No. 1

* Weights of Activities are calculated relative to (METERIAL SUPPLY)


Tuesday, July 05, 2011

2.99%

Page 54 of 59

Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

ENPPI
W.P.5 DECK AND TSF SUPPLY & FABRICATION
METERIAL SUPPLY
COMMODITIES ONE BY ONE
Insulation Joint

P.O.

24-Jul-11

17-Aug-11

35

Place Main Mat. S/

18-Sep-11

31-Oct-11

15

RFS

07-Dec-11

18-Jan-12

35

Material At Site

11-Jan-12

22-Feb-12

15

Injection fitting

P.O.

27-Jul-11

23-Aug-11

35

Place Main Mat. S/

21-Sep-11

31-Oct-11

15

RFS

10-Dec-11

18-Jan-12

35

14-Jan-12

22-Feb-12

15

Material At Site

Earthing material

24-Aug-11

20-Aug-11

35

Place Main Mat. S/

13-Sep-11

10-Sep-11

15

RFS

26-Dec-11

23-Dec-11

35

Material At Site

14-Feb-12

22-Jan-12

15

P.O.

Lighting material
13-Sep-11

35

28-Sep-11

23-Oct-11

15

14-Dec-11

24-Dec-11

35

18-Jan-12

27-Jan-12

15

P.O.

22-Aug-11

Place Main Mat. S/


RFS
Material At Site

Electrical Cable trays

P.O.

24-Jul-11

07-Jul-11

Place Main Mat. S/

19-Aug-11

07-Aug-11

15

RFS

18-Oct-11

02-Oct-11

35

Material At Site

22-Nov-11

06-Nov-11

15

P.O.

27-Jul-11

10-Jul-11

35

Place Main Mat. S/

13-Sep-11

28-Aug-11

15

RFS

04-Dec-11

22-Nov-11

35

08-Jan-12

27-Dec-11

15

Navigation aids system

02-Aug-11

15-Aug-11

15

Receiv. Supp. Key

16-Sep-11

28-Sep-11

20

Place Main Mat. S/

06-Oct-11

20-Oct-11

15

RFS

05-Dec-11

18-Dec-11

35

Material At Site

09-Jan-12

22-Jan-12

15

P.O.

0.00%

0.09%

0.00%

0.00%

0.15%

0.00%

0.00%

1.39%

0.00%

0.00%

2.78%

0.00%

0.00%

1.49%

0.00%

0.00%

8.17%

0.00%

0.00%

Layout No. 1

* Weights of Activities are calculated relative to (METERIAL SUPPLY)


Tuesday, July 05, 2011

0.00%

35

Electrical Cables

Material At Site

0.18%

Page 55 of 59

Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

ENPPI
W.P.5 DECK AND TSF SUPPLY & FABRICATION
METERIAL SUPPLY
COMMODITIES ONE BY ONE
Instrument & Mechanical bulk material

P.O.

07-Aug-11

18-Aug-11

35

Place Main Mat. S/

30-Aug-11

05-Sep-11

15

RFS

01-Nov-11

06-Nov-11

35

Material At Site

06-Dec-11

07-Dec-11

15

Inst. Junction Box

P.O.

11-Aug-11

21-Aug-11

35

Place Main Mat. S/

13-Sep-11

28-Sep-11

15

RFS

05-Nov-11

09-Nov-11

35

10-Dec-11

14-Dec-11

15

Material At Site

HIPPS

12-Jul-11

14-Jul-11

15

23-Oct-11

01-Nov-11

20

Place Main Mat. S/

15-Nov-11

24-Nov-11

15

RFS

24-Mar-12

17-Mar-12

35

Material At Site

28-Apr-12

21-Apr-12

15

P.O.
Receiv. Supp. Key

Choke valves

19-Jul-11

09-Aug-11

Receiv. Supp. Key

02-Nov-11

24-Nov-11

20

Place Main Mat. S/

22-Nov-11

14-Dec-11

15

RFS

31-Mar-12

21-Apr-12

35

21-Apr-12

11-Jun-12

15

Loose instrument

P.O.

31-Jul-11

25-Aug-11

35

Place Main Mat. S/

26-Oct-11

23-Oct-11

15

RFS

13-Jan-12

10-Jan-12

35

Material At Site

24-Feb-12

20-Feb-12

15

Instrument cable trays

P.O.
Place Main Mat. S/

28-Jul-11

05-Aug-11

35

22-Aug-11

08-Sep-11

15

RFS

22-Oct-11

08-Nov-11

35

Material At Site

12-Nov-11

04-Dec-11

15

Electro hydraulic wellhead control panel

P.O.

18-Jul-11

18-Jul-11

15
20

Receiv. Supp. Key

08-Oct-11

04-Oct-11

Place Main Mat. S/

07-Nov-11

03-Nov-11

15

RFS

06-Jan-12

01-Jan-12

35

Material At Site

11-Feb-12

05-Feb-12

15

0.00%

0.33%

0.00%

0.00%

7.71%

0.00%

0.00%

3.32%

0.00%

0.00%

0.92%

0.00%

0.00%

1.68%

0.00%

0.00%

5.41%

0.00%

0.00%

Layout No. 1

* Weights of Activities are calculated relative to (METERIAL SUPPLY)


Tuesday, July 05, 2011

0.00%

15

P.O.

Material At Site

1.44%

Page 56 of 59

Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

ENPPI
W.P.5 DECK AND TSF SUPPLY & FABRICATION
METERIAL SUPPLY
COMMODITIES ONE BY ONE
Wing valves

P.O.

20-Jul-11

04-Aug-11

15

Receiv. Supp. Key

04-Oct-11

20-Oct-11

20

Place Main Mat. S/

06-Dec-11

03-Jan-12

15

RFS

01-Apr-12

16-Apr-12

35

06-May-12

21-May-12

15

Material At Site

Instrument cable and cable glands

P.O.

25-Jul-11

28-Aug-11

35

Place Main Mat. S/

01-Sep-11

01-Sep-11

15

RFS

28-Nov-11

11-Dec-11

35

Material At Site

02-Jan-12

13-Jan-12

15

Sand & Corrosion probes

15-Aug-11

15-Sep-11

35

Place Main Mat. S/

30-Oct-11

09-Nov-11

15

RFS

29-Dec-11

09-Jan-12

35

Material At Site

02-Feb-12

11-Feb-12

15

P.O.

Multi phase flow meter

P.O.

24-Jul-11

03-Jul-11

Receiv. Supp. Key

18-Sep-11

18-Sep-11

20

Place Main Mat. S/

08-Oct-11

20-Sep-11

15

RFS

06-Jan-12

21-Dec-11

35

10-Feb-12

25-Jan-12

15

Material At Site

0.00%

0.00%

0.83%

0.00%

0.00%

0.50%

0.00%

0.00%

10.97%

0.00%

0.00%

0.54%

0.00%

0.00%

13.25%

0.00%

15.00%

15

Service water pump

P.O.

02-Aug-11

02-Aug-11

15

Receiv. Supp. Key

19-Sep-11

06-Oct-11

20

Place Main Mat. S/

09-Oct-11

26-Oct-11

15

RFS

28-Nov-11

14-Dec-11

35

Material At Site

04-Jan-12

20-Jan-12

15

Turret crane crane


15

P.O.

24-Jul-11

Receiv. Supp. Key

01-Nov-11

27-Sep-11

20

Place Main Mat. S/

11-Nov-11

09-Oct-11

15

RFS

29-Feb-12

19-Feb-12

35

Material At Site

28-Mar-12

18-Mar-12

15

21-Jun-11

Layout No. 1

* Weights of Activities are calculated relative to (METERIAL SUPPLY)


Tuesday, July 05, 2011

2.70%

Page 57 of 59

Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

ENPPI
W.P.5 DECK AND TSF SUPPLY & FABRICATION
METERIAL SUPPLY
COMMODITIES ONE BY ONE
Monorail crane

P.O.

17-Oct-11

17-Oct-11

15

Receiv. Supp. Key

13-Dec-11

13-Dec-11

20

Place Main Mat. S/

23-Dec-11

23-Dec-11

15

RFS

01-Feb-12

01-Feb-12

35

07-Mar-12

07-Mar-12

15

Material At Site

Survival module

P.O.

02-Aug-11

07-Aug-11

15

Receiv. Supp. Key

09-Oct-11

26-Oct-11

20

Place Main Mat. S/

29-Oct-11

15-Nov-11

15

RFS

26-Dec-11

29-Dec-11

35

Material At Site

30-Jan-12

04-Feb-12

15

Piping bulk 1st batch

P.O.

03-Jul-11

07-Jul-11

Place Main Mat. S/

28-Aug-11

04-Sep-11

15

RFS

09-Oct-11

10-Oct-11

35

Material At Site

13-Nov-11

13-Nov-11

15

0.00%

0.00%

3.10%

0.00%

0.00%

8.70%

0.00%

0.00%

5.22%

0.00%

0.00%

35

Piping bulk 2nd batch

P.O.

03-Jul-11

07-Jul-11

35

Place Main Mat. S/

16-Oct-11

23-Oct-11

15

RFS

16-Nov-11

22-Nov-11

35

21-Dec-11

26-Dec-11

15

Material At Site

0.17%

100.00%

Total

METERIAL SUPPLY

100.00%

0.00%

1.99%
1.99%

Layout No. 1

* Weights of Activities are calculated relative to (METERIAL SUPPLY)


Tuesday, July 05, 2011

0.00%

Page 58 of 59

Data'Nes Systems, Release 2.21

Project No.: 3467-200

Issuance Status Report

SETH Offshore EPC Project


Dates

Milestone
Planned

Actual

Expected

Milestone
Value

As Of : 25-Jun-11

* Relative
Weight

Planned
Progress%

Actual
Progress%

ENPPI
W.P.9 OFFSHORE HOOK-UP & COMMISSIONING
COMMISSIONING
SYSTEM BY SYSTEM
Commissioning activities

100.00%

Start

01-Jun-12

01-Jun-12

20

Finish

30-Jun-12

30-Jun-12

80

100.00%

Total

COMMISSIONING

100.00%

0.00%
0.00%

0.00%

0.00%
0.00%

Layout No. 1

* Weights of Activities are calculated relative to (COMMISSIONING)


Tuesday, July 05, 2011

0.00%

Page 59 of 59

Data'Nes Systems, Release 2.21

PAGE 25 OF 33

PTB

SETH OFFSHORE DEVELOPMENT EPC PROJECT


PLANNING PORTION IN THE MONTHLY PROGRESS REPORT

Egypt

Rev. (0)
Jun 2011

4.2.2 TECNOMARE

GFL 003-0405

3467-200

ITEM DESCRIPTION

1.1

PROJECT MANAGEMENT

1.2

DETAILED ENGINEERING

1.3

PROCUREMENT SERVICES

1.4

SUBSTRUCTURE ( PREDRILLING TEMPLATE , PILES AND JACKET) FABRICATION

1.5

DECK AND TSF MATERIAL/EQUIPMENT SUPPLY AND FABRICATION

1.6

PIPELINE SPOOLS FABRICATION

1.7

LOAD OUT AND SEA FASTENING

1.8

OFFSHORE HOOK-UP AND COMMISSIONING

1.9

COST IMPACT DUE TO CRASHING THE SCHEDULE TO MEET TARGET DATE INCLUDING (INTERNALS BONUS
FOR LABORS , THREE SHIFT WITH COMPLETE NDT , OVERTIME, ADDITIONAL SHIFTS , LABOR DAILY
LOGISTICS ,..ETC )

TOTAL

Weight

Progress @
cut-off date

Monthly
progress

Previous
month
Progress

14,17%
36,71%
1,35%
3,91%
37,25%

39,46%
51,65%
37,07%
35,00%
35,00%

5,57%
11,60%
5,06%
11,67%
0,00%

33,89%
40,05%
32,01%
23,33%
35,00%

6,61%

0,00%

0,00%

0,00%

100,00%

39,46%

5,57%

33,89%

14,17%

39,46%

5,57%

33,89%

14,17%

39,46%

5,57%

33,89%

26,16%
3,90%

66,10%
20,00%

16,28%
0,00%

49,82%
20,00%

1,06%
1,14%
4,45%

0,00%
0,00%
20,00%

0,00%
0,00%
0,00%

0,00%
0,00%
20,00%

36,71%

51,65%

11,60%

40,05%

0,54%

26,66%

6,66%

20,00%

1.1. PROJECT MANAGEMENT


1.1.1.

PROJECT SERVICES

1.1.2

QA/QC

1.1.3

HSE

1.1.4

SYSTEM INTEGRITY ASSURANCE

1.1.5

CLIENT FACILITIES

1.1.6

CONSORTIUM FACILITES

SUBTOTAL 1.1
1.2. DETAILED ENGINEERING
1.2.1

DECK

1.2.2

SSIV/PLEM (TECHNICAL FOLLOW UP)

1.2.4

LOAD OUT AND SEAFASTENING

1.2.5

OFFSHORE TRANSPORTATION

1.2.6

HOOKUP AND COMMISSIONING

1.2.7

MANUALS

1.2.8

AS BUILT DOSSIER

1.2.9

CERTIFICATION ( ASSISTANCE)

1.2.10

TECHNICAL FOLLOW ON FOR T & I CONTRACTS

SUBTOTAL 1.2
1.3. PROCUREMENT SERVICES
1.3.1

COMPANY PROVIDED ITEMS

1.3.2

CONTRACTOR PROVIDED ITEMS

1.3.3

PLEM/SSIV

1.3.4

HOOK-UP AND COMMISSIONING

1.3.5

LOAD OUT AND SEA FASTENING

1.3.6

PLC/RTU

0,81%

44,00%

4,00%

40,00%

SUBTOTAL 1.3

1,35%

37,07%

5,06%

32,01%

3,91%

35,00%

11,67%

23,33%

3,91%

35,00%

11,67%

23,33%

1.4. SUBSTRUCTURE
1.4.1

YARD MOBILIZATION

1.4.2

PRE_DRILLING TEMPLATE

1.4.3

PILES

1.4.4

JACKET STRUCTURES

1.4.5

BOAT LANDING, BARGE BUMPERS

1.4.6

ANODES INSTALLATION

1.4.7

RISERS, CAISSONS AND SUPPORTS,

1.4.8

BUOYANCY TANKS FABRICATION & ERECTION

1.4.9

GROUT SEALS AND SHOCK CELLS

1.4.10

WEIGHT CONTROL

1.4.11

SURFACE PREPARATION AND PAINTING

1.4.12

INSPECTIONS, TESTING AND PRE-COMMISSIONING

1.4.13

INSTALLATION AIDS ,BALLASTING AND GROUTING SYSTEM, WALK WAY ,STAIRS UPENDING TRENNIONS

1.4.14

BARGE PREPARATION (BERTHING , CLEANING , BLASTING , TEFLON, GRILLAGE LOAD AND OFFLOAD,..)

1.4.15

GRILLAGE SUPPLY, FABRICATION

SUBTOTAL 1.4

1.5 DECK MATERIAL/EQUIPMENT SUPPLY AND FABRICATION


1.5.1.

YARD MOBILIZATION

1.5.2.

MAIN STRUCTURES

1.5.3.

SECONDARY STRUCTURES

1.5.4.

MECHANICAL EQUIPMENT

1.5.5.

PIPING AND MANUAL VALVES

1.5.6

ELECTRICAL

1.5.7

INSTRUMENTATION

1.5.8

SURFACE PREPARATION AND PAINTING

1.5.9

INSULATION

1.5.10

MECHANICAL COMPLETION AND PRECOMMISSIONING

1.5.11

WEIGHT CONTROL

1.5.12

INSTALLATION AIDS FABRICATION AND GRILLAGE SUPPLY

1.5.13

BARGE PREPARATION (BERTHING , CLEANING , BLASTING , GRILLAGE LOAD AND OFFLOAD,..)

1.5.14

FIRE FIGHTING AND SAFETY EQUIPMENT

1.5.15

ARCHITECTURE

1.5.16

ELECTRICAL POWER GENERATION

1.5.17

OTHER INSTRUMENTATION

a.

MATERIAL/EQUIPMENT SUPPLY
a.1 PLC/RTU

37,25%

35,00%

0,00%

35,00%

37,25%

35,00%

0,00%

35,00%

6,61%

0,00%

0,00%

0,00%

6,61%

0,00%

0,00%

0,00%

a.2 NAV AIDS


a.3 INSTRUMENTATION BULKS
b.
1.5.18

INSULATION
UTILITY EQUIPMENT, FIRE FIGHTING SYSTEM

SUBTOTAL 1.5
1.6 PIPELINE AND SPOOLS
SUBTOTAL 1.6
1.7 LOAD OUT AND SEAFASTENING
SUBTOTAL 1.7
1.8 OFFSHORE HOOK - UP AND COMMISSIONING
1.8.1

OFFSHORE HOOK - UP AND COMMISSIONING

JACKET AND DECK

1.8.1.1 HOOK-UP AND COMMISSIONING SUPPLY OF MATERIALS


1.8.1.2 COMMISSIONING SPARE PARTS
1.8.1.3 HOOK-UP, COMMISSIONING ACTIVITIES AND TESTS
1.8.1.4 FIRST FILLING FOR DIESEL
1.8.1.5 ASISTANT DURING START UP

SUBTOTAL 1.8

PAGE 26 OF 33

PTB

SETH OFFSHORE DEVELOPMENT EPC PROJECT


PLANNING PORTION IN THE MONTHLY PROGRESS REPORT

Egypt

Rev. (0)
Jun 2011

4.23 PETROJET

GFL 003-0405

3467-200

LEVELIOVERALLWP

PETROJET

CLIENT :PETROBEL
PROJECT : SETH DEVELOPMENT PROJECT

WK

14

R.W%

R.W%

25Jun11

DATE:
ACTUAL%

ActivityName

TotalBudgeteUnits(Hrs)

PETROJETWORKPACKAGE

16,500,000

WEEKNO.

13

PLANNED%
StartDate

FinishDate

DEV/ITEM

DEV/
OVERALL

ITEM

OVERALL

ITEM

OVERALL

100%

22.34%

22.34%

18.00%

18.00%

31-Mar-11

31-Oct-12

4.34%

4.34%

WP1

PROJECT MANAGEMENT

2,125,000

13%

18.00%

2.32%

18.00%

2.32%

31-Mar-11

31-Oct-12

0.00%

0.00%

WP3

PROCUREMENT SERVICES

100,000

1%

18.00%

0.11%

18.00%

0.11%

31-Mar-11

31-Oct-12

0.00%

0.00%

WP4

SUBSTRUCTURE ( P.D.T, PILES AND JACKET )


FABRICATION

5,195,000

31%

44.27%

13.94%

32.53%

10.24%

31-Mar-11

15-Mar-12

11.74%

3.69%

WP5

DECK & TSF MATERIAL/EQUIPMENT SUPPLY AND


FABRICATION

5,860,000

36%

16.82%

5.97%

15.01%

5.33%

31-Mar-11

29-Apr-12

1.81%

0.64%

WP6

PIPELINE SPOOLS FABRICATION

620,000

4%

0.00%

0.00%

0.00%

0.00%

23-Feb-12

25-Apr-12

0.00%

0.00%

WP8

LOAD OUT AND SEA FASTENING

1,400,000

8%

0.00%

0.00%

0.00%

0.00%

18-Oct-11

08-May-12

0.00%

0.00%

WP9

OFFSHORE HOOK-UP AND COMMISSIONING

900,000

5%

0.00%

0.00%

0.00%

0.00%

16-May-12

15-Jun-12

0.00%

0.00%

COST IMPACT DUE TO CRASHING THE SCHEDULE


TO MEET TARGET DATE.

300,000

2%

0.00%

0.00%

0.00%

0.00%

15-Nov-11

15-Apr-12

0.00%

0.00%

1/40

WP1 PROGRESS Sheet

PETROJET

CLIENT : PETROBEL

PROJECT : SETH DEVELOPMENT PROJECT

Act ID

Activity Name

W.P.1: PROJECT MANAGEMENT

WK

WEEK NO.

25Jun11

DATE :

Original
Duration
(Days)

ITEM

OVERALL

ITEM

OVERALL

100.00%

580

18.00%

18.00%

18.00%

R.W %

ACTUAL %

13

PLANNED %
DEV/ITEM

DEV/
OVERALL

Start Date

Finish Date

18.00%

31-Mar-11

31-Oct-12

0.00%

0.00%

M01

Apr-11

6.00%

25

100.00%

6.00%

100.00%

6.00%

31-Mar-11

25-Apr-11

0.00%

0.00%

M02

May-11

6.00%

29

100.00%

6.00%

100.00%

6.00%

26Apr11

25May11

0.00%

0.00%

M03

Jun-11

6.00%

30

100.00%

6.00%

100.00%

6.00%

26May11

25Jun11

0.00%

0.00%

M04

Jul-11

6.00%

29

0.00%

0.00%

0.00%

0.00%

26Jun11

25Jul11

0.00%

0.00%

M05

Aug-11

6.00%

30

0.00%

0.00%

0.00%

0.00%

26Jul11

25Aug11

0.00%

0.00%

M06

Sep-11

6.00%

30

0.00%

0.00%

0.00%

0.00%

26Aug11

25Sep11

0.00%

0.00%

M07

Oct-11

6.00%

29

0.00%

0.00%

0.00%

0.00%

26Sep11

25Oct11

0.00%

0.00%

M08

Nov-11

6.00%

30

0.00%

0.00%

0.00%

0.00%

26Oct11

25Nov11

0.00%

0.00%

M09

Dec-11

6.00%

29

0.00%

0.00%

0.00%

0.00%

26Nov11

25Dec11

0.00%

0.00%

M10

Jan-12

6.00%

30

0.00%

0.00%

0.00%

0.00%

26Dec11

25Jan12

0.00%

0.00%

M11

Feb-12

6.00%

30

0.00%

0.00%

0.00%

0.00%

26Jan12

25Feb12

0.00%

0.00%

M12

Mar-12

6.00%

28

0.00%

0.00%

0.00%

0.00%

26Feb12

25Mar12

0.00%

0.00%

M13

Apr-12

4.00%

30

0.00%

0.00%

0.00%

0.00%

26Mar12

25Apr12

0.00%

0.00%

M14

May-12

4.00%

29

0.00%

0.00%

0.00%

0.00%

26Apr12

25May12

0.00%

0.00%

M15

Jun-12

4.00%

30

0.00%

0.00%

0.00%

0.00%

26May12

25Jun12

0.00%

0.00%

M16

Jul-12

4.00%

29

0.00%

0.00%

0.00%

0.00%

26Jun12

25Jul12

0.00%

0.00%

M17

Aug-12

4.00%

30

0.00%

0.00%

0.00%

0.00%

26Jul12

25Aug12

0.00%

0.00%

M18

Sep-12

4.00%

30

0.00%

0.00%

0.00%

0.00%

26Aug12

25Sep12

0.00%

0.00%

M19

Oct-12

4.00%

29

0.00%

0.00%

0.00%

0.00%

26Sep12

25Oct12

0.00%

0.00%

02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

2/40

WP3 PROGRESS Sheet

PETROJET

CLIENT : PETROBEL

PROJECT : SETH DEVELOPMENT PROJECT

Act ID

Activity Name

W.P.3: PROCUREMENT SERVICES

WK

WEEK NO.

25Jun11

DATE :

Original
Duration
(Days)

ITEM

OVERALL

ITEM

OVERALL

100.00%

580

18.00%

18.00%

18.00%

R.W %

ACTUAL %

13

PLANNED %
Start Date

Finish Date

DEV/ITEM

DEV/
OVERALL

18.00%

31-Mar-11

31-Oct-12

0.0%

0.0%

M01

Apr-11

6.00%

25

100.00%

6.00%

100.00%

6.00%

31-Mar-11

25-Apr-11

0.0%

0.0%

M02

May-11

6.00%

29

100.00%

6.00%

100.00%

6.00%

26Apr11

25May11

0.0%

0.0%

M03

Jun-11

6.00%

30

100.00%

6.00%

100.00%

6.00%

26May11

25Jun11

0.0%

0.0%

M04

Jul-11

6.00%

29

0.00%

0.00%

0.00%

0.00%

26Jun11

25Jul11

0.0%

0.0%

M05

Aug-11

6.00%

30

0.00%

0.00%

0.00%

0.00%

26Jul11

25Aug11

0.0%

0.0%

M06

Sep-11

6.00%

30

0.00%

0.00%

0.00%

0.00%

26Aug11

25Sep11

0.0%

0.0%

M07

Oct-11

6.00%

29

0.00%

0.00%

0.00%

0.00%

26Sep11

25Oct11

0.0%

0.0%

M08

Nov-11

6.00%

30

0.00%

0.00%

0.00%

0.00%

26Oct11

25Nov11

0.0%

0.0%

M09

Dec-11

6.00%

29

0.00%

0.00%

0.00%

0.00%

26Nov11

25Dec11

0.0%

0.0%

M10

Jan-12

6.00%

30

0.00%

0.00%

0.00%

0.00%

26Dec11

25Jan12

0.0%

0.0%

M11

Feb-12

6.00%

30

0.00%

0.00%

0.00%

0.00%

26Jan12

25Feb12

0.0%

0.0%

M12

Mar-12

6.00%

28

0.00%

0.00%

0.00%

0.00%

26Feb12

25Mar12

0.0%

0.0%

M13

Apr-12

4.00%

30

0.00%

0.00%

0.00%

0.00%

26Mar12

25Apr12

0.0%

0.0%

M14

May-12

4.00%

29

0.00%

0.00%

0.00%

0.00%

26Apr12

25May12

0.0%

0.0%

M15

Jun-12

4.00%

30

0.00%

0.00%

0.00%

0.00%

26May12

25Jun12

0.0%

0.0%

M16

Jul-12

4.00%

29

0.00%

0.00%

0.00%

0.00%

26Jun12

25Jul12

0.0%

0.0%

M17

Aug-12

4.00%

30

0.00%

0.00%

0.00%

0.00%

26Jul12

25Aug12

0.0%

0.0%

M18

Sep-12

4.00%

30

0.00%

0.00%

0.00%

0.00%

26Aug12

25Sep12

0.0%

0.0%

M19

Oct-12

4.00%

29

0.00%

0.00%

0.00%

0.00%

26Sep12

25Oct12

0.0%

0.0%

02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

3/40

WP4 PROGRESS Sheet

PETROJET

CLIENT
: PETROBEL
PROJECT : SETH DEVELOPMENT PROJECT
Total
Budgete
Units (Hrs)

R.W %

262712

JACKET STRUCTURE FABRICATION


MAIN STRUCTURE FABRICATION

Act ID

Activity Name

W.P.4: SUBSTRUCTURES (PILES, JACKET & PDT) FABRICATION

General

25Jun11

DATE :

WK

WEEK NO.

Original
Duration
(Days)

ITEM

OVERALL

ITEM

OVERALL

100.00%

351

44.27%

44.27%

32.53%

246356

93.77%

351

45.22%

42.41%

133676

54.26%

344

70.65%

864

0.65%

344

ACTUAL %

13

PLANNED %
Start Date

Finish Date

DEV/ITEM

DEV/
OVERALL

32.53%

31-Mar-11

15-Mar-12

11.74%

11.74%

34.69%

32.53%

31Mar11

15Mar12

10.53%

9.87%

38.33%

54.94%

29.81%

31Mar11

08Mar12

15.70%

8.52%

0.00%

0.00%

0.00%

0.00%

31-Mar-11

08-Mar-12

0.00%

0.00%

100.00%

0.00%

100.00%

0.00%

31-Mar-11

31-Mar-11

0.00%

0.00%

PTJ2000

Jacketmainstructurefabricationstart

0.00%

PTJ2210

Jacketmainstructurefabricationfinish

0.00%

0.00%

0.00%

0.00%

29-Feb-12

29-Feb-12

0.00%

0.00%

PTJ2230

Jacketweighing

864

100 00%
100.00%

0 00%
0.00%

0 00%
0.00%

0 00%
0.00%

07Mar12

08Mar12

0 00%
0.00%

0 00%
0.00%

42224

31.59%

88

94.95%

29.99%

99.86%

31.54%

31-Mar-11

26-Jun-11

-4.91%

-1.55%

1596

3.78%

21

90.00%

3.40%

100.00%

3.78%

31-Mar-11

26-Apr-11

-10.00%

-0.38%

JACKET LEGS FABRICATION


PTJ5000

PREPARATIONOFSKIDWAY

PTJ5010

PREPARATIONLEGFORROWA&BTRIALFIT

LEG A1
DIM 1400

544

1.29%

100.00%

1.29%

88.89%

1.15%

18-Jun-11

26-Jun-11

11.11%

0.14%

9992

23.66%

78

91.61%

21.68%

100.00%

23.66%

31-Mar-11

16-Jun-11

-8.39%

-1.98%

5520

55.24%

53

87.50%

48.34%

100.00%

55.24%

31-Mar-11

22-May-11

-12.50%

-6.91%

PTJ5160

LEGSPLICEFITUP

1224

22.17%

95.00%

21.07%

100.00%

22.17%

31-Mar-11

10-Apr-11

-5.00%

-1.11%

PTJ5170

CANSFITUP

1224

22.17%

80.00%

17.74%

100.00%

22.17%

11-Apr-11

21-Apr-11

-20.00%

-4.43%

PTJ5180

LEGSPLICEWELDING&NDT

1536

27.83%

12

95.00%

26.43%

100.00%

27.83%

23-Apr-11

8-May-11

-5.00%

-1.39%

PTJ5190

CANWELDING&NDT

1536

27.83%

12

80.00%

22.26%

100.00%

27.83%

9-May-11

22-May-11

-20.00%

-5.57%

2564

25.66%

47

100.00%

25.66%

100.00%

25.66%

23-Apr-11

8-Jun-11

0.00%

0.00%

23-Apr-11

04-May-11

0.00%

0.00%

DIM 1200
PTJ5090

LEGSPLICEFITUP

612

23.87%

100.00%

23.87%

100.00%

23.87%

PTJ5110

CANSFITUP

272

10.61%

100.00%

10.61%

100.00%

10.61%

5-May-11

9-May-11

0.00%

0.00%

PTJ5100

CONEFITUP

272

10.61%

100.00%

10.61%

100.00%

10.61%

10-May-11

14-May-11

0.00%

0.00%

PTJ5120

LEGSPLICEWELDING&NDT

768

29.95%

12

100.00%

29.95%

100.00%

29.95%

15-May-11

28-May-11

0.00%

0.00%

PTJ5130

CONEWELDING&NDT

320

12.48%

100.00%

12.48%

100.00%

12.48%

29-May-11

2-Jun-11

0.00%

0.00%

PTJ5140

CANWELDING&NDT

320

12.48%

100.00%

12.48%

100.00%

12.48%

04-Jun-11

08-Jun-11

0.00%

0.00%
-1.48%

1908

19.10%

33

92.24%

17.61%

100.00%

19.10%

15-May-11

16-Jun-11

-7.76%

PTJ5020

LEGSPLICEFITUP

340

17.82%

100.00%

17.82%

100.00%

17.82%

15-May-11

19-May-11

0.00%

0.00%

PTJ5040

CANSFITUP

272

14.26%

75.00%

10.69%

100.00%

14.26%

21-May-11

24-May-11

-25.00%

-3.56%

PTJ5030

CONEFITUP

272

14.26%

100.00%

14.26%

100.00%

14.26%

25-May-11

29-May-11

0.00%

0.00%

DIM 1000

4/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP4 PROGRESS Sheet

Act ID

Activity Name

Total
Budgete
Units (Hrs)

R.W %

Original
Duration
(Days)

ITEM

OVERALL

ITEM

OVERALL

ACTUAL %

PLANNED %
Start Date

Finish Date

DEV/ITEM

DEV/
OVERALL

30-May-11

05-Jun-11

0.00%

0.00%

PTJ5050

LEGSPLICEWELDING&NDT

384

20.13%

100.00%

20.13%

100.00%

20.13%

PTJ5060

CONEWELDING&NDT

320

16.77%

100.00%

16.77%

100.00%

16.77%

6-Jun-11

11-Jun-11

0.00%

0.00%

PTJ5070

CANWELDING&NDT

320

16.77%

75.00%

12.58%

100.00%

16.77%

12-Jun-11

16-Jun-11

-25.00%

-4.19%

10172

24.09%

78

98.55%

23.74%

100.00%

24.09%

31-Mar-11

16-Jun-11

-1.45%

-0.35%

5556

54.62%

53

100.00%

54.62%

100.00%

54.62%

31-Mar-11

22-May-11

0.00%

0.00%

LEG A2
DIM 1400
PTJ5350

LEGSPLICEFITUP

1260

22.68%

100.00%

22.68%

100.00%

22.68%

31Mar11

10Apr11

0.00%

0.00%

PTJ5360

CANSFITUP

1224

22.03%

100.00%

22.03%

100.00%

22.03%

11-Apr-11

21-Apr-11

0.00%

0.00%

PTJ5370

LEGSPLICEWELDING&NDT

1536

27.65%

12

100.00%

27.65%

100.00%

27.65%

23-Apr-11

08-May-11

0.00%

0.00%

PTJ5380

CANWELDING&NDT

1536

27.65%

12

100.00%

27.65%

100.00%

27.65%

09-May-11

22-May-11

0.00%

0.00%

2772

27.25%

55

100.00%

27.25%

100.00%

27.25%

23Apr11

16Jun11

0.00%

0.00%

DIM 1200
PTJ5280

LEGSPLICEFITUP

612

22.08%

100.00%

22.08%

100.00%

22.08%

23-Apr-11

04-May-11

0.00%

0.00%

PTJ5300

CANSFITUP

272

9.81%

100.00%

9.81%

100.00%

9.81%

5-May-11
y

9-May-11
y

0.00%

0.00%

PTJ5290

CONEFITUP

288

10.39%

100.00%

10.39%

100.00%

10.39%

10-May-11

18-May-11

0.00%

0.00%

PTJ5310

LEGSPLICEWELDING&NDT

832

30.01%

13

100.00%

30.01%

100.00%

30.01%

19-May-11

2-Jun-11

0.00%

0.00%

PTJ5320

CONEWELDING&NDT

384

13.85%

100.00%

13.85%

100.00%

13.85%

04-Jun-11

09-Jun-11

0.00%

0.00%

PTJ5330

CANWELDING&NDT

DIM 1000

384

13.85%

100.00%

13.85%

100.00%

13.85%

11-Jun-11

16-Jun-11

0.00%

0.00%

1844

18.13%

33

91.97%

16.67%

100.00%

18.13%

10-May-11

11-Jun-11

-8.03%

-1.45%

PTJ5210

LEGSPLICEFITUP

340

18.44%

100.00%

18.44%

100.00%

18.44%

10-May-11

15-May-11

0.00%

0.00%

PTJ5230

CANSFITUP

272

14.75%

75.00%

11.06%

100.00%

14.75%

16-May-11

19-May-11

-25.00%

-3.69%

PTJ5220

CONEFITUP

272

14.75%

100.00%

14.75%

100.00%

14.75%

21-May-11

24-May-11

0.00%

0.00%

PTJ5240

LEGSPLICEWELDING&NDT

384

20.82%

100.00%

20.82%

100.00%

20.82%

25-May-11

31-May-11

0.00%

0.00%

PTJ5250

CONEWELDING&NDT

256

13.88%

100.00%

13.88%

100.00%

13.88%

1-Jun-11

5-Jun-11

0.00%

0.00%

PTJ5260

CANWELDING&NDT

320

17.35%

75.00%

13.02%

100.00%

17.35%

06Jun11

11Jun11

25.00%

4.34%

10072

23.85%

78

91.68%

21.87%

100.00%

23.85%

31-Mar-11

16-Jun-11

-8.32%

-1.98%

5520

54.81%

53

87.50%

47.95%

100.00%

54.81%

31-Mar-11

22-May-11

-12.50%

-6.85%

1224

22.17%

95.00%

21.07%

100.00%

22.17%

31-Mar-11

10-Apr-11

-5.00%

-1.11%

LEG B1
DIM 1400
PTJ5540

LEGSPLICEFITUP

PTJ5550

CANSFITUP

1224

22.17%

80.00%

17.74%

100.00%

22.17%

11-Apr-11

21-Apr-11

-20.00%

-4.43%

PTJ5560

LEGSPLICEWELDING&NDT

1536

27.83%

12

95.00%

26.43%

100.00%

27.83%

23-Apr-11

8-May-11

-5.00%

-1.39%

PTJ5570

CANWELDING&NDT

1536

27.83%

12

80.00%

22.26%

100.00%

27.83%

9-May-11

22-May-11

-20.00%

-5.57%

2644

26.25%

50

100.00%

26.25%

100.00%

26.25%

23-Apr-11

11-Jun-11

0.00%

0.00%

DIM 1200
PTJ5470

LEGSPLICEFITUP

612

23.15%

100.00%

23.15%

100.00%

23.15%

23Apr11

04May11

0.00%

0.00%

PTJ5490

CANSFITUP

272

10.29%

100.00%

10.29%

100.00%

10.29%

05-May-11

09-May-11

0.00%

0.00%

5/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP4 PROGRESS Sheet

Act ID

Activity Name

Total
Budgete
Units (Hrs)

R.W %

Original
Duration
(Days)

ITEM

OVERALL

ITEM

OVERALL

ACTUAL %

PLANNED %
Start Date

Finish Date

DEV/ITEM

DEV/
OVERALL

PTJ5480

CONEFITUP

272

10.29%

100.00%

10.29%

100.00%

10.29%

10-May-11

14-May-11

0.00%

0.00%

PTJ5500

LEGSPLICEWELDING&NDT

768

29.05%

12

100.00%

29.05%

100.00%

29.05%

15-May-11

28-May-11

0.00%

0.00%

PTJ5510

CONEWELDING&NDT

384

14.52%

100.00%

14.52%

100.00%

14.52%

29May11

04Jun11

0.00%

0.00%

PTJ5520

CANWELDING&NDT

336

12.71%

100.00%

12.71%

100.00%

12.71%

05-Jun-11

11-Jun-11

0.00%

0.00%

1908

18.94%

33

92.24%

17.47%

100.00%

18.94%

15-May-11

16-Jun-11

-7.76%

-1.47%

PTJ5400

LEGSPLICEFITUP

340

17.82%

100.00%

17.82%

100.00%

17.82%

15-May-11

19-May-11

0.00%

0.00%

PTJ5420

CANSFITUP

272

14.26%

75.00%

10.69%

100.00%

14.26%

21-May-11

24-May-11

-25.00%

-3.56%

PTJ5410

CONEFITUP

272

14.26%

100.00%

14.26%

100.00%

14.26%

25-May-11

29-May-11

0.00%

0.00%

PTJ5430

LEGSPLICEWELDING&NDT

384

20.13%

100.00%

20.13%

100.00%

20.13%

30-May-11

5-Jun-11

0.00%

0.00%

PTJ5440

CONEWELDING&NDT

320

16.77%

100.00%

16.77%

100.00%

16.77%

6-Jun-11

11-Jun-11

0.00%

0.00%

PTJ5450

CANWELDING&NDT

320

16.77%

75.00%

12.58%

100.00%

16.77%

12-Jun-11

16-Jun-11

-25.00%

-4.19%

9848

23.32%

76

98.50%

22.97%

100.00%

23.32%

31-Mar-11

14-Jun-11

-1.50%

-0.35%

DIM 1000

LEG B2

5248

53 29%
53.29%

50

100 00%
100.00%

53 29%
53.29%

100 00%
100.00%

53 29%
53.29%

31 M 11
31-Mar-11

19 M 11
19-May-11

0.00%

0.00%

PTJ5730

LEGSPLICEFITUP

1088

20.73%

100.00%

20.73%

100.00%

20.73%

31-Mar-11

9-Apr-11

0.00%

0.00%

PTJ5740

CANSFITUP

1088

20.73%

100.00%

20.73%

100.00%

20.73%

10-Apr-11

19-Apr-11

0.00%

0.00%

PTJ5750

LEGSPLICEWELDING&NDT

1536

29.27%

12

100.00%

29.27%

100.00%

29.27%

20Apr11

05May11

0.00%

0.00%

PTJ5760

CANWELDING&NDT

1536

29.27%

12

100.00%

29.27%

100.00%

29.27%

07-May-11

19-May-11

0.00%

0.00%

DIM 1400

2692

27.34%

50

100.00%

27.34%

100.00%

27.34%

20-Apr-11

8-Jun-11

0.00%

0.00%

PTJ5660

LEGSPLICEFITUP

612

22.73%

100.00%

22.73%

100.00%

22.73%

20-Apr-11

2-May-11

0.00%

0.00%

PTJ5680

CANSFITUP

272

10.10%

100.00%

10.10%

100.00%

10.10%

03-May-11

07-May-11

0.00%

0.00%

PTJ5670

CONEFITUP

272

10.10%

100.00%

10.10%

100.00%

10.10%

8-May-11

11-May-11

0.00%

0.00%

PTJ5690

LEGSPLICEWELDING&NDT

768

28.53%

12

100.00%

28.53%

100.00%

28.53%

12-May-11

25-May-11

0.00%

0.00%

PTJ5700

CONE WELDING & NDT

384

14.26%

100.00%

14.26%

100.00%

14.26%

26May11

1Jun11

0.00%

0.00%

PTJ5710

CAN WELDING & NDT

DIM 1200

DIM 1000

384

14.26%

100.00%

14.26%

100.00%

14.26%

2Jun11

8Jun11

0.00%

0.00%

1908

19.37%

34

92.24%

17.87%

100.00%

19.37%

12-May-11

14-Jun-11

-7.76%

-1.50%

340

17.82%

100.00%

17.82%

100.00%

17.82%

12May11

17May11

0.00%

0.00%

PTJ5590

LEG SPLICE FIT UP

PTJ5610

CANS FIT UP

272

14.26%

75.00%

10.69%

100.00%

14.26%

18May11

22May11

25.00%

3.56%

PTJ5600

CONE FIT UP

272

14.26%

100.00%

14.26%

100.00%

14.26%

23May11

26May11

0.00%

0.00%

PTJ5620

LEG SPLICE WELDING & NDT

384

20.13%

100.00%

20.13%

100.00%

20.13%

28May11

2Jun11

0.00%

0.00%

PTJ5630

CONE WELDING & NDT

320

16.77%

100.00%

16.77%

100.00%

16.77%

4Jun11

8Jun11

0.00%

0.00%

PTJ5640

CAN WELDING & NDT

320

16.77%

75.00%

12.58%

100.00%

16.77%

9Jun11

14Jun11

25.00%

4.19%

35012

26.19%

189

86.21%

22.58%

33.60%

8.80%

31-Mar-11

05-Oct-11

52.61%

13.78%

8996

25.69%

59

88.67%

22.78%

0.00%

0.00%

8Aug11

5Oct11

88.67%

22.78%

JACKET BRACING FABRICATION


BRACING ROW 1

6/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP4 PROGRESS Sheet

Act ID

Activity Name

SPLICING
HORIZONTAL

Total
Budgete
Units (Hrs)

R.W %

Original
Duration
(Days)

ITEM

OVERALL

ITEM

OVERALL

8996

100.00%

59

88.67%

88.67%

0.00%

ACTUAL %

PLANNED %
Start Date

Finish Date

DEV/ITEM

DEV/
OVERALL

0.00%

8Aug11

5Oct11

88.67%

88.67%

3304

36.73%

53

100.00%

36.73%

0.00%

0.00%

8Aug11

29Sep11

100.00%

36.73%

PTJ3180

FITUP HORIZONTAL BRACES ATELEV 56.2

324

9.81%

100.00%

9.81%

0.00%

0.00%

8Aug11

17Aug11

100.00%

9.81%

PTJ3170

FITUP HORIZONTAL BRACES AT ELEV 33.4

324

9.81%

100.00%

9.81%

0.00%

0.00%

18Aug11

28Aug11

100.00%

9.81%

PTJ3200

FITUP HORIZONTAL BRACES AT ELEV 79.0

324

9.81%

100.00%

9.81%

0.00%

0.00%

18Aug11

28Aug11

100.00%

9.81%

PTJ3270

WELDING & NDT HORIZONTAL BRACES AT ELEV 56.2

384

11.62%

12

100.00%

11.62%

0.00%

0.00%

18Aug11

4Sep11

100.00%

11.62%

PTJ3160

FITUP HORIZONTAL BRACES AT ELEV 10.6

288

8.72%

100.00%

8.72%

0.00%

0.00%

29Aug11

10Sep11

100.00%

8.72%

PTJ3260

WELDING & NDT HORIZONTAL BRACES AT ELEV 33.4

384

11.62%

12

100.00%

11.62%

0.00%

0.00%

29Aug11

14Sep11

100.00%

11.62%

PTJ3290

WELDING & NDT HORIZONTAL BRACES AT ELEV 79.0

384

11.62%

12

100.00%

11.62%

0.00%

0.00%

29Aug11

14Sep11

100.00%

11.62%

PTJ3190

FITUP HORIZONTAL BRACES AT ELEV +6.4

252

7.63%

100.00%

7.63%

0.00%

0.00%

11Sep11

18Sep11

100.00%

7.63%

PTJ3250

WELDING & NDT HORIZONTAL BRACES AT ELEV 10.6

320

9.69%

10

100.00%

9.69%

0.00%

0.00%

11Sep11

21Sep11

100.00%

9.69%

10

100.00%

9.69%

0.00%

0.00%

19Sep11

29Sep11

100.00%

9.69%
51.95%

PTJ3280

WELDING & NDT HORIZONTAL BRACES AT ELEV +6.4

DIAGONAL BRACES

320

9.69%

5692

63.27%

49

82.10%

51.95%

0.00%

0.00%

18Aug11

5Oct11

82.10%

PTJ3140

FITUP DIAGONAL BRACES BETWEEN ELEV 33.4 & 56.2

720

12.65%

20

100.00%

12.65%

0.00%

0.00%

18Aug11

13Sep11

100.00%

12.65%

PTJ3150

FITUP DIAGONAL BRACES BETWEEN ELEV 56.2 & 79.0

792

13.91%

22

75.00%

10.44%

0.00%

0.00%

18Aug11

15Sep11

75.00%

10.44%

PTJ3130

FITUP DIAGONAL BRACES BETWEEN ELEV 10.6 & 33.4

576

10.12%

16

75.00%

7.59%

0.00%

0.00%

29Aug11

19Sep11

75.00%

7.59%

PTJ3120

FITUP DIAGONAL BRACES BETWEEN ELEV +6.4 & 10.6

468

8.22%

13

75.00%

6.17%

0.00%

0.00%

11Sep11

25Sep11

75.00%

6.17%

PTJ3230

WELDING & NDT DIAGONAL BRACES BETWEEN ELEV 33.4 & 56.2

896

15.74%

14

100.00%

15.74%

0.00%

0.00%

14Sep11

29Sep11

100.00%

15.74%

PTJ3240

WELDING & NDT DIAGONAL BRACES BETWEEN ELEV 56.2 & 79.0

960

16.87%

15

75.00%

12.65%

0.00%

0.00%

17Sep11

3Oct11

75.00%

12.65%

PTJ3220

WELDING & NDT DIAGONAL BRACES BETWEEN ELEV 10.6 & 33.4

704

12.37%

11

75.00%

9.28%

0.00%

0.00%

20Sep11

2Oct11

75.00%

9.28%

PTJ3210

WELDING & NDT DIAGONAL BRACES BETWEEN ELEV +6.4 & 10.6

BRACING ROW 2
SPLICING
HORIZONTAL

576

10.12%

75.00%

7.59%

0.00%

0.00%

26Sep11

5Oct11

75.00%

7.59%

9964

28.46%

91

94.38%

26.86%

98.83%

28.13%

31Mar11

29Jun11

4.45%

1.27%

9964

100.00%

91

94.38%

94.38%

98.83%

98.83%

31Mar11

29Jun11

4.45%

4.45%

2428

24.37%

20

100.00%

24.37%

100.00%

24.37%

31Mar11

19Apr11

0.00%

0.00%

PTJ3340

FITUP HORIZONTAL BRACES AT ELEV 10.6

180

7.41%

100.00%

7.41%

100.00%

7.41%

31Mar11

5Apr11

0.00%

0.00%

PTJ3350

FITUP HORIZONTAL BRACES AT ELEV 33.4

252

10.38%

100.00%

10.38%

100.00%

10.38%

31Mar11

7Apr11

0.00%

0.00%

PTJ3360

FITUP HORIZONTAL BRACES AT ELEV 56.2

252

10.38%

100.00%

10.38%

100.00%

10.38%

31Mar11

7Apr11

0.00%

0.00%

PTJ3370

FITUP HORIZONTAL BRACES AT ELEV +6.4

180

7.41%

100.00%

7.41%

100.00%

7.41%

31Mar11

5Apr11

0.00%

0.00%

PTJ3380

FITUP HORIZONTAL BRACES AT ELEV 79.0

252

10.38%

100.00%

10.38%

100.00%

10.38%

31Mar11

7Apr11

0.00%

0.00%

PTJ3430

WELDING & NDT HORIZONTAL BRACES AT ELEV 10.6

224

9.23%

100.00%

9.23%

100.00%

9.23%

6Apr11

13Apr11

0.00%

0.00%

PTJ3470

WELDING & NDT HORIZONTAL BRACES AT ELEV +6.4

224

9.23%

100.00%

9.23%

100.00%

9.23%

6Apr11

13Apr11

0.00%

0.00%

PTJ3440

WELDING & NDT HORIZONTAL BRACES AT ELEV 33.4

288

11.86%

100.00%

11.86%

100.00%

11.86%

9Apr11

19Apr11

0.00%

0.00%

PTJ3450

WELDING & NDT HORIZONTAL BRACES AT ELEV 56.2

288

11.86%

100.00%

11.86%

100.00%

11.86%

9Apr11

19Apr11

0.00%

0.00%

PTJ3460

WELDING & NDT HORIZONTAL BRACES AT ELEV 79.0

288

11.86%

100.00%

11.86%

100.00%

11.86%

9Apr11

19Apr11

0.00%

0.00%

5988

60.10%

65

100.00%

60.10%

100.00%

60.10%

6Apr11

9Jun11

0.00%

0.00%

DIAGONAL BRACES

7/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP4 PROGRESS Sheet

Act ID

Activity Name

Total
Budgete
Units (Hrs)

R.W %

Original
Duration
(Days)

ITEM

OVERALL

ITEM

OVERALL

100.00%

9.08%

100.00%

ACTUAL %

PLANNED %
Start Date

Finish Date

DEV/ITEM

DEV/
OVERALL

9.08%

6Apr11

14Apr11

0.00%

0.00%

PTJ3300

FITUP DIAGONAL BRACES BETWEEN ELEV +6.4 & 10.6

544

9.08%

PTJ3310

FITUP DIAGONAL BRACES BETWEEN ELEV 10.6 & 33.4

612

10.22%

100.00%

10.22%

100.00%

10.22%

9Apr11

19Apr11

0.00%

0.00%

PTJ3320

FITUP DIAGONAL BRACES BETWEEN ELEV 33.4 & 56.2

816

13.63%

12

100.00%

13.63%

100.00%

13.63%

9Apr11

23Apr11

0.00%

0.00%

PTJ3330

FITUP DIAGONAL BRACES BETWEEN ELEV 56.2 & 79.0

816

13.63%

12

100.00%

13.63%

100.00%

13.63%

9Apr11

23Apr11

0.00%

0.00%

PTJ3390

WELDING DIAGONAL BRACES BETWEEN ELEV +6.4 & 10.6

512

8.55%

100.00%

8.55%

100.00%

8.55%

16Apr11

26Apr11

0.00%

0.00%

PTJ3400

WELDING DIAGONAL BRACES BETWEEN ELEV 10.6 & 33.4

768

12.83%

12

100.00%

12.83%

100.00%

12.83%

20Apr11

5May11

0.00%

0.00%

PTJ3410

WELDING DIAGONAL BRACES BETWEEN ELEV 33.4 & 56.2

896

14.96%

14

100.00%

14.96%

100.00%

14.96%

7May11

22May11

0.00%

0.00%

PTJ3420

WELDING DIAGONAL BRACES BETWEEN ELEV 56.2 & 79.0

1024

17.10%

16

100.00%

17.10%

100.00%

17.10%

23May11

9Jun11

0.00%

0.00%

1548

15.54%

54

63.84%

9.92%

92.48%

14.37%

7May11

29Jun11

28.65%

4.45%

VERTICAL
PTJ3970

FITUP VERTICAL BRACES BETWEEN ELEV 10.6 & 33.4

180

11.63%

75.00%

8.72%

100.00%

11.63%

7May11

11May11

25.00%

2.91%

PTJ8040

WELDING VERTICAL BRACES BETWEEN ELEV 10.6 & 33.4

224

14.47%

55.00%

7.96%

100.00%

14.47%

12May11

19May11

45.00%

6.51%

16.28%

75.00%

12.21%

100.00%

16.28%

23May11

30May11

25.00%

4.07%
9.30%

PTJ3980

FITUP VERTICAL BRACES BETWEEN ELEV 33.4 & 56.2

PTJ8050

WELDING VERTICAL BRACES BETWEEN ELEV 33.4 & 56.2

320

20.67%

10

55.00%

11.37%

100.00%

20.67%

31May11

11Jun11

45.00%

PTJ3990

FITUP VERTICAL BRACES BETWEEN ELEV 56.2 & 79.0

252

16.28%

75.00%

12.21%

100.00%

16.28%

11Jun11

18Jun11

25.00%

4.07%

PTJ8060

WELDING VERTICAL BRACES BETWEEN ELEV 56.2 & 79.0

1.79%

BRACING ROW 3

252

320

20.67%

10

55.00%

11.37%

63.64%

13.15%

19Jun11

29Jun11

8.64%

1716

4.90%

19

75.00%

3.68%

100.00%

4.90%

21May11

8Jun11

25.00%

1.23%

PTJ8120

FITUP BRACES BETWEEN ELEV 10.6 & 33.4

252

14.69%

75.00%

11.01%

100.00%

14.69%

21May11

28May11

25.00%

3.67%

PTJ8130

FITUP BRACES BETWEEN ELEV 33.4 & 56.2

252

14.69%

75.00%

11.01%

100.00%

14.69%

21May11

28May11

25.00%

3.67%

PTJ8140

FITUP BRACES BETWEEN ELEV 56.2 & 79.0

252

14.69%

75.00%

11.01%

100.00%

14.69%

21May11

28May11

25.00%

3.67%

PTJ8150

WELDING VERTICAL BRACES BETWEEN ELEV +10.6 & 33.4

320

18.65%

10

75.00%

13.99%

100.00%

18.65%

29May11

8Jun11

25.00%

4.66%

PTJ8160

WELDING VERTICAL BRACES BETWEEN ELEV 33.4 & 56.2

320

18.65%

10

75.00%

13.99%

100.00%

18.65%

29May11

8Jun11

25.00%

4.66%

PTJ8170

WELDING VERTICAL BRACES BETWEEN ELEV 56.2 & 79.0

320

18.65%

10

75.00%

13.99%

100.00%

18.65%

29May11

8Jun11

25.00%

4.66%

BRACING ROW A

5516

15.75%

59

76.52%

12.05%

0.00%

0.00%

27Jun11

24Aug11

76.52%

12.05%

FABRICATION

5516

100.00%

59

76.52%

76.52%

0.00%

0.00%

27Jun11

24Aug11

76.52%

76.52%

PTJ8210

FITUP DIAGONAL BRACES BETWEEN ELEV +6.4 & 10.6

408

7.40%

95.00%

7.03%

0.00%

0.00%

27Jun11

3Jul11

95.00%

7.03%

PTJ8220

FITUP DIAGONAL BRACES BETWEEN ELEV 10.6 & 33.4

544

9.86%

95.00%

9.37%

0.00%

0.00%

4Jul11

12Jul11

95.00%

9.37%

PTJ8250

WELDING DIAGONAL BRACES BETWEEN ELEV +6.4 & 10.6

576

10.44%

85.00%

8.88%

0.00%

0.00%

4Jul11

13Jul11

85.00%

8.88%

PTJ8230

FITUP DIAGONAL BRACES BETWEEN ELEV 33.4 & 56.2

680

12.33%

10

85.00%

10.48%

0.00%

0.00%

13Jul11

25Jul11

85.00%

10.48%

PTJ8260

WELDING DIAGONAL BRACES BETWEEN ELEV 10.6 & 33.4

704

12.76%

11

85.00%

10.85%

0.00%

0.00%

13Jul11

26Jul11

85.00%

10.85%

PTJ8240

FITUP DIAGONAL BRACES BETWEEN ELEV 56.2 & 79.0

748

13.56%

11

85.00%

11.53%

0.00%

0.00%

26Jul11

7Aug11

85.00%

11.53%

PTJ8270

WELDING DIAGONAL BRACES BETWEEN ELEV 33.4 & 56.2

896

16.24%

14

65.00%

10.56%

0.00%

0.00%

26Jul11

10Aug11

65.00%

10.56%

PTJ8280

WELDING DIAGONAL BRACES BETWEEN ELEV 56.2 & 79.0

960

17.40%

15

45.00%

7.83%

0.00%

0.00%

8Aug11

24Aug11

45.00%

7.83%

BRACING ROW B

5516

15.75%

59

83.94%

13.22%

0.00%

0.00%

27Jun11

24Aug11

83.94%

13.22%

FABRICATION

5516

100.00%

59

83.94%

83.94%

0.00%

0.00%

27Jun11

24Aug11

83.94%

83.94%

408

7.40%

100.00%

7.40%

0.00%

0.00%

27Jun11

3Jul11

100.00%

7.40%

PTJ8330

FITUP DIAGONAL BRACES BETWEEN ELEV +6.4 & 10.6

8/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP4 PROGRESS Sheet

Act ID

Activity Name

Total
Budgete
Units (Hrs)

R.W %

Original
Duration
(Days)

ITEM

OVERALL

ITEM

OVERALL

100.00%

9.86%

0.00%

0.00%

ACTUAL %

PLANNED %
Start Date

Finish Date

DEV/ITEM

DEV/
OVERALL

4Jul11

12Jul11

100.00%

9.86%

PTJ8340

FITUP DIAGONAL BRACES BETWEEN ELEV 10.6 & 33.4

544

9.86%

PTJ8370

WELDING DIAGONAL BRACES BETWEEN ELEV +6.4 & 10.6

576

10.44%

100.00%

10.44%

0.00%

0.00%

4Jul11

13Jul11

100.00%

10.44%

PTJ8350

FITUP DIAGONAL BRACES BETWEEN ELEV 33.4 & 56.2

680

12.33%

10

100.00%

12.33%

0.00%

0.00%

13Jul11

25Jul11

100.00%

12.33%

PTJ8380

WELDING DIAGONAL BRACES BETWEEN ELEV 10.6 & 33.4

704

12.76%

11

100.00%

12.76%

0.00%

0.00%

13Jul11

26Jul11

100.00%

12.76%

PTJ8360

FITUP DIAGONAL BRACES BETWEEN ELEV 56.2 & 79.0

748

13.56%

11

65.00%

8.81%

0.00%

0.00%

26Jul11

7Aug11

65.00%

8.81%

PTJ8390

WELDING DIAGONAL BRACES BETWEEN ELEV 33.4 & 56.2

896

16.24%

14

100.00%

16.24%

0.00%

0.00%

26Jul11

10Aug11

100.00%

16.24%

PTJ8400

WELDING DIAGONAL BRACES BETWEEN ELEV 56.2 & 79.0

960

17.40%

15

35.00%

6.09%

0.00%

0.00%

8Aug11

24Aug11

35.00%

6.09%

1856

5.30%

26

85.00%

4.51%

5.16%

0.27%

25Jun11

20Jul11

79.84%

4.23%

PTJ8450

FITUP BRACES BETWEEN ELEV 10.6 & 33.4

252

13.58%

85.00%

11.54%

12.50%

1.70%

25Jun11

2Jul11

72.50%

9.84%

PTJ8460

FITUP BRACES BETWEEN ELEV 33.4 & 56.2

360

19.40%

10

85.00%

16.49%

9.09%

1.76%

25Jun11

5Jul11

75.91%

14.72%

PTJ8470

FITUP BRACES BETWEEN ELEV 56.2 & 79.0

252

13.58%

85.00%

11.54%

12.50%

1.70%

25Jun11

2Jul11

72.50%

9.84%

13.19%

0.00%

0.00%

3Jul11

12Jul11

85.00%

13.19%

BRACING ROW C

PTJ8480

WELDING BRACES BETWEEN ELEV 10.6 & 33.4

288

15.52%

85.00%

PTJ8490

WELDING BRACES BETWEEN ELEV 56.2 & 79.0

288

15.52%

85.00%

13.19%

0.00%

0.00%

3Jul11

12Jul11

85.00%

13.19%

PTJ8500

WELDING BRACES BETWEEN ELEV 33.4 & 56.2

416

22.41%

13

85.00%

19.05%

0.00%

0.00%

6Jul11

20Jul11

85.00%

19.05%

1448

4.14%

22

75.00%

3.10%

7.18%

0.30%

25Jun11

16Jul11

67.82%

2.80%

BRACING ROW D
PTJ8540

FITUP BRACES BETWEEN ELEV 10.6 & 33.4

180

12.43%

75.00%

9.32%

20.00%

2.49%

25Jun11

29Jun11

55.00%

6.84%

PTJ8550

FITUP BRACES BETWEEN ELEV 33.4 & 56.2

288

19.89%

75.00%

14.92%

11.11%

2.21%

25Jun11

3Jul11

63.89%

12.71%

PTJ8560

FITUP BRACES BETWEEN ELEV 56.2 & 79.0

180

12.43%

75.00%

9.32%

20.00%

2.49%

25Jun11

29Jun11

55.00%

6.84%

PTJ8570

WELDING BRACES BETWEEN ELEV 10.6 & 33.4

224

15.47%

75.00%

11.60%

0.00%

0.00%

30Jun11

7Jul11

75.00%

11.60%

PTJ8580

WELDING BRACES BETWEEN ELEV 56.2 & 79.0

224

15.47%

75.00%

11.60%

0.00%

0.00%

30Jun11

7Jul11

75.00%

11.60%

PTJ8590

WELDING BRACES BETWEEN ELEV 33.4 & 56.2

352

24.31%

11

75.00%

18.23%

0.00%

0.00%

4Jul11

16Jul11

75.00%

18.23%

31088

23.26%

227

74.72%

17.38%

61.66%

14.34%

31-Mar-11

12-Nov-11

13.05%

3.04%

4280

13.77%

91

100.00%

13.77%

90.51%

12.46%

4Apr11

3Jul11

9.49%

1.31%

JACKET ELEVATIONS FABRICATION


ELEV + 6400
FITUP

1260

29.44%

34

100.00%

29.44%

100.00%

29.44%

4Apr11

7May11

0.00%

0.00%

PTJ8630

FITUP OF SIZE 24"

720

57.14%

20

100.00%

57.14%

100.00%

57.14%

4Apr11

28Apr11

0.00%

0.00%

PTJ8640

FITUP OF SIZE 16"

324

25.71%

100.00%

25.71%

100.00%

25.71%

23Apr11

4May11

0.00%

0.00%

PTJ8650

FITUP OF SIZE 20"

WELDING&NDT

216

17.14%

100.00%

17.14%

100.00%

17.14%

30Apr11

7May11

0.00%

0.00%

1344

31.40%

23

100.00%

31.40%

100.00%

31.40%

8May11

30May11

0.00%

0.00%
0.00%

PTJ8660

WELDING OF SIZE 24"

768

57.14%

12

100.00%

57.14%

100.00%

57.14%

8May11

21May11

0.00%

PTJ8670

WELDING OF SIZE 16"

320

23.81%

100.00%

23.81%

100.00%

23.81%

22May11

26May11

0.00%

0.00%

PTJ8680

WELDING OF SIZE 20"

256

19.05%

100.00%

19.05%

100.00%

19.05%

26May11

30May11

0.00%

0.00%

CONDUCTORS AT ELEV + 6400


FITUP

1676

39.16%

44

100.00%

39.16%

75.77%

29.67%

21May11

3Jul11

24.23%

9.49%

504

30.07%

24

100.00%

30.07%

100.00%

30.07%

21May11

13Jun11

0.00%

0.00%

PTJ9100

FITUP OF CONDUCTOR

324

64.29%

100.00%

64.29%

100.00%

64.29%

21May11

30May11

0.00%

0.00%

PTJ9110

FITUP OF CONDUCTOR SUPPORT

180

35.71%

100.00%

35.71%

100.00%

35.71%

8Jun11

13Jun11

0.00%

0.00%

9/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP4 PROGRESS Sheet

Act ID

Activity Name

WELDING & NDT

Total
Budgete
Units (Hrs)

R.W %

Original
Duration
(Days)

ITEM

OVERALL

ITEM

OVERALL

512

30.55%

21

100.00%

30.55%

100.00%

ACTUAL %

PLANNED %
Start Date

Finish Date

DEV/ITEM

DEV/
OVERALL

30.55%

31May11

20Jun11

0.00%

0.00%
0.00%

PTJ9120

WELDING OF CONDUCTOR

320

62.50%

10

100.00%

62.50%

100.00%

62.50%

31May11

11Jun11

0.00%

PTJ9130

WELDING OF CONDUCTOR SUPPORT

192

37.50%

100.00%

37.50%

100.00%

37.50%

14Jun11

20Jun11

0.00%

0.00%

61.54%

24.23%

CONDUCTORS ERECTION
PTJ9140

ERECTION OF CONDUCTOR WITH ELEVATIONS

ELEV 10600

660

39.38%

13

100.00%

39.38%

38.46%

15.15%

21Jun11

3Jul11

660

100.00%

11

100.00%

100.00%

38.46%

38.46%

21Jun11

3Jul11

61.54%

61.54%

6716

21.60%

148

30.82%

6.66%

62.51%

13.50%

31-Mar-11

25-Aug-11

-31.69%

-6.85%

2448

36.45%

48

35.00%

12.76%

100.00%

36.45%

31-Mar-11

17-May-11

-65.00%

-23.69%

PTJ8700

FITUP OF SIZE 28"

1044

42.65%

29

35.00%

14.93%

100.00%

42.65%

31Mar11

7May11

65.00%

27.72%

PTJ8710

FITUP OF SIZE 20"

936

38.24%

26

35.00%

13.38%

100.00%

38.24%

12Apr11

15May11

65.00%

24.85%

PTJ8720

FITUP OF SIZE 16"

288

11.76%

35.00%

4.12%

100.00%

11.76%

2May11

10May11

65.00%

7.65%

PTJ8730

FITUP OF SIZE 14"

180

7.35%

35.00%

2.57%

100.00%

7.35%

12May11

17May11

65.00%

4.78%

5.79%

67.52%

26.06%

18May11

12Jul11

52.52%

20.27%

FITUP

2592

38.59%

56

15.00%

PTJ8740

WELDING OF SIZE 28"

1120

43.21%

35

15.00%

6.48%

95.12%

41.10%

18May11

27Jun11

80.12%

34.62%

PTJ8750

WELDING OF SIZE 20"

992

38.27%

31

15.00%

5.74%

61.11%

23.39%

4Jun11

9Jul11

46.11%

17.65%

PTJ8760

WELDING OF SIZE 16"

288

11.11%

15.00%

1.67%

27.27%

3.03%

23Jun11

3Jul11

12.27%

1.36%

PTJ8770

WELDING OF SIZE 14"

WELDING&NDT

CONDUCTORS AT ELEV 10600


FITUP

192

7.41%

15.00%

1.11%

0.00%

0.00%

6Jul11

12Jul11

15.00%

1.11%

1676

24.96%

54

49.16%

12.27%

0.00%

0.00%

3Jul11

25Aug11

49.16%

12.27%

504

30.07%

35

100.00%

30.07%

0.00%

0.00%

3Jul11

6Aug11

100.00%

30.07%

PTJ9150

FITUP OF CONDUCTOR

324

64.29%

100.00%

64.29%

0.00%

0.00%

3Jul11

12Jul11

100.00%

64.29%

PTJ9160

FITUP OF CONDUCTOR SUPPORT

180

35.71%

100.00%

35.71%

0.00%

0.00%

1Aug11

6Aug11

100.00%

35.71%

WELDING & NDT

512

30.55%

32

62.50%

19.09%

0.00%

0.00%

13Jul11

13Aug11

62.50%

19.09%

PTJ9170

WELDING OF CONDUCTOR

320

62.50%

10

100.00%

62.50%

0.00%

0.00%

13Jul11

25Jul11

100.00%

62.50%

PTJ9180

WELDING OF CONDUCTOR SUPPORT

192

37.50%

0.00%

0.00%

0.00%

0.00%

7Aug11

13Aug11

0.00%

0.00%
0.00%

CONDUCTORS ERECTION
PTJ9190

ERECTION OF CONDUCTOR WITH ELEVATIONS

ELEV 33400
FITUP

660

39.38%

12

0.00%

0.00%

0.00%

0.00%

14Aug11

25Aug11

0.00%

660

100.00%

11

0.00%

0.00%

0.00%

0.00%

14Aug11

25Aug11

0.00%

0.00%

7092

22.81%

120

66.64%

15.20%

85.07%

19.41%

31-Mar-11

28-Jul-11

-18.43%

-4.20%

2664

37.56%

36

100.00%

37.56%

100.00%

37.56%

31-Mar-11

5-May-11

0.00%

0.00%

PTJ8790

FITUP OF SIZE 28"

1008

37.84%

14

100.00%

37.84%

100.00%

37.84%

31Mar11

16Apr11

0.00%

0.00%

PTJ8810

FITUP OF SIZE 16"

396

14.86%

11

100.00%

14.86%

100.00%

14.86%

9Apr11

21Apr11

0.00%

0.00%

PTJ8800

FITUP OF SIZE 24"

720

27.03%

10

100.00%

27.03%

100.00%

27.03%

17Apr11

30Apr11

0.00%

0.00%

PTJ8820

FITUP OF SIZE 20"

288

10.81%

100.00%

10.81%

100.00%

10.81%

23Apr11

3May11

0.00%

0.00%

PTJ8830

FITUP OF SIZE 18"

WELDING&NDT

252

9.46%

100.00%

9.46%

100.00%

9.46%

27Apr11

5May11

0.00%

0.00%

2752

38.80%

39

45.00%

17.46%

100.00%

38.80%

7-May-11

14-Jun-11

-55.00%

-21.34%

PTJ8840

WELDING OF SIZE 28"

1024

37.21%

16

45.00%

16.74%

100.00%

37.21%

7May11

24May11

55.00%

20.47%

PTJ8860

WELDING OF SIZE 16"

384

13.95%

45.00%

6.28%

100.00%

13.95%

24May11

30May11

55.00%

7.67%

10/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP4 PROGRESS Sheet

Act ID

Activity Name

Total
Budgete
Units (Hrs)

R.W %

Original
Duration
(Days)

ITEM

OVERALL

ITEM

OVERALL

100.00%

27.91%

ACTUAL %

PLANNED %
Start Date

Finish Date

DEV/ITEM

DEV/
OVERALL

26May11

8Jun11

55.00%

15.35%

PTJ8850

WELDING OF SIZE 24"

768

27.91%

12

45.00%

12.56%

PTJ8870

WELDING OF SIZE 20"

320

11.63%

45.00%

5.23%

100.00%

11.63%

7Jun11

12Jun11

55.00%

6.40%

PTJ8880

WELDING OF SIZE 18"

256

9.30%

45.00%

4.19%

100.00%

9.30%

11Jun11

14Jun11

55.00%

5.12%

1676

23.63%

54

49.16%

11.62%

36.83%

8.70%

5-Jun-11

28-Jul-11

12.33%

2.91%

504

30.07%

33

100.00%

30.07%

64.29%

19.33%

5Jun11

7Jul11

35.71%

10.74%

100.00%

64.29%

100.00%

64.29%

5Jun11

14Jun11

0.00%

0.00%

CONDUCTORS AT ELEV 33400


FITUP
PTJ9200

FITUP OF CONDUCTOR

324

64.29%

PTJ9210

FITUP OF CONDUCTOR SUPPORT

180

35.71%

100.00%

35.71%

0.00%

0.00%

3Jul11

7Jul11

100.00%

35.71%

512

30.55%

30

62.50%

19.09%

57.29%

17.50%

15Jun11

14Jul11

5.21%

1.59%

PTJ9220

WELDING OF CONDUCTOR

320

62.50%

10

100.00%

62.50%

91.67%

57.29%

15Jun11

26Jun11

8.33%

5.21%

PTJ9230

WELDING OF CONDUCTOR SUPPORT

192

37.50%

0.00%

0.00%

0.00%

0.00%

9Jul11

14Jul11

0.00%

0.00%

660

39.38%

13

0.00%

0.00%

0.00%

0.00%

16Jul11

28Jul11

0.00%

0.00%

100.00%

11

0.00%

0.00%

0.00%

0.00%

16Jul11

28Jul11

0.00%

0.00%

7520

24.19%

140

94.34%

22.82%

67.34%

16.29%

31-Mar-11

17-Aug-11

27.00%

6.53%

2772

36.86%

54

100.00%

36.86%

100.00%

36.86%

31-Mar-11

23-May-11

0.00%

0.00%
0.00%

WELDING & NDT

CONDUCTORS ERECTION
PTJ9240

ERECTION OF CONDUCTOR WITH ELEVATIONS

ELEV 56200
FITUP

660

PTJ8900

FITUP OF SIZE 28"

1044

37.66%

29

100.00%

37.66%

100.00%

37.66%

31Mar11

7May11

0.00%

PTJ8910

FITUP OF SIZE 24"

684

24.68%

19

100.00%

24.68%

100.00%

24.68%

26Apr11

18May11

0.00%

0.00%

PTJ8920

FITUP OF SIZE 16"

396

14.29%

11

100.00%

14.29%

100.00%

14.29%

28Apr11

11May11

0.00%

0.00%

PTJ8930

FITUP OF SIZE 20"

396

14.29%

11

100.00%

14.29%

100.00%

14.29%

9May11

21May11

0.00%

0.00%

PTJ8940

FITUP OF SIZE 18"

252

9.09%

100.00%

9.09%

100.00%

9.09%

16May11

23May11

0.00%

0.00%

3072

40.85%

42

100.00%

40.85%

73.55%

30.05%

24-May-11

4-Jul-11

26.45%

10.81%

WELDING&NDT
PTJ8950

WELDING OF SIZE 28"

1152

37.50%

18

100.00%

37.50%

100.00%

37.50%

24May11

13Jun11

0.00%

0.00%

PTJ8970

WELDING OF SIZE 16"

448

14.58%

100.00%

14.58%

100.00%

14.58%

12Jun11

19Jun11

0.00%

0.00%

PTJ8960

WELDING OF SIZE 24"

768

25.00%

12

100.00%

25.00%

78.57%

19.64%

15Jun11

28Jun11

21.43%

5.36%

PTJ8980

WELDING OF SIZE 20"

448

14.58%

100.00%

14.58%

12.50%

1.82%

25Jun11

2Jul11

87.50%

12.76%

PTJ8990

WELDING OF SIZE 18"

256

8.33%

100.00%

8.33%

0.00%

0.00%

30Jun11

4Jul11

100.00%

8.33%

1676

22.29%

54

74.58%

16.62%

1.93%

0.43%

25-Jun-11

17-Aug-11

72.65%

16.19%

504

30.07%

34

100.00%

30.07%

6.43%

1.93%

25Jun11

CONDUCTORS AT ELEV 56200


FITUP

28Jul11

93.57%

28.14%

PTJ9250

FITUP OF CONDUCTOR

324

64.29%

100.00%

64.29%

10.00%

6.43%

25Jun11

4Jul11

90.00%

57.86%

PTJ9260

FITUP OF CONDUCTOR SUPPORT

180

35.71%

100.00%

35.71%

0.00%

0.00%

24Jul11

28Jul11

100.00%

35.71%

WELDING & NDT

512

30.55%

31

81.25%

24.82%

0.00%

0.00%

5Jul11

4Aug11

81.25%

24.82%

PTJ9270

WELDING OF CONDUCTOR

320

62.50%

10

100.00%

62.50%

0.00%

0.00%

5Jul11

16Jul11

100.00%

62.50%

PTJ9280

WELDING OF CONDUCTOR SUPPORT

192

37.50%

50.00%

18.75%

0.00%

0.00%

30Jul11

4Aug11

50.00%

18.75%

660

39.38%

12

50.00%

19.69%

0.00%

0.00%

6Aug11

17Aug11

50.00%

19.69%

660

100.00%

11

50.00%

50.00%

0.00%

0.00%

6Aug11

17Aug11

50.00%

50.00%

5480

17.63%

82

92.29%

16.27%

0.00%

0.00%

23-Aug-11

12-Nov-11

92.29%

16.27%

CONDUCTORS ERECTION
PTJ9290
ELEV 79000

ERECTION OF CONDUCTOR WITH ELEVATIONS

11/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP4 PROGRESS Sheet

Act ID

Activity Name

FITUP

Total
Budgete
Units (Hrs)

R.W %

2664

Original
Duration
(Days)

ITEM

OVERALL

ITEM

OVERALL

48.61%

35

100.00%

48.61%

0.00%

ACTUAL %

PLANNED %
Start Date

Finish Date

DEV/ITEM

DEV/
OVERALL

0.00%

23-Aug-11

26-Sep-11

100.00%

48.61%

PTJ9010

FITUP OF SIZE 28"

1080

40.54%

15

100.00%

40.54%

0.00%

0.00%

23Aug11

12Sep11

100.00%

40.54%

PTJ9020

FITUP OF SIZE 16"

648

24.32%

100.00%

24.32%

0.00%

0.00%

7Sep11

17Sep11

100.00%

24.32%

PTJ9030

FITUP OF SIZE 24"

720

27.03%

10

100.00%

27.03%

0.00%

0.00%

13Sep11

24Sep11

100.00%

27.03%

PTJ9040

FITUP OF SIZE 20"

WELDING&NDT

216

8.11%

100.00%

8.11%

0.00%

0.00%

20Sep11

26Sep11

100.00%

8.11%

2816

51.39%

47

85.00%

43.68%

0.00%

0.00%

27-Sep-11

12-Nov-11

85.00%

43.68%

PTJ9050

WELDING OF SIZE 28"

1152

40.91%

18

85.00%

34.77%

0.00%

0.00%

27Sep11

18Oct11

85.00%

34.77%

PTJ9060

WELDING OF SIZE 16"

640

22.73%

10

85.00%

19.32%

0.00%

0.00%

13Oct11

24Oct11

85.00%

19.32%

PTJ9070

WELDING OF SIZE 24"

768

27.27%

12

85.00%

23.18%

0.00%

0.00%

20Oct11

2Nov11

85.00%

23.18%

PTJ9080

WELDING OF SIZE 20"

256

9.09%

85.00%

7.73%

0.00%

0.00%

2Nov11

12Nov11

85.00%

7.73%

12832

9.60%

87

7.29%

0.70%

0.00%

0.00%

05-Dec-11

29-Feb-12

7.29%

0.70%

3208

25.00%

64

0.22%

0.06%

0.00%

0.00%

5-Dec-11

6-Feb-12

0.22%

0.06%

5.00%

PILE SLEEVES FABRICATION


AT LEG B1
PTJ9460

CUTTING & EDGE PREPARATION OF PILE SLEEVE PLATE

144

4.49%

0.22%

0.00%

0.00%

5Dec11

8Dec11

5.00%

0.22%

PTJ9500

GIRTH WELD OF PILE SLEEVE

1152

35 91%
35.91%

24

0 00%
0.00%

0 00%
0.00%

0 00%
0.00%

14Dec11

11Jan12

0 00%
0.00%

0 00%
0.00%

PTJ9470

CUTTING & EDGE PREPARATION OF PILE SLEEVE SHEAR PLATE & STIFFENERS

144

4.49%

0.00%

0.00%

0.00%

8Jan12

11Jan12

0.00%

0.00%

PTJ9510

ERECTION OF SHEAR & STIFFENERS PLATE WITH PILE SLEEVE

1248

38.90%

12

0.00%

0.00%

0.00%

12Jan12

25Jan12

0.00%

0.00%

PTJ9520

ERECTION OF PILE SLEEVE WITH LEGS

520

16.21%

10

0.00%

0.00%

0.00%

26Jan12

6Feb12

0.00%

0.00%
7.24%

3208

25.00%

64

28.95%

7.24%

0.00%

0.00%

5-Dec-11

6-Feb-12

28.95%

PTJ9320

CUTTING & EDGE PREPARATION OF PILE SLEEVE PLATE

144

4.49%

5.00%

0.22%

0.00%

0.00%

5Dec11

8Dec11

5.00%

0.22%

PTJ9360

GIRTH WELD OF PILE SLEEVE

1152

35.91%

24

80.00%

28.73%

0.00%

0.00%

14Dec11

11Jan12

80.00%

28.73%

PTJ9330

CUTTING & EDGE PREPARATION OF PILE SLEEVE SHEAR PLATE & STIFFENERS

144

4.49%

0.00%

0.00%

0.00%

8Jan12

11Jan12

0.00%

0.00%

PTJ9370

ERECTION OF SHEAR & STIFFENERS PLATE WITH PILE SLEEVE

1248

38.90%

12

0.00%

0.00%

0.00%

12Jan12

25Jan12

0.00%

0.00%

PTJ9380

ERECTION OF PILE SLEEVE WITH LEGS

AT LEG A1

AT LEG A2

520

16.21%

10

3208

25.00%

64

0.00%

0.00%

0.00%

0.00%

26Jan12

6Feb12

0.00%

0.00%

0.00%

0.00%

0.00%

28-Dec-11

29-Feb-12

0.00%

0.00%

PTJ9390

CUTTING & EDGE PREPARATION OF PILE SLEEVE PLATE

144

4.49%

0.00%

0.00%

0.00%

28Dec11

1Jan12

0.00%

0.00%

PTJ9430

GIRTH WELD OF PILE SLEEVE

1152

35.91%

24

0.00%

0.00%

0.00%

8Jan12

4Feb12

0.00%

0.00%

PTJ9400

CUTTING & EDGE PREPARATION OF PILE SLEEVE SHEAR PLATE & STIFFENERS

144

4.49%

0.00%

0.00%

0.00%

31Jan12

4Feb12

0.00%

0.00%

PTJ9440

ERECTION OF SHEAR & STIFFENERS PLATE WITH PILE SLEEVE

1248

38.90%

12

0.00%

0.00%

0.00%

5Feb12

18Feb12

0.00%

0.00%

PTJ9450

ERECTION OF PILE SLEEVE WITH LEGS

AT LEG B2

520

16.21%

10

3208

25.00%

64

0.00%

0.00%

0.00%

0.00%

19Feb12

29Feb12

0.00%

0.00%

0.00%

0.00%

0.00%

28-Dec-11

29-Feb-12

0.00%

0.00%

PTJ9530

CUTTING & EDGE PREPARATION OF PILE SLEEVE PLATE

144

4.49%

0.00%

0.00%

0.00%

28Dec11

1Jan12

0.00%

0.00%

PTJ9570

GIRTH WELD OF PILE SLEEVE

1152

35.91%

24

0.00%

0.00%

0.00%

8Jan12

4Feb12

0.00%

0.00%

PTJ9540

CUTTING & EDGE PREPARATION OF PILE SLEEVE SHEAR PLATE & STIFFENERS

144

4.49%

0.00%

0.00%

0.00%

31Jan12

4Feb12

0.00%

0.00%

12/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP4 PROGRESS Sheet

Act ID

Activity Name

Total
Budgete
Units (Hrs)

R.W %

Original
Duration
(Days)

ACTUAL %
ITEM

PLANNED %
Start Date

Finish Date

DEV/ITEM

DEV/
OVERALL

OVERALL

ITEM

OVERALL

0.00%

0.00%

5Feb12

18Feb12

0.00%

0.00%

PTJ9580

ERECTION OF SHEAR & STIFFENERS PLATE WITH PILE SLEEVE

1248

38.90%

12

0.00%

PTJ9590

ERECTION OF PILE SLEEVE WITH LEGS

520

16.21%

10

0.00%

0.00%

0.00%

19Feb12

29Feb12

0.00%

0.00%

11656

8.72%

257

0.00%

0.00%

3.00%

0.26%

18-Jun-11

29-Feb-12

-3.00%

-0.26%

476

4.08%

0.00%

0.00%

0.00%

0.00%

21-Nov-11

28-Nov-11

0.00%

0.00%

476

100.00%

0.00%

0.00%

0.00%

0.00%

21Nov11

28Nov11

0.00%

0.00%

476

100.00%

0.00%

0.00%

0.00%

21Nov11

28Nov11

0.00%

0.00%

476

4.08%

0.00%

0.00%

0.00%

0.00%

4-Jan-12

12-Jan-12

0.00%

0.00%

476

100.00%

0.00%

0.00%

0.00%

0.00%

4Jan12

12Jan12

0.00%

0.00%

476

100.00%

0.00%

0.00%

0.00%

4Jan12

12Jan12

0.00%

0.00%

476

4.08%

0.00%

0.00%

0.00%

0.00%

13-Nov-11

20-Nov-11

0.00%

0.00%

476

100.00%

0.00%

0.00%

0.00%

0.00%

13Nov11

20Nov11

0.00%

0.00%

476

100.00%

0.00%

0.00%

0.00%

13Nov11

20Nov11

0.00%

0.00%

476

4.08%

0.00%

0.00%

0.00%

0.00%

30-Nov-11

7-Dec-11

0.00%

0.00%

476

100 00%
100.00%

0 00%
0.00%

0 00%
0.00%

0 00%
0.00%

0 00%
0.00%

30Nov11

7Dec11

0 00%
0.00%

0 00%
0.00%

476

100.00%

0.00%

0.00%

0.00%

30Nov11

7Dec11

0.00%

0.00%

2040

17.50%

148

0.00%

0.00%

17.16%

3.00%

18-Jun-11

12-Nov-11

-17.16%

-3.00%

2000

98.04%

146

0.00%

0.00%

17.50%

17.16%

18Jun11

10Nov11

17.50%

17.16%

0.00%

13.00%

JACKET ERECTION
ELEV 79.0
ERECTION ON ROW2
PTJ9090

ERECTION OF ELEV AT 79 ON ROW 2

ELEV +6.4
ERECTION ON ROW2
PTJ8690

ERECTION OF ELEV AT + 6.4 ON ROW 2

ELEV 56.2
ERECTION ON ROW2
PTJ9000

ERECTION OF ELEV AT 56.2 ON ROW 2

ELEV 33.4
ERECTION ON ROW2
PTJ8890

ERECTION OF ELEV AT 33.4 ON ROW 2

ROW 2
ERECTION
HORIZONTAL

500

25.00%

17

0.00%

52.00%

13.00%

18Jun11

4Jul11

52.00%

PTJ9340

FITUP OF HORIZONTAL ON LEG

180

36.00%

0.00%

100.00%

36.00%

18Jun11

22Jun11

100.00%

36.00%

PTJ9350

WELDING OF HORIZONTAL ON LEG

320

64.00%

10

0.00%

25.00%

16.00%

23Jun11

4Jul11

25.00%

16.00%

DIAGONAL BRACES

1000

50.00%

36

0.00%

9.00%

4.50%

23Jun11

28Jul11

9.00%

4.50%

PTJ8070

FITUP OF DIAGONAL ON LEG

360

36.00%

10

0.00%

25.00%

9.00%

23Jun11

4Jul11

25.00%

9.00%

PTJ8080

WELDING OF DIAGONAL ON LEG

640

64.00%

20

0.00%

0.00%

0.00%

5Jul11

28Jul11

0.00%

0.00%

VERTICAL

0.00%

500

25.00%

23

0.00%

0.00%

0.00%

19Oct11

10Nov11

0.00%

0.00%

PTJ8090

FITUP OF VERTICAL BRACES WITH ROW 2 BRACES

180

36.00%

0.00%

0.00%

0.00%

19Oct11

24Oct11

0.00%

0.00%

PTJ8100

WELDING OF VERTICAL BRACES WITH ROW 2 BRACES

320

64.00%

10

0.00%

0.00%

0.00%

25Oct11

10Nov11

0.00%

0.00%

0.00%

0.00%

0.00%

12Nov11

12Nov11

0.00%

0.00%

0.00%

0.00%

0.00%

12Nov11

12Nov11

0.00%

0.00%

0.00%

0.00%

18Dec11

25Dec11

0.00%

0.00%

LIFTING OVER TRUSS RUNNER


PTJ8110

LIFTING OVER TRUSS RUNNERS

ELEV 10.6
ERECTION ON ROW2

0.00%

40

1.96%

40

100.00%

476

4.08%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

18Dec11

25Dec11

0.00%

0.00%

0.00%

0.00%

0.00%

18Dec11

25Dec11

0.00%

0.00%

0.00%

476

100.00%

476

100.00%

1224

10.50%

108

0.00%

0.00%

0.00%

0.00%

13Sep11

29Dec11

0.00%

0.00%

1224

100.00%

108

0.00%

0.00%

0.00%

0.00%

13Sep11

29Dec11

0.00%

0.00%

PTJ8300

ERECTION X BRACES BETWEEN 56.2 & 79.0

408

33.33%

0.00%

0.00%

0.00%

13Sep11

19Sep11

0.00%

0.00%

PTJ8320

ERECTION X BRACES BETWEEN 33.4 & 56.2

272

22.22%

0.00%

0.00%

0.00%

21Nov11

24Nov11

0.00%

0.00%

PTJ8780

ERECTION OF ELEV AT 10.6 ON ROW 2

ROW A
ERECTION

13/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP4 PROGRESS Sheet

Act ID

Activity Name

PTJ8310

ERECTION X BRACES BETWEEN 10.6 & 33.4

PTJ8290

ERECTION X BRACES BETWEEN +6.4 & 10.6

ROW B
ERECTION

Total
Budgete
Units (Hrs)

R.W %

272

22.22%

Original
Duration
(Days)

ACTUAL %
ITEM

PLANNED %
Start Date

Finish Date

DEV/ITEM

DEV/
OVERALL

OVERALL

ITEM

OVERALL

0.00%

0.00%

0.00%

8Dec11

12Dec11

0.00%

0.00%

272

22.22%

0.00%

0.00%

0.00%

26Dec11

29Dec11

0.00%

0.00%

1224

10.50%

106

0.00%

0.00%

0.00%

0.00%

20Sep11

3Jan12

0.00%

0.00%

1224

100.00%

106

0.00%

0.00%

0.00%

0.00%

20Sep11

3Jan12

0.00%

0.00%

PTJ8420

ERECTION X BRACES BETWEEN 56.2 & 79.0

408

33.33%

0.00%

0.00%

0.00%

20Sep11

26Sep11

0.00%

0.00%

PTJ8440

ERECTION X BRACES BETWEEN 33.4 & 56.2

272

22.22%

0.00%

0.00%

0.00%

26Nov11

29Nov11

0.00%

0.00%

PTJ8430

ERECTION X BRACES BETWEEN 10.6 & 33.4

272

22.22%

0.00%

0.00%

0.00%

13Dec11

17Dec11

0.00%

0.00%

PTJ8410

ERECTION X BRACES BETWEEN +6.4 & 10.6

272

22.22%

0.00%

0.00%

0.00%

31Dec11

3Jan12

0.00%

0.00%

816

7.00%

22

0.00%

0.00%

0.00%

21Nov11

12Dec11

0.00%

0.00%

ROW C

0.00%

PTJ8510

ERECTION ROW C BRACES BETWEEN 56.2 & 79.0

272

33.33%

0.00%

0.00%

0.00%

21Nov11

24Nov11

0.00%

0.00%

PTJ8520

ERECTION ROW C BRACES BETWEEN 33.4 & 56.2

272

33.33%

0.00%

0.00%

0.00%

8Dec11

12Dec11

0.00%

0.00%

PTJ8530

ERECTION ROW C BRACES BETWEEN 10.6 & 33.4

272

33.33%

0.00%

0.00%

0.00%

8Dec11

12Dec11

0.00%

0.00%

408

3.50%

29

0.00%

0.00%

0.00%

29Nov11

27Dec11

0.00%

0.00%

PTJ8600

ERECTION ROW D BRACES BETWEEN 56.2 & 79.0

136

33.33%

0.00%

0.00%

0.00%

29Nov11

30Nov11

0.00%

0.00%

PTJ8610

ERECTION ROW D BRACES BETWEEN 33.4 & 56.2

136

33.33%

0.00%

0.00%

0.00%

8Dec11

10Dec11

0.00%

0.00%

PTJ8620

ERECTION ROW D BRACES BETWEEN 10.6 & 33.4

136

33.33%

816

7.00%

ROW D

ROW 3

0.00%

0.00%

0.00%

0.00%

0.00%

26Dec11

27Dec11

0.00%

0.00%

0.00%

0.00%

0.00%

2Feb12

6Feb12

0.00%

0.00%

PTJ8180

ERECTION ROW 3 BRACES BETWEEN 10.6 & 33.4

272

33.33%

0.00%

0.00%

0.00%

2Feb12

6Feb12

0.00%

0.00%

PTJ8190

ERECTION ROW 3 BRACES BETWEEN 33.4 & 56.2

272

33.33%

0.00%

0.00%

0.00%

2Feb12

6Feb12

0.00%

0.00%

PTJ8200

ERECTION ROW 3 BRACES BETWEEN 56.2 & 79.0

272

33.33%

0.00%

0.00%

0.00%

2Feb12

6Feb12

0.00%

0.00%

2748

23.58%

152

0.00%

0.00%

0.00%

0.00%

1Oct11

29Feb12

0.00%

0.00%

500

18.20%

18

0.00%

0.00%

0.00%

0.00%

1Oct11

18Oct11

0.00%

0.00%

180

36.00%

0.00%

0.00%

0.00%

1Oct11

5Oct11

0.00%

0.00%

ROW 1
HORIZONTAL
PTJ9480

FITUP OF HORIZONTAL ON LEG

PTJ9490

WELDING OF HORIZONTAL ON LEG

DIAGONAL BRACES
PTJ9410

FITUP OF DIAGONAL ON LEG

PTJ9420

WELDING OF DIAGONAL ON LEG

ERECTION ROW 1

320

64.00%

10

1000

36.39%

40

360

36.00%

10

0.00%

0.00%

0.00%

0.00%

8Oct11

18Oct11

0.00%

0.00%

0.00%

0.00%

0.00%

8Oct11

16Nov11

0.00%

0.00%

0.00%

0.00%

0.00%

8Oct11

18Oct11

0.00%

0.00%

0.00%

0.00%

0.00%

19Oct11

16Nov11

0.00%

0.00%

0.00%

0.00%

0.00%

7Feb12

29Feb12

0.00%

0.00%

0.00%

0.00%

0.00%

7Feb12

7Feb12

0.00%

0.00%

640

64.00%

20

1248

45.41%

23

128

10.26%

0.00%

PTJ8000

LIFTING OF ROW 1 OVER ELAVATIONS & ROW A,B

PTJ8010

FITUP OF ROW 1 OVER ELAVATIONS & ROW A,B

160

12.82%

0.00%

0.00%

0.00%

8Feb12

12Feb12

0.00%

0.00%

PTJ8020

WELDING OF ROW 1 OVER ELAVATIONS & ROW A,B

960

76.92%

15

0.00%

0.00%

0.00%

13Feb12

29Feb12

0.00%

0.00%

108888

44.20%

342

6.89%

11.04%

4.88%

31Mar11

06Mar12

4.55%

2.01%

JACKET MISCELLANEOUS FABRICATION

15.59%

PTJ9600

Jacket miscellaneous fabrication start

0.00%

0.00%

0.00%

0.00%

3Sep11

3Sep11

0.00%

0.00%

PTJ11020

Jacket miscellaneous fabrication finish

0.00%

0.00%

0.00%

0.00%

6Mar12

6Mar12

0.00%

0.00%

8804

8.09%

65

0.00%

0.00%

0.00%

02-Jan-12

06-Mar-12

0.00%

0.00%

BOAT LAND

0.00%

14/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP4 PROGRESS Sheet

Act ID

Activity Name

Main Legs

Total
Budgete
Units (Hrs)

R.W %

Original
Duration
(Days)

ITEM

OVERALL

ITEM

OVERALL

236

2.68%

0.00%

0.00%

0.00%

ACTUAL %

PLANNED %
Start Date

Finish Date

DEV/ITEM

DEV/
OVERALL

0.00%

2Jan12

6Jan12

0.00%

0.00%

BL1000

Cutting & Assembly

108

45.76%

0.00%

0.00%

0.00%

2Jan12

4Jan12

0.00%

0.00%

BL1010

Welding & NDT

128

54.24%

0.00%

0.00%

0.00%

3Jan12

6Jan12

0.00%

0.00%

880

10.00%

20

0.00%

0.00%

0.00%

7Jan12

26Jan12

0.00%

0.00%

Back Elevation

0.00%

BL1040

Cutting & Assembly

400

45.45%

10

0.00%

0.00%

0.00%

7Jan12

16Jan12

0.00%

0.00%

BL1050

Welding & NDT

480

54.55%

15

0.00%

0.00%

0.00%

12Jan12

26Jan12

0.00%

0.00%

Front Elevation

3552

40.35%

21

0.00%

0.00%

0.00%

11Feb12

2Mar12

0.00%

0.00%

BL1020

Cutting & Assembly

1632

45.95%

12

0.00%

0.00%

0.00%

11Feb12

22Feb12

0.00%

0.00%

BL1030

Welding & NDT

1920

54.05%

15

0.00%

0.00%

0.00%

17Feb12

2Mar12

0.00%

0.00%

Plan at Elev. +2.6

0.00%

336

3.82%

14

0.00%

0.00%

0.00%

28Jan12

10Feb12

0.00%

0.00%

BL1060

Cutting & Assembly

144

42.86%

0.00%

0.00%

0.00%

28Jan12

31Jan12

0.00%

0.00%

BL1070

Welding & NDT

192

57.14%

0.00%

0.00%

0.00%

5Feb12

10Feb12

0.00%

0.00%

Plan at Elev. +2.4

0.00%

404

4.59%

15

0.00%

0.00%

0.00%

27Jan12

10Feb12

0.00%

0.00%

BL1080

Cutting & Assembly

180

44.55%

0.00%

0.00%

0.00%

27Jan12

31Jan12

0.00%

0.00%

BL1090

Welding & NDT

224

55.45%

0.00%

0.00%

0.00%

4Feb12

10Feb12

0.00%

0.00%

0.00%

0.00%

0.00%

27Jan12

10Feb12

0.00%

0.00%

0.00%

0.00%

0.00%

27Jan12

31Jan12

0.00%

0.00%

Plan at Elev. 30

404

4.59%

15

BL1100

Cutting & Assembly

180

44.55%

BL1110

Welding & NDT

224

55.45%

336

3.82%

10

BL1120

Cutting & Assembly

144

42.86%

BL1130

Welding & NDT

192

57.14%

56

0.64%

18

36

64.29%

Boat landing Sections (a,b.c,d,e)

Grating
BL1140

Trial Fit and Grating Stopper Fixation

BL1150

Final Installation

Stairs & Ladders


BL1160

Fabrication

BL1170

Installation

Handrails
BL1200

Fabrication

BL1210

Installation

Mooring Cleat

20

35.71%

268

3.04%

160

59.70%

108

40.30%

200

2.27%

16

128

64.00%

72

36.00%

68

0.77%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

4Feb12

10Feb12

0.00%

0.00%

0.00%

0.00%

0.00%

1Feb12

10Feb12

0.00%

0.00%

0.00%

0.00%

0.00%

1Feb12

4Feb12

0.00%

0.00%

0.00%

0.00%

0.00%

5Feb12

10Feb12

0.00%

0.00%

0.00%

0.00%

0.00%

18Feb12

6Mar12

0.00%

0.00%

0.00%

0.00%

0.00%

18Feb12

18Feb12

0.00%

0.00%

0.00%

0.00%

0.00%

6Mar12

6Mar12

0.00%

0.00%

0.00%

0.00%

0.00%

24Feb12

2Mar12

0.00%

0.00%

0.00%

0.00%

0.00%

24Feb12

28Feb12

0.00%

0.00%

0.00%

0.00%

0.00%

29Feb12

2Mar12

0.00%

0.00%

0.00%

0.00%

0.00%

20Feb12

6Mar12

0.00%

0.00%

0.00%

0.00%

0.00%

20Feb12

23Feb12

0.00%

0.00%

0.00%

0.00%

0.00%

5Mar12

6Mar12

0.00%

0.00%

0.00%

0.00%

0.00%

1Mar12

2Mar12

0.00%

0.00%

BL1220

Fabrication

32

47.06%

0.00%

0.00%

0.00%

1Mar12

1Mar12

0.00%

0.00%

BL1230

Installation

36

52.94%

0.00%

0.00%

0.00%

2Mar12

2Mar12

0.00%

0.00%

72

0.82%

0.00%

0.00%

0.00%

6Mar12

6Mar12

0.00%

0.00%

72

100.00%

0.00%

0.00%

0.00%

6Mar12

6Mar12

0.00%

0.00%

Rubber
BL1240

Installation of Rubber & Tightening

0.00%

15/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP4 PROGRESS Sheet

Act ID

Activity Name

Lower Support
Fabrication

Total
Budgete
Units (Hrs)

R.W %

Original
Duration
(Days)

ITEM

OVERALL

ITEM

OVERALL

716

8.13%

27

0.00%

0.00%

0.00%

0.00%

ACTUAL %

PLANNED %
Start Date

Finish Date

DEV/ITEM

DEV/
OVERALL

0.00%

5Feb12

2Mar12

0.00%

0.00%

540

75.42%

16

0.00%

0.00%

0.00%

5Feb12

20Feb12

0.00%

0.00%

BL1250

Cutting & Assembly

252

46.67%

0.00%

0.00%

0.00%

5Feb12

11Feb12

0.00%

0.00%

BL1260

Welding & NDT

288

53.33%

0.00%

0.00%

0.00%

12Feb12

20Feb12

0.00%

0.00%

176

24.58%

0.00%

0.00%

0.00%

28Feb12

2Mar12

0.00%

0.00%

80

45.45%

0.00%

0.00%

0.00%

28Feb12

29Feb12

0.00%

0.00%

Installation with Jacket legs


BL1270

Profiling Template & Assembly with Legs

BL1280

Welding & NDT

Upper Support
Fabrication

0.00%

96

54.55%

0.00%

0.00%

0.00%

29Feb12

2Mar12

0.00%

0.00%

972

11.04%

23

0.00%

0.00%

0.00%

0.00%

9Feb12

2Mar12

0.00%

0.00%

636

65.43%

19

0.00%

0.00%

0.00%

0.00%

9Feb12

27Feb12

0.00%

0.00%

BL1290

Cutting & Assembly

252

39.62%

0.00%

0.00%

0.00%

9Feb12

15Feb12

0.00%

0.00%

BL1300

Welding & NDT

384

60.38%

12

0.00%

0.00%

0.00%

16Feb12

27Feb12

0.00%

0.00%

336

34.57%

0.00%

0.00%

0.00%

28Feb12

2Mar12

0.00%

0.00%

Installation with Jacket legs

0.00%

BL1310

Profiling Template & Assembly with Legs

144

42.86%

0.00%

0.00%

0.00%

28Feb12

29Feb12

0.00%

0.00%

BL1320

Welding & NDT

192

57.14%

0.00%

0.00%

0.00%

29Feb12

2Mar12

0.00%

0.00%

304

3.45%

0.00%

0.00%

0.00%

3Mar12

4Mar12

0.00%

0.00%

304

100.00%

0.00%

0.00%

0.00%

3Mar12

4Mar12

0.00%

0.00%

2952

2.71%

30

0.00%

0.00%

0.00%

0.00%

06-Feb-12

06-Mar-12

0.00%

0.00%

0.00%

Boat landing trial fit


BL1330

Boat Landing Trial Fit

BARGE BUMPER
Main Pipe

0.00%

504

17.07%

15

0.00%

0.00%

0.00%

6Feb12

20Feb12

0.00%

0.00%

BB1000

Cutting & Assembly

216

42.86%

0.00%

0.00%

0.00%

6Feb12

11Feb12

0.00%

0.00%

BB1010

Welding & NDT

288

57.14%

0.00%

0.00%

0.00%

12Feb12

20Feb12

0.00%

0.00%

Upper Support

1312

44.44%

28

0.00%

0.00%

0.00%

0.00%

6Feb12

4Mar12

0.00%

0.00%

976

74.39%

23

0.00%

0.00%

0.00%

0.00%

6Feb12

28Feb12

0.00%

0.00%

BB1060

Cutting & Assembly

432

44.26%

12

0.00%

0.00%

0.00%

6Feb12

17Feb12

0.00%

0.00%

BB1070

Welding & NDT

544

55.74%

17

336

25.61%

42.86%

Fabrication

Installation with Jacket legs

0.00%

0.00%

0.00%

0.00%

12Feb12

28Feb12

0.00%

0.00%

0.00%

0.00%

0.00%

29Feb12

4Mar12

0.00%

0.00%

0.00%

0.00%

0.00%

29Feb12

1Mar12

0.00%

0.00%

BB1080

Profiling Template & Assembly with Legs

144

BB1090

Welding & NDT

192

57.14%

0.00%

0.00%

0.00%

2Mar12

4Mar12

0.00%

0.00%

976

33.06%

24

0.00%

0.00%

0.00%

0.00%

10Feb12

4Mar12

0.00%

0.00%

336

34.43%

0.00%

0.00%

0.00%

0.00%

29Feb12

4Mar12

0.00%

0.00%

Lower Support
Installation with Jacket legs
BB1040

Profiling Template & Assembly with Legs

144

42.86%

0.00%

0.00%

0.00%

29Feb12

1Mar12

0.00%

0.00%

BB1050

Welding & NDT

192

57.14%

0.00%

0.00%

0.00%

2Mar12

4Mar12

0.00%

0.00%

Fabrication

640

65.57%

19

0.00%

0.00%

0.00%

10Feb12

28Feb12

0.00%

0.00%

BB1020

Cutting & Assembly

288

45.00%

0.00%

0.00%

0.00%

10Feb12

17Feb12

0.00%

0.00%

BB1030

Welding & NDT

352

55.00%

11

0.00%

0.00%

0.00%

18Feb12

28Feb12

0.00%

0.00%

160

5.42%

0.00%

0.00%

0.00%

5Mar12

6Mar12

0.00%

0.00%

Barge Bumper Trial Fit

0.00%

0.00%

16/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP4 PROGRESS Sheet

Act ID

BB1100

Activity Name
Barge Bumper Trial Fit

RISER 16" & CLAMPS

Total
Budgete
Units (Hrs)

R.W %

160

100.00%

2472

2.27%

62

Original
Duration
(Days)

ACTUAL %
ITEM

0.00%

PLANNED %
Start Date

Finish Date

DEV/ITEM

DEV/
OVERALL

OVERALL

ITEM

OVERALL

0.00%

0.00%

0.00%

5Mar12

6Mar12

0.00%

0.00%

0.00%

0.00%

0.00%

03-Sep-11

03-Nov-11

0.00%

0.00%

PTJ10590

RISER 16 " FABRICATION

792

32.04%

22

0.00%

0.00%

0.00%

3Sep11

27Sep11

0.00%

0.00%

PTJ10620

CLAMPS FOR RISER 16 " FABRICATION

648

26.21%

18

0.00%

0.00%

0.00%

3Sep11

22Sep11

0.00%

0.00%

PTJ10600

RISER COATING

168

6.80%

0.00%

0.00%

0.00%

28Sep11

5Oct11

0.00%

0.00%

PTJ10630

CLAMPS FOR RISER 16 " INSTALLATION

504

20.39%

14

0.00%

0.00%

0.00%

8Oct11

23Oct11

0.00%

0.00%

PTJ10610

RISER 16 " INSTALLATION

360

14.56%

10

0.00%

0.00%

0.00%

24Oct11

3Nov11

0.00%

0.00%

1440

1.32%

51

0.00%

0.00%

0.00%

03-Sep-11

23-Oct-11

0.00%

0.00%

504

35.00%

14

0.00%

0.00%

0.00%

3Sep11

18Sep11

0.00%

0.00%

JTUBE 16 " & CLAMPS

0.00%

PTJ10640

JTUBE16 " FABRICATION

PTJ10650

CLAMPS FOR JTUBE16 " FABRICATION

432

30.00%

12

0.00%

0.00%

0.00%

3Sep11

15Sep11

0.00%

0.00%

PTJ10660

CLAMPS FOR JTUBE16 " INSTALLATION

360

25.00%

10

0.00%

0.00%

0.00%

8Oct11

18Oct11

0.00%

0.00%

PTJ10680

JTUBE16 " INSTALLATION

144

10.00%

0.00%

0.00%

0.00%

19Oct11

23Oct11

0.00%

0.00%

504

0.46%

41

0.00%

0.00%

0.00%

03-Sep-11

13-Oct-11

0.00%

0.00%

FUTURE JTUBE CLAMPS

0.00%

PTJ10690

CLAMPS FOR FUTURE JTUBE FABRICATION

288

57.14%

0.00%

0.00%

0.00%

3Sep11

11Sep11

0.00%

0.00%

PTJ10700

CLAMPS FOR FUTURE JTUBE INSTALLATION

216

42.86%

0.00%

0.00%

0.00%

8Oct11

13Oct11

0.00%

0.00%

1384

1.27%

21

0.00%

0.00%

0.00%

14-Feb-12

05-Mar-12

0.00%

0.00%

SUMP CAISSON 30"

0.00%

PTJ10710

SUMP CAISSON 30 " FABRICATION

952

68.79%

14

0.00%

0.00%

0.00%

14Feb12

29Feb12

0.00%

0.00%

PTJ10720

SUPPORTS SUMP CAISSON 30 " FABRICATION

72

5.20%

0.00%

0.00%

0.00%

21Feb12

22Feb12

0.00%

0.00%

PTJ10730

SUPPORTS SUMP CAISSON 30 " INSTALLATION

216

15.61%

0.00%

0.00%

0.00%

23Feb12

29Feb12

0.00%

0.00%

PTJ10740

SUPPORTS SUMP CAISSON 30 " INSTALLATION

144

10.40%

0.00%

0.00%

0.00%

1Mar12

5Mar12

0.00%

0.00%

2880

2.64%

100

0.00%

0.00%

0.00%

03-Sep-11

11-Dec-11

0.00%

0.00%

MUD MAT

0.00%

PTJ10750

MUD MAT FABRICATION

2160

75.00%

60

0.00%

0.00%

0.00%

3Sep11

17Nov11

0.00%

0.00%

PTJ10760

MUD MAT INSTALLATION

720

25.00%

20

0.00%

0.00%

0.00%

19Nov11

11Dec11

0.00%

0.00%

1712

1.57%

55

0.00%

0.00%

0.00%

03-Sep-11

27-Oct-11

0.00%

0.00%

WALK WAY & STAIRS

0.00%

PTJ10350

FITUP OF WALK WAY & STARIR

384

22.43%

12

0.00%

0.00%

0.00%

3Sep11

15Sep11

0.00%

0.00%

PTJ10360

WELDING & NDT OF WALK WAY & STARIRS

512

29.91%

16

0.00%

0.00%

0.00%

17Sep11

4Oct11

0.00%

0.00%

PTJ10370

ERECTION WALK WAY ON TOP ELEVATION

816

47.66%

12

0.00%

0.00%

0.00%

15Oct11

27Oct11

0.00%

0.00%

19224

17.65%

141

85.67%

15.13%

62.53%

11.04%

31-Mar-11

18-Aug-11

23.14%

4.09%

9612

50.00%

141

85.67%

42.84%

62.53%

31.27%

31-Mar-11

18-Aug-11

23.14%

11.57%

3204

33.33%

59

85.67%

28.56%

100.00%

33.33%

31-Mar-11

28-May-11

LAUNCH RUNNERS
AT ROW D
FROM EL. 33400 TO 10600

-14.33%

-4.78%

PTJ9820

FITUP OF LUNCH TRUSS FROM EL 33.4 UP TO 10.6

2100

65.54%

35

95.00%

62.27%

100.00%

65.54%

31Mar11

14May11

5.00%

3.28%

PTJ9830

WELDING & NDT LUNCH TRUSS FROM EL 33.4 UP TO 10.6

1000

31.21%

25

75.00%

23.41%

100.00%

31.21%

26Apr11

25May11

25.00%

7.80%

PTJ9840

LIFTING OF LUNCH TRUSS FROM EL 79 UP TO 56 ON SKID WAY

104

3.25%

0.00%

100.00%

3.25%

26May11

28May11

100.00%

3.25%

17/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP4 PROGRESS Sheet

Act ID

Activity Name

FROM EL. 56200 TO 33400

Total
Budgete
Units (Hrs)

R.W %

3204

Original
Duration
(Days)

ITEM

OVERALL

ITEM

OVERALL

33.33%

54

85.67%

28.56%

85.99%

ACTUAL %

PLANNED %
Start Date

Finish Date

DEV/ITEM

DEV/
OVERALL

28.66%

15-May-11

7-Jul-11

-0.32%

-0.11%

PTJ9790

FITUP OF LUNCH TRUSS FROM EL 56 UP TO 33.4

2100

65.54%

35

95.00%

62.27%

100.00%

65.54%

15May11

23Jun11

5.00%

3.28%

PTJ9800

WELDING & NDT OF LUNCH TRUSS FROM EL 56 UP TO 33.4

1000

31.21%

25

75.00%

23.41%

65.52%

20.45%

7Jun11

5Jul11

9.48%

2.96%

PTJ9810

LIFTING OF LUNCH TRUSS FROM EL 79 UP TO 56 ON SKID WAY

104

3.25%

0.00%

0.00%

0.00%

6Jul11

7Jul11

0.00%

0.00%

3204

33.33%

55

85.67%

28.56%

1.60%

0.53%

25-Jun-11

18-Aug-11

84.08%

28.03%

PTJ9760

FITUP OF LUNCH TRUSS FROM EL 79 UP TO 56

2100

65.54%

35

95.00%

62.27%

2.44%

1.60%

25Jun11

4Aug11

92.56%

60.67%

PTJ9770

WELDING & NDT OF LUNCH TRUSS FROM EL 79 UP TO 56

1000

31.21%

25

75.00%

23.41%

0.00%

0.00%

18Jul11

16Aug11

75.00%

23.41%

PTJ9780

LIFTING OF LUNCH TRUSS FROM EL 79 UP TO 56 ON SKID WAY

104

3.25%

0.00%

0.00%

0.00%

17Aug11

18Aug11

0.00%

0.00%

9612

50.00%

141

85.67%

42.84%

62.53%

31.27%

31-Mar-11

18-Aug-11

23.14%

11.57%

3204

33.33%

59

85.67%

28.56%

100.00%

33.33%

31-Mar-11

28-May-11

-14.33%

-4.78%

2100

65.54%

35

95.00%

62.27%

100.00%

65.54%

31Mar11

14May11

5.00%

3.28%

25

75.00%

23.41%

100.00%

31.21%

26Apr11

25May11

25.00%

7.80%

FROM EL. 79000 TO 56200

AT ROW C
FROM EL. 33400 TO 10600
PTJ9730

FITUP OF LUNCH TRUSS FROM EL 33.4 UP TO 10.6

PTJ9740

WELDING & NDT LUNCH TRUSS FROM EL 33.4 UP TO 10.6

PTJ9750

LIFTING OF LUNCH TRUSS FROM EL 79 UP TO 56 ON SKID WAY

FROM EL. 79000 TO 56200

1000

31.21%

104

3.25%

0.00%

100.00%

3.25%

26May11

28May11

100.00%

3.25%

3204

33.33%

55

85.67%

28.56%

1.60%

0.53%

25-Jun-11

18-Aug-11

84.08%

28.03%

2.44%

1.60%

25Jun11

4Aug11

92.56%

60.67%

PTJ9670

FITUP OF LUNCH TRUSS FROM EL 79 UP TO 56

2100

65.54%

35

95.00%

62.27%

PTJ9680

WELDING & NDT OF LUNCH TRUSS FROM EL 79 UP TO 56

1000

31.21%

25

75.00%

23.41%

0.00%

0.00%

18Jul11

16Aug11

75.00%

23.41%

PTJ9690

LIFTING OF LUNCH TRUSS FROM EL 79 UP TO 56 ON SKID WAY

104

3.25%

0.00%

0.00%

0.00%

17Aug11

18Aug11

0.00%

0.00%

3204

33.33%

54

85.67%

28.56%

85.99%

28.66%

15-May-11

7-Jul-11

-0.32%

-0.11%

PTJ9700

FITUP OF LUNCH TRUSS FROM EL 56 UP TO 33.4

2100

65.54%

35

95.00%

62.27%

100.00%

65.54%

15May11

23Jun11

5.00%

3.28%

PTJ9710

WELDING & NDT OF LUNCH TRUSS FROM EL 56 UP TO 33.4

1000

31.21%

25

75.00%

23.41%

65.52%

20.45%

7Jun11

5Jul11

9.48%

2.96%

PTJ9720

LIFTING OF LUNCH TRUSS FROM EL 79 UP TO 56 ON SKID WAY

104

3.25%

0.00%

0.00%

0.00%

6Jul11

7Jul11

0.00%

0.00%

0.46%

0.00%

0.00%

25-Aug-11

06-Mar-12

14.04%

0.46%

0.00%

0.00%

0.00%

25Aug11

12Sep11

0.00%

0.00%

FROM EL. 56200 TO 33400

3564

3.27%

195

PTJ10000

INSTALL ANODES FOR ROW A

468

13.13%

13

PTJ10140

INSTALL ANODES FOR ROW B

576

16.16%

10.51%

0.00%

0.00%

11Sep11

19Sep11

65.00%

10.51%

PTJ10220

INSTALL ANODES FOR ELEV 56.2

252

7.07%

0.00%

0.00%

0.00%

30Oct11

12Nov11

0.00%

0.00%

PTJ10230

INSTALL ANODES FOR ELEV 79.0

252

7.07%

0.00%

0.00%

0.00%

13Nov11

20Nov11

0.00%

0.00%

PTJ10180

INSTALL ANODES FOR ROW C

216

6.06%

0.00%

0.00%

0.00%

14Nov11

20Nov11

0.00%

0.00%

PTJ10190

INSTALL ANODES FOR ROW D

216

6.06%

0.00%

0.00%

0.00%

22Nov11

28Nov11

0.00%

0.00%

PTJ10210

INSTALL ANODES FOR ELEV 33.4

180

5.05%

0.00%

0.00%

0.00%

24Nov11

29Nov11

0.00%

0.00%

PTJ10200

INSTALL ANODES FOR ELEV 10.6

180

5.05%

0.00%

0.00%

0.00%

12Dec11

17Dec11

0.00%

0.00%

PTJ10150

INSTALL ANODES FOR ROW 1

360

10.10%

10

0.00%

0.00%

0.00%

18Jan12

29Jan12

0.00%

0.00%

PTJ10170

INSTALL ANODES FOR ROW 3

216

6.06%

0.00%

0.00%

0.00%

26Jan12

1Feb12

0.00%

0.00%

PTJ10160

INSTALL ANODES FOR ROW 2

360

10.10%

10

3.54%

0.00%

0.00%

11Feb12

21Feb12

35.00%

3.54%

PTJ10240

INSTALL ANODES FOR MUD MAT

252

7.07%

0.00%

0.00%

0.00%

28Feb12

6Mar12

0.00%

0.00%

PTJ10250

INSTALL ANODES FOR SUMP CASSOIN

36

1.01%

0.00%

0.00%

0.00%

6Mar12

6Mar12

0.00%

0.00%

ANODES

14.04%

65.00%

35.00%

18/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP4 PROGRESS Sheet

Act ID

Activity Name

BOUNCY TANKS

Total
Budgete
Units (Hrs)

R.W %

47488

Original
Duration
(Days)

ITEM

OVERALL

ITEM

OVERALL

43.61%

102

0.00%

0.00%

0.00%

0.00%

ACTUAL %

PLANNED %
Start Date

Finish Date

DEV/ITEM

DEV/
OVERALL

0.00%

03-Sep-11

13-Dec-11

0.00%

0.00%

11872

25.00%

102

0.00%

0.00%

0.00%

3-Sep-11

13-Dec-11

0.00%

0.00%

PTJ9850

CUTTING & EDGE PREPARATION OF BOUNCY TANK PLATE

408

3.44%

0.00%

0.00%

0.00%

3Sep11

8Sep11

0.00%

0.00%

PTJ9860

CUTTING & EDGE PREPARATION OF BOUNCY TANK SUPPORTS & STIFFENERS

816

6.87%

12

0.00%

0.00%

0.00%

3Sep11

15Sep11

0.00%

0.00%

PTJ9870

ROLLING OF BOUNCY TANK PLATE

720

6.06%

20

0.00%

0.00%

0.00%

10Sep11

2Oct11

0.00%

0.00%

PTJ9880

SEAM WELD & REROLLING OF BOUNCY TANK PLATE

2304

19.41%

24

0.00%

0.00%

0.00%

14Sep11

12Oct11

0.00%

0.00%

PTJ9890

ERECTION OF SUPPORTS & STIFFENERS PLATE WITH BOUNCY TANK

3744

31.54%

24

0.00%

0.00%

0.00%

13Oct11

15Nov11

0.00%

0.00%

PTJ9900

GIRTH WELD OF BOUNCY TANK

3360

28.30%

24

0.00%

0.00%

0.00%

16Nov11

13Dec11

0.00%

0.00%

PTJ9910

ERECTION OF BOUNCY TANK WITH LEGS

520

4.38%

10

0.00%

0.00%

0.00%

16Nov11

27Nov11

0.00%

0.00%

AT LEG A1

11872

25.00%

102

0.00%

0.00%

0.00%

3-Sep-11

13-Dec-11

0.00%

0.00%

PTJ9920

CUTTING & EDGE PREPARATION OF BOUNCY TANK PLATE

408

3.44%

0.00%

0.00%

0.00%

3Sep11

8Sep11

0.00%

0.00%

PTJ9930

CUTTING & EDGE PREPARATION OF BOUNCY TANK SUPPORTS & STIFFENERS

816

6.87%

12

0.00%

0.00%

0.00%

3Sep11

15Sep11

0.00%

0.00%

PTJ9940

ROLLING OF BOUNCY TANK PLATE

720

6.06%

20

0.00%

0.00%

0.00%

10Sep11

2Oct11

0.00%

0.00%

PTJ9950

SEAM WELD & REROLLING OF BOUNCY TANK PLATE

2304

19.41%

24

0.00%

0.00%

0.00%

14Sep11

12Oct11

0.00%

0.00%

PTJ9960

ERECTION OF SUPPORTS & STIFFENERS PLATE WITH BOUNCY TANK

3744

31.54%

24

0.00%

0.00%

0.00%

13Oct11

15Nov11

0.00%

0.00%

PTJ9970

GIRTH WELD OF BOUNCY TANK

3360

28.30%

24

0.00%

0.00%

0.00%

16Nov11

13Dec11

0.00%

0.00%

PTJ9980

ERECTION OF BOUNCY TANK WITH LEGS

520

4.38%

10

0.00%

0.00%

0.00%

16Nov11

27Nov11

0.00%

0.00%

AT LEG A2

0.00%

11872

25.00%

102

0.00%

0.00%

0.00%

3-Sep-11

13-Dec-11

0.00%

0.00%

PTJ10010

CUTTING & EDGE PREPARATION OF BOUNCY TANK SUPPRTS & STIFFENERS

816

6.87%

12

0.00%

0.00%

0.00%

3Sep11

15Sep11

0.00%

0.00%

PTJ9990

CUTTING & EDGE PREPARATION OF BOUNCY TANK PLATE

408

3.44%

0.00%

0.00%

0.00%

3Sep11

8Sep11

0.00%

0.00%

PTJ10020

ROLLING OF BOUNCY TANK PLATE

720

6.06%

20

0.00%

0.00%

0.00%

10Sep11

2Oct11

0.00%

0.00%

PTJ10030

SEAM WELD & REROLLING OF BOUNCY TANK PLATE

2304

19.41%

24

0.00%

0.00%

0.00%

14Sep11

12Oct11

0.00%

0.00%

PTJ10040

ERECTION OF SUPPORTS & STIFFENERS PLATE WITH BOUNCY TANK

3744

31.54%

24

0.00%

0.00%

0.00%

13Oct11

15Nov11

0.00%

0.00%

PTJ10050

GIRTH WELD OF BOUNCY TANK

3360

28.30%

24

0.00%

0.00%

0.00%

16Nov11

13Dec11

0.00%

0.00%

PTJ10060

ERECTION OF BOUNCY TANK WITH LEGS

520

4.38%

10

0.00%

0.00%

0.00%

16Nov11

27Nov11

0.00%

0.00%

102

0.00%

0.00%

0.00%

3-Sep-11

13-Dec-11

0.00%

0.00%

AT LEG B1

0.00%

11872

25.00%

PTJ10070

CUTTING & EDGE PREPARATION OF BOUNCY TANK PLATE

408

3.44%

0.00%

0.00%

0.00%

3Sep11

8Sep11

0.00%

0.00%

PTJ10080

CUTTING & EDGE PREPARATION OF BOUNCY TANK SUPPORTS & STIFFENERS

816

6.87%

12

0.00%

0.00%

0.00%

3Sep11

15Sep11

0.00%

0.00%

PTJ10090

ROLLING OF BOUNCY TANK PLATE

720

6.06%

20

0.00%

0.00%

0.00%

10Sep11

2Oct11

0.00%

0.00%

PTJ10100

SEAM WELD & REROLLING OF BOUNCY TANK PLATE

2304

19.41%

24

0.00%

0.00%

0.00%

14Sep11

12Oct11

0.00%

0.00%

PTJ10110

ERECTION OF SUPPORTS& STIFFENERS PLATE WITH BOUNCY TANK

3744

31.54%

24

0.00%

0.00%

0.00%

13Oct11

15Nov11

0.00%

0.00%

PTJ10120

GIRTH WELD OF BOUNCY TANK

3360

28.30%

24

0.00%

0.00%

0.00%

16Nov11

13Dec11

0.00%

0.00%

PTJ10130

ERECTION OF BOUNCY TANK WITH LEGS

520

4.38%

10

0.00%

0.00%

0.00%

16Nov11

27Nov11

0.00%

0.00%

2160

1.98%

40

0.00%

0.00%

0.00%

15-Jan-12

23-Feb-12

0.00%

0.00%

AT LEG B2

BALLASTING & GROUTING SYSTEM

0.00%

0.00%

19/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP4 PROGRESS Sheet

Act ID

Activity Name

Total
Budgete
Units (Hrs)

R.W %

Original
Duration
(Days)

ACTUAL %
ITEM

PLANNED %
Start Date

Finish Date

DEV/ITEM

DEV/
OVERALL

6Feb12

0.00%

0.00%

OVERALL

ITEM

OVERALL

0.00%

0.00%

15Jan12

PTJ10790

BALASTING INSTALLATION

720

33.33%

20

0.00%

PTJ10970

GROUTING INSTALLATION ON ROW 1

720

33.33%

20

0.00%

0.00%

0.00%

15Jan12

6Feb12

0.00%

0.00%

PTJ10980

GROUTING INSTALLATION ON ROW 2

720

33.33%

20

0.00%

0.00%

0.00%

1Feb12

23Feb12

0.00%

0.00%

12000

11.02%

148

0.00%

0.00%

0.00%

0.00%

15-Sep-11

09-Feb-12

0.00%

0.00%

12000

100.00%

120

0.00%

0.00%

0.00%

0.00%

15Sep11

9Feb12

0.00%

0.00%

1152

1.06%

38

0.00%

0.00%

0.00%

0.00%

03-Sep-11

10-Oct-11

0.00%

0.00%

GRILLAGE & SEA FASTENING


PTJ10800

GRILLAGE & SEA FASTENING FABRICATION

INSTALLATION AIDS
PTJ10770

INSTALLATION AIDS FABRICATION

792

68.75%

22

0.00%

0.00%

0.00%

3Sep11

27Sep11

0.00%

0.00%

PTJ10780

INSTALLATION AIDS INSTALLATION

360

31.25%

10

0.00%

0.00%

0.00%

28Sep11

10Oct11

0.00%

0.00%

1152

1.06%

19

0.00%

0.00%

0.00%

14-Jan-12

01-Feb-12

0.00%

0.00%

PTJ9300

FITUP OF PREBENT CONDUCTOR

576

50.00%

0.00%

0.00%

0.00%

14Jan12

22Jan12

0.00%

0.00%

PTJ9310

WELDING OF PREBENT CONDUCTOR

576

50.00%

0.00%

0.00%

0.00%

23Jan12

1Feb12

0.00%

0.00%

3312

1.34%

163

0.00%

0.00%

0.00%

05Oct11

15Mar12

0.00%

0.00%

0 00%
0.00%

0 00%
0.00%

5 Oct 11
5Oct11

13 Oct 11
13Oct11

0 00%
0.00%

0 00%
0.00%

PREBENT CONDUCTOR

PAINTING

0.00%

0.00%

PTJ10320

SPLASH PAINTING FOR MISC


MISC. (H.R,
(H R STAIRS,
STAIRS ...ETC)
ETC)

168

5 07%
5.07%

0 00%
0.00%

PTJ10300

SPLASH PAINTING FOR ROW A

168

5.07%

0.00%

0.00%

0.00%

18Dec11

25Dec11

0.00%

0.00%

PTJ10310

SPLASH PAINTING FOR ROW B

168

5.07%

0.00%

0.00%

0.00%

22Dec11

29Dec11

0.00%

0.00%

PTJ10340

ATMOSPHERIC PAINTING FOR TOP ELEV

336

10.14%

0.00%

0.00%

0.00%

27Dec11

3Jan12

0.00%

0.00%

PTJ10280

SPLASH PAINTING FOR ROW 1

168

5.07%

0.00%

0.00%

0.00%

30Jan12

6Feb12

0.00%

0.00%

PTJ10330

PILE MARKING

1344

40.58%

28

0.00%

0.00%

0.00%

13Feb12

15Mar12

0.00%

0.00%

PTJ10260

SPLASH PAINTING FOR BOAT LAND

672

20.29%

14

0.00%

0.00%

0.00%

19Feb12

5Mar12

0.00%

0.00%

PTJ10290

SPLASH PAINTING FOR ROW 2

168

5.07%

0.00%

0.00%

0.00%

22Feb12

29Feb12

0.00%

0.00%

PTJ10270

SPLASH PAINTING FOR BARGE BUMPER

120

3.62%

0.00%

0.00%

0.00%

11Mar12

15Mar12

0.00%

0.00%

480

0.19%

11

0.00%

0.00%

0.00%

25Feb12

06Mar12

0.00%

0.00%

INSPECTION, TESTING & PRECOMMISIONING

0.00%

PTJ10990

RISER HYDRO TEST

160

33.33%

10

0.00%

0.00%

0.00%

25Feb12

6Mar12

0.00%

0.00%

PTJ11000

BALLASTING SYSTEM TEST

160

33.33%

10

0.00%

0.00%

0.00%

25Feb12

6Mar12

0.00%

0.00%

PTJ11010

GROUTING SYSTEM TEST

PILES FABRICATION

160

33.33%

10

0.00%

0.00%

0.00%

25Feb12

6Mar12

0.00%

0.00%

11872

4.52%

178

15.95%

0.72%

0.00%

0.00%

02Jul11

26Dec11

15.95%

0.72%

100.00%

0.00%

0.00%

0.00%

2Jul11

2Jul11

100.00%

0.00%

0.00%

0.00%

0.00%

26Dec11

26Dec11

0.00%

0.00%

51.48%

12.87%

0.00%

0.00%

02Jul11

05Sep11

51.48%

12.87%

PTJ2030

Piiles fabrication start

0.00%

PTJ10380

Piiles fabrication finish

0.00%

2968

25.00%

66

AT LEG A1
PTJ10390

Manual fitup & welding 8 joints

1440

48.52%

24

50.00%

24.26%

0.00%

0.00%

2Jul11

30Jul11

50.00%

24.26%

PTJ10420

Automatic welding 4 joints

576

19.41%

24

100.00%

19.41%

0.00%

0.00%

6Jul11

3Aug11

100.00%

19.41%

PTJ10430

back weld manual 4 joints

192

6.47%

16

100.00%

6.47%

0.00%

0.00%

17Jul11

4Aug11

100.00%

6.47%

PTJ10410

Welding beads (41 joints)

160

5.39%

10

25.00%

1.35%

0.00%

0.00%

4Aug11

15Aug11

25.00%

1.35%

20/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP4 PROGRESS Sheet

Act ID

PTJ10400

Activity Name
Welding for manual joint (4 joints)

AT LEG A2

Total
Budgete
Units (Hrs)

R.W %

600

20.22%

10

2968

25.00%

102

Original
Duration
(Days)

ACTUAL %
ITEM

0.00%

PLANNED %
Start Date

Finish Date

DEV/ITEM

DEV/
OVERALL

OVERALL

ITEM

OVERALL

0.00%

0.00%

0.00%

22Aug11

5Sep11

0.00%

0.00%

0.00%

0.00%

0.00%

02Jul11

11Oct11

0.00%

0.00%

PTJ10440

Manual fitup & welding 8 joints

1440

48.52%

24

0.00%

0.00%

0.00%

2Jul11

30Jul11

0.00%

0.00%

PTJ10450

Automatic welding 4 joints

576

19.41%

24

0.00%

0.00%

0.00%

11Aug11

11Sep11

0.00%

0.00%

PTJ10460

back weld manual 4 joints

192

6.47%

16

0.00%

0.00%

0.00%

22Aug11

12Sep11

0.00%

0.00%

PTJ10480

Welding beads (41 joints)

160

5.39%

10

0.00%

0.00%

0.00%

12Sep11

22Sep11

0.00%

0.00%

PTJ10470

Welding for manual joint (4 joints)

AT LEG B1

600

20.22%

10

0.00%

0.00%

0.00%

29Sep11

11Oct11

0.00%

0.00%

2968

25.00%

143

12.33%

3.08%

0.00%

0.00%

02Jul11

21Nov11

12.33%

3.08%

PTJ10490

Manual fitup & welding 8 joints

1440

48.52%

24

23.75%

11.52%

0.00%

0.00%

2Jul11

30Jul11

23.75%

11.52%

PTJ10500

Automatic welding 4 joints

576

19.41%

24

0.00%

0.00%

0.00%

0.00%

19Sep11

17Oct11

0.00%

0.00%

PTJ10510

back weld manual 4 joints

192

6.47%

16

0.00%

0.00%

0.00%

0.00%

29Sep11

18Oct11

0.00%

0.00%

PTJ10530

Welding beads (41 joints)

160

5.39%

10

15.00%

0.81%

0.00%

0.00%

18Oct11

29Oct11

15.00%

0.81%

PTJ10520

Welding for manual joint (4 joints)

0.00%

0.00%

0.00%

10Nov11
10
Nov 11

21Nov11
21
Nov 11

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

02Jul11

26Dec11

0.00%

0.00%

AT LEG B2

600

20.22%

10

2968

25.00%

178

PTJ10540

Manual fitup & welding 8 joints

1440

48.52%

24

0.00%

0.00%

0.00%

2Jul11

30Jul11

0.00%

0.00%

PTJ10550

Automatic welding 4 joints

576

19.41%

24

0.00%

0.00%

0.00%

25Oct11

27Nov11

0.00%

0.00%

PTJ10560

back weld manual 4 joints

192

6.47%

16

0.00%

0.00%

0.00%

10Nov11

28Nov11

0.00%

0.00%

PTJ10580

Welding beads (41 joints)

160

5.39%

10

0.00%

0.00%

0.00%

28Nov11

8Dec11

0.00%

0.00%

PTJ10570

Welding for manual joint (4 joints)

600

20.22%

10

0.00%

0.00%

0.00%

15Dec11

26Dec11

0.00%

0.00%

4484

1.71%

85

66.77%

1.14%

0.00%

0.00%

16Jul11

08Oct11

66.77%

1.14%

0.00%

100.00%

0.00%

0.00%

0.00%

16Jul11

16Jul11

100.00%

0.00%

6.69%

0.00%

0.00%

16Jul11

20Jul11

100.00%

6.69%

PREDRILLING TEMPLATE
PTD000

Predrilling template fabrication start

PTJ10810

cutting & assembly of bottom plate

300

6.69%

100.00%

PTJ10900

fabrication of cones

1020

22.75%

15

100.00%

22.75%

0.00%

0.00%

16Jul11

2Aug11

100.00%

22.75%

PTJ10820

welding & NDT of bottom plate

240

5.35%

100.00%

5.35%

0.00%

0.00%

3Aug11

9Aug11

100.00%

5.35%

PTJ10830

cutting, rolling and assembly of outer frame

360

8.03%

100.00%

8.03%

0.00%

0.00%

3Aug11

9Aug11

100.00%

8.03%

PTJ10840

welding & NDT of outer frame

200

4.46%

95.00%

4.24%

0.00%

0.00%

10Aug11

15Aug11

95.00%

4.24%

PTJ10850

fabrication of beams ( built up section )

360

8.03%

10

95.00%

7.63%

0.00%

0.00%

16Aug11

27Aug11

95.00%

7.63%

PTJ10860

installation of beams with bottom frame

252

5.62%

55.00%

3.09%

0.00%

0.00%

28Aug11

7Sep11

55.00%

3.09%

PTJ10870

cutting of conductor pipe

120

2.68%

75.00%

2.01%

0.00%

0.00%

8Sep11

10Sep11

75.00%

2.01%

PTJ10920

fabrication of pad eyes

180

4.01%

35.00%

1.40%

0.00%

0.00%

8Sep11

13Sep11

35.00%

1.40%

PTJ10880

fabrication & installation of shims plates

144

3.21%

25.00%

PTJ10930

installation of pad eyes

180

4.01%

PTJ10890

installation of conductor pipe

180

4.01%

35.00%

0.80%

0.00%

0.00%

11Sep11

14Sep11

25.00%

0.80%

0.00%

0.00%

0.00%

14Sep11

19Sep11

0.00%

0.00%

1.40%

0.00%

0.00%

15Sep11

20Sep11

35.00%

1.40%

21/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP4 PROGRESS Sheet

Act ID

Activity Name

Total
Budgete
Units (Hrs)

R.W %

360

8.03%

Original
Duration
(Days)

ACTUAL %
ITEM

PLANNED %

OVERALL

ITEM

OVERALL

0.00%

0.00%

0.00%

Start Date

Finish Date

DEV/ITEM

DEV/
OVERALL

18Sep11

28Sep11

0.00%

0.00%

PTJ10940

fabrication of lifting tool

PTJ10910

installation of cones

252

5.62%

3.37%

0.00%

0.00%

21Sep11

28Sep11

60.00%

3.37%

PTJ10950

painting of template

336

7.49%

0.00%

0.00%

0.00%

29Sep11

8Oct11

0.00%

0.00%

PTJ2010

Predrilling template fabrication finish

0.00%

0.00%

0.00%

0.00%

8Oct11

8Oct11

0.00%

0.00%

10
60.00%

22/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP5 PROGRESS Sheet

PETROJET

CLIENT : PETROBEL
PROJECT : SETH DEVELOPMENT PROJECT
Total
Budgete
Units (Hrs)

R.W %

165152

DECK FABRICATION
General Activities

Activity Name

Act ID

W.P.5: DECK & TSF FABRICATION

25Jun11

DATE :

WK

WEEK NO.

Original
Duration
(Days)

ITEM

OVERALL

ITEM

OVERALL

100.00%

396

16.82%

16.82%

15.01%

129068

78.15%

396

21.52%

16.82%

8768

6.79%

337

0.00%
100.00%

ACTUAL %

13

PLANNED %

DEV/
OVERALL

Start Date

Finish Date

DEV/ITEM

15.01%

31-Mar-11

29-Apr-12

1.81%

1.81%

19.20%

15.01%

31Mar11

29Apr12

2.32%

1.81%

0.00%

0.00%

0.00%

28May11

28Apr12

0.00%

0.00%

0.00%

100.00%

0.00%

28-May-11

28-May-11

0.00%

0.00%

0.00%

0.00%

0.00%

10-Aug-11

08-Dec-11

0.00%

0.00%

0.00%

0.00%

0.00%

03-Sep-11

03-Sep-11

100.00%

0.00%

PTJ2040

Deckprimarystructurefabricationstart

0.00%

PTJ1150

Staticequipment(bypetrojet)

0.00%

120

PTJ2160

Decksecondraystructurefabricationstart

0.00%

PTJ1160

Piping&E&Isupports(bypetrojet)

0.00%

30

0.00%

0.00%

0.00%

16Nov11

16Dec11

0.00%

0.00%

PTJ2060

Deckpre-commisioning

6400

72.99%

40

0.00%

0.00%

0.00%

11-Feb-12

27-Mar-12

0.00%

0.00%

PTJ2090

Deckcommisioning

2080

23.72%

26

0.00%

0.00%

0.00%

28-Mar-12

28-Apr-12

0.00%

0.00%

PTJ2065

Craneassemblyanderection

0.00%

20

0.00%

0.00%

0.00%

28-Mar-12

21-Apr-12

0.00%

0.00%

PTJ2220

Deckweighing

288

3.28%

0.00%

0.00%

0.00%

21-Apr-12

22-Apr-12

0.00%

0.00%

104416

80.90%

395

26.60%

21.52%

23.74%

19.20%

31Mar11

29Apr12

2.86%

2.32%

3504

3.36%

56

100.00%

3.36%

100.00%

3.36%

31-Mar-11

25-May-11

0.00%

0.00%

22

100.00%

45.21%

100.00%

45.21%

31-Mar-11

27-Apr-11

0.00%

0.00%

Deck Structure Fabrication


Deck Legs Fabrication

100.00%

PTD1000

Cutting&Assembly

1584

45.21%

PTD1005

Welding&NDT

1920

54.79%

30

100.00%

54.79%

100.00%

54.79%

19-Apr-11

25-May-11

0.00%

0.00%

728

0.70%

241

7.03%

0.05%

17.58%

0.12%

28-May-11

23-Jan-12

-10.55%

-0.07%

40.00%

7.03%

100.00%

17.58%

28-May-11

31-May-11

-60.00%

-10.55%

0.00%

0.00%

0.00%

05-Jan-12

12-Jan-12

0.00%

0.00%

Braces Below Cellar


PTJD1020

ProfilingTemplate

128

17.58%

PTD1030

Assembly

216

29.67%

PTD1040

Welding&NDT

384

52.75%

12

20912

20.03%

186

3776

18.06%

Cellar Deck Fabrication (+11.000)


Joints Fabrication

0.00%

0.00%

0.00%

10-Jan-12

23-Jan-12

0.00%

0.00%

44.70%

8.95%

45.70%

9.15%

28-May-11

29-Nov-11

-1.00%

-0.20%

30

86.02%

15.53%

97.85%

17.67%

28-May-11

26-Jun-11

-11.83%

-2.14%

16

100.00%

44.07%

100.00%

44.07%

28-May-11

14-Jun-11

0.00%

0.00%

75.00%

41.95%

96.15%

53.78%

01-Jun-11

26-Jun-11

-21.15%

-11.83%

PTD1050

Cutting&Assembly

1664

44.07%

PTD1060

Welding&NDT

2112

55.93%

22

10784

51.57%

61

45.40%

23.41%

54.36%

28.03%

28-May-11

27-Jul-11

-8.96%

-4.62%

4896

45.40%

36

100.00%

45.40%

70.73%

32.11%

28-May-11

7-Jul-11

29.27%

13.29%

Main Beams Fabrication


PTD1070

Cutting&Assembly

23/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP5 PROGRESS Sheet

Activity Name

Act ID

PTD1080

Welding&NDT

Secondary Beams Fabrication

Total
Budgete
Units (Hrs)

R.W %

Original
Duration
(Days)

PLANNED %
Start Date

ITEM

OVERALL

ITEM

OVERALL

Finish Date

DEV/ITEM

DEV/
OVERALL

5888

54.60%

46

0.00%

40.74%

22.24%

4-Jun-11

27-Jul-11

-40.74%

-22.24%

3376

16.14%

40

35.66%

5.76%

0.00%

0.00%

3-Sep-11

12-Oct-11

35.66%

5.76%

76.00%

35.66%

0.00%

0.00%

03-Sep-11

27-Sep-11

76.00%

35.66%

0.00%

0.00%

0.00%

10-Sep-11

12-Oct-11

0.00%

0.00%

0.00%

0.00%

0.00%

13-Oct-11

29-Nov-11

0.00%

0.00%

PTD1090

Cutting&Assembly

1584

46.92%

22

PTD1100

Welding&NDT

1792

53.08%

28

2976

14.23%

48

Embossed Plates

ACTUAL %

0.00%

PTD1110

Cutting&Assembly

1440

48.39%

20

0.00%

0.00%

0.00%

13-Oct-11

10-Nov-11

0.00%

0.00%

PTD1120

Welding&NDT

1536

51.61%

24

0.00%

0.00%

0.00%

27-Oct-11

29-Nov-11

0.00%

0.00%

716

0.69%

19

34.36%

0.24%

0.00%

0.00%

03Sep11

21Sep11

34.36%

0.24%

236

32.96%

49.32%

16.26%

0.00%

0.00%

03-Sep-11

10-Sep-11

49.32%

16.26%

PLAN AT EL. + 9.200


Main Beams Fabrication
PTD1710

Cutting&Assembly

108

45.76%

90.00%

41.19%

0.00%

0.00%

03-Sep-11

05-Sep-11

90.00%

41.19%

PTD1720

Welding&NDT

128

54.24%

15.00%

8.14%

0.00%

0.00%

06-Sep-11

10-Sep-11

15.00%

8.14%

240

33.52%

54.00%

18.10%

0.00%

0.00%

11-Sep-11

15-Sep-11

54.00%

18.10%

90.00%

54.00%

0.00%

0.00%

11-Sep-11

12-Sep-11

90.00%

54.00%

0.00%

0.00%

0.00%

13-Sep-11

15-Sep-11

0.00%

0.00%

0.00%

0.00%

0.00%

17-Sep-11

21-Sep-11

0.00%

0.00%

Secondary Beams Fabrication


PTD1730

Cutting&Assembly

144

60.00%

PTD1740

Welding&NDT

96

40.00%

240

33.52%

GRATING

0.00%

PTD1750

Cutting&Assembly

144

60.00%

0.00%

0.00%

0.00%

17-Sep-11

18-Sep-11

0.00%

0.00%

PTD1760

Welding&NDT

96

40.00%

0.00%

0.00%

0.00%

19-Sep-11

21-Sep-11

0.00%

0.00%

1824

1.75%

44

33.95%

0.59%

0.00%

0.00%

03Sep11

16Oct11

33.95%

0.59%

1184

64.91%

20

41.35%

26.84%

0.00%

0.00%

03-Sep-11

22-Sep-11

41.35%

26.84%

90.00%

41.35%

0.00%

0.00%

3-Sep-11

11-Sep-11

90.00%

41.35%

0.00%

0.00%

0.00%

12-Sep-11

22-Sep-11

0.00%

0.00%

PLAN AT EL. + 9.700


Main Beams Fabrication
PTD1630

Cutting&Assembly

544

45.95%

PTD1640

Welding&NDT

640

54.05%

10

336

18.42%

11

38.57%

7.11%

0.00%

0.00%

24-Sep-11

04-Oct-11

38.57%

7.11%

90.00%

38.57%

0.00%

0.00%

24-Sep-11

27-Sep-11

90.00%

38.57%

0.00%

0.00%

0.00%

28-Sep-11

4-Oct-11

0.00%

0.00%

0.00%

0.00%

0.00%

05-Oct-11

16-Oct-11

0.00%

0.00%

Secondary Beams Fabrication


PTD1650

Cutting&Assembly

144

42.86%

PTD1660

Welding&NDT

192

57.14%

304

16.67%

12

GRATING

0.00%

PTD1670

Cutting&Assembly

144

47.37%

0.00%

0.00%

0.00%

5-Oct-11

10-Oct-11

0.00%

0.00%

PTD1680

Welding&NDT

160

52.63%

0.00%

0.00%

0.00%

11-Oct-11

16-Oct-11

0.00%

0.00%

2704

2.59%

71

0.00%

0.00%

0.00%

03Sep11

12Nov11

0.00%

0.00%

WELL HEAD MEZZANINE AT (+ 16.000)

0.00%

24/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP5 PROGRESS Sheet

Activity Name

Act ID

Joints Fabrication

Total
Budgete
Units (Hrs)

R.W %

548

Original
Duration
(Days)

ITEM

OVERALL

ITEM

OVERALL

20.27%

12

0.00%

0.00%

0.00%

ACTUAL %

PLANNED %
DEV/ITEM

DEV/
OVERALL

Start Date

Finish Date

0.00%

03-Sep-11

14-Sep-11

0.00%

0.00%

PTD1530

Cutting&Assembly

260

47.45%

0.00%

0.00%

0.00%

3-Sep-11

7-Sep-11

0.00%

0.00%

PTD1540

Welding&NDT

288

52.55%

0.00%

0.00%

0.00%

8-Sep-11

14-Sep-11

0.00%

0.00%

1380

51.04%

26

0.00%

0.00%

0.00%

15-Sep-11

10-Oct-11

0.00%

0.00%

Main Beams Fabrication

0.00%

PTD1550

Cutting&Assembly

612

44.35%

0.00%

0.00%

0.00%

15Sep11

25Sep11

0.00%

0.00%

PTD1560

Welding&NDT

768

55.65%

12

0.00%

0.00%

0.00%

26-Sep-11

10-Oct-11

0.00%

0.00%

404

14.94%

14

0.00%

0.00%

0.00%

11-Oct-11

24-Oct-11

0.00%

0.00%

Secondary Beams Fabrication

0.00%

PTD1570

Cutting&Assembly

180

44.55%

0.00%

0.00%

0.00%

11-Oct-11

16-Oct-11

0.00%

0.00%

PTD1580

Welding&NDT

224

55.45%

0.00%

0.00%

0.00%

17Oct11

24Oct11

0.00%

0.00%

372

13.76%

19

0.00%

0.00%

0.00%

25-Oct-11

12-Nov-11

0.00%

0.00%

GRATING

0.00%

PTD1590

C tti &A
bl
Cutting&Assembly

180

48 39%
48.39%

0 00%
0.00%

0 00%
0.00%

0 00%
0.00%

25 O t 11
25-Oct-11

30 O t 11
30-Oct-11

0 00%
0.00%

0 00%
0.00%

PTD1600

Welding&NDT

192

51.61%

0.00%

0.00%

0.00%

31-Oct-11

12-Nov-11

0.00%

0.00%

6592

6.31%

187

0.00%

27.18%

1.72%

28-May-11

30-Nov-11

-27.18%

-1.72%

28-May-11

12-Jun-11

-100.00%

-27.18%

Braces & Legs between Cellar and Main

0.00%

PTD1130

ProfilingTemplate

1792

27.18%

14

0.00%

100.00%

27.18%

PTD1140

Assembly

1728

26.21%

24

0.00%

0.00%

0.00%

4-Oct-11

1-Nov-11

0.00%

0.00%

PTD1150

Welding&NDT

3072

46.60%

32

0.00%

0.00%

0.00%

19-Oct-11

30-Nov-11

0.00%

0.00%

21696

20.78%

170

37.79%

7.85%

28.38%

5.90%

28-May-11

13-Nov-11

9.41%

1.96%

4576

21.09%

53

78.18%

16.49%

56.36%

11.89%

28-May-11

19-Jul-11

21.82%

4.60%

2080

45.45%

20

100.00%

45.45%

100.00%

45.45%

28-May-11

19-Jun-11

0.00%

0.00%

Main Deck Fabrication (+17.000)


Joints Fabrication
PTD1160

Cutting&Assembly

PTD1170

Welding&NDT

Main Beams Fabrication

2496

54.55%

26

60.00%

32.73%

20.00%

10.91%

20-Jun-11

19-Jul-11

40.00%

21.82%

11040

50.88%

80

35.48%

18.05%

32.41%

16.49%

30-May-11

17-Aug-11

3.06%

1.56%

80.00%

35.48%

64.29%

28.51%

30May11

10Jul11

15.71%

6.97%

0.00%

7.02%

3.91%

22-Jun-11

17-Aug-11

-7.02%

-3.91%

PTD1180

Cutting&Assembly

4896

44.35%

36

PTD1190

Welding&NDT

6144

55.65%

48

3104

14.31%

38

22.73%

3.25%

0.00%

0.00%

3-Sep-11

10-Oct-11

22.73%

3.25%

PTD1200

Cutting&Assembly

1440

46.39%

20

49.00%

22.73%

0.00%

0.00%

3-Sep-11

25-Sep-11

49.00%

22.73%

PTD1210

Welding&NDT

1664

53.61%

26

0.00%

0.00%

0.00%

10-Sep-11

10-Oct-11

0.00%

0.00%

2976

13.72%

50

0.00%

0.00%

0.00%

25-Sep-11

13-Nov-11

0.00%

0.00%

Secondary Beams Fabrication

Embossed Plates

0.00%

PTD1220

Cutting&Assembly

1440

48.39%

20

0.00%

0.00%

0.00%

25-Sep-11

18-Oct-11

0.00%

0.00%

PTD1230

Welding & NDT

1536

51.61%

24

0.00%

0.00%

0.00%

11Oct11

13Nov11

0.00%

0.00%

2048

1.96%

255

0.00%

25.00%

0.49%

28-May-11

6-Feb-12

-25.00%

-0.49%

Braces & Legs Above Main

0.00%

25/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP5 PROGRESS Sheet

Activity Name

Act ID

Total
Budgete
Units (Hrs)

R.W %

Original
Duration
(Days)

ACTUAL %
ITEM

PLANNED %

OVERALL

ITEM

OVERALL

Start Date

Finish Date

DEV/ITEM

DEV/
OVERALL

PTD1240

ProfilingTemplate

512

25.00%

0.00%

100.00%

25.00%

28-May-11

5-Jun-11

-100.00%

-25.00%

PTD1250

Assembly

576

28.13%

0.00%

0.00%

0.00%

24Jan12

1Feb12

0.00%

0.00%

PTD1260

Welding & NDT

960

46.88%

10

0.00%

0.00%

0.00%

26Jan12

6Feb12

0.00%

0.00%

3.78%

15.09%

1.35%

28-May-11

20-Dec-11

27.20%

2.43%

9328

8.93%

207

42.29%

PTD1270

Profiling Template

1408

15.09%

22

92.00%

13.89%

100.00%

15.09%

28May11

21Jun11

8.00%

1.21%

PTD1280

Assembly

2880

30.87%

40

92.00%

28.40%

0.00%

0.00%

18Oct11

8Dec11

92.00%

28.40%

PTD1290

Welding & NDT

5040

54.03%

35

0.00%

0.00%

0.00%

10Nov11

20Dec11

0.00%

0.00%

9440

9.04%

136

19.73%

1.78%

0.00%

0.00%

07-Aug-11

20-Dec-11

19.73%

1.78%

704

7.46%

33

50.91%

3.80%

0.00%

0.00%

7Aug11

8Sep11

50.91%

3.80%

Braces Below Heli Deck

Heli Deck Fabrication (+29.125)


Joints Fabrication
PTD1300

Cutting & Assembly

320

45.45%

100.00%

45.45%

0.00%

0.00%

7Aug11

15Aug11

100.00%

45.45%

PTD1310

Welding & NDT

384

54.55%

12

10.00%

5.45%

0.00%

0.00%

23Aug11

8Sep11

10.00%

5.45%

1408

14.92%

38

45.45%

6.78%

0.00%

0.00%

16Aug11

22Sep11

45.45%

6.78%

PTD1320

Cutting & Assembly

640

45 45%
45.45%

16

100 00%
100.00%

45 45%
45.45%

0 00%
0.00%

0 00%
0.00%

16 Aug 11
16Aug11

6 Sep 11
6Sep11

100 00%
100.00%

45 45%
45.45%

PTD1330

Welding & NDT

768

54.55%

24

0.00%

0.00%

0.00%

23Aug11

22Sep11

0.00%

0.00%

3776

40.00%

45

22.88%

9.15%

0.00%

0.00%

3Sep11

17Oct11

22.88%

9.15%

50.00%

22.88%

0.00%

0.00%

3Sep11

29Sep11

50.00%

22.88%

0.00%

0.00%

0.00%

10Sep11

17Oct11

0.00%

0.00%

0.00%

0.00%

0.00%

12Oct11

20Nov11

0.00%

0.00%

Main Beams Fabrication

Secondary Beams Fabrication


PTD1340

Cutting & Assembly

1728

45.76%

24

PTD1350

Welding & NDT

2048

54.24%

32

2832

30.00%

40

Covering Plates

0.00%

PTD1360

Cutting & Assembly

1296

45.76%

18

0.00%

0.00%

0.00%

12Oct11

1Nov11

0.00%

0.00%

PTD1370

Welding & NDT

1536

54.24%

24

0.00%

0.00%

0.00%

18Oct11

20Nov11

0.00%

0.00%

472

5.00%

16

PTD1380

Cutting & Assembly

216

45.76%

PTD1390

Welding & NDT

Gutter

Landing Area

256

54.24%

248

2.63%

30

0.00%

0.00%

0.00%

0.00%

0.00%

21Nov11

6Dec11

0.00%

0.00%

0.00%

0.00%

0.00%

21Nov11

27Nov11

0.00%

0.00%

0.00%

0.00%

0.00%

28Nov11

6Dec11

0.00%

0.00%

0.00%

0.00%

0.00%

21Nov11

20Dec11

0.00%

0.00%

PTD1400

Cutting & Assembly

120

48.39%

0.00%

0.00%

0.00%

21Nov11

27Nov11

0.00%

0.00%

PTD1410

Welding & NDT

128

51.61%

0.00%

0.00%

0.00%

12Dec11

20Dec11

0.00%

0.00%

Misellaneuos

15820

15.15%

162

0.00%

0.00%

0.00%

0.00%

19-Nov-11

29-Apr-12

0.00%

0.00%

Fabrication

10656

67.36%

155

0.00%

0.00%

0.00%

0.00%

19Nov11

22Apr12

0.00%

0.00%

PTMD1010

Handrails & Cups

1536

14.41%

24

0.00%

0.00%

0.00%

19Nov11

15Dec11

0.00%

0.00%

PTMD1060

Safety Net

1792

16.82%

28

0.00%

0.00%

0.00%

21Nov11

22Dec11

0.00%

0.00%

PTMD1040

Monorail Beam

720

6.76%

10

0.00%

0.00%

0.00%

30Nov11

11Dec11

0.00%

0.00%

PTMD1020

Hatches

640

6.01%

20

0.00%

0.00%

0.00%

22Dec11

15Jan12

0.00%

0.00%

PTMD1090

Fire Wall

2448

22.97%

18

0.00%

0.00%

0.00%

25Dec11

15Jan12

0.00%

0.00%

26/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP5 PROGRESS Sheet

Activity Name

Act ID

Total
Budgete
Units (Hrs)

R.W %

Original
Duration
(Days)

ACTUAL %
ITEM

PLANNED %

OVERALL

ITEM

OVERALL

Start Date

Finish Date

DEV/ITEM

DEV/
OVERALL

PTMD1050

Name Plate

256

2.40%

0.00%

0.00%

0.00%

2Jan12

11Jan12

0.00%

0.00%

PTMD1000

Stairs & Walkways

2400

22.52%

24

0.00%

0.00%

0.00%

3Jan12

31Jan12

0.00%

0.00%

PTMD1030

Crane Boom Rest

192

1.80%

0.00%

0.00%

0.00%

9Jan12

15Jan12

0.00%

0.00%

PTMD1070

Pad Eyes

672

6.31%

0.00%

0.00%

0.00%

15Apr12

22Apr12

0.00%

0.00%

5164

32.64%

139

0.00%

0.00%

0.00%

12Dec11

29Apr12

0.00%

0.00%
0.00%

Installation

0.00%

PTMD1140

Monorail Beam

360

6.97%

10

0.00%

0.00%

0.00%

12Dec11

22Dec11

0.00%

PTMD1110

Handrails & Cups

864

16.73%

24

0.00%

0.00%

0.00%

2Jan12

30Jan12

0.00%

0.00%

PTMD1160

Safety Net

1152

22.31%

16

0.00%

0.00%

0.00%

4Jan12

23Jan12

0.00%

0.00%

PTMD1100

Stairs & Walkways

1080

20.91%

15

0.00%

0.00%

0.00%

24Jan12

9Feb12

0.00%

0.00%

PTMD1120

Hatches

288

5.58%

0.00%

0.00%

0.00%

24Jan12

1Feb12

0.00%

0.00%

PTMD1130

Crane Boom Rest

72

1.39%

0.00%

0.00%

0.00%

24Jan12

25Jan12

0.00%

0.00%

PTMD1150

Name Plate

144

2.79%

0.00%

0.00%

0.00%

24Jan12

28Jan12

0.00%

0.00%

PTMD1190

Fire Wall

864

16.73%

12

0.00%

0.00%

0.00%

24Jan12

6Feb12

0.00%

0.00%

PTMD1170

Pad Eyes

340

6.58%

0.00%

0.00%

0.00%

22Apr12

29Apr12

0.00%

0.00%

952

0.91%

79

0.00%

0.00%

0.00%

24Jan12

11Apr12

0.00%

0.00%

Deck Flare

0.00%

PTD1500

Cutting & Assembly

400

42.02%

20

0.00%

0.00%

0.00%

24Jan12

15Feb12

0.00%

0.00%

PTD1510

Welding & NDT

512

53.78%

32

0.00%

0.00%

0.00%

16Feb12

24Mar12

0.00%

0.00%

PTD1520

Trial Fit

40

4.20%

0.00%

0.00%

0.00%

10Apr12

11Apr12

0.00%

0.00%

8152

7.81%

241

0.00%

0.00%

21.20%

1.65%

28May11

23Jan12

21.20%

1.65%

1728

21.20%

27

0.00%

0.00%

100.00%

21.20%

28May11

23Jun11

100.00%

21.20%

1728

100.00%

24

0.00%

100.00%

100.00%

28May11

23Jun11

100.00%

100.00%

304

3.73%

0.00%

0.00%

0.00%

17Dec11

18Dec11

0.00%

0.00%

0.00%

0.00%

0.00%

17Dec11

18Dec11

0.00%

0.00%

0.00%

0.00%

0.00%

19Dec11

4Jan12

0.00%

0.00%

Deck Assembly
Skid Beams & Shoes Preparation
PTD1420

Skid Beams & Shoes Preparation

Lifting Deck Legs Over Skid Beams & Skid Shoes


PTD1430

Lifting Deck Legs Over Skid Beams & Skid Shoes

Lifting Cellar Deck Over Deck Legs

304

100.00%

1584

19.43%

17

0.00%

0.00%

PTD1440

Lifting

592

37.37%

0.00%

0.00%

0.00%

19Dec11

19Dec11

0.00%

0.00%

PTD1450

Assembly

480

30.30%

0.00%

0.00%

0.00%

20Dec11

26Dec11

0.00%

0.00%

PTD1460

Welding & NDT

512

32.32%

0.00%

0.00%

0.00%

27Dec11

4Jan12

0.00%

0.00%

692

8.49%

0.00%

0.00%

0.00%

5Jan12

10Jan12

0.00%

0.00%

lifting of plan at + 9.2

0.00%

PTD1700

Lifting

592

85.55%

0.00%

0.00%

0.00%

5Jan12

5Jan12

0.00%

0.00%

PTD1770

Assembly

36

5.20%

0.00%

0.00%

0.00%

8Jan12

8Jan12

0.00%

0.00%

PTD1780

Welding & NDT

64

9.25%

0.00%

0.00%

0.00%

9Jan12

10Jan12

0.00%

0.00%

692

8.49%

592

85.55%

lifting of plan at + 9.7


PTD1610

Lifting

0.00%

0.00%

0.00%

0.00%

5Jan12

10Jan12

0.00%

0.00%

0.00%

0.00%

0.00%

5Jan12

5Jan12

0.00%

0.00%

27/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP5 PROGRESS Sheet

Activity Name

Act ID

Total
Budgete
Units (Hrs)

R.W %

Original
Duration
(Days)

ACTUAL %

PLANNED %
Start Date

ITEM

OVERALL

ITEM

OVERALL

Finish Date

DEV/ITEM

DEV/
OVERALL

PTD1620

Assembly

36

5.20%

0.00%

0.00%

0.00%

8Jan12

8Jan12

0.00%

0.00%

PTD1690

Welding & NDT

64

9.25%

0.00%

0.00%

0.00%

9Jan12

10Jan12

0.00%

0.00%

800

9.81%

lifting of mezzanine deck at + 16

0.00%

0.00%

0.00%

5Jan12

10Jan12

0.00%

0.00%

0.00%

0.00%

0.00%

5Jan12

5Jan12

0.00%

0.00%

10.00%

0.00%

0.00%

0.00%

8Jan12

8Jan12

0.00%

0.00%

128

16.00%

0.00%

0.00%

0.00%

9Jan12

10Jan12

0.00%

0.00%

2352

28.85%

13

0.00%

0.00%

0.00%

11Jan12

23Jan12

0.00%

0.00%

PTD1790

Lifting

592

74.00%

PTD1800

Assembly

80

PTD1810

Welding & NDT

Lifting Main Deck Over cellar Deck

0.00%

0.00%

PTD1470

Lifting

736

31.29%

0.00%

0.00%

0.00%

11Jan12

11Jan12

0.00%

0.00%

PTD1480

Assembly

720

30.61%

0.00%

0.00%

0.00%

12Jan12

17Jan12

0.00%

0.00%

PTD1490

Welding & NDT

896

38.10%

0.00%

0.00%

0.00%

16Jan12

23Jan12

0.00%

0.00%

15548

12.05%

201

0.00%

0.00%

0.00%

22Sep11

09Apr12

0.00%

0.00%

Atmosphric Painting

0.00%

PT1110

Plane at + 9.2

960

6.17%

0.00%

0.00%

0.00%

22Sep11

27Sep11

0.00%

0.00%

PT1120

97
Plane at + 9.7

960

6 17%
6.17%

0 00%
0.00%

0 00%
0.00%

0 00%
0.00%

17 Oct 11
17Oct11

22 Oct 11
22Oct11

0 00%
0.00%

0 00%
0.00%

PT1130

Wellhead mezzanine

1920

12.35%

10

0.00%

0.00%

0.00%

13Nov11

23Nov11

0.00%

0.00%

PT1030

Cellar Deck & Braces Above Cellar

2880

18.52%

15

0.00%

0.00%

0.00%

1Dec11

18Dec11

0.00%

0.00%

PT1080

Piping Support

108

0.69%

0.00%

0.00%

0.00%

6Dec11

17Dec11

0.00%

0.00%

PT1010

Deck Legs

432

2.78%

0.00%

0.00%

0.00%

10Dec11

15Dec11

0.00%

0.00%

PT1020

Braces Below Cellar

120

0.77%

0.00%

0.00%

0.00%

13Dec11

18Dec11

0.00%

0.00%

PT1050

Heli Deck & Braces Below Heli

1728

11.11%

12

0.00%

0.00%

0.00%

21Dec11

3Jan12

0.00%

0.00%

PT1040

Main Deck

2880

18.52%

15

0.00%

0.00%

0.00%

24Dec11

10Jan12

0.00%

0.00%

PT1090

Cable Trays Supports

120

0.77%

10

0.00%

0.00%

0.00%

11Jan12

23Jan12

0.00%

0.00%

PT1045

Braces Above Main

80

0.51%

0.00%

0.00%

0.00%

18Jan12

23Jan12

0.00%

0.00%

PT1070

Piping painting

1008

6.48%

14

0.00%

0.00%

0.00%

18Jan12

4Feb12

0.00%

0.00%

PT1060

Miscellaneous (Stairs,H/R,...etc)

1344

8.64%

14

0.00%

0.00%

0.00%

22Jan12

6Feb12

0.00%

0.00%

PT1100

Deck Flare

1008

6.48%

14

0.00%

0.00%

0.00%

25Mar12

9Apr12

0.00%

0.00%

336

0.26%

0.00%

0.00%

0.00%

21Apr12

29Apr12

0.00%

0.00%

336

100.00%

0.00%

0.00%

0.00%

21Apr12

29Apr12

0.00%

0.00%

13280

8.04%

84

0.00%

0.00%

0.00%

16Dec11

09Mar12

0.00%

0.00%

Anti Skid Painting


PT1000

Heli Deck

E&I

0.00%

0.00%

PTJ2080

E & I Work start

0.00%

0.00%

0.00%

0.00%

16Dec11

16Dec11

0.00%

0.00%

PTJ2100

E & I Work finish

0.00%

0.00%

0.00%

0.00%

9Mar12

9Mar12

0.00%

0.00%

13280

100.00%

84

0.00%

0.00%

0.00%

0.00%

16Dec11

09Mar12

0.00%

0.00%

6424

48.37%

84

0.00%

0.00%

0.00%

0.00%

16-Dec-11

09-Mar-12

0.00%

0.00%

E&I (onshore)
Instrumentation

28/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP5 PROGRESS Sheet

Activity Name

Act ID

Total
Budgete
Units (Hrs)

R.W %

Original
Duration
(Days)

ITEM
0.00%

ACTUAL %

PLANNED %
Start Date

OVERALL

ITEM

Finish Date

DEV/ITEM

OVERALL

DEV/
OVERALL

1336

20.80%

52

0.00%

0.00%

0.00%

16Dec11

6Feb12

0.00%

0.00%

E&I1090

Fabrication

832

62.28%

26

0.00%

0.00%

0.00%

16Dec11

11Jan12

0.00%

0.00%

E&I1100

Installation

504

37.72%

14

0.00%

0.00%

0.00%

23-Jan-12

06-Feb-12

0.00%

0.00%

1248

19.43%

26

0.00%

0.00%

0.00%

23Jan12

18Feb12

0.00%

0.00%

1248

100.00%

26

0.00%

0.00%

0.00%

23Jan12

18Feb12

0.00%

0.00%

800

12.45%

20

0.00%

0.00%

0.00%

10Feb12

1Mar12

0.00%

0.00%

Installation

800

100.00%

20

0.00%

0.00%

0.00%

10Feb12

1Mar12

0.00%

0.00%

HCU & Local Panels Activities

256

3.99%

16

256

100.00%

16

720

11.21%

18

720

100.00%

18

320

4.98%

20

320

100 00%
100.00%

20

160

2.49%

10

160

100.00%

10

128

1.99%

128

100.00%

1200

18.68%

25

1200

100.00%

25

128

1.99%

Cable Trays Supports

Cable Trays
E&I1110

Installation

Tubing Activities
E&I1120

E&I1130

HCU & Local Panels Activities

Fusible Plug & ESD Puch Bottons


E&I1140

Fusible Plug & ESD Puch Bottons

J. Box Activities
E&I1150

J Box Activities
J.

Instrument Installation & Calibration


E&I1160

Instrument Installation & Calibration

Air Gas Header


E&I1170

Air Gas Header

Cable Laying & Termination


E&I1180

Cable Laying & Termination

Fire & Gas activities


E&I1190

Fire & Gas activities

Telecommunication System
E&I1200

TelecommunicationSystem

Electrical
Cable Trays Supports

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

6Feb12

24Feb12

0.00%

0.00%

0.00%

0.00%

0.00%

6Feb12

24Feb12

0.00%

0.00%

0.00%

0.00%

0.00%

6Feb12

26Feb12

0.00%

0.00%

0 00%
0.00%

0 00%
0.00%

0 00%
0.00%

6 Feb 12
6Feb12

26 Feb 12
26Feb12

0 00%
0.00%

0 00%
0.00%

0.00%

0.00%

0.00%

25Feb12

6Mar12

0.00%

0.00%

0.00%

0.00%

0.00%

25Feb12

6Mar12

0.00%

0.00%

0.00%

0.00%

0.00%

24Feb12

3Mar12

0.00%

0.00%

0.00%

0.00%

0.00%

24Feb12

3Mar12

0.00%

0.00%

0.00%

0.00%

0.00%

12Feb12

8Mar12

0.00%

0.00%

0.00%

0.00%

0.00%

12Feb12

8Mar12

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

1Mar12

9Mar12

0.00%

0.00%

0.00%

0.00%

0.00%

1Mar12

9Mar12

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

1-Mar-12

9-Mar-12

0.00%

0.00%

0.00%

0.00%

0.00%

1-Mar-12

9-Mar-12

0.00%

0.00%

0.00%

0.00%

16-Dec-11

01-Mar-12

0.00%

0.00%

6856

51.63%

76

0.00%

0.00%

1336

19.49%

52

0.00%

0.00%

0.00%

0.00%

16-Dec-11

6-Feb-12

0.00%

0.00%

26

0.00%

0.00%

0.00%

16Dec11

11Jan12

0.00%

0.00%

0.00%

0.00%

0.00%

23Jan12

6Feb12

0.00%

0.00%

0.00%

0.00%

0.00%

23-Jan-12

18-Feb-12

0.00%

0.00%

0.00%

0.00%

0.00%

23Jan12

18Feb12

0.00%

0.00%

0.00%

0.00%

0.00%

16-Dec-11

23-Jan-12

0.00%

0.00%

0.00%

0.00%

0.00%

16Dec11

23Jan12

0.00%

0.00%

0.00%

0.00%

0.00%

31-Dec-11

25-Jan-12

0.00%

0.00%

0.00%

0.00%

0.00%

31Dec11

25Jan12

0.00%

0.00%

14

1248

18.20%

26

1248

100.00%

26

912

13.30%

38

912

100.00%

38

1000

14.59%

25

1000

100.00%

25

Lighting Activities

0.00%

5Mar12

100.00%

37.72%

E&I1040

0.00%

5Mar12

128

504

Lighting Activities

0.00%

18Feb12
18Feb12

Installation

Installation

0.00%

0.00%
0.00%

E&I1010

E&I1030

0.00%

0.00%
0.00%

1.99%

832

Conduit Activities

0.00%

0.00%
0.00%

100.00%

Fabrication

Installation

0.00%

128

62.28%

E&I1020

0.00%

128

E&I1000

Cable Trays

0.00%

0.00%

0.00%

0.00%

29/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP5 PROGRESS Sheet

Activity Name

Act ID

Navigation Aids
E&I1050

Navigation Aids

Earthing Activities
E&I1060

Earthing Activities

Power & Small Equip. Inst.


E&I1070

Power & Small Equip. Inst.

Cable Laying & Termination


E&I1080

Cable Laying & Termination

EQUIPMENT

Total
Budgete
Units (Hrs)

R.W %

Original
Duration
(Days)

ITEM

OVERALL

0.00%

240

3.50%

15

240

100.00%

15

280

4.08%

14

280

100.00%

14

240

3.50%

12

240

100.00%

12

1600

23.34%

25

1600

100.00%

25

5232

3.17%

71

ACTUAL %

0.00%

0.00%

0.00%

0.00%

PLANNED %
Start Date

Finish Date

DEV/ITEM

DEV/
OVERALL

ITEM

OVERALL

0.00%

0.00%

0.00%

16-Dec-11

31-Dec-11

0.00%

0.00%

0.00%

0.00%

0.00%

16Dec11

31Dec11

0.00%

0.00%

0.00%

0.00%

0.00%

16-Feb-12

1-Mar-12

0.00%

0.00%

0.00%

0.00%

0.00%

16Feb12

1Mar12

0.00%

0.00%

0.00%

0.00%

0.00%

16-Feb-12

28-Feb-12

0.00%

0.00%

0.00%

0.00%

0.00%

16Feb12

28Feb12

0.00%

0.00%

0.00%

0.00%

0.00%

31-Jan-12

25-Feb-12

0.00%

0.00%

0.00%

0.00%

0.00%

31Jan12

25Feb12

0.00%

0.00%

0.00%

0.00%

0.00%

07Dec11

16Feb12

0.00%

0.00%

PTJ2070

Equipmentinstallationstart

0.00%

0.00%

0.00%

0.00%

23-Dec-11

23-Dec-11

0.00%

0.00%

PTJ2130

Equipment installation finish

0.00%

0.00%

0.00%

0.00%

16Feb12

16Feb12

0.00%

0.00%

5232

100.00%

71

0.00%

0.00%

0.00%

07Dec11

16Feb12

0.00%

0.00%

Equipement Installation (onshore)

0.00%

TSF1110

Installation of production manifold module on celler deck

288

5.50%

0.00%

0.00%

0.00%

7Dec11

10Dec11

0.00%

0.00%

TSF1090

Equipment Installation on Heli Deck

288

5.50%

0.00%

0.00%

0.00%

23Dec11

27Dec11

0.00%

0.00%

TSF1100

Installation of E & I module on main deck

288

5.50%

0.00%

0.00%

0.00%

7Jan12

10Jan12

0.00%

0.00%

TSF1070

EquipmentInstallationonCellarDeck

2040

38.99%

15

0.00%

0.00%

0.00%

1-Feb-12

16-Feb-12

0.00%

0.00%

TSF1080

Equipment Installation on Main Deck

2040

38.99%

15

0.00%

0.00%

0.00%

1Feb12

16Feb12

0.00%

0.00%

TSF1060

Equipment Installation Below Cellar Deck

288

5.50%

0.00%

0.00%

0.00%

12Feb12

16Feb12

0.00%

0.00%

17572

10.64%

113

0.00%

0.00%

0.00%

19Nov11

11Mar12

0.00%

0.00%

PIPING

0.00%

PTJ2050

Piping & piping support fabrication start

0.00%

0.00%

0.00%

0.00%

19Nov11

19Nov11

0.00%

0.00%

PTJ2110

Piping & piping support erection finish

0.00%

0.00%

0.00%

0.00%

11Mar12

11Mar12

0.00%

0.00%

17572

100.00%

113

0.00%

0.00%

0.00%

19Nov11

11Mar12

0.00%

0.00%

C.S Piping Fab. & Erec., Valves Erection (onshore)

0.00%

TSF1000

Piping Fabrication

8960

50.99%

70

0.00%

0.00%

0.00%

19Nov11

28Jan12

0.00%

0.00%

TSF1010

Piping Supports Fabrication

1408

8.01%

22

0.00%

0.00%

0.00%

19Nov11

11Dec11

0.00%

0.00%

TSF1020

Piping Erection

4760

27.09%

35

0.00%

0.00%

0.00%

26Jan12

1Mar12

0.00%

0.00%

TSF1030

Piping Supports Erection

800

4.55%

20

0.00%

0.00%

0.00%

10Feb12

1Mar12

0.00%

0.00%

TSF1040

Valve Installation

300

1.71%

15

0.00%

0.00%

0.00%

15Feb12

1Mar12

0.00%

0.00%

PTJ2120

Piping hydrotest

1344

7.65%

21

0.00%

0.00%

0.00%

19Feb12

11Mar12

0.00%

0.00%

30/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP6 PROGRESS Sheet

PETROJET

CLIENT : PETROBEL
PROJECT : SETH DEVELOPMENT PROJECT
Total
Budgete
Units (Hrs)

R.W %

W.P.6: PIPELINE SPOOLS FABRICATION

21752

SETH PLEM & EXISTING TUNA PLEM

25Jun11

DATE :

WK

WEEK NO.

Original
Duration
(Days)

ITEM

OVERALL

ITEM

OVERALL

100.00%

59

0.00%

0.00%

0.00%

10992

50.53%

59

0.00%

0.00%

1948

17.72%

59

0.00%

BEFORE METROLOGY

1652

84.80%

59

PIPE LINE & BENDS

1652

100.00%

59

Activity Name

Act ID

SPOOL NO. S1 (CLOSING) ( P.L S2 )

ACTUAL %

13

PLANNED %
DEV/ITEM

DEV/
OVERALL

Start Date

Finish Date

0.00%

23-Feb-12

25-Apr-12

0.00%

0.00%

0.00%

0.00%

23Feb12

25Apr12

0.00%

0.00%

0.00%

0.00%

0.00%

24Mar12

25Apr12

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

24-Mar-12

23-Apr-12

0.00%

0.00%

0.00%

0.00%

0.00%

0.00%

24-Mar-12

23-Apr-12

0.00%

0.00%

SS740

FITUPFLANGESANDFITTINGWITHLINEPIPE

48

2.91%

48

0.00%

0.00%

0.00%

16-Apr-12
p

18-Apr-12
p

0.00%

0.00%

SS750

WELDING&NDTFORFLANGESWITHLINEPIPE

64

3.87%

48

0.00%

0.00%

0.00%

18Apr12

21Apr12

0.00%

0.00%

SS690

SPOOLS&BENDSPLACEDONSUITABLESUPPORTS

96

5.81%

48

0.00%

0.00%

0.00%

24-Mar-12

26-Mar-12

0.00%

0.00%

SS760

APPLYSHRINKABLESLEEVE

128

7.75%

60

0.00%

0.00%

0.00%

21-Apr-12

23-Apr-12

0.00%

0.00%

SS700

CUTTING&BEVELINGBEFOREMETROLOGY

180

10.90%

48

0.00%

0.00%

0.00%

26-Mar-12

29-Mar-12

0.00%

0.00%

SS710

FITUPFORLINEPIPE&BENDSBEFOREMETROLOGY

240

14.53%

48

0.00%

0.00%

0.00%

29-Mar-12

4-Apr-12

0.00%

0.00%

SS730

COATINGOFBENDS

384

23.24%

48

0.00%

0.00%

0.00%

14Apr12

21Apr12

0.00%

0.00%

SS720

WELDING&NDTFORLINEPIPE&BENDSBEFOREMETROLOGY

512

30.99%

48

0.00%

0.00%

0.00%

04-Apr-12

14-Apr-12

0.00%

0.00%

296

15.20%

59

0.00%

0.00%

0.00%

15-Apr-12

25-Apr-12

0.00%

0.00%

0.00%

60

0.00%

0.00%

0.00%

15-Apr-12

15-Apr-12

0.00%

0.00%

AFTER METROLOGY

0.00%

SS770

RECEVINGMETROLOGY

SS810

APPLYSHRINKABLESLEEVE

32

10.81%

60

0.00%

0.00%

0.00%

23-Apr-12

24-Apr-12

0.00%

0.00%

SS800

PIGGING&HYDROTEST

32

10.81%

60

0.00%

0.00%

0.00%

21-Apr-12

23-Apr-12

0.00%

0.00%

SS820

LIFTINGTEST

32

10.81%

60

0.00%

0.00%

0.00%

24-Apr-12

25-Apr-12

0.00%

0.00%

SS780

FITUPAFTERMETROLOGY

72

24.32%

60

0.00%

0.00%

0.00%

15-Apr-12

17-Apr-12

0.00%

0.00%

SS790

WELDING&NDTAFTERMETROLOGY

128

43.24%

60

0.00%

0.00%

0.00%

17-Apr-12

21-Apr-12

0.00%

0.00%

1716

15.61%

59

0.00%

0.00%

0.00%

0.00%

23Feb12

24Mar12

0.00%

0.00%

1716

100.00%

59

0.00%

0.00%

0.00%

0.00%

23-Feb-12

24-Mar-12

0.00%

0.00%

32

1.86%

60

0.00%

0.00%

0.00%

22-Mar-12

23-Mar-12

0.00%

0.00%

SPOOL NO. S2 ( S1 S3 )
PIPE LINE & BENDS
SS910

PIGGING&HYDROTEST

31/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP6 PROGRESS Sheet

Activity Name

Act ID

Total
Budgete
Units (Hrs)

R.W %

Original
Duration
(Days)

ACTUAL %
ITEM

PLANNED %

OVERALL

ITEM

OVERALL

Start Date

Finish Date

DEV/ITEM

DEV/
OVERALL

SS920

LIFTINGTEST

32

1.86%

60

0.00%

0.00%

0.00%

24-Mar-12

24-Mar-12

0.00%

0.00%

SS880

FITUPFLANGESANDFITTINGWITHLINEPIPE

48

2.80%

47

0.00%

0.00%

0.00%

18-Mar-12

19-Mar-12

0.00%

0.00%

SS890

WELDING&NDTFORFLANGESWITHLINEPIPE

64

3.73%

47

0.00%

0.00%

0.00%

20-Mar-12

21-Mar-12

0.00%

0.00%

SS830

SPOOLS&BENDSPLACEDONSUITABLESUPPORTS

96

5.59%

47

0.00%

0.00%

0.00%

23-Feb-12

25-Feb-12

0.00%

0.00%

SS900

APPLYSHRINKABLESLEEVE

128

7.46%

60

0.00%

0.00%

0.00%

22-Mar-12

23-Mar-12

0.00%

0.00%

SS840

CUTTING&BEVELING

180

10.49%

47

0.00%

0.00%

0.00%

26-Feb-12

28-Feb-12

0.00%

0.00%

SS850

FITUPFORLINEPIPE&BENDS

240

13.99%

47

0.00%

0.00%

0.00%

29-Feb-12

5-Mar-12

0.00%

0.00%

SS870

COATINGOFBENDS

384

22.38%

47

0.00%

0.00%

0.00%

15-Mar-12

21-Mar-12

0.00%

0.00%

SS860

WELDING&NDTFORLINEPIPE&BENDS

512

29.84%

47

0.00%

0.00%

0.00%

6-Mar-12

14-Mar-12

0.00%

0.00%

1948

17.72%

59

0.00%

0.00%

0.00%

0.00%

24Mar12

25Apr12

0.00%

0.00%

BEFORE METROLOGY

1652

84.80%

59

0.00%

0.00%

0.00%

0.00%

24-Mar-12

23-Apr-12

0.00%

0.00%

PIPE LINE & BENDS

1652

100 00%
100.00%

59

0 00%
0.00%

0 00%
0.00%

0 00%
0.00%

0 00%
0.00%

24
12
24-Mar-12

23 A 12
23-Apr-12

0 00%
0.00%

0 00%
0.00%

SPOOL NO. S3 (CLOSING) ( S2 S4 )

SS980

FITUPFLANGESANDFITTINGWITHLINEPIPE

48

2.91%

48

0.00%

0.00%

0.00%

16-Apr-12

18-Apr-12

0.00%

0.00%

SS990

WELDING&NDTFORFLANGESWITHLINEPIPE

64

3.87%

48

0.00%

0.00%

0.00%

18-Apr-12

21-Apr-12

0.00%

0.00%

SS930

SPOOLS&BENDSPLACEDONSUITABLESUPPORTS

96

5.81%

48

0.00%

0.00%

0.00%

24-Mar-12

26-Mar-12

0.00%

0.00%

SS1000

APPLYSHRINKABLESLEEVE

128

7.75%

60

0.00%

0.00%

0.00%

21-Apr-12

23-Apr-12

0.00%

0.00%

SS940

CUTTING&BEVELINGBEFOREMETROLOGY

180

10.90%

48

0.00%

0.00%

0.00%

26-Mar-12

29-Mar-12

0.00%

0.00%

SS950

FITUPFORLINEPIPE&BENDSBEFOREMETROLOGY

240

14.53%

48

0.00%

0.00%

0.00%

29-Mar-12

4-Apr-12

0.00%

0.00%

SS970

COATINGOFBENDS

384

23.24%

48

0.00%

0.00%

0.00%

14-Apr-12

21-Apr-12

0.00%

0.00%

SS960

WELDING&NDTFORLINEPIPE&BENDSBEFOREMETROLOGY

512

30.99%

48

0.00%

0.00%

0.00%

04Apr12

14Apr12

0.00%

0.00%

296

15.20%

59

0.00%

0.00%

0.00%

15-Apr-12

25-Apr-12

0.00%

0.00%

0.00%

60

0.00%

0.00%

0.00%

15-Apr-12

15-Apr-12

0.00%

0.00%

AFTER METROLOGY

0.00%

SS1010

RECEVINGMETROLOGY

SS1050

APPLYSHRINKABLESLEEVE

32

10.81%

60

0.00%

0.00%

0.00%

23-Apr-12

24-Apr-12

0.00%

0.00%

SS1040

PIGGING&HYDROTEST

32

10.81%

60

0.00%

0.00%

0.00%

21-Apr-12

23-Apr-12

0.00%

0.00%

SS1060

LIFTINGTEST

32

10.81%

60

0.00%

0.00%

0.00%

24-Apr-12

25-Apr-12

0.00%

0.00%

SS1020

FITUPAFTERMETROLOGY

72

24.32%

60

0.00%

0.00%

0.00%

15-Apr-12

17-Apr-12

0.00%

0.00%

SS1030

WELDING&NDTAFTERMETROLOGY

128

43.24%

60

0.00%

0.00%

0.00%

17-Apr-12

21-Apr-12

0.00%

0.00%

1716

15.61%

59

0.00%

0.00%

0.00%

23Feb12

24Mar12

0.00%

0.00%

SPOOL NO. S4 ( S4 SETH PLEM )

0.00%

32/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP6 PROGRESS Sheet

Activity Name

Act ID

PIPE LINE & BENDS

Total
Budgete
Units (Hrs)

R.W %

1716

Original
Duration
(Days)

ITEM

OVERALL

ITEM

OVERALL

100.00%

59

0.00%

0.00%

0.00%

ACTUAL %

PLANNED %

DEV/
OVERALL

Start Date

Finish Date

DEV/ITEM

0.00%

23-Feb-12

24-Mar-12

0.00%

0.00%

SS1150

PIGGING&HYDROTEST

32

1.86%

60

0.00%

0.00%

0.00%

22Mar12

23Mar12

0.00%

0.00%

SS1160

LIFTINGTEST

32

1.86%

60

0.00%

0.00%

0.00%

24-Mar-12

24-Mar-12

0.00%

0.00%

SS1120

FITUPFLANGESANDFITTINGWITHLINEPIPE

48

2.80%

47

0.00%

0.00%

0.00%

18-Mar-12

19-Mar-12

0.00%

0.00%

SS1130

WELDING&NDTFORFLANGESWITHLINEPIPE

64

3.73%

47

0.00%

0.00%

0.00%

20-Mar-12

21-Mar-12

0.00%

0.00%

SS1070

SPOOLS&BENDSPLACEDONSUITABLESUPPORTS

96

5.59%

47

0.00%

0.00%

0.00%

23-Feb-12

25-Feb-12

0.00%

0.00%

SS1140

APPLYSHRINKABLESLEEVE

128

7.46%

60

0.00%

0.00%

0.00%

22Mar12

23Mar12

0.00%

0.00%

SS1080

CUTTING&BEVELING

180

10.49%

47

0.00%

0.00%

0.00%

26-Feb-12

28-Feb-12

0.00%

0.00%

SS1090

FITUPFORLINEPIPE&BENDS

240

13.99%

47

0.00%

0.00%

0.00%

29-Feb-12

05-Mar-12

0.00%

0.00%

SS1110

COATINGOFBENDS

384

22.38%

47

0.00%

0.00%

0.00%

15-Mar-12

21-Mar-12

0.00%

0.00%

SS1100

WELDING&NDTFORLINEPIPE&BENDS

512

29.84%

47

0.00%

0.00%

0.00%

06Mar12

14Mar12

0.00%

0.00%

1716

15.61%

59

0.00%

0.00%

0.00%

0.00%

23Feb12

24Mar12

0.00%

0.00%

1716

100.00%

59

0.00%

0.00%

0.00%

0.00%

23-Feb-12

24-Mar-12

0.00%

0.00%

SPOOL NO. S5 ( SETH PLEM S6 )


PIPE LINE & BENDS
SS1250

PIGGING&HYDROTEST

32

1.86%

60

0.00%

0.00%

0.00%

22-Mar-12

23-Mar-12

0.00%

0.00%

SS1260

LIFTINGTEST

32

1.86%

60

0.00%

0.00%

0.00%

24-Mar-12

24-Mar-12

0.00%

0.00%

SS1220

FITUPFLANGESANDFITTINGWITHLINEPIPE

48

2.80%

47

0.00%

0.00%

0.00%

18-Mar-12

19-Mar-12

0.00%

0.00%

SS1230

WELDING&NDTFORFLANGESWITHLINEPIPE

64

3.73%

47

0.00%

0.00%

0.00%

20-Mar-12

21-Mar-12

0.00%

0.00%

SS1170

SPOOLS&BENDSPLACEDONSUITABLESUPPORTS

96

5.59%

47

0.00%

0.00%

0.00%

23-Feb-12

25-Feb-12

0.00%

0.00%

SS1240

APPLYSHRINKABLESLEEVE

128

7.46%

60

0.00%

0.00%

0.00%

22-Mar-12

23-Mar-12

0.00%

0.00%

SS1180

CUTTING&BEVELING

180

10.49%

47

0.00%

0.00%

0.00%

26-Feb-12

28-Feb-12

0.00%

0.00%

SS1190

FITUPFORLINEPIPE&BENDS

240

13.99%

47

0.00%

0.00%

0.00%

29-Feb-12

5-Mar-12

0.00%

0.00%

SS1210

COATINGOFBENDS

384

22.38%

47

0.00%

0.00%

0.00%

15-Mar-12

21-Mar-12

0.00%

0.00%

SS1200

WELDING&NDTFORLINEPIPE&BENDS

512

29.84%

47

0.00%

0.00%

0.00%

6-Mar-12

14-Mar-12

0.00%

0.00%

1948

17.72%

59

0.00%

0.00%

0.00%

0.00%

24Mar12

25Apr12

0.00%

0.00%

BEFORE METROLOGY

1652

84.80%

59

0.00%

0.00%

0.00%

0.00%

24-Mar-12

23-Apr-12

0.00%

0.00%

PIPE LINE & BENDS

1652

100.00%

59

0.00%

0.00%

0.00%

0.00%

24-Mar-12

23-Apr-12

0.00%

0.00%

SPOOL NO. S6 (CLOSING) ( S5 TUNA PLEM )

SS1320

FITUPFLANGESANDFITTINGWITHLINEPIPE

48

2.91%

48

0.00%

0.00%

0.00%

16-Apr-12

18-Apr-12

0.00%

0.00%

SS1330

WELDING&NDTFORFLANGESWITHLINEPIPE

64

3.87%

48

0.00%

0.00%

0.00%

18-Apr-12

21-Apr-12

0.00%

0.00%

33/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP6 PROGRESS Sheet

Activity Name

Act ID

SS1270

SPOOLS&BENDSPLACEDONSUITABLESUPPORTS

Total
Budgete
Units (Hrs)

R.W %

96

5.81%

Original
Duration
(Days)

ACTUAL %
ITEM

PLANNED %
Start Date

Finish Date

DEV/ITEM

DEV/
OVERALL

0.00%

24-Mar-12

26-Mar-12

0.00%

0.00%

OVERALL

ITEM

OVERALL

48

0.00%

0.00%

SS1340

APPLYSHRINKABLESLEEVE

128

7.75%

60

0.00%

0.00%

0.00%

21-Apr-12

23-Apr-12

0.00%

0.00%

SS1280

CUTTING & BEVELING BEFORE METROLOGY

180

10.90%

48

0.00%

0.00%

0.00%

26Mar12

29Mar12

0.00%

0.00%

SS1290

FITUPFORLINEPIPE&BENDSBEFOREMETROLOGY

240

14.53%

48

0.00%

0.00%

0.00%

29-Mar-12

4-Apr-12

0.00%

0.00%

SS1310

COATINGOFBENDS

384

23.24%

48

0.00%

0.00%

0.00%

14-Apr-12

21-Apr-12

0.00%

0.00%

SS1300

WELDING & NDT FOR LINE PIPE & BENDS BEFORE METROLOGY

512

30.99%

48

0.00%

0.00%

0.00%

4Apr12

14Apr12

0.00%

0.00%

296

15.20%

59

0.00%

0.00%

0.00%

15-Apr-12

25-Apr-12

0.00%

0.00%

RECEVINGMETROLOGY

0.00%

60

0.00%

0.00%

0.00%

15-Apr-12

15-Apr-12

0.00%

0.00%

SS1390

APPLY SHRINKABLE SLEEVE

32

10.81%

60

0.00%

0.00%

0.00%

23Apr12

24Apr12

0.00%

0.00%

SS1380

PIGGING & HYDRO TEST

32

10.81%

60

0.00%

0.00%

0.00%

21Apr12

23Apr12

0.00%

0.00%

SS1400

LIFTING TEST

32

10.81%

60

0.00%

0.00%

0.00%

24Apr12

25Apr12

0.00%

0.00%

SS1360

FITUPAFTERMETROLOGY

72

24.32%

60

0.00%

0.00%

0.00%

15-Apr-12

17-Apr-12

0.00%

0.00%

SS1370

WELDING & NDT AFTER METROLOGY

128

43.24%

60

0.00%

0.00%

0.00%

17Apr12

21Apr12

0.00%

0.00%

10760

49.47%

59

0.00%

0.00%

0.00%

0.00%

23Feb12

25Apr12

0.00%

0.00%

1948

18.10%

59

0.00%

0.00%

0.00%

0.00%

24Mar12

25Apr12

0.00%

0.00%

BEFORE METROLOGY

1652

84.80%

59

0.00%

0.00%

0.00%

0.00%

24-Mar-12

23-Apr-12

0.00%

0.00%

PIPE LINE & BENDS

1652

100.00%

59

0.00%

0.00%

0.00%

0.00%

24-Mar-12

23-Apr-12

0.00%

0.00%

AFTER METROLOGY
SS1350

SETH P/F & NEW SSIV


SPOOL NO. S6 (CLOSING) ( S5 SETH P/F )

0.00%

SS600

FIT UP FLANGES AND FITTING WITH LINE PIPE

48

2.91%

48

0.00%

0.00%

0.00%

16Apr12

18Apr12

0.00%

0.00%

SS610

WELDING & NDT FOR FLANGES WITH LINE PIPE

64

3.87%

48

0.00%

0.00%

0.00%

18Apr12

21Apr12

0.00%

0.00%

SS550

SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

96

5.81%

48

0.00%

0.00%

0.00%

24Mar12

26Mar12

0.00%

0.00%

SS620

APPLY SHRINKABLE SLEEVE

128

7.75%

60

0.00%

0.00%

0.00%

21Apr12

23Apr12

0.00%

0.00%

SS560

CUTTING & BEVELING BEFORE METROLOGY

180

10.90%

48

0.00%

0.00%

0.00%

26Mar12

29Mar12

0.00%

0.00%

SS570

FIT UP FOR LINE PIPE & BENDS BEFORE METROLOGY

240

14.53%

48

0.00%

0.00%

0.00%

29Mar12

4Apr12

0.00%

0.00%

SS590

COATING OF BENDS

384

23.24%

48

0.00%

0.00%

0.00%

14Apr12

21Apr12

0.00%

0.00%

SS580

WELDING & NDT FOR LINE PIPE & BENDS BEFORE METROLOGY

512

30.99%

48

0.00%

0.00%

0.00%

4Apr12

14Apr12

0.00%

0.00%

296

15.20%

59

0.00%

0.00%

0.00%

15-Apr-12

25-Apr-12

0.00%

0.00%

AFTER METROLOGY

0.00%

SS630

RECEVING METROLOGY

0.00%

60

0.00%

0.00%

0.00%

15Apr12

15Apr12

0.00%

0.00%

SS670

APPLY SHRINKABLE SLEEVE

32

10.81%

60

0.00%

0.00%

0.00%

23Apr12

24Apr12

0.00%

0.00%

SS660

PIGGING & HYDRO TEST

32

10.81%

60

0.00%

0.00%

0.00%

21Apr12

23Apr12

0.00%

0.00%

SS680

LIFTING TEST

32

10.81%

60

0.00%

0.00%

0.00%

24Apr12

25Apr12

0.00%

0.00%

34/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP6 PROGRESS Sheet

Activity Name

Act ID

Total
Budgete
Units (Hrs)

R.W %

Original
Duration
(Days)

ACTUAL %
ITEM

PLANNED %

OVERALL

ITEM

OVERALL

Start Date

Finish Date

DEV/ITEM

DEV/
OVERALL

SS640

FITUPAFTERMETROLOGY

72

24.32%

60

0.00%

0.00%

0.00%

15-Apr-12

17-Apr-12

0.00%

0.00%

SS650

WELDING & NDT AFTER METROLOGY

128

43.24%

60

0.00%

0.00%

0.00%

17Apr12

21Apr12

0.00%

0.00%

1716

15.95%

59

0.00%

0.00%

0.00%

0.00%

23Feb12

24Mar12

0.00%

0.00%

1716

100.00%

59

0.00%

0.00%

0.00%

0.00%

23-Feb-12

24-Mar-12

0.00%

0.00%
0.00%

SPOOL NO. S2 ( S1 SSIV )


PIPE LINE & BENDS
SS230

PIGGING & HYDRO TEST

32

1.86%

60

0.00%

0.00%

0.00%

22Mar12

23Mar12

0.00%

SS240

LIFTING TEST

32

1.86%

60

0.00%

0.00%

0.00%

24Mar12

24Mar12

0.00%

0.00%

SS200

FIT UP FLANGES AND FITTING WITH LINE PIPE

48

2.80%

47

0.00%

0.00%

0.00%

18Mar12

19Mar12

0.00%

0.00%

SS210

WELDING & NDT FOR FLANGES WITH LINE PIPE

64

3.73%

47

0.00%

0.00%

0.00%

20Mar12

21Mar12

0.00%

0.00%

SS150

SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

96

5.59%

47

0.00%

0.00%

0.00%

23Feb12

25Feb12

0.00%

0.00%

SS220

APPLY SHRINKABLE SLEEVE

128

7.46%

60

0.00%

0.00%

0.00%

22Mar12

23Mar12

0.00%

0.00%

SS160

CUTTING & BEVELING

180

10.49%

47

0.00%

0.00%

0.00%

26Feb12

28Feb12

0.00%

0.00%

SS170

FIT UP FOR LINE PIPE & BENDS

240

13 99%
13.99%

47

0 00%
0.00%

0 00%
0.00%

0 00%
0.00%

29 Feb 12
29Feb12

5 Mar 12
5Mar12

0 00%
0.00%

0 00%
0.00%

SS190

COATING OF BENDS

384

22.38%

47

0.00%

0.00%

0.00%

15Mar12

21Mar12

0.00%

0.00%

SS180

WELDING & NDT FOR LINE PIPE & BENDS

512

29.84%

47

0.00%

0.00%

0.00%

6Mar12

14Mar12

0.00%

0.00%

1716

15.95%

59

0.00%

0.00%

0.00%

0.00%

23Feb12

24Mar12

0.00%

0.00%

1716

100.00%

59

0.00%

0.00%

0.00%

0.00%

23-Feb-12

24-Mar-12

0.00%

0.00%

SPOOL NO. S3 ( SSIV S4 )


PIPE LINE & BENDS
SS330

PIGGING & HYDRO TEST

32

1.86%

60

0.00%

0.00%

0.00%

22Mar12

23Mar12

0.00%

0.00%

SS340

LIFTING TEST

32

1.86%

60

0.00%

0.00%

0.00%

24Mar12

24Mar12

0.00%

0.00%

SS300

FIT UP FLANGES AND FITTING WITH LINE PIPE

48

2.80%

47

0.00%

0.00%

0.00%

18Mar12

19Mar12

0.00%

0.00%

SS310

WELDING & NDT FOR FLANGES WITH LINE PIPE

64

3.73%

47

0.00%

0.00%

0.00%

20Mar12

21Mar12

0.00%

0.00%

SS250

SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

96

5.59%

47

0.00%

0.00%

0.00%

23Feb12

25Feb12

0.00%

0.00%

SS320

APPLY SHRINKABLE SLEEVE

128

7.46%

60

0.00%

0.00%

0.00%

22Mar12

23Mar12

0.00%

0.00%

SS260

CUTTING & BEVELING

180

10.49%

47

0.00%

0.00%

0.00%

26Feb12

28Feb12

0.00%

0.00%

SS270

FIT UP FOR LINE PIPE & BENDS

240

13.99%

47

0.00%

0.00%

0.00%

29Feb12

5Mar12

0.00%

0.00%

SS290

COATING OF BENDS

384

22.38%

47

0.00%

0.00%

0.00%

15Mar12

21Mar12

0.00%

0.00%

SS280

WELDING & NDT FOR LINE PIPE & BENDS

512

29.84%

47

0.00%

0.00%

0.00%

6Mar12

14Mar12

0.00%

0.00%

1948

18.10%

59

0.00%

0.00%

0.00%

0.00%

24Mar12

25Apr12

0.00%

0.00%

BEFORE METROLOGY

1652

84.80%

59

0.00%

0.00%

0.00%

0.00%

24-Mar-12

23-Apr-12

0.00%

0.00%

PIPE LINE & BENDS

1652

100.00%

59

0.00%

0.00%

0.00%

0.00%

24-Mar-12

23-Apr-12

0.00%

0.00%

48

2.91%

48

0.00%

0.00%

0.00%

16Apr12

18Apr12

0.00%

0.00%

SPOOL NO. S1 (CLOSING) ( P.L SETH PLEM )

SS060

FIT UP FLANGES AND FITTING WITH LINE PIPE

35/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP6 PROGRESS Sheet

Activity Name

Act ID

Total
Budgete
Units (Hrs)

R.W %

64

3.87%

Original
Duration
(Days)

ACTUAL %
ITEM

PLANNED %
DEV/ITEM

DEV/
OVERALL

Start Date

Finish Date

0.00%

18Apr12

21Apr12

0.00%

0.00%

OVERALL

ITEM

OVERALL

48

0.00%

0.00%

SS070

WELDING & NDT FOR FLANGES WITH LINE PIPE

SS 10

SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

96

5.81%

48

0.00%

0.00%

0.00%

24Mar12

26Mar12

0.00%

0.00%

SS080

APPLY SHRINKABLE SLEEVE

128

7.75%

60

0.00%

0.00%

0.00%

21Apr12

23Apr12

0.00%

0.00%

SS020

CUTTING & BEVELING BEFORE METROLOGY

180

10.90%

48

0.00%

0.00%

0.00%

26Mar12

29Mar12

0.00%

0.00%

SS030

FIT UP FOR LINE PIPE & BENDS BEFORE METROLOGY

240

14.53%

48

0.00%

0.00%

0.00%

29Mar12

4Apr12

0.00%

0.00%

SS050

COATING OF BENDS

384

23.24%

48

0.00%

0.00%

0.00%

14Apr12

21Apr12

0.00%

0.00%

SS040

WELDING & NDT FOR LINE PIPE & BENDS BEFORE METROLOGY

512

30.99%

48

0.00%

0.00%

0.00%

4Apr12

14Apr12

0.00%

0.00%

296

15.20%

59

0.00%

0.00%

0.00%

15-Apr-12

25-Apr-12

0.00%

0.00%

AFTER METROLOGY

0.00%

SS090

RECEVING METROLOGY

0.00%

60

0.00%

0.00%

0.00%

15Apr12

15Apr12

0.00%

0.00%

SS130

APPLY SHRINKABLE SLEEVE

32

10.81%

60

0.00%

0.00%

0.00%

23Apr12

24Apr12

0.00%

0.00%

SS120

PIGGING & HYDRO TEST

32

10.81%

60

0.00%

0.00%

0.00%

21Apr12

23Apr12

0.00%

0.00%

SS140

LIFTING TEST

32

10.81%

60

0.00%

0.00%

0.00%

24Apr12

25Apr12

0.00%

0.00%

SS100

FIT UP AFTER METROLOGY

72

24.32%

60

0.00%

0.00%

0.00%

15Apr12

17Apr12

0.00%

0.00%

SS110

WELDING & NDT AFTER METROLOGY

128

43.24%

60

0.00%

0.00%

0.00%

17Apr12

21Apr12

0.00%

0.00%

1716

15.95%

59

0.00%

0.00%

0.00%

0.00%

23Feb12

24Mar12

0.00%

0.00%

1716

100.00%

59

0.00%

0.00%

0.00%

0.00%

23-Feb-12

24-Mar-12

0.00%

0.00%

SPOOL NO. S5 ( S4 S6 )
PIPE LINE & BENDS
SS530

PIGGING & HYDRO TEST

32

1.86%

60

0.00%

0.00%

0.00%

22Mar12

23Mar12

0.00%

0.00%

SS540

LIFTING TEST

32

1.86%

60

0.00%

0.00%

0.00%

24Mar12

24Mar12

0.00%

0.00%

SS500

FIT UP FLANGES AND FITTING WITH LINE PIPE

48

2.80%

47

0.00%

0.00%

0.00%

18Mar12

19Mar12

0.00%

0.00%

SS510

WELDING & NDT FOR FLANGES WITH LINE PIPE

64

3.73%

47

0.00%

0.00%

0.00%

20Mar12

21Mar12

0.00%

0.00%

SS450

SPOOLS&BENDSPLACEDONSUITABLESUPPORTS

96

5.59%

47

0.00%

0.00%

0.00%

23Feb12

25Feb12

0.00%

0.00%

SS520

APPLY SHRINKABLE SLEEVE

128

7.46%

60

0.00%

0.00%

0.00%

22Mar12

23Mar12

0.00%

0.00%

SS460

CUTTING & BEVELING

180

10.49%

47

0.00%

0.00%

0.00%

26Feb12

28Feb12

0.00%

0.00%

SS470

FIT UP FOR LINE PIPE & BENDS

240

13.99%

47

0.00%

0.00%

0.00%

29Feb12

5Mar12

0.00%

0.00%

SS490

COATING OF BENDS

384

22.38%

47

0.00%

0.00%

0.00%

15Mar12

21Mar12

0.00%

0.00%

SS480

WELDING & NDT FOR LINE PIPE & BENDS

512

29.84%

47

0.00%

0.00%

0.00%

6Mar12

14Mar12

0.00%

0.00%

1716

15.95%

59

0.00%

0.00%

0.00%

0.00%

23Feb12

24Mar12

0.00%

0.00%

1716

100.00%

59

0.00%

0.00%

0.00%

0.00%

23-Feb-12

24-Mar-12

0.00%

0.00%

SPOOL NO. S4 ( S3 S5 )
PIPE LINE & BENDS
SS430

PIGGING & HYDRO TEST

32

1.86%

60

0.00%

0.00%

0.00%

22Mar12

23Mar12

0.00%

0.00%

SS440

LIFTING TEST

32

1.86%

60

0.00%

0.00%

0.00%

24Mar12

24Mar12

0.00%

0.00%

36/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP6 PROGRESS Sheet

Activity Name

Act ID

Total
Budgete
Units (Hrs)

R.W %

Original
Duration
(Days)

ACTUAL %
ITEM

PLANNED %

OVERALL

ITEM

OVERALL

Start Date

Finish Date

DEV/ITEM

DEV/
OVERALL

SS400

FIT UP FLANGES AND FITTING WITH LINE PIPE

48

2.80%

47

0.00%

0.00%

0.00%

18Mar12

19Mar12

0.00%

0.00%

SS410

WELDING & NDT FOR FLANGES WITH LINE PIPE

64

3.73%

47

0.00%

0.00%

0.00%

20Mar12

21Mar12

0.00%

0.00%

SS350

SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

96

5.59%

47

0.00%

0.00%

0.00%

23Feb12

25Feb12

0.00%

0.00%

SS420

APPLY SHRINKABLE SLEEVE

128

7.46%

60

0.00%

0.00%

0.00%

22Mar12

23Mar12

0.00%

0.00%

SS360

CUTTING & BEVELING

180

10.49%

47

0.00%

0.00%

0.00%

26Feb12

28Feb12

0.00%

0.00%

SS370

FITUPFORLINEPIPE&BENDS

240

13.99%

47

0.00%

0.00%

0.00%

29Feb12

05Mar12

0.00%

0.00%

SS390

COATING OF BENDS

384

22.38%

47

0.00%

0.00%

0.00%

15Mar12

21Mar12

0.00%

0.00%

SS380

WELDING&NDTFORLINEPIPE&BENDS

512

29.84%

47

0.00%

0.00%

0.00%

06Mar12

14Mar12

0.00%

0.00%

37/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP8 PROGRESS Sheet

PETROJET

CLIENT : PETROBEL
PROJECT : SETH DEVELOPMENT PROJECT

Activity Name

Act ID

W.P.8: LOADOUT, SEAFASTENING, TRANSPORTATION & INSTALLATION

Total
Budgete
Units (Hrs)

R.W %

27456

25Jun11

DATE :

WK

WEEK NO.

Original
Duration
(Days)

ITEM

OVERALL

ITEM

OVERALL

100.00%

204

0.00%

0.00%

0.00%

ACTUAL %

13

PLANNED %
Start Date

Finish Date

DEV/ITEM

DEV/
OVERALL

0.00%

18-Oct-11

08-May-12

0.00%

0.00%

PTJ1070

Pre-drillingtemplateseafasteningandloadout

840

3.06%

0.00%

0.00%

0.00%

18Oct11

24Oct11

0.00%

0.00%

PTJ1170

SubSeaSpoolsLoadoutfirsttrip

840

3.06%

0.00%

0.00%

0.00%

25Mar12

31Mar12

0.00%

0.00%

PTJ1180

SubSeaSpoolsLoadoutsecondtripforclosingspools

840

3.06%

0.00%

0.00%

0.00%

25-Apr-12

02-May-12

0.00%

0.00%

PTJ1060

Deckseafasteningandloadout

7896

28.76%

0.00%

0.00%

0.00%

02-May-12

08-May-12

0.00%

0.00%

PTJ1050

Jacket&Pilesseafasteningandloadout

17040

62.06%

15

0.00%

0.00%

0.00%

17-Mar-12

31-Mar-12

0.00%

0.00%

38/40
02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

WP9 PROGRESS Sheet

PETROJET

CLIENT : PETROBEL
PROJECT : SETH DEVELOPMENT PROJECT

Act ID

Activity Name

W.P.9: OFFSHORE HOOKUP, COMMISSIONING AND ASSISTANT FOR START UP

25Jun11

DATE :

WK

WEEK NO.

Original
Duration
(Days)

ITEM

OVERALL

ITEM

OVERALL

100.00%

46

0.00%

0.00%

0.00%

R.W %

ACTUAL %

13

PLANNED %
DEV/ITEM

DEV/
OVERALL

Start Date

Finish Date

0.00%

15-May-12

30-Jun-12

0.00%

0.00%

M01

May-12

50.00%

16

0.00%

0.00%

0.00%

0.00%

15-May-12

31-May-12

0.00%

0.00%

M02

Jun-12

50.00%

30

0.00%

0.00%

0.00%

0.00%

01-Jun-12

30-Jun-12

0.00%

0.00%

02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

39/40

CRASHING COST

PETROJET

CLIENT : PETROBEL
PROJECT : SETH DEVELOPMENT PROJECT

Act ID

Activity Name

W.P.1: PROJECT MANAGEMENT

25Jun11

DATE :

WK

WEEK NO.

Original
Duration
(Days)

ITEM

OVERALL

ITEM

OVERALL

100.00%

182

0.00%

0.00%

0.00%

R.W %

ACTUAL %

13

PLANNED %
DEV/ITEM

DEV/
OVERALL

Start Date

Finish Date

0.00%

01-Nov-11

01-May-12

0.00%

0.00%

M01

Nov-11

10.00%

24

0.00%

0.00%

0.00%

0.00%

01-Nov-11

25-Nov-11

0.00%

0.00%

M02

Dec-11

20.00%

29

0.00%

0.00%

0.00%

0.00%

26Nov11

25Dec11

0.00%

0.00%

M03

Jan-12

20.00%

30

0.00%

0.00%

0.00%

0.00%

26Dec11

25Jan12

0.00%

0.00%

M04

Feb-12

20.00%

30

0.00%

0.00%

0.00%

0.00%

26Jan12

25Feb12

0.00%

0.00%

M05

Mar-12

20.00%

28

0.00%

0.00%

0.00%

0.00%

26Feb12

25Mar12

0.00%

0.00%

M06

Apr-12

10.00%

30

0.00%

0.00%

0.00%

0.00%

26Mar12

25Apr12

0.00%

0.00%

02/07/201110:32

E:\SETH\WEEKLY&MONTHLYREPORT\MONTHLY\MONTHLY250611\

40/40

PAGE 27 OF 33

PTB

SETH OFFSHORE DEVELOPMENT EPC PROJECT


PLANNING PORTION IN THE MONTHLY PROGRESS REPORT

Egypt

Rev. (0)
Jun 2011

4.3. UPDATED SCHEDULE

GFL 003-0405

3467-200

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

SETH OFFSHORE
OFFS
EPC PROJECT UPDATED SCHEDULE
CONTRACTUAL MILESTONES
CONTRACT

BL Project
Finish

Start

335 31-Mar-11

31-Jul-12

28-Mar-11 A

31-Jul-12

335 31-Mar-11

31-Jul-12

31-Mar-11 A

31-Jul-12

Finish

Project start

0 31-Mar-11

A1030

Finishing the basic engineering review and Endorsement report iss...

31-Mar-11

31-Mar-11 A

A2320

Recieve PTB LLI's Technical Offers from PTB

31-Mar-11

31-Mar-11 A

A17

Recieving LOI from PTB

31-Mar-11

31-Mar-11 A

A2290

All LLI's awarded (By Petrobel)

19-Apr-11

19-Apr-11 A

A2330

PTB LLI's TER's by Enppi

0 19-Apr-11

A2360

EPC Contract Signature

29-Apr-11

29-Apr-11 A

ART6.1

Authorization for Predrilling template ready for sail out: transportati...

24-Oct-11

24-Oct-11*

ART6.7

Pipeline spools ready for load out in four weeks from company req...

23-Mar-12

23-Mar-12

ART6.3

Deck Mechanical Completion

01-Apr-12

31-Mar-12*

ART6.2.1

Jacket and Piles ready for load out

14-Apr-12

14-Apr-12*

ART6.2.2

Company Authorization for Jacket & Piles ready for Sail out

21-Apr-12

21-Apr-12*

ART6.4.1

Deck and Flare Ready for Load out

01-May-12

30-Apr-12*

ART6.4.2

Company authorization for ready for sail out of Deck and flare

10-May-12

08-May-12

ART6.5

Offshore hook up and Final commissioning

02-Jul-12

30-Jun-12

A6.6

Assistance for start up (1) week from Company request

31-Jul-12

30-Jul-12

A2

Project completion

31-Jul-12

31-Jul-12*

W.P.1: PRO
PROJECT MANAGEMENT
A2380

Design review (Internal meeting)

A1010

Management activities

W.P.2: ENG
ENGINEERING
PROCESS

31-Mar-11 A

31-Jul-12

335 31-Mar-11

31-Jul-12

31-Mar-11 A

31-Jul-12

12-Jul-11

21-Aug-11

23-Aug-11

335 31-Mar-11

31-Jul-12

31-Mar-11 A

31-Jul-12

255 31-Mar-11

21-Mar-12

31-Mar-11 A

08-Apr-12

254 03-Apr-11

21-Mar-12

03-Apr-11 A

08-Apr-12

Primary Baseline
Actual Work

Baseline ...

Remaining...

2012
F M A M J JulA

19-Apr-11 A

31-Jul-12

Start Date:28-Mar-11
Finish Date:31-Jul-12
Critical Re... Data Date:25-Jun-11

Remaining Level of Effort

31-Mar-11 A

335 31-Mar-11

3 07-Jul-11

2011
A M J Jul A S O N D

A1

ENPPI

Page 1 of 64

By: Haytham A.Rahman


Date
25-May-11

Revision
Rev.0

Checked
A.Maghawry

Approved
A.Fathy

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID
A2230

Activity Name
HAZOP meeting

Drawings

Original BL Project
Duration Start

BL Project
Finish

Start

Finish

0 13-Jun-11

16-Jun-11

21-Jul-11

21-Jul-11

129 03-Apr-11

05-Oct-11

03-Apr-11 A

04-Oct-11

2011
A M J Jul A S O N D

A2420

UFD's IFD

5 06-Apr-11

13-Apr-11

06-Apr-11 A

10-Apr-11 A

A1410

PFD's IFD

5 03-Apr-11

10-Apr-11

03-Apr-11 A

10-Apr-11 A

A2430

Heat and material balance IFD

5 03-Apr-11

10-Apr-11

03-Apr-11 A

10-Apr-11 A

A1420

P&ID's IFD

5 10-Apr-11

17-Apr-11

10-Apr-11 A

21-Apr-11 A

A2570

Escape route and safety signs layouts IFD

5 31-May-11

07-Jun-11

10-May-11 A

16-May-11 A

A2560

Fire fighting and safety layouts IFD

5 05-May-11

12-May-11

05-May-11 A

17-May-11 A

A2410

Process block diagram IFD

5 07-Jun-11

14-Jun-11

12-Jun-11 A

20-Jun-11 A

A2190

Cause & Effect IFD

5 09-May-11

16-May-11

19-May-11 A

23-Jun-11 A

A1570

P&ID's IFC

7 05-Sep-11

14-Sep-11

05-Sep-11

13-Sep-11

A2200

Cause & Effect IFC

5 14-Sep-11

21-Sep-11

14-Sep-11

20-Sep-11

A1560

PFD's IFF

5 14-Sep-11

21-Sep-11

14-Sep-11

20-Sep-11

A4750

UFD's IFF

5 21-Sep-11

28-Sep-11

21-Sep-11

27-Sep-11

A4760

Fire fighting and safety layouts IFC

5 21-Sep-11

28-Sep-11

21-Sep-11

27-Sep-11

A4740

Process block flow diagram IFF

5 21-Sep-11

28-Sep-11

21-Sep-11

27-Sep-11

A4770

Escape route and safety signs layouts IFC

Technical Lists

Page 2 of 64

5 28-Sep-11

05-Oct-11

28-Sep-11

04-Oct-11

249 10-Apr-11

21-Mar-12

10-Apr-11 A

08-Apr-12

A5320

Design basis IFD

3 10-Apr-11

12-Apr-11

10-Apr-11 A

12-Apr-11 A

A2550

Safety philosophy IFD

5 20-Apr-11

27-Apr-11

20-Apr-11 A

27-Apr-11 A

A2540

Hazardous area classification schedule IFD

5 26-Apr-11

04-May-11

26-Apr-11 A

05-May-11 A

A2210

Equipment list IFD

5 08-May-11

15-May-11

08-May-11 A

11-May-11 A

A2460

Utility load summary IFD

3 19-Jun-11

26-Jun-11

15-Jun-11 A

23-Jun-11 A

A2440

Process report IFD

13 05-Jun-11

12-Jun-11

26-Jun-11

12-Jul-11

A2450

Blow down report IFD

5 03-Jul-11

10-Jul-11

26-Jul-11

01-Aug-11

A2240

HAZOP Report

10 21-Jul-11

04-Aug-11

25-Aug-11

12-Sep-11

A2220

Equipment list IFF

5 12-Sep-11

19-Sep-11

12-Sep-11

18-Sep-11

A4790

Process report IFF

5 14-Sep-11

21-Sep-11

14-Sep-11

20-Sep-11

A4810

Utility load summary IFF

5 20-Sep-11

27-Sep-11

20-Sep-11

26-Sep-11

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

Finish

Hazardous area classification schedule IFC

5 21-Sep-11

28-Sep-11

21-Sep-11

27-Sep-11

A4800

Blow down report IFF

5 26-Sep-11

03-Oct-11

26-Sep-11

02-Oct-11

A4830

Safety philosophy IFF

5 03-Oct-11

11-Oct-11

03-Oct-11

10-Oct-11

A2580

Precommissioning procedures IFD

5 22-Feb-12

29-Feb-12

11-Mar-12

15-Mar-12

A2590

Plant operating guide IFD

5 29-Feb-12

07-Mar-12

18-Mar-12

22-Mar-12

A4840

Precommissioning procedures IFF

5 07-Mar-12

14-Mar-12

25-Mar-12

29-Mar-12

A4850

Plant operating guide IFF

5 14-Mar-12

21-Mar-12

01-Apr-12

08-Apr-12

52 03-Apr-11

09-May-11

03-Apr-11 A

29-May-11 A

A2470

Chemical injection package MRQ

3 03-Apr-11

06-Apr-11

03-Apr-11 A

06-Apr-11 A

A2490

Safety equipment and life saving MRQ

7 03-Apr-11

12-Apr-11

03-Apr-11 A

12-Apr-11 A

A2480

Fire protection system MRQ

5 06-Apr-11

12-Apr-11

06-Apr-11 A

12-Apr-11 A

A2510

Flame arrestor MRQ

5 20-Apr-11

27-Apr-11

13-Apr-11 A

17-Apr-11 A

A2500

Vent stack tips MRQ

5 02-May-11

09-May-11

01-May-11 A

09-May-11 A

A1440

Process commodities MRQ's (Other equipment)

15 10-Apr-11

02-May-11

06-Apr-11 A

29-May-11 A

78 08-May-11

11-Jul-11

18-Apr-11 A

26-Jul-11

TER's
A2600

Chemical injection package TER

30 08-May-11

19-Jun-11

18-Apr-11 A

01-Jun-11 A

A2610

Fire protection system TER

25 11-May-11

14-Jun-11

26-Apr-11 A

05-Jul-11

A2620

Safety equipment and life saving TER

25 08-May-11

12-Jun-11

26-Apr-11 A

07-Jul-11

A2640

Flame arrestor TER

20 26-May-11

23-Jun-11

26-Jun-11

21-Jul-11

A1450

Process commodities TER's

45 09-May-11

11-Jul-11

22-Apr-11 A

26-Jul-11

A2630

Vent stack tips TER

13 06-Jun-11

04-Jul-11

01-Jun-11 A

26-Jul-11

MRP

43 10-Jul-11

29-Aug-11

03-Jul-11

04-Sep-11

A2660

Chemical injection package MRP

5 10-Jul-11

17-Jul-11

03-Jul-11

07-Jul-11

A2670

Fire protection system MRP

5 10-Jul-11

14-Jul-11

19-Jul-11

25-Jul-11

A2680

Safety equipment and life saving MRP

5 10-Jul-11

17-Jul-11

07-Aug-11

11-Aug-11

A2700

Flame arrestor MRP

5 21-Jul-11

28-Jul-11

21-Aug-11

25-Aug-11

A1460

Process commodities MRP's

25 25-Jul-11

29-Aug-11

27-Jul-11

04-Sep-11

A2690

Vent stack tips MRP

10-Aug-11

24-Aug-11

04-Sep-11

5 03-Aug-11

2011
A M J Jul A S O N D

A4820

MRQ's

Page 3 of 64

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Vendor pr
prints review
A2720

Chemical injection package Vendor prints review

A2740

Safety equipment and life saving Vendor prints review

A1470

Vendor prints review

A2760

Flame arrestor Vendor prints review

A2730

Fire protection system Vendor prints review

A2750

Vent stack tips Vendor prints review

PIPING
Drawings

Original BL Project
Duration Start

BL Project
Finish

Start

119 24-Jul-11

26-Dec-11

17-Jul-11

10-Jan-12

100 25-Jul-11

25-Dec-11

17-Jul-11

14-Dec-11

80 25-Jul-11

24-Nov-11

21-Aug-11

21-Dec-11

100 25-Jul-11

25-Dec-11

26-Jul-11

25-Dec-11

07-Dec-11

04-Sep-11

01-Jan-12

21-Dec-11

03-Aug-11

02-Jan-12

80 23-Aug-11

26-Dec-11

13-Sep-11

10-Jan-12

240 31-Mar-11

24-Jan-12

31-Mar-11 A

03-Jan-12

178 17-Apr-11

04-Jan-12

05-Apr-11 A

03-Jan-12

80 07-Aug-11
100 24-Jul-11

Finish

Plot Plan IFD

5 17-Apr-11

24-Apr-11

05-Apr-11 A

10-Apr-11 A

A1670

Plot Plan IFC

5 14-Sep-11

21-Sep-11

14-Sep-11

20-Sep-11

A6220

GA's IFD

8 15-Sep-11

27-Sep-11

18-Sep-11

27-Sep-11

A1680

ISO's

10 31-Oct-11

20-Nov-11

31-Oct-11

17-Nov-11

A1690

GA's IFC

15 02-Nov-11

30-Nov-11

02-Nov-11

29-Nov-11

A2790

Hydro test maps IFC

7 24-Nov-11

06-Dec-11

24-Nov-11

05-Dec-11

A6190

Piping support plan IFC

5 14-Dec-11

21-Dec-11

14-Dec-11

20-Dec-11

A6200

Piping support location IFC

5 21-Dec-11

28-Dec-11

21-Dec-11

27-Dec-11

A6210

Piping penetration location IFC

5 28-Dec-11

04-Jan-12

28-Dec-11

03-Jan-12

145 12-May-11

14-Dec-11

19-May-11 A

13-Dec-11

A2780

Line Designation table (LDT) IFD

5 12-May-11

19-May-11

19-May-11 A

01-Jun-11 A

A4920

Line Designation table (LDT) IFC

5 14-Sep-11

21-Sep-11

14-Sep-11

20-Sep-11

A6180

Piping support list IFC

Specifications
Specificat
A6230

Piping material classes IFD

A6240

Final Piping material classes

Model

2011
A M J Jul A S O N D

A1660

Technical Lists

Page 4 of 64

5 07-Dec-11

14-Dec-11

07-Dec-11

13-Dec-11

44 16-May-11

13-Jun-11

16-May-11 A

14-Jul-11

5 16-May-11

23-May-11

16-May-11 A

23-May-11 A

15 06-Jun-11

13-Jun-11

26-Jun-11

14-Jul-11

100 23-May-11

23-Nov-11

26-Jun-11

22-Nov-11

A1990

Model Review (30%)

14 23-May-11

26-May-11

26-Jun-11

13-Jul-11

A2000

Model Review (60%)

3 21-Jul-11

26-Jul-11

13-Sep-11

15-Sep-11

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID
A2010

Activity Name
Model Review (90%)

MRQ's

Original BL Project
Duration Start

BL Project
Finish

Start

Finish

3 20-Nov-11

23-Nov-11

20-Nov-11

22-Nov-11

16 31-Mar-11

24-Apr-11

31-Mar-11 A

29-May-11 A

Piping bulk MRQ

5 31-Mar-11

07-Apr-11

31-Mar-11 A

07-Apr-11 A

A5410

Injection fitting MRQ

5 17-Apr-11

24-Apr-11

17-Apr-11 A

24-Apr-11 A

A5400

Insulation Joint MRQ

5 13-Apr-11

20-Apr-11

22-May-11 A

29-May-11 A

55 10-May-11

15-Jun-11

28-Apr-11 A

24-Jul-11

A1730

Piping bulk TER

15 10-May-11

31-May-11

28-Apr-11 A

17-May-11 A

A5420

Insulation Joint TER

15 19-May-11

09-Jun-11

30-May-11 A

21-Jul-11

A5430

Injection fitting TER

19 25-May-11

15-Jun-11

28-Jun-11

24-Jul-11

46 20-Jun-11

20-Jul-11

26-Jun-11

28-Aug-11

MRP
A1740

Piping bulk MRP

5 20-Jun-11

27-Jun-11

26-Jun-11

30-Jun-11

A5530

Injection fitting MRP

5 13-Jul-11

20-Jul-11

22-Aug-11

28-Aug-11

A5540

Insulation Joint MRP

5 10-Jul-11

17-Jul-11

22-Aug-11

28-Aug-11

180 04-May-11

24-Jan-12

14-Jun-11 A

03-Jan-12

Vendor pr
prints review
A6110

Production Manifold Vendor prints review

180 04-May-11

24-Jan-12

14-Jun-11 A

05-Dec-11

A1750

Piping bulk Vendor prints review

100 05-Jul-11

05-Dec-11

10-Jul-11

07-Dec-11

A5550

Injection fitting Vendor prints review

80 28-Jul-11

30-Nov-11

06-Sep-11

03-Jan-12

A5560

Insulation Joint Vendor prints review

80 25-Jul-11

24-Nov-11

06-Sep-11

03-Jan-12

224 24-Apr-11

24-Jan-12

04-Apr-11 A

08-Jan-12

141 24-Apr-11

20-Oct-11

20-Apr-11 A

17-Nov-11

ELECTRICAL
ELECTRIC
Drawings

2011
A M J Jul A S O N D

A1720

TER's

Page 5 of 64

A3210

Lighting and navigational aids layouts IFD

5 24-Apr-11

02-May-11

20-Apr-11 A

26-Apr-11 A

A5290

Earthing layouts IFD

5 10-May-11

17-May-11

10-May-11 A

16-May-11 A

A3190

Hazardous area classification layout IFD

5 10-May-11

17-May-11

10-May-11 A

19-May-11 A

A1240

Electrical layouts IFD

15 09-May-11

30-May-11

25-May-11 A

23-Jun-11 A

A3200

Cable routing layouts IFD

5 19-May-11

26-May-11

16-Jun-11 A

23-Jun-11 A

A1230

Single line diagram IFD

20 23-May-11

30-May-11

26-Jun-11

21-Jul-11

A3220

Earthing layouts IFC

5 21-Sep-11

28-Sep-11

21-Sep-11

27-Sep-11

A1600

Electrical layouts IFC

8 21-Sep-11

03-Oct-11

21-Sep-11

02-Oct-11

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

Finish

Cable routing layouts IFC

5 28-Sep-11

05-Oct-11

28-Sep-11

04-Oct-11

A5300

Interconnecting wiring diagram IFC

5 29-Sep-11

09-Oct-11

29-Sep-11

05-Oct-11

A5270

Hazardous area classification schedule IFC

5 05-Oct-11

13-Oct-11

05-Oct-11

12-Oct-11

A1590

Single line diagram IFF

7 11-Oct-11

20-Oct-11

11-Oct-11

19-Oct-11

A5280

Lighting and navigational aids layouts IFC

5 12-Oct-11

19-Oct-11

13-Nov-11

17-Nov-11

73 15-May-11

11-Oct-11

26-Jun-11

10-Oct-11

A1580

Power system study IFD

15 15-May-11

24-May-11

26-Jun-11

14-Jul-11

A1250

Power system study IFF

10 26-Sep-11

11-Oct-11

26-Sep-11

10-Oct-11

52 24-Apr-11

20-Jun-11

04-Apr-11 A

22-Jun-11 A

MRQ's
A3030

Electrical Cables MRQ

5 02-May-11

09-May-11

04-Apr-11 A

10-Apr-11 A

A3040

Electrical Cable trays MRQ

5 24-Apr-11

02-May-11

05-Apr-11 A

10-Apr-11 A

A3050

Navigation aids system MRQ

5 09-May-11

16-May-11

20-Apr-11 A

26-Apr-11 A

A6130

Earthing material MRQ

17 30-May-11

06-Jun-11

29-May-11 A

20-Jun-11 A

A1980

Electrical commodities MRQ

15 30-May-11

20-Jun-11

10-Apr-11 A

22-Jun-11 A

A3060

Lighting material MRQ

18 26-May-11

02-Jun-11

25-May-11 A

22-Jun-11 A

55 22-May-11

18-Jul-11

20-Apr-11 A

04-Aug-11

TER's
A3080

Electrical Cable trays TER

20 22-May-11

19-Jun-11

20-Apr-11 A

02-May-11 A

A3070

Electrical Cables TER

20 23-May-11

20-Jun-11

25-Apr-11 A

29-May-11 A

A3090

Navigation aids system TER

20 30-May-11

27-Jun-11

16-May-11 A

10-Jul-11

A1210

Electrical commodities TER

25 13-Jun-11

18-Jul-11

03-Jul-11

04-Aug-11

A3100

Lighting material TER

20 08-Jun-11

06-Jul-11

10-Jul-11

04-Aug-11

A6250

Earthing material TER

20 20-Jun-11

18-Jul-11

10-Jul-11

04-Aug-11

75 10-Jul-11

15-Sep-11

19-Jun-11 A

04-Oct-11

MRP

2011
A M J Jul A S O N D

A5310

Technical Lists

Page 6 of 64

A3110

Electrical Cables MRP

5 13-Jul-11

20-Jul-11

19-Jun-11 A

20-Jun-11 A

A3120

Electrical Cable trays MRP

8 10-Jul-11

17-Jul-11

26-Jun-11

05-Jul-11

A3130

Navigation aids system MRP

5 19-Jul-11

26-Jul-11

02-Aug-11

08-Aug-11

A3140

Lighting material MRP

3 27-Jul-11

01-Aug-11

28-Aug-11

04-Sep-11

A6310

Earthing material MRP

5 08-Aug-11

15-Aug-11

28-Aug-11

06-Sep-11

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID
A1700

Activity Name
Electrical commodities MRP

Vendor pr
prints review

Original BL Project
Duration Start

BL Project
Finish

Start

Finish

15 22-Aug-11

15-Sep-11

14-Sep-11

04-Oct-11

170 04-May-11

24-Jan-12

09-Jun-11 A

08-Jan-12

Electrical Cable trays Vendor prints review

80 25-Jul-11

24-Nov-11

10-Jul-11

02-Nov-11

A3150

Electrical Cables Vendor prints review

80 01-Aug-11

04-Dec-11

21-Jul-11

21-Nov-11

A6100

E&I Module Vendor prints review

170 04-May-11

24-Jan-12

09-Jun-11 A

05-Dec-11

A3250

Earthing Vendor prints review

60 23-Aug-11

28-Nov-11

11-Sep-11

11-Dec-11

A3170

Navigation aids system Vendor prints review

80 02-Aug-11

05-Dec-11

16-Aug-11

18-Dec-11

A3180

Lighting material Vendor prints review

80 11-Aug-11

14-Dec-11

11-Sep-11

08-Jan-12

235 31-Mar-11

22-Feb-12

31-Mar-11 A

08-Mar-12

131 05-May-11

16-Nov-11

20-Apr-11 A

16-Nov-11

Drawings
A3280

Instrumenthook up drawing IFD

5 19-May-11

26-May-11

20-Apr-11 A

28-Apr-11 A

A3310

Instrument junction box and wiring diagram IFD

5 26-May-11

02-Jun-11

02-May-11 A

08-May-11 A

A3290

Field instrument layout IFD

5 05-May-11

12-May-11

05-May-11 A

19-May-11 A

A3300

Cable drawings IFD

16 12-May-11

19-May-11

25-May-11 A

14-Jun-11 A

A1270

Instrument Layouts & Wiring drawings IFD

15 19-May-11

09-Jun-11

20-Apr-11 A

15-Jun-11 A

A5660

Field instrument layout IFC

5 20-Oct-11

27-Oct-11

20-Oct-11

26-Oct-11

A5670

Cable drawings IFC

5 27-Oct-11

03-Nov-11

27-Oct-11

02-Nov-11

A5690

Instrumenthook up drawing IFC

5 01-Nov-11

14-Nov-11

01-Nov-11

13-Nov-11

A5680

Instrument junction box and wiring diagram IFC

5 03-Nov-11

16-Nov-11

03-Nov-11

15-Nov-11

A1280

Instrument Layouts & Wiring drawings IFC

15 20-Oct-11

16-Nov-11

20-Oct-11

16-Nov-11

104 26-Apr-11

25-Sep-11

26-Apr-11 A

22-Sep-11

Technical Lists
A1290

Instrument Index IFD

5 26-Apr-11

04-May-11

26-Apr-11 A

03-May-11 A

A2250

Instrument data sheets

8 26-May-11

07-Jun-11

01-Jun-11 A

12-Jun-11 A

A3320

Instrument cable schedule IFD

0 26-May-11

02-Jun-11

08-Jun-11 A

15-Jun-11 A

A1610

Instrument Index IFC

7 14-Sep-11

25-Sep-11

14-Sep-11

22-Sep-11

74 31-Mar-11

09-Jun-11

31-Mar-11 A

26-Jun-11

MRQ's

2011
A M J Jul A S O N D

A3640

INSTRUMENTATION
INSTRUME

Page 7 of 64

A3330

HIPPS MRQ

5 31-Mar-11

07-Apr-11

01-Apr-11 A

03-Apr-11 A

A3340

Electro hydraulic wellhead control panel MRQ

5 04-Apr-11

12-Apr-11

31-Mar-11 A

07-Apr-11 A

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

Finish

10 03-Apr-11

17-Apr-11

02-Apr-11 A

10-Apr-11 A

Instrument commodities MRQ (HIPPS , Multiphase Flow Meter .....)

A3350

Multi phase flow meter MRQ

5 03-Apr-11

10-Apr-11

03-Apr-11 A

10-Apr-11 A

A3360

Wing valves MRQ

5 06-Apr-11

13-Apr-11

03-Apr-11 A

10-Apr-11 A

A3370

Choke valves MRQ

5 06-Apr-11

13-Apr-11

03-Apr-11 A

10-Apr-11 A

A5710

Instrument & Mechanical bulk material MRQ

5 26-May-11

02-Jun-11

25-Apr-11 A

03-May-11 A

A3380

Loose instrument MRQ

9 18-May-11

25-May-11

25-May-11 A

06-Jun-11 A

A5720

Junction boxes MRQ

0 02-Jun-11

09-Jun-11

25-May-11 A

06-Jun-11 A

A3390

Instrument cable and cable glands MRQ

22 16-May-11

23-May-11

25-May-11 A

23-Jun-11 A

A2310

Instrument commodities MRQ (Trays ,Bulks ,Cables .....)

35 20-Apr-11

09-Jun-11

25-May-11 A

26-Jun-11

A3400

Instrument Cable trays MRQ

20 24-May-11

31-May-11

31-May-11 A

26-Jun-11

A2820

Sand & Corrosion probes MRQ

22 25-May-11

01-Jun-11

25-May-11 A

26-Jun-11

73 24-Apr-11

07-Jul-11

02-Apr-11 A

18-Aug-11

A3430

Multi phase flow meter TER

20 15-May-11

12-Jun-11

28-Apr-11 A

25-May-11 A

A3410

HIPPS TER

20 03-May-11

31-May-11

26-Apr-11 A

09-Jun-11 A

A3440

Wing valves TER

20 16-May-11

13-Jun-11

02-May-11 A

15-Jun-11 A

A3420

Electro hydraulic wellhead control panel TER

20 15-May-11

12-Jun-11

21-Apr-11 A

16-Jun-11 A

A3450

Choke valves TER

20 18-May-11

15-Jun-11

26-Apr-11 A

05-Jul-11

A5950

Instrument & Mechanical bulk material TER

10 19-Jun-11

03-Jul-11

26-May-11 A

14-Jul-11

A3470

Instrument cable and cable glands TER

10 06-Jun-11

20-Jun-11

10-Jul-11

21-Jul-11

A5780

Junction boxes TER

10 23-Jun-11

07-Jul-11

21-Jun-11 A

21-Jul-11

A3460

Loose instrument TER

10 12-Jun-11

26-Jun-11

20-Jun-11 A

24-Jul-11

A3480

Instrument Cable trays TER

25 14-Jun-11

28-Jun-11

26-Jun-11

28-Jul-11

A5870

Sand & Corrosion probes TER

20 16-Jun-11

07-Jul-11

10-Jul-11

04-Aug-11

A2300

Instrument commodities TER's (Trays ,Bulks ,Cables .....)

35 19-May-11

07-Jul-11

26-Jun-11

11-Aug-11

A1340

Instrument commodities TER's (HIPPS , Multiphase Flow Meter .....)

40 24-Apr-11

20-Jun-11

02-Apr-11 A

18-Aug-11

57 16-Jun-11

08-Aug-11

22-Jun-11 A

13-Sep-11

MRP

2011
A M J Jul A S O N D

A1310

TER's

Page 8 of 64

A3510

Multi phase flow meter MRP

5 10-Jul-11

17-Jul-11

22-Jun-11 A

23-Jun-11 A

A3500

Electro hydraulic wellhead control panel MRP

5 12-Jul-11

19-Jul-11

06-Jul-11

12-Jul-11

A3490

HIPPS MRP

5 28-Jun-11

05-Jul-11

07-Jul-11

13-Jul-11

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

Finish

Wing valves MRP

5 11-Jul-11

18-Jul-11

24-Jul-11

28-Jul-11

A3530

Choke valves MRP

5 10-Jul-11

17-Jul-11

27-Jul-11

02-Aug-11

A5960

Instrument & Mechanical bulk material MRP

5 24-Jul-11

31-Jul-11

07-Aug-11

11-Aug-11

A5790

Junction boxes MRP

5 28-Jul-11

04-Aug-11

14-Aug-11

18-Aug-11

A3550

Instrument cable and cable glands MRP

5 11-Jul-11

18-Jul-11

14-Aug-11

18-Aug-11

A3540

Loose instrument MRP

5 17-Jul-11

24-Jul-11

15-Aug-11

21-Aug-11

A3560

Cable trays MRP

5 14-Jul-11

21-Jul-11

16-Aug-11

22-Aug-11

A5380

Instrument cable trays MRP

5 14-Jul-11

21-Jul-11

16-Aug-11

22-Aug-11

A5880

Sand & Corrosion probes MRP

5 01-Aug-11

08-Aug-11

28-Aug-11

06-Sep-11

A1350

Instrument commodities MRP's

35 16-Jun-11

04-Aug-11

24-Jul-11

13-Sep-11

175 04-May-11

22-Feb-12

13-Jun-11 A

08-Mar-12

A3580

Electro hydraulic wellhead control panel Vendor prints review

80 27-Jul-11

29-Nov-11

21-Jul-11

21-Nov-11

A3600

Wing valves Vendor prints review

80 26-Jul-11

28-Nov-11

04-Aug-11

06-Dec-11

A6120

Shutdown and blowdown valves Vendor prints review

170 04-May-11

10-Jan-12

13-Jun-11 A

07-Dec-11

A3590

Multi phase flow meter Vendor prints review

100 25-Jul-11

25-Dec-11

10-Jul-11

07-Dec-11

A5970

Instrument & Mechanical bulk material Vendor prints review

70 08-Aug-11

24-Nov-11

21-Aug-11

07-Dec-11

A3610

Choke valves Vendor prints review

80 25-Jul-11

24-Nov-11

11-Aug-11

13-Dec-11

A5800

Junction boxes Vendor prints review

70 14-Aug-11

30-Nov-11

28-Aug-11

14-Dec-11

A3620

Loose instrument Vendor prints review

70 01-Aug-11

17-Nov-11

04-Sep-11

18-Dec-11

A5770

Instrument cable trays Vendor prints review

70 31-Jul-11

15-Nov-11

04-Sep-11

18-Dec-11

A5890

Sand & Corrosion probes Vendor prints review

70 16-Aug-11

05-Dec-11

11-Sep-11

25-Dec-11

A3630

Instrument cable and cable glands Vendor prints review

80 26-Jul-11

28-Nov-11

28-Aug-11

28-Dec-11

A3570

HIPPS Vendor prints review

150 13-Jul-11

22-Feb-12

24-Jul-11

01-Mar-12

A1360

Vendor prints Review

120 04-Aug-11

01-Feb-12

14-Sep-11

08-Mar-12

239 03-Apr-11

01-Feb-12

03-Apr-11 A

01-Feb-12

120 04-Apr-11

26-Sep-11

04-Apr-11 A

25-Sep-11

MECHANICAL
MECHANIC
Technical Lists

2011
A M J Jul A S O N D

A3520

Vendor pr
prints review

Page 9 of 64

A1050

Issue motor load list 1st issue

10 04-Apr-11

19-Apr-11

04-Apr-11 A

14-Apr-11 A

A6320

Issue motor load list 2nd issue

0 07-Jul-11

21-Jul-11

14-Jun-11 A

23-Jun-11 A

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

A5480

Handling Study

A2390

Issue motor load list IFF

MRQ's

Original BL Project
Duration Start

BL Project
Finish

Start

Finish

0 02-May-11

09-May-11

26-Jun-11

26-Jun-11

10 12-Sep-11

26-Sep-11

12-Sep-11

25-Sep-11

84 03-Apr-11

28-Jul-11

03-Apr-11 A

28-Jul-11

5 06-Apr-11

13-Apr-11

03-Apr-11 A

10-Apr-11 A

10 03-Apr-11

17-Apr-11

03-Apr-11 A

25-Apr-11 A

Turret crane MRQ

A1060

Mechanical commodities MRQ's (Excluding Monorail crane)

A3650

Service water pump MRQ

5 18-Apr-11

25-Apr-11

18-Apr-11 A

25-Apr-11 A

A3680

Monorail crane MRQ

5 21-Jul-11

28-Jul-11

24-Jul-11

28-Jul-11

84 08-May-11

06-Sep-11

20-Apr-11 A

06-Sep-11

A3710

Turret crane TER

20 15-May-11

12-Jun-11

20-Apr-11 A

04-May-11 A

A3690

Service water pump TER

15 17-May-11

07-Jun-11

10-May-11 A

03-Jul-11

A1070

Mechanical commodities TER (Excluding Monorail crane)

25 08-May-11

12-Jun-11

20-Apr-11 A

04-Jul-11

A3720

Monorail crane TER

15 11-Aug-11

06-Sep-11

14-Aug-11

06-Sep-11

92 10-Jul-11

10-Oct-11

10-May-11 A

10-Oct-11

5 10-Jul-11

17-Jul-11

10-May-11 A

15-Jun-11 A

10 10-Jul-11

24-Jul-11

21-Jul-11

03-Aug-11

MRP
A3750

Turret crane MRP

A1100

Mechanical commodities MRP

A3730

Service water pump MRP

5 11-Jul-11

18-Jul-11

28-Jul-11

03-Aug-11

A3760

Monorail crane MRP

3 04-Oct-11

10-Oct-11

05-Oct-11

10-Oct-11

181 04-May-11

01-Feb-12

26-May-11 A

01-Feb-12

Vendor pr
prints review
A6330

Receiving final weights and dimensions for mechanical equipment

A3810

Micro Turbine Vendor prints review

180 04-May-11

24-Jan-12

26-May-11 A

22-Nov-11

A3820

Emergency GeneratorVendor prints review

160 04-May-11

24-Jan-12

12-Jun-11 A

05-Dec-11

A3790

Turret crane crane Vendor prints review

100 25-Jul-11

25-Dec-11

10-Jul-11

07-Dec-11

A3770

Service water pump Vendor prints review

80 26-Jul-11

28-Nov-11

14-Aug-11

14-Dec-11

A1120

Vendor prints review

100 25-Jul-11

25-Dec-11

15-Aug-11

12-Jan-12

A3800

Monorail crane Vendor prints review

80 04-Oct-11

01-Feb-12

05-Oct-11

01-Feb-12

OFFSHORE
OFFSHOR

155 31-Mar-11

05-Dec-11

10-Apr-11 A

04-Dec-11

Drawings

126 30-May-11

05-Dec-11

30-May-11 A

04-Dec-11

10 30-May-11

13-Jun-11

30-May-11 A

13-Jun-11 A

A2350

Tray / Piping Supports Drawings IFD

0 20-Sep-11

2011
A M J Jul A S O N D

A3670

TER's

Page 10 of 64

21-Sep-11

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

A5340

Tray / Piping Supports Drawings IFC

Model

Original BL Project
Duration Start

BL Project
Finish

Start

Finish

10 20-Nov-11

05-Dec-11

20-Nov-11

04-Dec-11

145 18-Apr-11

20-Nov-11

18-Apr-11 A

17-Nov-11

Generate PDS Modeling For Topsides

20 18-Apr-11

17-May-11

18-Apr-11 A

17-May-11 A

A5360

Finalize PDS Modeling For Topsides based on Tecnomare IFC dw...

15 24-Oct-11

20-Nov-11

24-Oct-11

17-Nov-11

5 24-Apr-11

28-Apr-11

10-Apr-11 A

14-Apr-11 A

5 24-Apr-11

28-Apr-11

10-Apr-11 A

14-Apr-11 A

20 01-Jun-11

28-Jun-11

22-May-11 A

03-Jul-11

20 01-Jun-11

28-Jun-11

22-May-11 A

03-Jul-11

5 20-Jul-11

26-Jul-11

25-Jul-11

31-Jul-11

5 20-Jul-11

26-Jul-11

25-Jul-11

31-Jul-11

60 31-Mar-11

26-Jun-11

26-Jun-11

20-Sep-11

60 31-Mar-11

26-Jun-11

26-Jun-11

20-Sep-11

261 06-Apr-11

11-May-12

03-Apr-11 A

21-Apr-12

261 06-Apr-11

28-Apr-12

03-Apr-11 A

21-Apr-12

261 06-Apr-11

28-Apr-12

03-Apr-11 A

21-Apr-12

87 06-Apr-11

02-Aug-11

03-Apr-11 A

07-Aug-11

A1490

Survival module MRQ

TER's
A1500

Survival module TER

MRP
A1510

Survival module MRP

Vendor pr
prints review
A1530

Vendor prints review

W.P.3: PROCUREMENT
PRO
SERVICES & MATERIAL SUPPLY
EQUIPMENT
EQUIPMEN
ENPPI LO
LONG LEAD ITEMS (Cranes ,Chemical unjec.,Fire protec. , Survival M...
PURCHASING
PURCHA

2011
A M J Jul A S O N D

A5350

MRQ's

Page 11 of 64

A3860

Chemical injection package Bidding

15 06-Apr-11

27-Apr-11

06-Apr-11 A

18-Apr-11 A

A4610

Turret crane Bidding

20 13-Apr-11

12-May-11

10-Apr-11 A

20-Apr-11 A

A4360

Electro hydraulic wellhead control panel Bidding

15 14-Apr-11

15-May-11

07-Apr-11 A

21-Apr-11 A

A4350

HIPPS Bidding

15 07-Apr-11

28-Apr-11

03-Apr-11 A

26-Apr-11 A

A3870

Fire protection system Bidding

10 13-Apr-11

26-Apr-11

13-Apr-11 A

26-Apr-11 A

A4370

Multi phase flow meter Bidding

20 10-Apr-11

09-May-11

10-Apr-11 A

28-Apr-11 A

A2080

Bidding (Multi phase flow , Chemical unjec.,Fire protec. , Survival ...

30 19-Apr-11

31-May-11

19-Apr-11 A

22-May-11 A

A4710

Survival module Bidding

22 02-May-11

31-May-11

14-Apr-11 A

22-May-11 A

A5140

Turret crane Issue Fax of commitment

3 12-Jun-11

10-Jul-11

25-May-11 A

29-May-11 A

B1040

Turret crane Issue PO

5 17-Jul-11

24-Jul-11

15-Jun-11 A

21-Jun-11 A

A5130

Multi phase flow meter Issue Fax of commitment

20 12-Jun-11

10-Jul-11

25-May-11 A

21-Jun-11 A

A4860

Chemical injection package Issue Fax of commitment

15 19-Jun-11

10-Jul-11

12-Jun-11 A

30-Jun-11

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

Finish

Multi phase flow meter Issue PO

6 17-Jul-11

24-Jul-11

26-Jun-11

03-Jul-11

A5250

Electro hydraulic wellhead control panel Issue Fax of commitment

8 14-Jun-11

12-Jul-11

26-Jun-11

05-Jul-11

A5120

HIPPS Issue Fax of commitment

20 31-May-11

28-Jun-11

20-Jun-11 A

06-Jul-11

B1050

Chemical injection package Issue PO

1 17-Jul-11

24-Jul-11

10-Jul-11

10-Jul-11

B1010

HIPPS Issue PO

0 05-Jul-11

12-Jul-11

14-Jul-11

14-Jul-11

A5330

Fire protection system Issue Fax of commitment

9 19-Jun-11

07-Jul-11

06-Jul-11

18-Jul-11

A5150

Survival module Issue Fax of commitment

15 29-Jun-11

19-Jul-11

04-Jul-11

24-Jul-11

A1020

Fire protection system Issue PO

5 17-Jul-11

21-Jul-11

26-Jul-11

01-Aug-11

A2090

Issue Fax of commitments (Multi phase flow , Chemical unjec.,Fir...

30 08-Jun-11

19-Jul-11

03-Apr-11 A

04-Aug-11

B1030

Survival module Issue PO

5 27-Jul-11

02-Aug-11

01-Aug-11

07-Aug-11

267 28-Jun-11

24-Mar-12

25-Jun-11

17-Mar-12

A4450

Multi phase flow meter Fabrication up to release for shipment

180 10-Jul-11

06-Jan-12

25-Jun-11

21-Dec-11

A3920

Chemical injection package Fabrication up to release for shipment

180 10-Jul-11

06-Jan-12

01-Jul-11

27-Dec-11

A4720

Survival module Fabrication up to release for shipment

160 20-Jul-11

26-Dec-11

25-Jul-11

31-Dec-11

A4440

Electro hydrolic wellhead control panel Fabrication up to release fo...

180 12-Jul-11

08-Jan-12

06-Jul-11

01-Jan-12

A3930

Fire protection system Fabrication up to release for shipment

170 08-Jul-11

03-Jan-12

19-Jul-11

04-Jan-12

A2100

Fabrication up to release for shipment (Multi phase flow , Chemica...

200 29-Jun-11

14-Jan-12

26-Jun-11

11-Jan-12

A4650

Turret crane Fabrication up to release for shipment

240 10-Jul-11

06-Mar-12

25-Jun-11

19-Feb-12

A2260

Fabrication up to release for shipment (HIPPS)

255 28-Jun-11

24-Mar-12

07-Jul-11

17-Mar-12

144 30-Nov-11

28-Apr-12

30-Nov-11

21-Apr-12

SHIPPING
SHIPPIN

2011
A M J Jul A S O N D

A1000

FABRICATION
FABRICA

Page 12 of 64

A4480

Multi phase flow meter Shipping

21 06-Jan-12

27-Jan-12

22-Dec-11

11-Jan-12

A5210

Chemical injection package Shipping

21 06-Jan-12

27-Jan-12

28-Dec-11

17-Jan-12

A4730

Survival module Shipping

21 27-Dec-11

16-Jan-12

01-Jan-12

21-Jan-12

A4470

Electro hydraulic wellhead control panel Shipping

21 08-Jan-12

29-Jan-12

02-Jan-12

22-Jan-12

A5170

Multi phase flow meter Custom clearance & inland transportation

14 27-Jan-12

10-Feb-12

12-Jan-12

25-Jan-12

A2110

Shipping (Multi phase flow ,Chemical unjec.,Fire protec. , Survival...

60 30-Nov-11

29-Jan-12

30-Nov-11

28-Jan-12

A3990

Fire protection system Shipping

21 04-Jan-12

24-Jan-12

08-Jan-12

28-Jan-12

A3980

Chemical injection package Custom clearance & inland transportat...

14 27-Jan-12

10-Feb-12

18-Jan-12

31-Jan-12

A5200

Survival module Custom clearance & inland transportation

14 17-Jan-12

30-Jan-12

22-Jan-12

04-Feb-12

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

Finish

Electro hydraulic wellhead control panel Custom clearance & inla...

14 29-Jan-12

12-Feb-12

23-Jan-12

05-Feb-12

A2120

Custom clearance & inland transportation (Multi phase flow ,Che...

45 29-Dec-11

12-Feb-12

29-Dec-11

11-Feb-12

A5190

Fire protection system Custom clearance & inland transportation

14 25-Jan-12

07-Feb-12

29-Jan-12

11-Feb-12

A4690

Turret crane Shipping

14 06-Mar-12

20-Mar-12

20-Feb-12

04-Mar-12

A5180

Turret crane Custom clearance & inland transportation

14 20-Mar-12

03-Apr-12

05-Mar-12

18-Mar-12

A4460

HIPPS Shipping

21 24-Mar-12

14-Apr-12

18-Mar-12

07-Apr-12

A2280

HIPPS Custom clearance & inland transportation

14 14-Apr-12

28-Apr-12

08-Apr-12

21-Apr-12

226 12-Apr-11

07-Mar-12

12-Apr-11 A

07-Mar-12

129 12-Apr-11

17-Oct-11

12-Apr-11 A

17-Oct-11

PURCHASING
PURCHA
A3880

Safety equipment and life saving Bidding

10 12-Apr-11

26-Apr-11

12-Apr-11 A

26-Apr-11 A

A3910

Service water pumps Bidding

15 25-Apr-11

17-May-11

25-Apr-11 A

10-May-11 A

A3900

Flame arrestor Bidding

15 27-Apr-11

19-May-11

17-Apr-11 A

19-May-11 A

A3890

Vent stack tips Bidding

20 09-May-11

06-Jun-11

09-May-11 A

01-Jun-11 A

B1060

Electro hydraulic wellhead control panel Issue PO

5 19-Jul-11

26-Jul-11

13-Jul-11

19-Jul-11

A1370

Bidding (Service pumps,Flame arrestor,Vent ,....).

25 02-May-11

06-Jun-11

25-Apr-11 A

21-Jul-11

A4900

Service water pumps Issue Fax of commitment

18 13-Jun-11

11-Jul-11

04-Jul-11

27-Jul-11

A4870

Safety equipment and life saving Issue Fax of commitment

20 12-Jun-11

10-Jul-11

10-Jul-11

04-Aug-11

B1080

Service water pumps Issue PO

5 18-Jul-11

25-Jul-11

04-Aug-11

10-Aug-11

A4620

Monorail crane Bidding

10 28-Jul-11

11-Aug-11

31-Jul-11

11-Aug-11

A4890

Flame arrestor Issue Fax of commitment

20 23-Jun-11

21-Jul-11

24-Jul-11

18-Aug-11

B1070

Safety equipment and life saving Issue PO

5 17-Jul-11

24-Jul-11

14-Aug-11

18-Aug-11

A1380

Issue Fax of commitments(Service pumps,Flame arrestor,Vent ,....).

25 29-Jun-11

03-Aug-11

20-Jul-11

23-Aug-11

A4880

Vent stack tips Issue Fax of commitment

20 06-Jul-11

03-Aug-11

27-Jul-11

23-Aug-11

B1090

Flame arrestor Issue PO

5 28-Jul-11

04-Aug-11

28-Aug-11

06-Sep-11

B1100

Issue POs (HCU.,Sea water pumps....).

25 13-Jul-11

17-Aug-11

03-Aug-11

11-Sep-11

B1110

Vent stack tips Issue PO

5 10-Aug-11

17-Aug-11

05-Sep-11

11-Sep-11

A5230

Monorail crane Issue Fax of commitment

20 06-Sep-11

04-Oct-11

07-Sep-11

04-Oct-11

B1120

Monorail crane Issue PO

5 10-Oct-11

17-Oct-11

11-Oct-11

17-Oct-11

189 10-Jul-11

01-Feb-12

28-Jul-11

01-Feb-12

FABRICATION
FABRICA

2011
A M J Jul A S O N D

A5700

OTHER E
EQUIPMENT (Service pumps,Flame arrestor,Vent ,....).

Page 13 of 64

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

Finish

Service water pump Fabrication up to release for shipment

140 11-Jul-11

28-Nov-11

28-Jul-11

14-Dec-11

A3950

Vent stack tips Fabrication up to release for shipment

120 08-Aug-11

06-Dec-11

29-Aug-11

26-Dec-11

A3960

Flame arrestorFabrication up to release for shipment

130 21-Jul-11

28-Nov-11

19-Aug-11

26-Dec-11

A1390

Fabrication up to release for shipment (Service pumps,Flame arre...

150 10-Jul-11

07-Dec-11

05-Aug-11

01-Jan-12

A3940

Safety equipment and life saving Fabrication up to release for ship...

150 10-Jul-11

07-Dec-11

05-Aug-11

01-Jan-12

A4660

Monorail crane Fabrication up to release for shipment

120 04-Oct-11

01-Feb-12

05-Oct-11

01-Feb-12

88 15-Nov-11

07-Mar-12

11-Dec-11

07-Mar-12

A4670

Service water pump Shipping

21 28-Nov-11

19-Dec-11

15-Dec-11

04-Jan-12

A4010

Vent stack tips Shipping

21 06-Dec-11

27-Dec-11

27-Dec-11

16-Jan-12

A4020

Flame arrestor Shipping

21 28-Nov-11

19-Dec-11

27-Dec-11

16-Jan-12

A6030

Service water pump Custom clearance & inland transportation

14 21-Dec-11

04-Jan-12

07-Jan-12

20-Jan-12

A4000

Safety equipment and life saving Shipping

21 07-Dec-11

28-Dec-11

02-Jan-12

22-Jan-12

A1400

Shipping (Service pumps,Flame arrestor,Vent ,....).

50 15-Nov-11

04-Jan-12

11-Dec-11

29-Jan-12

A5510

Flame arrestor Custom clearance & inland transportation

14 19-Dec-11

02-Jan-12

17-Jan-12

30-Jan-12

A5520

Vent stack tips Custom clearance & inland transportation

14 27-Dec-11

10-Jan-12

17-Jan-12

30-Jan-12

A5500

Safety equipment and life saving Custom clearance & inland trans...

14 28-Dec-11

11-Jan-12

23-Jan-12

05-Feb-12

A1710

Custom clearance & inland transportation (Service pumps,Flame a...

35 14-Dec-11

18-Jan-12

09-Jan-12

12-Feb-12

A4700

Monorail crane Shipping

21 01-Feb-12

22-Feb-12

02-Feb-12

22-Feb-12

A6040

Monorail crane Custom clearance & inland transportation

14 22-Feb-12

07-Mar-12

23-Feb-12

07-Mar-12

318 19-Apr-11

26-Jan-12

29-Apr-11 A

01-Mar-12

307 19-Apr-11

15-Dec-11

29-Apr-11 A

15-Dec-11

PETROBEL LONG LEAD ITEMS


PETROBE
FABRICATION
FABRICA

2011
A M J Jul A S O N D

A4630

SHIPPING
SHIPPIN

Page 14 of 64

A6150

Manual Valves Fabrication up to release for shipment

240 19-Apr-11

15-Dec-11

23-Jun-11 A

12-Dec-11

A2160

Fabrication up to release for shipment

240 19-Apr-11

15-Dec-11

25-May-11 A

15-Dec-11

A4040

Micro Turbine Fabrication up to release for shipment

240 19-Apr-11

15-Dec-11

26-May-11 A

15-Dec-11

A4050

Diesel generator Fabrication up to release for shipment

240 19-Apr-11

15-Dec-11

20-Jun-11 A

15-Dec-11

A4060

E&I Module Fabrication up to release for shipment

240 19-Apr-11

15-Dec-11

21-Jun-11 A

15-Dec-11

A4070

Production Manifold Fabrication up to release for shipment

240 19-Apr-11

15-Dec-11

26-May-11 A

15-Dec-11

A4080

Shutdown and blowdown valves Fabrication up to release for ship...

240 19-Apr-11

15-Dec-11

29-Apr-11 A

15-Dec-11

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

SHIPPING
SHIPPIN

Original BL Project
Duration Start

BL Project
Finish

Start

Finish

77 15-Dec-11

26-Jan-12

16-Dec-11

01-Mar-12

Micro Turbine Custom clearance & inland transportation

14 12-Jan-12

26-Jan-12

16-Dec-11

29-Dec-11

A6060

Diesel generator Custom clearance & inland transportation

14 12-Jan-12

26-Jan-12

16-Dec-11

29-Dec-11

A4130

Shutdown and blowdown valves Shipping

21 15-Dec-11

12-Jan-12

16-Dec-11

05-Jan-12

A6160

Manual Valves Shipping

21 15-Dec-11

05-Jan-12

16-Dec-11

05-Jan-12

A4110

E&I Module Shipping

28 15-Dec-11

12-Jan-12

16-Dec-11

12-Jan-12

A4120

Production Manifold Shipping

28 15-Dec-11

12-Jan-12

16-Dec-11

12-Jan-12

A6090

Shutdown and blowdown valves & inland transportation

14 12-Jan-12

26-Jan-12

06-Jan-12

19-Jan-12

A6170

Manual Valves & inland transportation

14 05-Jan-12

19-Jan-12

06-Jan-12

19-Jan-12

A4090

Micro Turbine Shipping

28 15-Dec-11

12-Jan-12

30-Dec-11

26-Jan-12

A4100

Diesel generator Shipping

28 15-Dec-11

12-Jan-12

30-Dec-11

26-Jan-12

A6070

E&I Module Custom clearance & inland transportation

14 12-Jan-12

26-Jan-12

13-Jan-12

26-Jan-12

A6080

Production Manifold Custom clearance & inland transportation

14 12-Jan-12

26-Jan-12

13-Jan-12

26-Jan-12

A2170

Shipping

35 15-Dec-11

19-Jan-12

20-Jan-12

23-Feb-12

A2180

Custom clearance & inland transportation

25 01-Jan-12

26-Jan-12

06-Feb-12

01-Mar-12

259 13-Apr-11

11-May-12

09-Apr-11 A

21-Apr-12

111 13-Apr-11

25-Aug-11

09-Apr-11 A

15-Sep-11

PURCHASING
PURCHA

2011
A M J Jul A S O N D

A6050

E&I BULK

Page 15 of 64

A5390

Electrical Cable trays Bidding

10 02-May-11

16-May-11

10-Apr-11 A

20-Apr-11 A

A4240

Electrical Cables Bidding

10 09-May-11

23-May-11

09-Apr-11 A

25-Apr-11 A

A4390

Choke valves Bidding

20 13-Apr-11

12-May-11

10-Apr-11 A

26-Apr-11 A

A4380

Wing valves Bidding

20 13-Apr-11

12-May-11

10-Apr-11 A

02-May-11 A

A4250

Navigation aids system Bidding

10 16-May-11

30-May-11

26-Apr-11 A

16-May-11 A

A5980

Instrument & Mechanical bulk material Bidding

10 05-Jun-11

19-Jun-11

03-May-11 A

26-May-11 A

A5070

Electrical Cable trays Issue Fax of commitments

15 19-Jun-11

10-Jul-11

02-May-11 A

30-May-11 A

A4400

Loose instrument Bidding

10 29-May-11

12-Jun-11

09-Jun-11 A

20-Jun-11 A

A5810

Junction boxes Bidding

10 09-Jun-11

23-Jun-11

07-Jun-11 A

20-Jun-11 A

A4420

Instrument Cable trays Bidding

10 31-May-11

14-Jun-11

23-Jun-11 A

26-Jun-11

A5080

Electrical Cables Issue Fax of commitments

6 22-Jun-11

13-Jul-11

26-Jun-11

03-Jul-11

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

Finish

Page 16 of 64

2011
A M J Jul A S O N D

A4410

Instrument cable and cable glands Bidding

10 23-May-11

06-Jun-11

26-Jun-11

07-Jul-11

A4260

Lighting material Bidding

10 25-May-11

08-Jun-11

22-Jun-11 A

07-Jul-11

A5900

Sand & Corrosion probes Bidding

10 02-Jun-11

16-Jun-11

27-Jun-11 A

07-Jul-11

A6260

Earthing material Bidding

10 06-Jun-11

20-Jun-11

21-Jun-11 A

07-Jul-11

C1040

Electrical Cables P.O

5 20-Jul-11

27-Jul-11

04-Jul-11

10-Jul-11

A1880

Bidding

35 09-May-11

27-Jun-11

20-Apr-11 A

11-Jul-11

C1020

Electrical Cable trays P.O

5 17-Jul-11

24-Jul-11

06-Jul-11

12-Jul-11

A5030

Wing valves Issue Fax of commitments

20 13-Jun-11

11-Jul-11

26-Jun-11

21-Jul-11

A5040

Choke valves Issue Fax of commitments

15 19-Jun-11

10-Jul-11

06-Jul-11

26-Jul-11

A5100

Navigation aids system Issue Fax of commitments

15 27-Jun-11

18-Jul-11

11-Jul-11

31-Jul-11

A5990

Instrument & Mechanical bulk material Issue Fax of commitments

15 03-Jul-11

24-Jul-11

17-Jul-11

04-Aug-11

C1000

Wing valves P.O

5 18-Jul-11

25-Jul-11

31-Jul-11

04-Aug-11

C1010

Choke valves P.O

5 17-Jul-11

24-Jul-11

03-Aug-11

09-Aug-11

A5060

Instrument cable and cable glands Issue Fax of commitments

15 20-Jun-11

11-Jul-11

24-Jul-11

11-Aug-11

A5830

Junction boxes Issue Fax of commitments

15 07-Jul-11

28-Jul-11

24-Jul-11

11-Aug-11

A5050

Loose instrument Issue Fax of commitments

15 26-Jun-11

17-Jul-11

25-Jul-11

14-Aug-11

A5090

Instrument Cable trays Issue Fax of commitments

10 30-Jun-11

14-Jul-11

02-Aug-11

15-Aug-11

C1060

Navigation aids system P.O

5 26-Jul-11

02-Aug-11

09-Aug-11

15-Aug-11

C1030

Instrument & Mechanical bulk material P.O

5 31-Jul-11

07-Aug-11

14-Aug-11

18-Aug-11

A5110

Lighting material Issue Fax of commitments

15 06-Jul-11

27-Jul-11

07-Aug-11

25-Aug-11

A5910

Sand & Corrosion probes Issue Fax of commitments

15 11-Jul-11

01-Aug-11

07-Aug-11

25-Aug-11

A6270

Earthing material Issue Fax of commitments

15 18-Jul-11

08-Aug-11

07-Aug-11

25-Aug-11

C1070

Instrument cable and cable glands P.O

5 18-Jul-11

25-Jul-11

21-Aug-11

25-Aug-11

C1050

Junction boxes P.O

5 04-Aug-11

11-Aug-11

21-Aug-11

25-Aug-11

A1890

E&I Bulk issue Fax of commitments

30 14-Jul-11

25-Aug-11

18-Jul-11

28-Aug-11

C1090

Loose instrument P.O

5 24-Jul-11

31-Jul-11

22-Aug-11

28-Aug-11

C1100

Instrument Cable trays P.O

5 21-Jul-11

28-Jul-11

23-Aug-11

29-Aug-11

C1080

Lighting material P.O

5 15-Aug-11

22-Aug-11

07-Sep-11

13-Sep-11

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

Finish

Sand & Corrosion probes P.O

5 08-Aug-11

15-Aug-11

07-Sep-11

13-Sep-11

C1120

Earthing material P.O

5 17-Aug-11

24-Aug-11

11-Sep-11

15-Sep-11

267 10-Jul-11

06-Apr-12

25-Jun-11

17-Mar-12

100 10-Jul-11

18-Oct-11

25-Jun-11

02-Oct-11

A4530

Electrical Cable trays Fabrication up to release for shipment

A6000

Instrument & Mechanical bulk material Fabrication up to release fo...

90 24-Jul-11

01-Nov-11

05-Aug-11

02-Nov-11

A5820

Junction boxes Fabrication up to release for shipment

90 28-Jul-11

05-Nov-11

12-Aug-11

09-Nov-11

A4280

Instrument Cable trays Fabrication up to release for shipment

90 14-Jul-11

22-Oct-11

16-Aug-11

13-Nov-11

A4270

Electrical Cables Fabrication up to release for shipment

140 17-Jul-11

04-Dec-11

06-Jul-11

22-Nov-11

A4520

Instrument cable and cable glands Fabrication up to release for shi...

120 11-Jul-11

28-Nov-11

12-Aug-11

09-Dec-11

A4290

Navigation aids system Fabrication up to release for shipment

140 18-Jul-11

05-Dec-11

01-Aug-11

18-Dec-11

A4300

Lighting material Fabrication up to release for shipment

120 27-Jul-11

14-Dec-11

26-Aug-11

23-Dec-11

A6280

Earthing material Fabrication up to release for shipment

120 08-Aug-11

26-Dec-11

26-Aug-11

23-Dec-11

A5920

Sand & Corrosion probes Fabrication up to release for shipment

135 01-Aug-11

29-Dec-11

26-Aug-11

07-Jan-12

A4510

Loose instrument Fabrication up to release for shipment

155 17-Jul-11

13-Jan-12

15-Aug-11

16-Jan-12

A1900

E&I Bulk Fabrication up to release for shipment

180 20-Jul-11

16-Jan-12

22-Jul-11

17-Jan-12

A4500

Choke valves Fabrication up to release for shipment

210 10-Jul-11

05-Apr-12

27-Jul-11

21-Feb-12

A4490

Wing valves Fabrication up to release for shipment

240 11-Jul-11

06-Apr-12

22-Jul-11

17-Mar-12

136 18-Oct-11

11-May-12

03-Oct-11

21-Apr-12

SHIPPING

2011
A M J Jul A S O N D

C1110

FABRICATION
FABRICA

Page 17 of 64

A4320

Electrical Cable trays Shipping

21 18-Oct-11

08-Nov-11

03-Oct-11

23-Oct-11

A4580

Electrical Cable trays Custom clearance & inland transportation

14 08-Nov-11

22-Nov-11

24-Oct-11

06-Nov-11

A5750

Instrument Cable trays Shipping

7 22-Oct-11

29-Oct-11

14-Nov-11

20-Nov-11

A6010

Instrument & Mechanical bulk material Shipping

21 01-Nov-11

22-Nov-11

03-Nov-11

23-Nov-11

A1910

1st batch of the E&I Bulk Shipping

21 05-Nov-11

26-Nov-11

10-Nov-11

30-Nov-11

A5840

Junction boxes Shipping

21 05-Nov-11

26-Nov-11

10-Nov-11

30-Nov-11

A5760

Instrument Cable trays Custom clearance & inland transportation

14 29-Oct-11

12-Nov-11

21-Nov-11

04-Dec-11

A6020

Instrument & Mechanical bulk material Custom clearance & inland ...

14 22-Nov-11

06-Dec-11

24-Nov-11

07-Dec-11

A4310

Electrical Cables Shipping

21 04-Dec-11

25-Dec-11

23-Nov-11

13-Dec-11

A1920

1st batch of the E&I Bulk Custom clearance & inland transportation

14 26-Nov-11

10-Dec-11

01-Dec-11

14-Dec-11

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

Finish

Junction boxes Custom clearance & inland transportation

14 26-Nov-11

10-Dec-11

01-Dec-11

14-Dec-11

A5630

Electrical Cables Custom clearance & inland transportation

14 25-Dec-11

08-Jan-12

14-Dec-11

27-Dec-11

A4570

Instrument cable and cable glands Shipping

21 28-Nov-11

19-Dec-11

10-Dec-11

30-Dec-11

A4330

Navigation aids system Shipping

21 05-Dec-11

26-Dec-11

19-Dec-11

08-Jan-12

A4340

Lighting material Shipping

21 14-Dec-11

04-Jan-12

24-Dec-11

13-Jan-12

A5740

Instrument cable and cable glands Custom clearance & inland tran...

14 19-Dec-11

02-Jan-12

31-Dec-11

13-Jan-12

A5640

Navigation aids system Custom clearance & inland transportation

14 26-Dec-11

09-Jan-12

09-Jan-12

22-Jan-12

A6300

Earthing material Shipping

21 26-Dec-11

24-Jan-12

25-Dec-11

22-Jan-12

A5650

Lighting material Custom clearance & inland transportation

14 04-Jan-12

18-Jan-12

14-Jan-12

27-Jan-12

A5930

Sand & Corrosion probes Shipping

21 29-Dec-11

19-Jan-12

08-Jan-12

28-Jan-12

A4560

Loose instrument Shipping

21 13-Jan-12

10-Feb-12

17-Jan-12

06-Feb-12

A5940

Sand & Corrosion probes Custom clearance & inland transportation

14 19-Jan-12

02-Feb-12

29-Jan-12

11-Feb-12

A6290

Earthing material Custom clearance & inland transportation

14 24-Jan-12

14-Feb-12

23-Jan-12

12-Feb-12

A2020

2nd batch of the E&I Bulk Shipping

40 06-Jan-12

15-Feb-12

08-Jan-12

16-Feb-12

A5860

Loose instrument Custom clearance & inland transportation

14 10-Feb-12

24-Feb-12

07-Feb-12

20-Feb-12

A2030

2nd batch of the E&I Bulk Custom clearance & inland transportation

28 02-Feb-12

01-Mar-12

04-Feb-12

02-Mar-12

A6340

Choke valves Shipping

21

22-Feb-12

21-Mar-12

A4540

Wing valves Shipping

21 06-Apr-12

27-Apr-12

18-Mar-12

07-Apr-12

A4550

Choke valves Custom clearance & inland transportation

21 05-Apr-12

26-Apr-12

22-Mar-12

11-Apr-12

A5730

Wing valves Custom clearance & inland transportation

14 27-Apr-12

11-May-12

08-Apr-12

21-Apr-12

220 07-Apr-11

10-Feb-12

07-Apr-11 A

22-Feb-12

PURCHASING
PURCHA

2011
A M J Jul A S O N D

A5850

PIPING BULK
BU

Page 18 of 64

106 07-Apr-11

27-Jul-11

07-Apr-11 A

07-Sep-11

A4930

Piping Bulk Bidding

15 07-Apr-11

28-Apr-11

07-Apr-11 A

28-Apr-11 A

A5440

Insulation Joint Bidding

20 20-Apr-11

19-May-11

29-May-11 A

30-May-11 A

A1940

Piping Bulk Issue Fax of commitment

14 31-May-11

20-Jun-11

05-Jun-11 A

22-Jun-11 A

A5450

Injection fitting Bidding

20 24-Apr-11

23-May-11

24-Apr-11 A

26-Jun-11

C2000

Piping Bulk P.O

5 27-Jun-11

04-Jul-11

03-Jul-11

07-Jul-11

A5470

Insulation Joint Issue Fax of commitment

20 12-Jun-11

10-Jul-11

25-Jul-11

21-Aug-11

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

Finish

20 15-Jun-11

13-Jul-11

25-Jul-11

21-Aug-11

Injection fitting Issue Fax of commitment

C2010

Insulation Joint P.O

5 17-Jul-11

24-Jul-11

29-Aug-11

07-Sep-11

C2020

Injection fitting P.O

5 20-Jul-11

27-Jul-11

29-Aug-11

07-Sep-11

208 20-Jun-11

06-Jan-12

25-Jun-11

18-Jan-12

A1950

piping Bulk Fabrication up to release for shipment

200 20-Jun-11

06-Jan-12

25-Jun-11

10-Jan-12

A5570

Insulation Joint Fabrication up to release for shipment

150 10-Jul-11

07-Dec-11

22-Aug-11

18-Jan-12

A5580

Injection fitting Fabrication up to release for shipment

150 13-Jul-11

10-Dec-11

22-Aug-11

18-Jan-12

136 10-Oct-11

10-Feb-12

10-Oct-11

22-Feb-12

SHIPPING
A1960

1st batch of the piping Bulk Shipping

21 10-Oct-11

31-Oct-11

10-Oct-11

30-Oct-11

A1970

1st batch of the piping Bulk Custom clearance & inland transport...

14 31-Oct-11

14-Nov-11

31-Oct-11

13-Nov-11

A2050

2nd batch of the piping Bulk Shipping

21 17-Nov-11

08-Dec-11

22-Nov-11

12-Dec-11

A2060

2nd batch of the piping Bulk Custom clearance & inland transport...

14 08-Dec-11

22-Dec-11

13-Dec-11

26-Dec-11

A2040

Last batch of the piping Bulk Shipping

21 06-Jan-12

27-Jan-12

11-Jan-12

31-Jan-12

A5590

Insulation Joint Shipping

21 07-Dec-11

28-Dec-11

19-Jan-12

08-Feb-12

A5620

Injection fitting Shipping

21 10-Dec-11

31-Dec-11

19-Jan-12

08-Feb-12

A2070

Last batch of the piping Bulk Custom clearance & inland transport...

14 27-Jan-12

10-Feb-12

01-Feb-12

14-Feb-12

A5600

Insulation Joint Custom clearance & inland transportation

14 28-Dec-11

11-Jan-12

09-Feb-12

22-Feb-12

A5610

Injection fitting Custom clearance & inland transportation

14 31-Dec-11

14-Jan-12

09-Feb-12

22-Feb-12

26 31-Mar-11

30-Apr-11

25-Jun-11

24-Jul-11

26 31-Mar-11

30-Apr-11

25-Jun-11

24-Jul-11

30 02-Jun-12

02-Jul-12

01-Jun-12

30-Jun-12

30 02-Jun-12

02-Jul-12

01-Jun-12

30-Jun-12

315 31-Mar-11

04-Jul-12

28-Mar-11 A

02-Jul-12

W.P.5: DEC
DECK & TSF FABRICATION
PTJ2200

Deck commisioning (Onshore)

W.P.9: OFF
OFFSHORE HOOK-UP, COMMISSIONING AND ASSISTANCE TO STA...
A2370

Deck Offshore Commissioning

TECNOMARE
TECNOMAR
2

Start of project

TECNOMARE DRIVING MILESTONES


TECNOMAR
STRUCTURAL
STRUCTU

0 31-Mar-11

2011
A M J Jul A S O N D

A5460

FABRICATION
FABRICA

Page 19 of 64

31-Mar-11 A

293 31-Mar-11

04-Jun-12

28-Mar-11 A

03-Jun-12

293 31-Mar-11

04-Jun-12

31-Mar-11 A

03-Jun-12

19

Soil Data (PTB)

0 31-Mar-11

31-Mar-11 A

16

input - deck plot plan & equipment list IFD (ENPPI)

0 24-Apr-11

24-Apr-11 A

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

Input- T&I contract ITT (PTB)

0 26-Jun-11

26-Jun-11*

64

Pressure Vessels Vendor Print out review (ENPPI)

0 31-Mar-11

26-Jun-11

69

Piping bulk & Valves MRP's (ENPPI)

0 27-Jun-11

03-Jul-11

54

Process Commodities MRP's (ENPPI)

0 29-Aug-11

05-Sep-11

17

input - deck final plot plan & equipment list (ENPPI)

0 21-Sep-11

21-Sep-11

13

input - crane barge (PTB)

0 24-Sep-11

24-Sep-11*

14

input - launching barge for jacket (PTB)

0 24-Sep-11

24-Sep-11*

79

Mechanical Vendor print review (ENPPI)

0 25-Dec-11

15-Jan-12

300

As built Markup documents (PTJ) for Jacket

0 07-May-12

07-May-12*

Load out structures

0 10-May-12

09-May-12*

310

As built Markup documents (PTJ) for deck

0 04-Jun-12

03-Jun-12

160 31-Mar-11

23-Nov-11

28-Mar-11 A

22-Nov-11

276

Plot Plan IFD (ENPPI)

24-Apr-11

28-Mar-11 A

106

Review of Basic Documents (Consortium feed endorsement)

31-Mar-11

31-Mar-11 A

158

SSIV vendor documents (PTB)

31-Mar-11

31-Mar-11 A

107

P & ID's ( IFD ) (ENPPI/PTB for LLI)

17-Apr-11

27-Apr-11 A

148

fire and gas requirements- HSE philosophy Fire Fighting Safety La...

24-Apr-11

02-May-11 A

112

C & E - issue for Design (ENPPI/PTB for LLI)

16-May-11

08-May-11 A

206

junction box wiring diagram for control & safety system IFD (ENPPI)

09-Jun-11

08-May-11 A

302

T4 for Radio Bridge (PTB)

08-Jun-11

08-Jun-11 A

128

Electrical interface with PLC/RTU (I/O list) (ENPPI)

30-May-11

08-Jun-11 A

138

Control and safety cable routing IFD (ENPPI)

09-Jun-11

20-Jun-11 A

136

Instrument TDS (ENPPI)

07-Jun-11

26-Jun-11

208

P & ID's ( IFC) (ENPPI/PTB for LLI)

14-Sep-11

13-Sep-11

286

Plot Plan IFC (ENPPI)

21-Sep-11

20-Sep-11

117

C & E - Issue for Construction (ENPPI/PTB for LLI)

21-Sep-11

20-Sep-11

198

3D model Review 90% Report (ENPPI)

23-Nov-11

22-Nov-11

W.P.1: PRO
PROJECT MANAGEMENT

444 31-Mar-11

17-Jun-12

2011
A M J Jul A S O N D

59

INSTRUMENTATION
INSTRUME

Finish

Page 20 of 64

31-Mar-11 A

15-Jun-12

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

Finish

technical coordination

444 31-Mar-11

17-Jun-12

31-Mar-11 A

15-Jun-12

43

engineering assistance to fab, load out & transportation home office

428 15-Apr-11

17-Jun-12

14-Apr-11 A

15-Jun-12

305

project services

444 31-Mar-11

17-Jun-12

31-Mar-11 A

15-Jun-12

315 31-Mar-11

04-Jul-12

31-Mar-11 A

02-Jul-12

196 31-Mar-11

01-Feb-12

31-Mar-11 A

31-Jan-12

STRUCTURAL
STRUCTU

306 31-Mar-11

21-Jun-12

31-Mar-11 A

19-Jun-12

MILESTONES
MILESTO

209 31-Mar-11

01-Feb-12

31-Mar-11 A

31-Jan-12

20

weight control

jacket main structure AFC dwg.s + MTO

0 31-Mar-11

31-Mar-11 A

deck AFC dwg.s + MTO main structure

0 04-Jul-11

12-Jul-11

jacket secondary structures AFC dwg.s + MTO

0 31-Jul-11

31-Jul-11*

deck AFC + MTO secondary structures (no equip. supports)

0 25-Sep-11

25-Sep-11

28

Weight Control Report 1st issue

0 25-Sep-11

25-Sep-11

deck AFC + MTO equip. supports

0 24-Oct-11

23-Oct-11

10

weight control report 2nd issue

0 24-Oct-11

23-Oct-11

11

weight control report 3rd issue

0 01-Feb-12

31-Jan-12

DECK DETAIL
DE
DESIGN

127 24-Apr-11

24-Oct-11

21-Apr-11 A

23-Oct-11

31

deck in service final analysis

15 24-Apr-11

16-May-11

21-Apr-11 A

09-Jun-11 A

29

deck & helideck lifting final analysis

20 24-Apr-11

23-May-11

21-Apr-11 A

15-Jun-11 A

32

deck seismic analysis

15 16-May-11

06-Jun-11

15-May-11 A

16-Jun-11 A

30

deck & helideck load out & transportation structural analysis updat...

15 23-May-11

13-Jun-11

22-May-11 A

22-Jun-11 A

33

deck & helideck joints local checks

15 13-Jun-11

04-Jul-11

23-Jun-11 A

11-Jul-11

34

deck main structure AFC dwg.s & MTO

50 24-Apr-11

04-Jul-11

24-Apr-11 A

11-Jul-11*

35

deck secondary structures design (no equipment support)

50 04-Jul-11

25-Sep-11

20-Jun-11 A

18-Sep-11

36

deck secondary structure AFC dwg.s & MTO (no equipment support)

100 24-Apr-11

25-Sep-11

24-Apr-11 A

22-Sep-11

45

Deck equipment supports design

15 21-Sep-11

13-Oct-11

21-Sep-11

12-Oct-11

44

Deck equipment supports & AFC dwg and MTO

22 21-Sep-11

24-Oct-11

21-Sep-11

23-Oct-11

178 25-Sep-11

21-Jun-12

25-Sep-11

19-Jun-12

105 25-Sep-11

06-Mar-12

25-Sep-11

06-Mar-12*

ASSISTANCE TO COMPANY
ASSISTAN
38

liaison with Certifying Authority

2011
A M J Jul A S O N D

18

W.P.2: ENG
ENGINEERING

Page 21 of 64

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

39

liason with Marine Warranty Surveyor

FOLLOW-ON OF T&I CONTRACT


FOLLOW
Analysis Finalization

Original BL Project
Duration Start

BL Project
Finish

Start

Finish

105 23-Jan-12

21-Jun-12

22-Jan-12

19-Jun-12

293 31-Mar-11

21-Jun-12

21-Apr-11 A

19-Jun-12

101 25-Sep-11

01-Mar-12

25-Sep-11

29-Feb-12

jacket launching naval final analysis

20 25-Sep-11

20-Oct-11

25-Sep-11

20-Oct-11

24

jacket launching structural analysis updating

15 23-Oct-11

10-Nov-11

23-Oct-11

10-Nov-11

25

jacket docking naval final analysis

20 13-Nov-11

08-Dec-11

13-Nov-11

08-Dec-11

27

jacket free floating & upending naval analysis - final analysis

20 01-Feb-12

01-Mar-12

31-Jan-12

29-Feb-12

293 31-Mar-11

21-Jun-12

21-Apr-11 A

19-Jun-12

49

ITT scope of work for T&I Contract

20 31-Mar-11

28-Apr-11

21-Apr-11 A

17-Jul-11

50

technical evaluation of the offers, clarification meetings & KOM

50 26-Jun-11

14-Sep-11

18-Jul-11

06-Oct-11

52

installation - transportation & installation procedures/manuals

39 17-Nov-11

29-Jan-12

16-Nov-11

25-Jan-12

51

post-award assistance

120 15-Sep-11

19-Mar-12

09-Oct-11

11-Apr-12

53

installation - engineering assistance during installation (at home of...

30 10-May-12

21-Jun-12

09-May-12

19-Jun-12

205 31-Mar-11

26-Jan-12

31-Mar-11 A

25-Jan-12

205 31-Mar-11

26-Jan-12

31-Mar-11 A

25-Jan-12

205 31-Mar-11

26-Jan-12

31-Mar-11 A

25-Jan-12

INSTRUMENTATION
INSTRUME
PLC/RTU - Telecom System
CONTROL
CONTRO

2011
A M J Jul A S O N D

26

Follow-up

Page 22 of 64

108

Review of PLC/RTU -ICSS Spec's

20 31-Mar-11

28-Apr-11

31-Mar-11 A

28-Apr-11 A

336

Junction Box wiring Diagram for SSIV issue for Design

21 17-Apr-11

17-May-11

14-Apr-11 A

17-May-11 A

246

F&G system layout issue for Design

22 02-May-11

01-Jun-11

21-Apr-11 A

24-May-11 A

156

ESD System Layout- issue for design

22 02-May-11

01-Jun-11

21-Apr-11 A

25-May-11 A

111

Functional / logic diagrams - issue for design

35 26-Apr-11

15-Jun-11

26-Apr-11 A

20-Jun-11 A

346

Junction Box wiring diagram for Seth ESD Pushbuttons issue for d...

26 18-May-11

23-Jun-11

10-May-11 A

22-Jun-11 A

188

Operator console - issue for design

18 29-May-11

22-Jun-11

22-May-11 A

22-Jun-11 A

110

I / O Database - issue for design

17 23-May-11

15-Jun-11

10-May-11 A

26-Jun-11

113

Simplified loop diagrams - issue for design

16 24-May-11

15-Jun-11

25-May-11 A

26-Jun-11

133

ESD/F&G - cable list issue for design

20 01-Jun-11

29-Jun-11

25-May-11 A

26-Jun-11

168

F&G cable routing layout - issue for design

22 09-Jun-11

11-Jul-11

01-Jun-11 A

19-Jul-11

178

ESD Pushbuttons cable routing layout - issue for design

22 09-Jun-11

11-Jul-11

01-Jun-11 A

19-Jul-11

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

Finish

Functional / Logic diagrams - issue for construction

19 14-Sep-11

11-Oct-11

13-Sep-11

10-Oct-11

356

Junction Box wiring Diagram for SSIV issue for Construction

18 14-Sep-11

11-Oct-11

14-Sep-11

10-Oct-11

266

F&G system layout issue for Construction

18 21-Sep-11

18-Oct-11

21-Sep-11

17-Oct-11

386

ESD System Layout- issue for construction

18 21-Sep-11

18-Oct-11

21-Sep-11

17-Oct-11

115

I / O database - issue for construction

20 27-Sep-11

25-Oct-11

26-Sep-11

24-Oct-11

118

Simplified loop diagrams - issue for construction

14 12-Oct-11

01-Nov-11

11-Oct-11

31-Oct-11

121

Operator Console Layout - issue for construction

18 25-Oct-11

20-Nov-11

24-Oct-11

17-Nov-11

396

Junction Box wiring diagram for Seth ESD Pushbuttons issue for c...

21 28-Nov-11

26-Dec-11

28-Nov-11

26-Dec-11

236

F&G cable routing layout- issue for construction

23 23-Nov-11

11-Jan-12

22-Nov-11

10-Jan-12

326

ESD Pushbuttons cable routing layout- issue for construction

29 23-Nov-11

19-Jan-12

22-Nov-11

18-Jan-12

131

ESD / F&G - cable list - issue for construction

18 02-Jan-12

26-Jan-12

02-Jan-12

25-Jan-12

105 10-Apr-11

18-Aug-11

10-Apr-11 A

15-Sep-11

256

Review of Telecom Specs

23 10-Apr-11

11-May-11

10-Apr-11 A

10-May-11 A

166

J. B Wiring Diagram for Telecom System for Seth

23 08-May-11

07-Jun-11

10-May-11 A

20-May-11 A

126

Telecom System Layout for Seth

23 28-Apr-11

31-May-11

24-Apr-11 A

24-May-11 A

296

Telecommunication Cables List

20 31-May-11

28-Jun-11

19-May-11 A

21-Jun-11 A

226

Telecom cable routing layout

22 12-Jun-11

12-Jul-11

21-Jun-11 A

19-Jul-11

366

TDS for electrical bulk material/ Telecom Bulks

25 07-Jun-11

12-Jul-11

05-Jul-11

22-Aug-11

196

Electrical Bulk Material Requisition for Telecom Sys. Seth

23 03-Jul-11

16-Aug-11

31-Jul-11

13-Sep-11

306

SOW of Modification on El Gamil Plant

24 04-Jul-11

18-Aug-11

14-Aug-11

15-Sep-11

35 08-Jun-11

28-Jul-11

15-May-11 A

15-Aug-11

RADIO LINK
LI
ON T4
186

J. B Wiring Diagram for Telecom System for Temsah - 4

23 08-Jun-11

10-Jul-11

15-May-11 A

20-Jul-11

176

Telecom System Layout for Temsah - 4

23 08-Jun-11

10-Jul-11

26-Jun-11

26-Jul-11

297

SOW of Modification of Bridge Platform

24 27-Jun-11

28-Jul-11

20-Jun-11 A

15-Aug-11

114 31-May-11

13-Dec-11

26-Jun-11

13-Dec-11

114 31-May-11

13-Dec-11

26-Jun-11

13-Dec-11

41 07-May-12

04-Jul-12

07-May-12

02-Jul-12

22 07-May-12

05-Jun-12

07-May-12

05-Jun-12

TECHNICAL FOLLOW-UP
TECHNIC
122

Vendor Print Review

AS-BUILT DRAWINGS
46

template, piles, jacket

2011
A M J Jul A S O N D

116

TELECOM
TELECO

Page 23 of 64

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID
47

Activity Name
deck, helideck & flare

SUBSEA S
SYSTEM
103

Vendor Print Review

W.P.3: PROCUREMENT
PRO
SERVICES & MATERIAL SUPPLY
PLC/RTU

Original BL Project
Duration Start

BL Project
Finish

Start

Finish

30 04-Jun-12

04-Jul-12

03-Jun-12

02-Jul-12

119 31-Mar-11

28-Sep-11

31-Mar-11 A

27-Sep-11

119 31-Mar-11

28-Sep-11

31-Mar-11 A

27-Sep-11

269 31-Mar-11

29-Apr-12

31-Mar-11 A

26-Apr-12

261 13-Apr-11

29-Apr-12

13-Apr-11 A

26-Apr-12

15 13-Apr-11

04-May-11

13-Apr-11 A

03-May-11 A

Technical Evaluation for PLC/RTU

143

Revised commercial submission by supplier

5 05-May-11

11-May-11

05-May-11 A

11-May-11 A

144

Commercial Evaluation

5 12-May-11

18-May-11

12-May-11 A

18-May-11 A

145

PO issuance for PLC/RTU

9 19-May-11

31-May-11

19-May-11 A

31-May-11 A

195

Submital of C&E IFD , Instrument commodities vendor print review...

04-Sep-11

14-Aug-11

185

Submital of I/O list IFD, TDS, JB wiring diag to th PLC/RTU Vendor

04-Sep-11

18-Aug-11

376

FAT Test

146

Expediting & Inspection for PLC/RTU

216
137

11 20-Dec-11

22-Jan-12

09-Jan-12

23-Jan-12

133 20-Jun-11

22-Jan-12

15-Jun-11 A

23-Jan-12

Delivery to Construction Yard

28 23-Jan-12

23-Feb-12

24-Jan-12

25-Feb-12

Onshore Precommissioning / Commissioning Assistance

42 11-Mar-12

29-Apr-12

10-Mar-12

26-Apr-12

11-Jan-12

31-Jul-11

19-Jan-12

7 13-Jul-11

24-Jul-11

31-Jul-11

09-Aug-11

10 24-Jul-11

07-Aug-11

09-Aug-11

23-Aug-11

116 13-Jul-11

189

RFQ Issuance for Telecom materials

190

Bidding for Telecom materials

241

Technical Evaluation for Telecom materials

7 07-Aug-11

16-Aug-11

23-Aug-11

01-Sep-11

202

Revised commercial submission by supplier

7 16-Aug-11

25-Aug-11

01-Sep-11

12-Sep-11

213

Commercial Evaluation

5 25-Aug-11

01-Sep-11

12-Sep-11

19-Sep-11

214

PO issuance for Telecom materials

3 01-Sep-11

06-Sep-11

19-Sep-11

22-Sep-11

235

Expediting & Inspection for Telecom materials

56 06-Sep-11

23-Nov-11

22-Sep-11

11-Dec-11

265

Transportation to site

28 23-Nov-11

10-Jan-12

11-Dec-11

18-Jan-12

275

Delivery to yard

GROUT SE
SEALS

2011
A M J Jul A S O N D

142

TELECOM BULK MATERIALS

Page 24 of 64

11-Jan-12

19-Jan-12

119 31-Mar-11

28-Sep-11

31-Mar-11 A

28-Sep-11

150

Bidding for G S

5 31-Mar-11

07-Apr-11

31-Mar-11 A

07-Apr-11 A

151

Technical Evaluation for G S

5 10-Apr-11

14-Apr-11

10-Apr-11 A

14-Apr-11 A

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

Finish

Revised commercial submission by supplier

5 17-Apr-11

21-Apr-11

17-Apr-11 A

21-Apr-11 A

153

Commercial Evaluation

5 24-Apr-11

28-Apr-11

24-Apr-11 A

28-Apr-11 A

154

PO issuance for G S

11 02-May-11

16-May-11

02-May-11 A

16-May-11 A

155

Expediting & Inspection for G S

68 17-May-11

31-Aug-11

25-May-11 A

31-Aug-11

165

Transportation to site

20 01-Sep-11

28-Sep-11

01-Sep-11

28-Sep-11

175

Delivery to yard

SHOCK CELLS
CE

28-Sep-11

28-Sep-11

117 31-Mar-11

28-Sep-11

31-Mar-11 A

26-Sep-11

5 31-Mar-11

07-Apr-11

31-Mar-11 A

07-Apr-11 A

15 10-Apr-11

28-Apr-11

10-Apr-11 A

28-Apr-11 A

179

RFQ Issuance for Shock Cells

180

Bidding for Shock Cells

191

Technical Evaluation for Shock Cells

7 02-May-11

10-May-11

02-May-11 A

10-May-11 A

192

Revised commercial submission by supplier

5 11-May-11

17-May-11

11-May-11 A

17-May-11 A

203

Commercial Evaluation

7 18-May-11

26-May-11

18-May-11 A

26-May-11 A

204

PO issuance for Shock Cells

3 29-May-11

31-May-11

25-May-11 A

29-May-11 A

225

Expediting & Inspection for Shock Cells

57 01-Jun-11

31-Aug-11

30-May-11 A

29-Aug-11

245

Transportation to site

20 01-Sep-11

28-Sep-11

30-Aug-11

26-Sep-11

255

Delivery to yard

W.P.9: OFF
OFFSHORE HOOK-UP, COMMISSIONING AND ASSISTANCE TO STA...
ONSHORE FACILITIES

28-Sep-11

26-Sep-11

50 19-Apr-12

17-Jun-12

19-Apr-12

17-Jun-12

50 19-Apr-12

17-Jun-12

19-Apr-12

17-Jun-12

A1650

Installation Telephone System Uopgrading in El Gamil Plant

30 19-Apr-12

24-May-12

19-Apr-12*

24-May-12

A1640

Installation of Radio Link Upgrading in El gamil Plant

30 19-Apr-12

24-May-12

19-Apr-12

24-May-12

A1620

Installation of DCS Node Upgrading in El gamil Plant

30 19-Apr-12

24-May-12

19-Apr-12

24-May-12

A1630

Installation of CCTV Upgrading in El gamil Plant

30 19-Apr-12

24-May-12

19-Apr-12

24-May-12

A1040

Connecting cables (Including Emergency, control and F&G signals)

30 13-May-12

17-Jun-12

13-May-12

17-Jun-12

335 31-Mar-11

31-Jul-12

31-Mar-11 A

31-Jul-12

340 31-Mar-11

01-Mar-12

31-Mar-11 A

02-Mar-12

339 31-Mar-11

01-Mar-12

31-Mar-11 A

02-Mar-12

PETROJET
PETROJET DRIVING MILESTONES
PROCUREMENT
PROCURE

2011
A M J Jul A S O N D

152

Page 25 of 64

PTJ1000

Structural material 1st & 2 nd batch (jacket primary, pile & deck leg...

0 31-Mar-11

31-Mar-11 A

PTJ1015

Structural material 3 rd batch (PDT) (PTB)

0 28-Apr-11

28-Apr-11 A

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

Finish

Structural material 4 rd batch, deck primary (main beams, legs, no...

0 21-May-11

30-Apr-11 A

PTJ1020

Structural material 5 th batch (jacket secondary & deck secondary)...

0 31-Aug-11

31-Aug-11*

PTJ1080

Piping bulk material (1st batch) (ENPPI)

0 14-Nov-11

14-Nov-11

PTJ1110

E & I 1st batch) (ENPPI)

0 10-Dec-11

15-Dec-11

PTJ1100

Start receiving equipment (ENPPI)

0 17-Dec-11

12-Jan-12

PTJ1120

Equipment (100%) (PTB)

24-Jan-12

24-Jan-12*

PTJ4010

Equipment by (100%) (ENPPI)

12-Feb-12

11-Feb-12

PTJ4000

Piping bulk material (Last batch) (ENPPI)

10-Feb-12

14-Feb-12

PTJ4020

E & I (Last batch) (ENPPI)

01-Mar-12

02-Mar-12

234 31-Mar-11

20-Nov-11

31-Mar-11 A

PTJ150

Pre-drilling template AFC dwg's (by techno)

0 31-Mar-11

31-Mar-11 A

PTJ100

Jacket main structure AFC dwg's (by techno)

0 31-Mar-11

31-Mar-11 A

PTJ110

Deck main structure AFC dwg's (by techno)

0 04-Jul-11

15-Apr-11 A

PTJ140

Jacket secondary structure AFC dwg's (by techno)

0 31-Jul-11

31-Jul-11

PTJ130

E & I AFC dwg's (by ENPPI)

0 16-Nov-11

16-Nov-11

PTJ120

Piping AFC dwg's (by ENPPI)

0 20-Nov-11

18-Nov-11

W.P.1: PRO
PROJECT MANAGEMENT
PTJ000

Project managment

W.P.2: ENG
ENGINEERING
JACKET
PTJ2170

Jacket main structure mark up drawing drawing

TSF
PTJ2240

Rec final weight & dimension for static equipment

PTJ2190

TSF mark up drawing

DECK
PTJ2180

Deck structure mark up drawing

W.P.4: SUBSTRUCTURES
SUB
(PILES, JACKET & PDT) FABRICATION
JACKET STRUCTURE
S
FABRICATION

18-Nov-11

490 31-Mar-11

31-Jul-12

31-Mar-11 A

31-Jul-12

490 31-Mar-11

31-Jul-12

31-Mar-11 A

31-Jul-12

222 15-Sep-11

04-Jun-12

15-Sep-11

02-Jun-12

15 01-Apr-12

17-Apr-12

01-Apr-12

17-Apr-12

15 01-Apr-12

17-Apr-12

01-Apr-12

17-Apr-12

222 15-Sep-11

04-Jun-12

15-Sep-11

02-Jun-12

2011
A M J Jul A S O N D

PTJ1010

DESIGN

Page 26 of 64

15-Sep-11

15-Sep-11*

21 10-May-12

04-Jun-12

09-May-12

02-Jun-12

16 10-May-12

29-May-12

09-May-12

27-May-12

16 10-May-12

29-May-12

09-May-12

27-May-12

240 31-Mar-11

15-Mar-12

31-Mar-11 A

15-Mar-12

240 31-Mar-11

15-Mar-12

31-Mar-11 A

15-Mar-12

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

MAIN STR
STRUCTURE FABRICATION
General

Original BL Project
Duration Start

BL Project
Finish

Start

Finish

259 31-Mar-11

23-Feb-12

31-Mar-11 A

29-Jan-12

259 31-Mar-11

23-Feb-12

31-Mar-11 A

29-Jan-12

0 31-Mar-11

PTJ2210 Jacket main structure fabrication finish

15-Feb-12

PTJ2230 Jacket weighing

2 22-Feb-12

23-Feb-12

28-Jan-12

29-Jan-12

75 31-Mar-11

22-Jun-11

31-Mar-11 A

29-Jun-11

8 14-Jun-11

22-Jun-11

15-May-11 A

08-Jun-11 A

PTJ5000 PREPARATION OF SKID WAY

20 31-Mar-11

24-Apr-11

31-Mar-11 A

26-Jun-11

LEG A1

67 31-Mar-11

13-Jun-11

31-Mar-11 A

29-Jun-11

45 31-Mar-11

18-May-11

31-Mar-11 A

29-Jun-11

PTJ51 LEG SPLICE FIT UP

9 31-Mar-11

10-Apr-11

31-Mar-11 A

25-Jun-11

PTJ51 CANS FIT UP

8 11-Apr-11

20-Apr-11

11-Apr-11 A

27-Jun-11

PTJ51 LEG SPLICE WELDING & NDT

10 21-Apr-11

04-May-11

23-Apr-11 A

27-Jun-11

PTJ51 CAN WELDING & NDT

12 05-May-11

18-May-11

09-May-11 A

29-Jun-11

41 21-Apr-11

05-Jun-11

23-Apr-11 A

04-Jun-11 A

PTJ50 LEG SPLICE FIT UP

7 21-Apr-11

01-May-11

23-Apr-11 A

31-May-11 A

PTJ51 CANS FIT UP

4 02-May-11

05-May-11

05-May-11 A

31-May-11 A

PTJ51 CONE FIT UP

4 07-May-11

10-May-11

10-May-11 A

01-Jun-11 A

12 11-May-11

24-May-11

15-May-11 A

02-Jun-11 A

PTJ51 CONE WELDING & NDT

5 25-May-11

30-May-11

22-May-11 A

02-Jun-11 A

PTJ51 CAN WELDING & NDT

5 31-May-11

05-Jun-11

19-May-11 A

04-Jun-11 A

PTJ5010 PREPARATION LEG FOR ROW A & B TRIAL FIT

DIM 14
1400

DIM 12
1200

PTJ51 LEG SPLICE WELDING & NDT

DIM 10
1000

2011
A M J Jul A S O N D

PTJ2000 Jacket main structure fabrication start

JACKET LEGS FABRICATION

Page 27 of 64

31-Mar-11 A
21-Jan-12

36 11-May-11

13-Jun-11

15-Apr-11 A

29-Jun-11

PTJ50 CONE WELDING & NDT

5 02-Jun-11

07-Jun-11

07-May-11 A

11-May-11 A

PTJ50 LEG SPLICE WELDING & NDT

6 26-May-11

01-Jun-11

30-Apr-11 A

12-May-11 A

PTJ50 CONE FIT UP

4 22-May-11

25-May-11

18-May-11 A

24-May-11 A

PTJ50 LEG SPLICE FIT UP

5 11-May-11

16-May-11

15-Apr-11 A

02-Jun-11 A

PTJ50 CANS FIT UP

4 17-May-11

21-May-11

21-May-11 A

28-Jun-11

PTJ50 CAN WELDING & NDT

5 08-Jun-11

13-Jun-11

12-May-11 A

29-Jun-11

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

67 31-Mar-11

13-Jun-11

31-Mar-11 A

28-Jun-11

45 31-Mar-11

18-May-11

31-Mar-11 A

01-Jun-11 A

PTJ53 LEG SPLICE FIT UP

9 31-Mar-11

10-Apr-11

31-Mar-11 A

26-May-11 A

PTJ53 CANS FIT UP

8 11-Apr-11

20-Apr-11

11-Apr-11 A

28-May-11 A

PTJ53 LEG SPLICE WELDING & NDT

10 21-Apr-11

04-May-11

23-Apr-11 A

30-May-11 A

PTJ53 CAN WELDING & NDT

12 05-May-11

18-May-11

09-May-11 A

01-Jun-11 A

48 21-Apr-11

13-Jun-11

23-Apr-11 A

19-Jun-11 A

PTJ52 LEG SPLICE FIT UP

7 21-Apr-11

01-May-11

23-Apr-11 A

30-May-11 A

PTJ53 CANS FIT UP

4 02-May-11

05-May-11

05-May-11 A

30-May-11 A

PTJ52 CONE FIT UP

8 07-May-11

15-May-11

10-May-11 A

31-May-11 A

13 16-May-11

30-May-11

19-May-11 A

02-Jun-11 A

PTJ53 CAN WELDING & NDT

6 07-Jun-11

13-Jun-11

14-May-11 A

05-Jun-11 A

PTJ53 CONE WELDING & NDT

6 31-May-11

06-Jun-11

19-Jun-11 A

19-Jun-11 A

28 07-May-11

07-Jun-11

17-Apr-11 A

28-Jun-11

PTJ52 CONE FIT UP

4 17-May-11

21-May-11

07-May-11 A

02-Jun-11 A

PTJ52 LEG SPLICE WELDING & NDT

6 22-May-11

28-May-11

15-May-11 A

02-Jun-11 A

PTJ52 CONE WELDING & NDT

4 29-May-11

01-Jun-11

17-Apr-11 A

04-Jun-11 A

PTJ52 LEG SPLICE FIT UP

5 07-May-11

11-May-11

10-May-11 A

25-Jun-11

PTJ52 CANS FIT UP

4 12-May-11

16-May-11

16-May-11 A

26-Jun-11

PTJ52 CAN WELDING & NDT

5 02-Jun-11

07-Jun-11

06-May-11 A

28-Jun-11

67 31-Mar-11

13-Jun-11

31-Mar-11 A

29-Jun-11

LEG A2
DIM 14
1400

DIM 12
1200

PTJ53 LEG SPLICE WELDING & NDT

DIM 10
1000

LEG B1
DIM 14
1400

Finish

45 31-Mar-11

18-May-11

31-Mar-11 A

29-Jun-11

9 31-Mar-11

10-Apr-11

31-Mar-11 A

25-Jun-11

PTJ55 CANS FIT UP

8 11-Apr-11

20-Apr-11

11-Apr-11 A

27-Jun-11

PTJ55 LEG SPLICE WELDING & NDT

10 21-Apr-11

04-May-11

23-Apr-11 A

27-Jun-11

PTJ55 CAN WELDING & NDT

12 05-May-11

18-May-11

09-May-11 A

29-Jun-11

43 21-Apr-11

07-Jun-11

23-Apr-11 A

04-Jun-11 A

7 21-Apr-11

01-May-11

23-Apr-11 A

29-May-11 A

PTJ54 LEG SPLICE FIT UP

2011
A M J Jul A S O N D

PTJ55 LEG SPLICE FIT UP

DIM 12
1200

Page 28 of 64

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

PTJ54 CANS FIT UP

4 02-May-11

05-May-11

05-May-11 A

30-May-11 A

PTJ54 CONE FIT UP

4 07-May-11

10-May-11

10-May-11 A

30-May-11 A

12 11-May-11

24-May-11

15-May-11 A

01-Jun-11 A

PTJ55 CONE WELDING & NDT

6 25-May-11

31-May-11

14-May-11 A

02-Jun-11 A

PTJ55 CAN WELDING & NDT

6 01-Jun-11

07-Jun-11

20-May-11 A

04-Jun-11 A

29 11-May-11

13-Jun-11

14-May-11 A

29-Jun-11

PTJ54 LEG SPLICE FIT UP

5 11-May-11

16-May-11

15-May-11 A

31-May-11 A

PTJ54 CONE FIT UP

4 22-May-11

25-May-11

16-May-11 A

02-Jun-11 A

PTJ54 LEG SPLICE WELDING & NDT

6 26-May-11

01-Jun-11

19-May-11 A

02-Jun-11 A

PTJ54 CONE WELDING & NDT

5 02-Jun-11

07-Jun-11

14-May-11 A

04-Jun-11 A

PTJ54 CANS FIT UP

4 17-May-11

21-May-11

21-May-11 A

28-Jun-11

PTJ54 CAN WELDING & NDT

5 08-Jun-11

13-Jun-11

18-May-11 A

29-Jun-11

65 31-Mar-11

11-Jun-11

31-Mar-11 A

27-Jun-11

43 31-Mar-11

16-May-11

31-Mar-11 A

31-May-11 A

PTJ57 LEG SPLICE FIT UP

8 31-Mar-11

09-Apr-11

31-Mar-11 A

26-May-11 A

PTJ57 CANS FIT UP

7 10-Apr-11

18-Apr-11

10-Apr-11 A

28-May-11 A

PTJ57 LEG SPLICE WELDING & NDT

10 19-Apr-11

02-May-11

20-Apr-11 A

30-May-11 A

PTJ57 CAN WELDING & NDT

12 03-May-11

16-May-11

07-May-11 A

31-May-11 A

43 19-Apr-11

05-Jun-11

20-Apr-11 A

18-Jun-11 A

PTJ56 LEG SPLICE FIT UP

8 19-Apr-11

28-Apr-11

20-Apr-11 A

29-May-11 A

PTJ56 CANS FIT UP

4 30-Apr-11

03-May-11

03-May-11 A

30-May-11 A

PTJ55 LEG SPLICE WELDING & NDT

DIM 10
1000

LEG B2
DIM 14
1400

DIM 12
1200

PTJ56 CONE FIT UP

Finish

4 04-May-11

08-May-11

08-May-11 A

30-May-11 A

22-May-11

12-May-11 A

01-Jun-11 A

PTJ57 CONE WELDING & NDT

6 23-May-11

29-May-11

21-May-11 A

02-Jun-11 A

PTJ57 CAN WELDING & NDT

6 30-May-11

05-Jun-11

18-Jun-11 A

18-Jun-11 A

29 09-May-11

11-Jun-11

12-May-11 A

27-Jun-11

PTJ55 LEG SPLICE FIT UP

5 09-May-11

14-May-11

12-May-11 A

31-May-11 A

PTJ56 CONE FIT UP

4 19-May-11

23-May-11

19-May-11 A

02-Jun-11 A

DIM 10
1000

2011
A M J Jul A S O N D

12 09-May-11

PTJ56 LEG SPLICE WELDING & NDT

Page 29 of 64

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

PTJ56 LEG SPLICE WELDING & NDT

6 24-May-11

30-May-11

21-May-11 A

04-Jun-11 A

PTJ56 CONE WELDING & NDT

5 31-May-11

05-Jun-11

18-Jun-11 A

18-Jun-11 A

PTJ56 CANS FIT UP

4 15-May-11

18-May-11

18-May-11 A

25-Jun-11

PTJ56 CAN WELDING & NDT

5 06-Jun-11

11-Jun-11

21-May-11 A

27-Jun-11

161 31-Mar-11

28-Sep-11

31-Mar-11 A

16-Jul-11

50 03-Aug-11

28-Sep-11

11-Apr-11 A

14-Jul-11

50 03-Aug-11

28-Sep-11

11-Apr-11 A

14-Jul-11

45 03-Aug-11

22-Sep-11

11-Apr-11 A

18-Jun-11 A

PTJ3 FITUP HORIZONTAL BRACES ATELEV -56.2

9 03-Aug-11

13-Aug-11

08-May-11 A

26-May-11 A

PTJ3 FITUP HORIZONTAL BRACES AT ELEV -79.0

9 14-Aug-11

23-Aug-11

18-May-11 A

30-May-11 A

PTJ3 FITUP HORIZONTAL BRACES AT ELEV -33.4

9 14-Aug-11

23-Aug-11

18-May-11 A

03-Jun-11 A

PTJ3 WELDING & NDT HORIZONTAL BRACES ATN ELEV -56.2

10 14-Aug-11

27-Aug-11

18-May-11 A

03-Jun-11 A

PTJ3 WELDING & NDT HORIZONTAL BRACES AT ELEV -79.0

10 24-Aug-11

07-Sep-11

21-May-11 A

07-Jun-11 A

PTJ3 FITUP HORIZONTAL BRACES AT ELEV -10.6

6 24-Aug-11

03-Sep-11

29-Apr-11 A

10-Jun-11 A

PTJ3 FITUP HORIZONTAL BRACES AT ELEV +6.4

7 04-Sep-11

11-Sep-11

11-Apr-11 A

13-Jun-11 A

PTJ3 WELDING & NDT HORIZONTAL BRACES AT ELEV -33.4

10 24-Aug-11

07-Sep-11

21-May-11 A

13-Jun-11 A

PTJ3 WELDING & NDT HORIZONTAL BRACES AT ELEV -10.6

10 04-Sep-11

14-Sep-11

11-May-11 A

14-Jun-11 A

PTJ3 WELDING & NDT HORIZONTAL BRACES AT ELEV +6.4

10 12-Sep-11

22-Sep-11

19-May-11 A

18-Jun-11 A

41 14-Aug-11

28-Sep-11

18-Apr-11 A

14-Jul-11

PTJ3 FITUP DIAGONAL BRACES BETWEEN ELEV -33.4 & -56.2

18 14-Aug-11

06-Sep-11

18-May-11 A

09-Jun-11 A

PTJ3 WELDING & NDT DIAGONAL BRACES BETWEEN ELEV -33.4 ...

14 07-Sep-11

22-Sep-11

14-May-11 A

20-Jun-11 A

PTJ3 FITUP DIAGONAL BRACES BETWEEN ELEV +6.4 & -10.6

13 04-Sep-11

18-Sep-11

11-May-11 A

07-Jul-11

PTJ3 FITUP DIAGONAL BRACES BETWEEN ELEV -10.6 & -33.4

14 24-Aug-11

12-Sep-11

14-May-11 A

09-Jul-11

PTJ3 FITUP DIAGONAL BRACES BETWEEN ELEV -56.2 & -79.0

20 14-Aug-11

08-Sep-11

18-Apr-11 A

10-Jul-11

PTJ3 WELDING & NDT DIAGONAL BRACES BETWEEN ELEV +6.4 &...

9 19-Sep-11

28-Sep-11

15-May-11 A

11-Jul-11

PTJ3 WELDING & NDT DIAGONAL BRACES BETWEEN ELEV -10.6 ...

11 13-Sep-11

25-Sep-11

20-May-11 A

11-Jul-11

PTJ3 WELDING & NDT DIAGONAL BRACES BETWEEN ELEV -56.2 ...

15 10-Sep-11

26-Sep-11

17-May-11 A

14-Jul-11

78 31-Mar-11

26-Jun-11

31-Mar-11 A

02-Jul-11

JACKET BRACING FABRICATION


BRACING ROW 1
BRACIN
SPLICING
SPLIC
HORIZONTAL
HORI

DIAGONAL BRACES
DIAG

BRACING ROW 2
BRACIN

Finish

Page 30 of 64

2011
A M J Jul A S O N D

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

78 31-Mar-11

26-Jun-11

31-Mar-11 A

02-Jul-11

15 31-Mar-11

18-Apr-11

31-Mar-11 A

28-May-11 A

PTJ3 FITUP HORIZONTAL BRACES AT ELEV +6.4

5 31-Mar-11

05-Apr-11

31-Mar-11 A

25-May-11 A

PTJ3 FITUP HORIZONTAL BRACES AT ELEV -10.6

5 31-Mar-11

05-Apr-11

31-Mar-11 A

25-May-11 A

PTJ3 FITUP HORIZONTAL BRACES AT ELEV -33.4

7 31-Mar-11

07-Apr-11

31-Mar-11 A

26-May-11 A

PTJ3 FITUP HORIZONTAL BRACES AT ELEV -56.2

7 31-Mar-11

07-Apr-11

31-Mar-11 A

26-May-11 A

PTJ3 FITUP HORIZONTAL BRACES AT ELEV -79.0

7 31-Mar-11

07-Apr-11

31-Mar-11 A

26-May-11 A

PTJ3 WELDING & NDT HORIZONTAL BRACES AT ELEV +6.4

7 06-Apr-11

13-Apr-11

06-Apr-11 A

26-May-11 A

PTJ3 WELDING & NDT HORIZONTAL BRACES AT ELEV -10.6

7 06-Apr-11

13-Apr-11

06-Apr-11 A

26-May-11 A

PTJ3 WELDING & NDT HORIZONTAL BRACES AT ELEV -33.4

8 09-Apr-11

18-Apr-11

09-Apr-11 A

28-May-11 A

PTJ3 WELDING & NDT HORIZONTAL BRACES AT ELEV -56.2

8 09-Apr-11

18-Apr-11

09-Apr-11 A

28-May-11 A

PTJ3 WELDING & NDT HORIZONTAL BRACES AT ELEV -79.0

8 09-Apr-11

18-Apr-11

09-Apr-11 A

28-May-11 A

56 06-Apr-11

06-Jun-11

06-Apr-11 A

25-Jun-11

PTJ3 FITUP DIAGONAL BRACES BETWEEN ELEV +6.4 & -10.6

8 06-Apr-11

14-Apr-11

06-Apr-11 A

31-May-11 A

PTJ3 FITUP DIAGONAL BRACES BETWEEN ELEV -10.6 & -33.4

8 09-Apr-11

18-Apr-11

09-Apr-11 A

31-May-11 A

PTJ3 FITUP DIAGONAL BRACES BETWEEN ELEV -33.4 & -56.2

11 09-Apr-11

21-Apr-11

09-Apr-11 A

02-Jun-11 A

PTJ3 FITUP DIAGONAL BRACES BETWEEN ELEV -56.2 & -79.0

11 09-Apr-11

21-Apr-11

09-Apr-11 A

02-Jun-11 A

PTJ3 WELDING DIAGONAL BRACES BETWEEN ELEV +6.4 & -10.6

7 16-Apr-11

24-Apr-11

16-Apr-11 A

05-Jun-11 A

PTJ3 WELDING DIAGONAL BRACES BETWEEN ELEV -10.6 & -33.4

10 19-Apr-11

02-May-11

20-Apr-11 A

08-Jun-11 A

PTJ3 WELDING DIAGONAL BRACES BETWEEN ELEV -33.4 & -56.2

14 03-May-11

18-May-11

07-May-11 A

18-Jun-11 A

PTJ3 WELDING DIAGONAL BRACES BETWEEN ELEV -56.2 & -79.0

16 19-May-11

06-Jun-11

23-May-11 A

25-Jun-11

SPLICING
SPLIC
HORIZONTAL
HORI

DIAGONAL BRACES
DIAG

VERTICAL
VERT

Finish

Page 31 of 64

2011
A M J Jul A S O N D

47 03-May-11

26-Jun-11

07-May-11 A

02-Jul-11

PTJ3 FITUP VERTICAL BRACES BETWEEN ELEV -10.6 & -33.4

5 03-May-11

08-May-11

07-May-11 A

26-Jun-11

PTJ3 FITUP VERTICAL BRACES BETWEEN ELEV -33.4 & -56.2

7 19-May-11

26-May-11

23-May-11 A

26-Jun-11

PTJ3 FITUP VERTICAL BRACES BETWEEN ELEV -56.2 & -79.0

7 07-Jun-11

14-Jun-11

11-Jun-11 A

26-Jun-11

PTJ8 WELDING VERTICAL BRACES BETWEEN ELEV -10.6 & -33.4

7 09-May-11

16-May-11

12-May-11 A

29-Jun-11

PTJ8 WELDING VERTICAL BRACES BETWEEN ELEV -33.4 & -56.2

10 28-May-11

07-Jun-11

31-May-11 A

02-Jul-11

PTJ8 WELDING VERTICAL BRACES BETWEEN ELEV -56.2 & -79.0

10 15-Jun-11

26-Jun-11

19-May-11 A

02-Jul-11

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

17 17-May-11

05-Jun-11

21-May-11 A

29-Jun-11

PTJ812 FITUP BRACES BETWEEN ELEV -10.6 & -33.4

7 17-May-11

24-May-11

21-May-11 A

26-Jun-11

PTJ813 FITUP BRACES BETWEEN ELEV -33.4 & -56.2

7 17-May-11

24-May-11

21-May-11 A

26-Jun-11

PTJ814 FITUP BRACES BETWEEN ELEV -56.2 & -79.0

7 17-May-11

24-May-11

21-May-11 A

26-Jun-11

PTJ815 WELDING VERTICAL BRACES BETWEEN ELEV +10.6 & -33.4

10 25-May-11

05-Jun-11

21-May-11 A

29-Jun-11

PTJ816 WELDING VERTICAL BRACES BETWEEN ELEV -33.4 & -56.2

10 25-May-11

05-Jun-11

22-May-11 A

29-Jun-11

PTJ817 WELDING VERTICAL BRACES BETWEEN ELEV -56.2 & -79.0

10 25-May-11

05-Jun-11

22-May-11 A

29-Jun-11

51 23-Jun-11

20-Aug-11

27-Apr-11 A

13-Jul-11

51 23-Jun-11

20-Aug-11

27-Apr-11 A

13-Jul-11

PTJ82 FITUP DIAGONAL BRACES BETWEEN ELEV +6.4 & -10.6

6 23-Jun-11

29-Jun-11

27-Apr-11 A

30-Jun-11

PTJ82 FITUP DIAGONAL BRACES BETWEEN ELEV -10.6 & -33.4

8 30-Jun-11

09-Jul-11

04-May-11 A

30-Jun-11

PTJ82 WELDING DIAGONAL BRACES BETWEEN ELEV +6.4 & -10.6

9 30-Jun-11

10-Jul-11

04-May-11 A

02-Jul-11

PTJ82 FITUP DIAGONAL BRACES BETWEEN ELEV -33.4 & -56.2

9 10-Jul-11

20-Jul-11

13-May-11 A

02-Jul-11

PTJ82 WELDING DIAGONAL BRACES BETWEEN ELEV -10.6 & -33.4

10 10-Jul-11

21-Jul-11

13-May-11 A

03-Jul-11

PTJ82 FITUP DIAGONAL BRACES BETWEEN ELEV -56.2 & -79.0

11 21-Jul-11

02-Aug-11

15-May-11 A

04-Jul-11

PTJ82 WELDING DIAGONAL BRACES BETWEEN ELEV -33.4 & -56.2

14 21-Jul-11

06-Aug-11

14-May-11 A

07-Jul-11

PTJ82 WELDING DIAGONAL BRACES BETWEEN ELEV - 56.2 & -79.0

15 03-Aug-11

20-Aug-11

08-May-11 A

13-Jul-11

103 23-Jun-11

20-Aug-11

13-Apr-11 A

16-Jul-11

103 23-Jun-11

20-Aug-11

13-Apr-11 A

16-Jul-11

PTJ83 FITUP DIAGONAL BRACES BETWEEN ELEV +6.4 & -10.6

5 23-Jun-11

29-Jun-11

27-Apr-11 A

09-Jun-11 A

PTJ83 FITUP DIAGONAL BRACES BETWEEN ELEV -10.6 & -33.4

8 30-Jun-11

09-Jul-11

04-May-11 A

12-Jun-11 A

9 30-Jun-11

BRACING ROW 3
BRACIN

BRACING ROW A
BRACIN
FABRICATION
FABRI

BRACING ROW B
BRACIN
FABRICATION
FABRI

PTJ83 WELDING DIAGONAL BRACES BETWEEN ELEV +6.4 & -10.6

Finish

10-Jul-11

04-May-11 A

12-Jun-11 A

21-Jul-11

13-Apr-11 A

15-Jun-11 A

9 10-Jul-11

20-Jul-11

13-Apr-11 A

18-Jun-11 A

PTJ83 WELDING DIAGONAL BRACES BETWEEN ELEV - 33.4 & -56.2

14 21-Jul-11

06-Aug-11

10-May-11 A

29-Jun-11

PTJ83 FITUP DIAGONAL BRACES BETWEEN ELEV -56.2 & -79.0

11 21-Jul-11

02-Aug-11

16-May-11 A

04-Jul-11

PTJ84 WELDING DIAGONAL BRACES BETWEEN ELEV - 56.2 & -79.0

15 03-Aug-11

20-Aug-11

08-May-11 A

16-Jul-11

23 21-Jun-11

17-Jul-11

25-Apr-11 A

28-Jun-11

PTJ83 FITUP DIAGONAL BRACES BETWEEN ELEV -33.4 & -56.2

BRACING ROW C
BRACIN

2011
A M J Jul A S O N D

10 10-Jul-11

PTJ83 WELDING DIAGONAL BRACES BETWEEN ELEV -10.6 & -33.4

Page 32 of 64

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

PTJ845 FITUP BRACES BETWEEN ELEV -10.6 & -33.4

7 21-Jun-11

28-Jun-11

25-Apr-11 A

26-Jun-11

PTJ847 FITUP BRACES BETWEEN ELEV -56.2 & -79.0

7 21-Jun-11

28-Jun-11

25-Apr-11 A

26-Jun-11

PTJ846 FITUP BRACES BETWEEN ELEV -33.4 & -56.2

10 21-Jun-11

02-Jul-11

25-Apr-11 A

26-Jun-11

PTJ848 WELDING BRACES BETWEEN ELEV -10.6 & -33.4

9 29-Jun-11

09-Jul-11

03-May-11 A

27-Jun-11

PTJ849 WELDING BRACES BETWEEN ELEV -56.2 & -79.0

9 29-Jun-11

09-Jul-11

03-May-11 A

27-Jun-11

13 03-Jul-11

17-Jul-11

06-May-11 A

28-Jun-11

19 21-Jun-11

12-Jul-11

25-Apr-11 A

29-Jun-11

PTJ854 FITUP BRACES BETWEEN ELEV -10.6 & -33.4

5 21-Jun-11

26-Jun-11

25-Apr-11 A

26-Jun-11

PTJ856 FITUP BRACES BETWEEN ELEV -56.2 & -79.0

5 21-Jun-11

26-Jun-11

25-Apr-11 A

26-Jun-11

PTJ855 FITUP BRACES BETWEEN ELEV -33.4 & -56.2

8 21-Jun-11

29-Jun-11

25-Apr-11 A

26-Jun-11

PTJ857 WELDING BRACES BETWEEN ELEV -10.6 & -33.4

7 27-Jun-11

04-Jul-11

30-Apr-11 A

27-Jun-11

PTJ858 WELDING BRACES BETWEEN ELEV -56.2 & -79.0

7 27-Jun-11

04-Jul-11

30-Apr-11 A

27-Jun-11

PTJ859 WELDING BRACES BETWEEN ELEV -33.4 & -56.2

11 30-Jun-11

12-Jul-11

04-May-11 A

29-Jun-11

185 31-Mar-11

30-Oct-11

31-Mar-11 A

03-Oct-11

78 04-Apr-11

29-Jun-11

04-Apr-11 A

23-Jun-11 A

28 04-Apr-11

03-May-11

04-Apr-11 A

02-Jun-11 A

PTJ86 FITUP OF SIZE 24"

18 04-Apr-11

26-Apr-11

04-Apr-11 A

26-May-11 A

PTJ86 FITUP OF SIZE 16"

7 21-Apr-11

01-May-11

23-Apr-11 A

31-May-11 A

PTJ86 FITUP OF SIZE 20"

5 27-Apr-11

03-May-11

30-Apr-11 A

02-Jun-11 A

17 04-May-11

26-May-11

08-May-11 A

14-Jun-11 A

PTJ86 WELDING OF SIZE 24"

12 04-May-11

17-May-11

08-May-11 A

05-Jun-11 A

PTJ86 WELDING OF SIZE 16"

5 18-May-11

23-May-11

22-May-11 A

11-Jun-11 A

PTJ86 WELDING OF SIZE 20"

4 23-May-11

26-May-11

08-May-11 A

14-Jun-11 A

CONDUCTORS AT ELEV + 6400


COND

38 17-May-11

29-Jun-11

08-May-11 A

23-Jun-11 A

18 28-May-11

16-Jun-11

14-May-11 A

20-Jun-11 A

10 28-May-11

07-Jun-11

19-May-11 A

16-Jun-11 A

6 11-Jun-11

16-Jun-11

14-May-11 A

20-Jun-11 A

11 18-Jun-11

29-Jun-11

21-May-11 A

23-Jun-11 A

PTJ850 WELDING BRACES BETWEEN ELEV -33.4 & -56.2


BRACING ROW D
BRACIN

JACKET ELEVATIONS FABRICATION


ELEV + 6400
FITUP

WELDING&NDT
WELD

WELDING & NDT


WELD
PTJ9 WELDING OF CONDUCTOR
PTJ9 WELDING OF CONDUCTOR SUPPORT
CONDUCTORS ERECTION
COND

Finish

Page 33 of 64

2011
A M J Jul A S O N D

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

11 18-Jun-11

29-Jun-11

21-May-11 A

23-Jun-11 A

21 17-May-11

09-Jun-11

08-May-11 A

19-Jun-11 A

PTJ9 FITUP OF CONDUCTOR

9 17-May-11

26-May-11

18-May-11 A

14-Jun-11 A

PTJ9 FITUP OF CONDUCTOR SUPPORT

5 05-Jun-11

09-Jun-11

08-May-11 A

19-Jun-11 A

159 31-Mar-11

21-Aug-11

31-Mar-11 A

03-Oct-11

41 31-Mar-11

14-May-11

31-Mar-11 A

24-Jul-11

PTJ87 FITUP OF SIZE 28"

26 31-Mar-11

03-May-11

31-Mar-11 A

13-Jul-11

PTJ87 FITUP OF SIZE 16"

8 28-Apr-11

07-May-11

02-May-11 A

17-Jul-11

PTJ87 FITUP OF SIZE 20"

23 12-Apr-11

11-May-11

12-Apr-11 A

21-Jul-11

PTJ87 FITUP OF SIZE 14"

5 09-May-11

14-May-11

12-May-11 A

24-Jul-11

48 15-May-11

09-Jul-11

15-May-11 A

13-Sep-11

PTJ87 WELDING OF SIZE 28"

35 15-May-11

23-Jun-11

18-May-11 A

28-Aug-11

PTJ87 WELDING OF SIZE 16"

9 20-Jun-11

29-Jun-11

23-May-11 A

04-Sep-11

PTJ87 WELDING OF SIZE 20"

31 31-May-11

05-Jul-11

15-May-11 A

10-Sep-11

PTJ87 WELDING OF SIZE 14"

6 03-Jul-11

09-Jul-11

15-May-11 A

13-Sep-11

CONDUCTORS AT ELEV - 10600


COND

79 29-Jun-11

21-Aug-11

13-May-11 A

03-Oct-11

30 29-Jun-11

01-Aug-11

15-May-11 A

18-Jun-11 A

PTJ9 FITUP OF CONDUCTOR

9 29-Jun-11

09-Jul-11

15-May-11 A

15-Jun-11 A

PTJ9 FITUP OF CONDUCTOR SUPPORT

5 27-Jul-11

01-Aug-11

15-May-11 A

18-Jun-11 A

59 10-Jul-11

08-Aug-11

13-May-11 A

20-Sep-11

9 10-Jul-11

20-Jul-11

13-May-11 A

23-Jun-11 A

PTJ9 ERECTION OF CONDUCTOR WITH ELEVATIONS


FITUP

ELEV - 10600
FITUP

WELDING&NDT
WELD

FITUP

WELDING & NDT


WELD
PTJ9 WELDING OF CONDUCTOR
PTJ9 WELDING OF CONDUCTOR SUPPORT

Finish

6 02-Aug-11

08-Aug-11

13-Sep-11

20-Sep-11

21-Aug-11

20-Sep-11

03-Oct-11

11 09-Aug-11

21-Aug-11

20-Sep-11

03-Oct-11

117 31-Mar-11

24-Jul-11

31-Mar-11 A

14-Aug-11

30 31-Mar-11

02-May-11

31-Mar-11 A

21-Jun-11 A

PTJ87 FITUP OF SIZE 28"

14 31-Mar-11

16-Apr-11

31-Mar-11 A

05-Jun-11 A

PTJ88 FITUP OF SIZE 16"

10 09-Apr-11

20-Apr-11

09-Apr-11 A

09-Jun-11 A

PTJ9 ERECTION OF CONDUCTOR WITH ELEVATIONS


ELEV - 33400
FITUP

2011
A M J Jul A S O N D

11 09-Aug-11

CONDUCTORS ERECTION
COND

Page 34 of 64

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

PTJ88 FITUP OF SIZE 24"

8 17-Apr-11

27-Apr-11

17-Apr-11 A

16-Jun-11 A

PTJ88 FITUP OF SIZE 20"

6 21-Apr-11

30-Apr-11

23-Apr-11 A

19-Jun-11 A

PTJ88 FITUP OF SIZE 18"

6 25-Apr-11

02-May-11

27-Apr-11 A

21-Jun-11 A

34 03-May-11

11-Jun-11

24-Apr-11 A

25-Jul-11

PTJ88 WELDING OF SIZE 28"

16 03-May-11

21-May-11

07-May-11 A

04-Jul-11

PTJ88 WELDING OF SIZE 16"

6 21-May-11

26-May-11

24-Apr-11 A

10-Jul-11

PTJ88 WELDING OF SIZE 24"

12 23-May-11

05-Jun-11

26-Apr-11 A

19-Jul-11

PTJ88 WELDING OF SIZE 20"

5 04-Jun-11

08-Jun-11

07-May-11 A

23-Jul-11

PTJ88 WELDING OF SIZE 18"

4 07-Jun-11

11-Jun-11

11-May-11 A

25-Jul-11

CONDUCTORS AT ELEV - 33400


COND

61 01-Jun-11

24-Jul-11

05-May-11 A

14-Aug-11

29 01-Jun-11

04-Jul-11

05-May-11 A

19-Jun-11 A

PTJ9 FITUP OF CONDUCTOR

9 01-Jun-11

11-Jun-11

05-May-11 A

18-Jun-11 A

PTJ9 FITUP OF CONDUCTOR SUPPORT

5 29-Jun-11

04-Jul-11

08-May-11 A

19-Jun-11 A

41 12-Jun-11

11-Jul-11

15-May-11 A

01-Aug-11

10 12-Jun-11

22-Jun-11

15-May-11 A

20-Jun-11 A

6 05-Jul-11

11-Jul-11

25-Jul-11

01-Aug-11

11 12-Jul-11

24-Jul-11

01-Aug-11

14-Aug-11

11 12-Jul-11

24-Jul-11

01-Aug-11

14-Aug-11

133 31-Mar-11

13-Aug-11

31-Mar-11 A

03-Aug-11

46 31-Mar-11

19-May-11

31-Mar-11 A

22-Jun-11 A

PTJ89 FITUP OF SIZE 28"

26 31-Mar-11

03-May-11

31-Mar-11 A

15-Jun-11 A

PTJ89 FITUP OF SIZE 24"

18 24-Apr-11

15-May-11

26-Apr-11 A

16-Jun-11 A

PTJ89 FITUP OF SIZE 16"

10 26-Apr-11

08-May-11

28-Apr-11 A

20-Jun-11 A

PTJ89 FITUP OF SIZE 20"

11 05-May-11

17-May-11

09-May-11 A

21-Jun-11 A

PTJ89 FITUP OF SIZE 18"

7 12-May-11

19-May-11

16-May-11 A

22-Jun-11 A

36 21-May-11

30-Jun-11

07-May-11 A

13-Jul-11

PTJ89 WELDING OF SIZE 28"

18 21-May-11

09-Jun-11

17-May-11 A

22-Jun-11 A

PTJ89 WELDING OF SIZE 24"

12 12-Jun-11

25-Jun-11

15-May-11 A

24-Jun-11 A

WELDING&NDT
WELD

FITUP

WELDING & NDT


WELD
PTJ9 WELDING OF CONDUCTOR
PTJ9 WELDING OF CONDUCTOR SUPPORT
CONDUCTORS ERECTION
COND
PTJ9 ERECTION OF CONDUCTOR WITH ELEVATIONS
ELEV - 56200
FITUP

WELDING&NDT
WELD

Finish

Page 35 of 64

2011
A M J Jul A S O N D

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

PTJ89 WELDING OF SIZE 16"

7 08-Jun-11

15-Jun-11

12-May-11 A

28-Jun-11

PTJ89 WELDING OF SIZE 20"

7 21-Jun-11

28-Jun-11

14-May-11 A

11-Jul-11

PTJ89 WELDING OF SIZE 18"

4 27-Jun-11

30-Jun-11

07-May-11 A

13-Jul-11

CONDUCTORS AT ELEV - 56200


COND

60 21-Jun-11

13-Aug-11

15-May-11 A

03-Aug-11

30 21-Jun-11

24-Jul-11

15-May-11 A

24-Jun-11 A

PTJ9 FITUP OF CONDUCTOR

9 21-Jun-11

30-Jun-11

15-May-11 A

23-Jun-11 A

PTJ9 FITUP OF CONDUCTOR SUPPORT

5 19-Jul-11

24-Jul-11

19-May-11 A

24-Jun-11 A

38 02-Jul-11

31-Jul-11

21-May-11 A

27-Jul-11

10 02-Jul-11

12-Jul-11

21-May-11 A

13-Jul-11

6 25-Jul-11

31-Jul-11

22-Jun-11 A

27-Jul-11

13 01-Aug-11

13-Aug-11

22-Jun-11 A

03-Aug-11

11 01-Aug-11

13-Aug-11

22-Jun-11 A

03-Aug-11

61 18-Aug-11

30-Oct-11

07-Apr-11 A

09-Aug-11

29 18-Aug-11

19-Sep-11

07-Apr-11 A

18-Jul-11

PTJ90 FITUP OF SIZE 28"

13 18-Aug-11

05-Sep-11

23-Apr-11 A

12-Jun-11 A

PTJ90 FITUP OF SIZE 16"

9 31-Aug-11

10-Sep-11

07-Apr-11 A

17-Jun-11 A

PTJ90 FITUP OF SIZE 24"

10 06-Sep-11

17-Sep-11

13-Apr-11 A

16-Jul-11

PTJ90 FITUP OF SIZE 20"

6 13-Sep-11

19-Sep-11

20-Apr-11 A

18-Jul-11

32 20-Sep-11

30-Oct-11

02-May-11 A

09-Aug-11

PTJ90 WELDING OF SIZE 28"

18 20-Sep-11

11-Oct-11

21-May-11 A

21-Jul-11

PTJ90 WELDING OF SIZE 16"

10 05-Oct-11

17-Oct-11

13-May-11 A

27-Jul-11

PTJ90 WELDING OF SIZE 24"

12 13-Oct-11

26-Oct-11

20-May-11 A

06-Aug-11

PTJ90 WELDING OF SIZE 20"

2 26-Oct-11

30-Oct-11

02-May-11 A

09-Aug-11

72 22-Nov-11

15-Feb-12

07-May-11 A

21-Jan-12

46 22-Nov-11

23-Jan-12

07-May-11 A

28-Dec-11

PTJ932 CUTTING & EDGE PREPARATION OF PILE SLEEVE PLATE

4 22-Nov-11

26-Nov-11

19-Jun-11 A

23-Nov-11

PTJ933 CUTTING & EDGE PREPARATION OF PILE SLEEVE SHEAR PL...

4 25-Dec-11

28-Dec-11

29-Nov-11

03-Dec-11

23 01-Dec-11

28-Dec-11

07-May-11 A

03-Dec-11

FITUP

WELDING & NDT


WELD
PTJ9 WELDING OF CONDUCTOR
PTJ9 WELDING OF CONDUCTOR SUPPORT
CONDUCTORS ERECTION
COND
PTJ9 ERECTION OF CONDUCTOR WITH ELEVATIONS
ELEV - 79000
FITUP

WELDING&NDT
WELD

PILE SLEEVES
SLE
FABRICATION
AT LEG A1

PTJ936 GIRTH WELD OF PILE SLEEVE

Finish

Page 36 of 64

2011
A M J Jul A S O N D

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

PTJ937 ERECTION OF SHEAR & STIFFENERS PLATE WITH PILE SLEE...

12 29-Dec-11

11-Jan-12

04-Dec-11

17-Dec-11

PTJ938 ERECTION OF PILE SLEEVE WITH LEGS

10 12-Jan-12

23-Jan-12

18-Dec-11

28-Dec-11

52 22-Nov-11

23-Jan-12

20-Jun-11 A

28-Dec-11

PTJ946 CUTTING & EDGE PREPARATION OF PILE SLEEVE PLATE

4 22-Nov-11

26-Nov-11

20-Jun-11 A

31-Oct-11

PTJ947 CUTTING & EDGE PREPARATION OF PILE SLEEVE SHEAR PL...

4 25-Dec-11

28-Dec-11

29-Nov-11

03-Dec-11

PTJ950 GIRTH WELD OF PILE SLEEVE

24 01-Dec-11

28-Dec-11

06-Nov-11

03-Dec-11

PTJ95

12 29-Dec-11

11-Jan-12

04-Dec-11

17-Dec-11

10 12-Jan-12

23-Jan-12

18-Dec-11

28-Dec-11

54 15-Dec-11

15-Feb-12

20-Nov-11

21-Jan-12

PTJ939 CUTTING & EDGE PREPARATION OF PILE SLEEVE PLATE

4 15-Dec-11

19-Dec-11

20-Nov-11

23-Nov-11

PTJ940 CUTTING & EDGE PREPARATION OF PILE SLEEVE SHEAR PL...

4 17-Jan-12

21-Jan-12

22-Dec-11

26-Dec-11

PTJ943 GIRTH WELD OF PILE SLEEVE

24 25-Dec-11

21-Jan-12

29-Nov-11

26-Dec-11

PTJ944 ERECTION OF SHEAR & STIFFENERS PLATE WITH PILE SLEE...

12 22-Jan-12

04-Feb-12

27-Dec-11

09-Jan-12

PTJ945 ERECTION OF PILE SLEEVE WITH LEGS

10 05-Feb-12

15-Feb-12

10-Jan-12

21-Jan-12

54 15-Dec-11

15-Feb-12

20-Nov-11

21-Jan-12

PTJ953 CUTTING & EDGE PREPARATION OF PILE SLEEVE PLATE

4 15-Dec-11

19-Dec-11

20-Nov-11

23-Nov-11

PTJ954 CUTTING & EDGE PREPARATION OF PILE SLEEVE SHEAR PL...

4 17-Jan-12

21-Jan-12

22-Dec-11

26-Dec-11

PTJ957 GIRTH WELD OF PILE SLEEVE

24 25-Dec-11

21-Jan-12

29-Nov-11

26-Dec-11

PTJ958 ERECTION OF SHEAR & STIFFENERS PLATE WITH PILE SLEE...

12 22-Jan-12

04-Feb-12

27-Dec-11

09-Jan-12

PTJ959 ERECTION OF PILE SLEEVE WITH LEGS

10 05-Feb-12

15-Feb-12

10-Jan-12

21-Jan-12

176 14-Jun-11

15-Feb-12

28-Jun-11

21-Jan-12

7 22-Dec-11

29-Dec-11

26-Oct-11

02-Nov-11

7 22-Dec-11

29-Dec-11

26-Oct-11

02-Nov-11

7 22-Dec-11

29-Dec-11

26-Oct-11

02-Nov-11

7 31-Oct-11

07-Nov-11

09-Aug-11

17-Aug-11

7 31-Oct-11

07-Nov-11

09-Aug-11

17-Aug-11

7 31-Oct-11

07-Nov-11

09-Aug-11

17-Aug-11

7 08-Nov-11

15-Nov-11

17-Aug-11

25-Aug-11

AT LEG B1

ERECTION OF SHEAR & STIFFENERS PLATE WITH PILE SLEE...

PTJ952 ERECTION OF PILE SLEEVE WITH LEGS


AT LEG A2

AT LEG B2

JACKET ERECTION
ELEV +6.4
+
ERECTION ON ROW2
ERECT
PTJ86 ERECTION OF ELEV AT + 6.4 ON ROW 2
ELEV -5
-56.2
ERECTION ON ROW2
ERECT
PTJ90 ERECTION OF ELEV AT -56.2 ON ROW 2
ELEV -7
-79.0

Finish

Page 37 of 64

2011
A M J Jul A S O N D

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

7 08-Nov-11

15-Nov-11

17-Aug-11

25-Aug-11

7 08-Nov-11

15-Nov-11

17-Aug-11

25-Aug-11

7 17-Nov-11

24-Nov-11

27-Aug-11

05-Sep-11

7 17-Nov-11

24-Nov-11

27-Aug-11

05-Sep-11

7 17-Nov-11

24-Nov-11

27-Aug-11

05-Sep-11

7 05-Dec-11

12-Dec-11

03-Oct-11

12-Oct-11

7 05-Dec-11

12-Dec-11

03-Oct-11

12-Oct-11

7 05-Dec-11

12-Dec-11

03-Oct-11

12-Oct-11

37 14-Jun-11

30-Oct-11

28-Jun-11

09-Aug-11

36 14-Jun-11

29-Oct-11

28-Jun-11

08-Aug-11

15 14-Jun-11

30-Jun-11

28-Jun-11

16-Jul-11

5 14-Jun-11

19-Jun-11

28-Jun-11

04-Jul-11

10 20-Jun-11

30-Jun-11

04-Jul-11

16-Jul-11

30 20-Jun-11

24-Jul-11

04-Jul-11

08-Aug-11

PTJ8 FITUP OF DIAGONAL ON LEG

10 20-Jun-11

30-Jun-11

04-Jul-11

16-Jul-11

PTJ8 WELDING OF DIAGONAL ON LEG

20 02-Jul-11

24-Jul-11

16-Jul-11

08-Aug-11

15 12-Oct-11

29-Oct-11

21-Jul-11

08-Aug-11

5 12-Oct-11

17-Oct-11

21-Jul-11

27-Jul-11

10 18-Oct-11

29-Oct-11

27-Jul-11

08-Aug-11

1 30-Oct-11

30-Oct-11

08-Aug-11

09-Aug-11

1 30-Oct-11

30-Oct-11

08-Aug-11

09-Aug-11

ERECTION ON ROW2
ERECT
PTJ90 ERECTION OF ELEV AT -79 ON ROW 2
ELEV - 33.4
ERECTION ON ROW2
ERECT
PTJ88 ERECTION OF ELEV AT -33.4 ON ROW 2
ELEV -1
-10.6
ERECTION ON ROW2
ERECT
PTJ87 ERECTION OF ELEV AT -10.6 ON ROW 2
ROW 2
ERECTION
ERECT
HORIZONTAL
HORI
PTJ9 FITUP OF HORIZONTAL ON LEG
PTJ9 WELDING OF HORIZONTAL ON LEG
DIAGONAL BRACES
DIAG

VERTICAL
VERT
PTJ8 FITUP OF VERTICAL BRACES WITH ROW 2 BRACES
PTJ8 WELDING OF VERTICAL BRACES WITH ROW 2 BRACES
LIFTING OVER TRUSS RUNNER
LIFTIN
PTJ81 LIFTING OVER TRUSS RUNNERS
ROW C

Finish

19 08-Nov-11

29-Nov-11

17-Aug-11

10-Sep-11

4 08-Nov-11

12-Nov-11

17-Aug-11

22-Aug-11

PTJ853 ERECTION ROW C BRACES BETWEEN - 10.6 & -33.4

4 26-Nov-11

29-Nov-11

05-Sep-11

10-Sep-11

PTJ852 ERECTION ROW C BRACES BETWEEN -33.4 & -56.2

4 26-Nov-11

29-Nov-11

05-Sep-11

10-Sep-11

67 06-Sep-11

17-Dec-11

28-Jul-11

17-Oct-11

67 06-Sep-11

17-Dec-11

28-Jul-11

17-Oct-11

6 06-Sep-11

12-Sep-11

28-Jul-11

04-Aug-11

ROW A
ERECTION
ERECT
PTJ83 ERECTION X BRACES BETWEEN -56.2 & -79.0

2011
A M J Jul A S O N D

ERECTION ROW C BRACES BETWEEN -56.2 & -79.0

PTJ85

Page 38 of 64

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

PTJ83 ERECTION X BRACES BETWEEN -33.4 & -56.2

4 08-Nov-11

12-Nov-11

17-Aug-11

22-Aug-11

PTJ83 ERECTION X BRACES BETWEEN -10.6 & -33.4

4 26-Nov-11

29-Nov-11

05-Sep-11

10-Sep-11

PTJ82 ERECTION X BRACES BETWEEN +6.4 & -10.6

4 13-Dec-11

17-Dec-11

12-Oct-11

17-Oct-11

65 13-Sep-11

21-Dec-11

04-Aug-11

22-Oct-11

65 13-Sep-11

21-Dec-11

04-Aug-11

22-Oct-11

PTJ84 ERECTION X BRACES BETWEEN -56.2 & -79.0

6 13-Sep-11

19-Sep-11

04-Aug-11

11-Aug-11

PTJ84 ERECTION X BRACES BETWEEN -33.4 & -56.2

4 13-Nov-11

16-Nov-11

22-Aug-11

27-Aug-11

PTJ84 ERECTION X BRACES BETWEEN -10.6 & -33.4

4 30-Nov-11

04-Dec-11

10-Sep-11

14-Sep-11

PTJ84 ERECTION X BRACES BETWEEN +6.4 & -10.6

4 18-Dec-11

21-Dec-11

17-Oct-11

22-Oct-11

41 16-Nov-11

14-Dec-11

25-Aug-11

15-Oct-11

PTJ860 ERECTION ROW D BRACES BETWEEN -56.2 & -79.0

2 16-Nov-11

17-Nov-11

25-Aug-11

28-Aug-11

PTJ86

ERECTION ROW D BRACES BETWEEN -33.4 & -56.2

2 26-Nov-11

27-Nov-11

05-Sep-11

07-Sep-11

PTJ862 ERECTION ROW D BRACES BETWEEN -10.6 & -33.4

2 13-Dec-11

14-Dec-11

12-Oct-11

15-Oct-11

4 19-Jan-12

23-Jan-12

23-Nov-11

27-Nov-11

PTJ818 ERECTION ROW 3 BRACES BETWEEN -10.6 & -33.4

4 19-Jan-12

23-Jan-12

23-Nov-11

27-Nov-11

PTJ819 ERECTION ROW 3 BRACES BETWEEN -33.4 & -56.2

4 19-Jan-12

23-Jan-12

23-Nov-11

27-Nov-11

PTJ820 ERECTION ROW 3 BRACES BETWEEN -56.2 & -79.0

4 19-Jan-12

23-Jan-12

23-Nov-11

27-Nov-11

170 24-Sep-11

15-Feb-12

04-Jul-11

21-Jan-12

15 24-Sep-11

11-Oct-11

04-Jul-11

21-Jul-11

5 24-Sep-11

28-Sep-11

04-Jul-11

10-Jul-11

10 29-Sep-11

11-Oct-11

10-Jul-11

21-Jul-11

ROW B
ERECTION
ERECT

ROW D

ROW 3

ROW 1
HORIZONTAL
HORIZ
PTJ94 FITUP OF HORIZONTAL ON LEG
PTJ94 WELDING OF HORIZONTAL ON LEG
DIAGONAL BRACES
DIAGO

Finish

30 29-Sep-11

03-Nov-11

10-Jul-11

14-Aug-11

10 29-Sep-11

11-Oct-11

10-Jul-11

21-Jul-11

PTJ94 WELDING OF DIAGONAL ON LEG

20 12-Oct-11

03-Nov-11

21-Jul-11

14-Aug-11

20 24-Jan-12

15-Feb-12

29-Dec-11

21-Jan-12

PTJ80 LIFTING OF ROW 1 OVER ELAVATIONS & ROW A,B

1 24-Jan-12

24-Jan-12

29-Dec-11

29-Dec-11

PTJ80 FITUP OF ROW 1 OVER ELAVATIONS & ROW A,B

4 25-Jan-12

29-Jan-12

31-Dec-11

03-Jan-12

15 30-Jan-12

15-Feb-12

04-Jan-12

21-Jan-12

PTJ80 WELDING OF ROW 1 OVER ELAVATIONS & ROW A,B

2011
A M J Jul A S O N D

PTJ94 FITUP OF DIAGONAL ON LEG

ERECTION ROW 1
ERECT

Page 39 of 64

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

JACKET M
MISCELLANEOUS FABRICATION

Original BL Project
Duration Start

BL Project
Finish

Start

206 31-Mar-11

21-Feb-12

31-Mar-11 A

PTJ9600 Jacket miscellaneous fabrication start

0 31-Aug-11

PTJ11020 Jacket miscellaneous fabrication finish

Finish
26-Jan-12

31-Aug-11
21-Feb-12

26-Jan-12

65 19-Dec-11

21-Feb-12

23-Nov-11

26-Jan-12

Main Le
Legs

5 19-Dec-11

23-Dec-11

23-Nov-11

27-Nov-11

BL1000 Cutting & Assembly

3 19-Dec-11

21-Dec-11

23-Nov-11

25-Nov-11

BL1010 Welding & NDT

4 20-Dec-11

23-Dec-11

24-Nov-11

27-Nov-11

20 24-Dec-11

12-Jan-12

28-Nov-11

17-Dec-11

BL1040 Cutting & Assembly

10 24-Dec-11

02-Jan-12

28-Nov-11

07-Dec-11

BL1050 Welding & NDT

15 29-Dec-11

12-Jan-12

03-Dec-11

17-Dec-11

21 28-Jan-12

17-Feb-12

02-Jan-12

22-Jan-12

BL1020 Cutting & Assembly

12 28-Jan-12

08-Feb-12

02-Jan-12

13-Jan-12

BL1030 Welding & NDT

15 03-Feb-12

17-Feb-12

08-Jan-12

22-Jan-12

14 14-Jan-12

27-Jan-12

19-Dec-11

01-Jan-12

BL1060 Cutting & Assembly

4 14-Jan-12

17-Jan-12

19-Dec-11

22-Dec-11

BL1070 Welding & NDT

6 22-Jan-12

27-Jan-12

27-Dec-11

01-Jan-12

15 13-Jan-12

27-Jan-12

18-Dec-11

01-Jan-12

BL1080 Cutting & Assembly

5 13-Jan-12

17-Jan-12

18-Dec-11

22-Dec-11

BL1090 Welding & NDT

7 21-Jan-12

27-Jan-12

26-Dec-11

01-Jan-12

15 13-Jan-12

27-Jan-12

18-Dec-11

01-Jan-12

5 13-Jan-12

17-Jan-12

18-Dec-11

22-Dec-11

Front Elevation
El

Plan at Elev. +2.6

Plan at Elev. +2.4

Plan at Elev. -30


BL1100 Cutting & Assembly
BL1110 Welding & NDT

7 21-Jan-12

27-Jan-12

26-Dec-11

01-Jan-12

10 18-Jan-12

27-Jan-12

23-Dec-11

01-Jan-12

BL1120 Cutting & Assembly

4 18-Jan-12

21-Jan-12

23-Dec-11

26-Dec-11

BL1130 Welding & NDT

6 22-Jan-12

27-Jan-12

27-Dec-11

01-Jan-12

18 04-Feb-12

21-Feb-12

09-Jan-12

26-Jan-12

BL1140 Trial Fit and Grating Stopper Fixation

1 04-Feb-12

04-Feb-12

09-Jan-12

09-Jan-12

BL1150 Final Installation

1 21-Feb-12

21-Feb-12

26-Jan-12

26-Jan-12

Boat lan
landing Sections (a,b.c,d,e)

Grating

2011
A M J Jul A S O N D

BOAT LAND
LA

Back El
Elevation

Page 40 of 64

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

8 10-Feb-12

17-Feb-12

15-Jan-12

22-Jan-12

BL1160 Fabrication

5 10-Feb-12

14-Feb-12

15-Jan-12

19-Jan-12

BL1170 Installation

3 15-Feb-12

17-Feb-12

20-Jan-12

22-Jan-12

16 06-Feb-12

21-Feb-12

11-Jan-12

26-Jan-12

BL1200 Fabrication

4 06-Feb-12

09-Feb-12

11-Jan-12

14-Jan-12

BL1210 Installation

2 20-Feb-12

21-Feb-12

25-Jan-12

26-Jan-12

2 16-Feb-12

17-Feb-12

21-Jan-12

22-Jan-12

BL1220 Fabrication

1 16-Feb-12

16-Feb-12

21-Jan-12

21-Jan-12

BL1230 Installation

1 17-Feb-12

17-Feb-12

22-Jan-12

22-Jan-12

1 21-Feb-12

21-Feb-12

26-Jan-12

26-Jan-12

1 21-Feb-12

21-Feb-12

26-Jan-12

26-Jan-12

27 22-Jan-12

17-Feb-12

27-Dec-11

22-Jan-12

4 14-Feb-12

17-Feb-12

19-Jan-12

22-Jan-12

BL127 Profiling Template & Assembly with Legs

2 14-Feb-12

15-Feb-12

19-Jan-12

20-Jan-12

BL128 Welding & NDT

3 15-Feb-12

17-Feb-12

20-Jan-12

22-Jan-12

16 22-Jan-12

06-Feb-12

27-Dec-11

11-Jan-12

BL125 Cutting & Assembly

7 22-Jan-12

28-Jan-12

27-Dec-11

02-Jan-12

BL126 Welding & NDT

9 29-Jan-12

06-Feb-12

03-Jan-12

11-Jan-12

23 26-Jan-12

17-Feb-12

31-Dec-11

22-Jan-12

19 26-Jan-12

13-Feb-12

31-Dec-11

18-Jan-12

7 26-Jan-12

01-Feb-12

31-Dec-11

06-Jan-12

12 02-Feb-12

13-Feb-12

07-Jan-12

18-Jan-12

4 14-Feb-12

17-Feb-12

19-Jan-12

22-Jan-12

BL131 Profiling Template & Assembly with Legs

2 14-Feb-12

15-Feb-12

19-Jan-12

20-Jan-12

BL132 Welding & NDT

3 15-Feb-12

17-Feb-12

20-Jan-12

22-Jan-12

2 18-Feb-12

19-Feb-12

23-Jan-12

24-Jan-12

2 18-Feb-12

19-Feb-12

23-Jan-12

24-Jan-12

30 23-Jan-12

21-Feb-12

28-Dec-11

26-Jan-12

Stairs & Ladders

Handrails
Handrai

Mooring Cleat

Rubber
BL1240 Installation of Rubber & Tightening
Lower Support
S
Installation with Jacket legs
Installa

Fabrication
Fabrica

Upper Support
S
Fabrication
Fabrica
BL129 Cutting & Assembly
BL130 Welding & NDT
Installation with Jacket legs
Installa

Boat lan
landing trial fit
BL1330 Boat Landing Trial Fit
BARGE B
BUMPER

Finish

Page 41 of 64

2011
A M J Jul A S O N D

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

15 23-Jan-12

06-Feb-12

28-Dec-11

11-Jan-12

BB1000 Cutting & Assembly

6 23-Jan-12

28-Jan-12

28-Dec-11

02-Jan-12

BB1010 Welding & NDT

9 29-Jan-12

06-Feb-12

03-Jan-12

11-Jan-12

28 23-Jan-12

19-Feb-12

28-Dec-11

24-Jan-12

23 23-Jan-12

14-Feb-12

28-Dec-11

19-Jan-12

BB10 Cutting & Assembly

12 23-Jan-12

03-Feb-12

28-Dec-11

08-Jan-12

BB10 Welding & NDT

17 29-Jan-12

14-Feb-12

03-Jan-12

19-Jan-12

5 15-Feb-12

19-Feb-12

20-Jan-12

24-Jan-12

BB10 Profiling Template & Assembly with Legs

2 15-Feb-12

16-Feb-12

20-Jan-12

21-Jan-12

BB10 Welding & NDT

3 17-Feb-12

19-Feb-12

22-Jan-12

24-Jan-12

24 27-Jan-12

19-Feb-12

01-Jan-12

24-Jan-12

5 15-Feb-12

19-Feb-12

20-Jan-12

24-Jan-12

BB10 Profiling Template & Assembly with Legs

2 15-Feb-12

16-Feb-12

20-Jan-12

21-Jan-12

BB10 Welding & NDT

3 17-Feb-12

19-Feb-12

22-Jan-12

24-Jan-12

19 27-Jan-12

14-Feb-12

01-Jan-12

19-Jan-12

8 27-Jan-12

03-Feb-12

01-Jan-12

08-Jan-12

11 04-Feb-12

14-Feb-12

09-Jan-12

19-Jan-12

2 20-Feb-12

21-Feb-12

25-Jan-12

26-Jan-12

2 20-Feb-12

21-Feb-12

25-Jan-12

26-Jan-12

42 31-Aug-11

27-Oct-11

31-Aug-11

19-Oct-11

PTJ106 CLAMPS FOR RISER 16 " FABRICATION

18 31-Aug-11

20-Sep-11

31-Aug-11

20-Sep-11

PTJ105 RISER 16 " FABRICATION

22 31-Aug-11

25-Sep-11

31-Aug-11

25-Sep-11

7 26-Sep-11

03-Oct-11

26-Sep-11

03-Oct-11

PTJ106 CLAMPS FOR RISER 16 " INSTALLATION

14 29-Sep-11

16-Oct-11

21-Sep-11

08-Oct-11

PTJ106 RISER 16 " INSTALLATION

10 17-Oct-11

27-Oct-11

09-Oct-11

19-Oct-11

26 31-Aug-11

16-Oct-11

31-Aug-11

29-Sep-11

PTJ106 CLAMPS FOR J-TUBE16 " FABRICATION

12 31-Aug-11

13-Sep-11

31-Aug-11

13-Sep-11

PTJ106 J-TUBE16 " FABRICATION

14 31-Aug-11

15-Sep-11

31-Aug-11

15-Sep-11

Main Pi
Pipe

Upper Support
S
Fabrication
Fabrica

Installation with Jacket legs


Installa

Lower Support
S
Installation with Jacket legs
Installa

Fabrication
Fabrica
BB10 Cutting & Assembly
BB10 Welding & NDT
Barge Bumper
B
Trial Fit
BB1100 Barge Bumper Trial Fit
RISER 16"
1 & CLAMPS

PTJ106 RISER COATING

J-TUBE 16 " & CLAMPS

Finish

Page 42 of 64

2011
A M J Jul A S O N D

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

10 29-Sep-11

11-Oct-11

14-Sep-11

25-Sep-11

4 12-Oct-11

16-Oct-11

26-Sep-11

29-Sep-11

14 31-Aug-11

05-Oct-11

31-Aug-11

15-Sep-11

PTJ106 CLAMPS FOR FUTURE J-TUBE FABRICATION

8 31-Aug-11

08-Sep-11

31-Aug-11

08-Sep-11

PTJ107 CLAMPS FOR FUTURE J-TUBE INSTALLATION

6 29-Sep-11

05-Oct-11

10-Sep-11

15-Sep-11

18 31-Jan-12

20-Feb-12

05-Jan-12

25-Jan-12

2 07-Feb-12

08-Feb-12

12-Jan-12

14-Jan-12

14 31-Jan-12

15-Feb-12

05-Jan-12

21-Jan-12

PTJ107 SUPPORTS SUMP CAISSON 30 " INSTALLATION

6 09-Feb-12

15-Feb-12

15-Jan-12

21-Jan-12

PTJ107 SUPPORTS SUMP CAISSON 30 " INSTALLATION

4 16-Feb-12

20-Feb-12

22-Jan-12

25-Jan-12

80 31-Aug-11

03-Dec-11

31-Aug-11

03-Dec-11

PTJ107 MUD MAT FABRICATION

60 31-Aug-11

09-Nov-11

31-Aug-11

09-Nov-11

PTJ107 MUD MAT INSTALLATION

20 10-Nov-11

03-Dec-11

10-Nov-11

03-Dec-11

47 31-Aug-11

25-Oct-11

31-Aug-11

25-Oct-11

PTJ103 FITUP OF WALK WAY & STARIR

12 31-Aug-11

13-Sep-11

31-Aug-11

13-Sep-11

PTJ103 WELDING & NDT OF WALK WAY & STARIRS

16 14-Sep-11

02-Oct-11

14-Sep-11

02-Oct-11

PTJ103 ERECTION WALK WAY ON TOP ELEVATION

12 12-Oct-11

25-Oct-11

12-Oct-11

25-Oct-11

118 31-Mar-11

14-Aug-11

31-Mar-11 A

14-Jul-11

118 31-Mar-11

14-Aug-11

31-Mar-11 A

14-Jul-11

87 31-Mar-11

24-May-11

31-Mar-11 A

10-Jul-11

PTJ98 FITUP OF LUNCH TRUSS FROM EL -33.4 UP TO -10.6

32 31-Mar-11

10-May-11

31-Mar-11 A

26-Jun-11

PTJ98 WELDING & NDT LUNCH TRUSS FROM EL -33.4 UP TO -10.6

24 24-Apr-11

22-May-11

26-Apr-11 A

07-Jul-11

2 23-May-11

24-May-11

07-Jul-11

10-Jul-11

50 11-May-11

04-Jul-11

15-Apr-11 A

12-Jul-11

PTJ97 FITUP OF LUNCH TRUSS FROM EL -56 UP TO -33.4

35 11-May-11

20-Jun-11

15-Apr-11 A

28-Jun-11

PTJ98 WELDING & NDT OF LUNCH TRUSS FROM EL -56 UP TO -33.4

25 04-Jun-11

02-Jul-11

07-May-11 A

10-Jul-11

PTJ98 LIFTING OF LUNCH TRUSS FROM EL -79 UP TO -56 ON SKID ...

2 03-Jul-11

04-Jul-11

10-Jul-11

12-Jul-11

45 21-Jun-11

14-Aug-11

25-Apr-11 A

14-Jul-11

PTJ106 CLAMPS FOR J-TUBE16 " INSTALLATION


PTJ106 J-TUBE16 " INSTALLATION
FUTURE J-TUBE CLAMPS

SUMP C
CAISSON 30"
PTJ107 SUPPORTS SUMP CAISSON 30 " FABRICATION
PTJ107 SUMP CAISSON 30 " FABRICATION

MUD MAT
MA

WALK W
WAY & STAIRS

LAUNCH RUNNERS
AT ROW D
FROM EL. -33400 TO -10600

PTJ98 LIFTING OF LUNCH TRUSS FROM EL -79 UP TO -56 ON SKID ...


FROM EL. -56200 TO -33400

FROM EL. -79000 TO -56200

Finish

Page 43 of 64

2011
A M J Jul A S O N D

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

Finish

34 21-Jun-11

31-Jul-11

25-Apr-11 A

30-Jun-11

PTJ97 WELDING & NDT OF LUNCH TRUSS FROM EL -79 UP TO -56

24 14-Jul-11

11-Aug-11

18-May-11 A

12-Jul-11

2 13-Aug-11

14-Aug-11

12-Jul-11

14-Jul-11

118 31-Mar-11

14-Aug-11

31-Mar-11 A

14-Jul-11

87 31-Mar-11

24-May-11

31-Mar-11 A

10-Jul-11

PTJ97 FITUP OF LUNCH TRUSS FROM EL -33.4 UP TO -10.6

32 31-Mar-11

10-May-11

31-Mar-11 A

26-Jun-11

PTJ97 WELDING & NDT LUNCH TRUSS FROM EL -33.4 UP TO -10.6

24 24-Apr-11

22-May-11

26-Apr-11 A

07-Jul-11

2 23-May-11

24-May-11

07-Jul-11

10-Jul-11

45 21-Jun-11

14-Aug-11

25-Apr-11 A

14-Jul-11

PTJ96 FITUP OF LUNCH TRUSS FROM EL -79 UP TO -56

34 21-Jun-11

31-Jul-11

25-Apr-11 A

30-Jun-11

PTJ96 WELDING & NDT OF LUNCH TRUSS FROM EL -79 UP TO -56

24 14-Jul-11

11-Aug-11

18-May-11 A

12-Jul-11

2 13-Aug-11

14-Aug-11

12-Jul-11

14-Jul-11

50 11-May-11

04-Jul-11

01-May-11 A

12-Jul-11

PTJ97 FITUP OF LUNCH TRUSS FROM EL -56 UP TO -33.4

35 11-May-11

20-Jun-11

01-May-11 A

28-Jun-11

PTJ97 WELDING & NDT OF LUNCH TRUSS FROM EL -56 UP TO -33.4

25 04-Jun-11

02-Jul-11

14-May-11 A

10-Jul-11

PTJ97 LIFTING OF LUNCH TRUSS FROM EL -79 UP TO -56 ON SKID ...

2 03-Jul-11

04-Jul-11

10-Jul-11

12-Jul-11

167 21-Aug-11

21-Feb-12

11-Jun-11 A

26-Jan-12

PTJ100 INSTALL ANODES FOR ROW A

13 21-Aug-11

05-Sep-11

13-Jul-11

28-Jul-11

PTJ101 INSTALL ANODES FOR ROW B

8 04-Sep-11

12-Sep-11

14-Jun-11 A

04-Aug-11

PTJ102 INSTALL ANODES FOR ELEV -56.2

7 23-Oct-11

30-Oct-11

01-Aug-11

09-Aug-11

PTJ101 INSTALL ANODES FOR ROW C

6 01-Nov-11

07-Nov-11

10-Aug-11

17-Aug-11

PTJ102 INSTALL ANODES FOR ELEV -79.0

7 31-Oct-11

07-Nov-11

09-Aug-11

17-Aug-11

PTJ101 INSTALL ANODES FOR ROW D

6 09-Nov-11

15-Nov-11

18-Aug-11

25-Aug-11

PTJ102 INSTALL ANODES FOR ELEV -33.4

5 12-Nov-11

16-Nov-11

21-Aug-11

27-Aug-11

PTJ102 INSTALL ANODES FOR ELEV -10.6

5 29-Nov-11

04-Dec-11

27-Sep-11

03-Oct-11

PTJ101 INSTALL ANODES FOR ROW 3

6 12-Jan-12

18-Jan-12

16-Nov-11

22-Nov-11

PTJ101 INSTALL ANODES FOR ROW 1

10 04-Jan-12

15-Jan-12

10-Dec-11

20-Dec-11

PTJ101 INSTALL ANODES FOR ROW 2

10 28-Jan-12

07-Feb-12

11-Jun-11 A

12-Jan-12

AT ROW C
FROM EL. -33400 TO -10600

PTJ97 LIFTING OF LUNCH TRUSS FROM EL -79 UP TO -56 ON SKID ...


FROM EL. -79000 TO -56200

PTJ96 LIFTING OF LUNCH TRUSS FROM EL -79 UP TO -56 ON SKID ...


FROM EL. -56200 TO -33400

ANODES

2011
A M J Jul A S O N D

PTJ97 FITUP OF LUNCH TRUSS FROM EL -79 UP TO -56

PTJ97 LIFTING OF LUNCH TRUSS FROM EL -79 UP TO -56 ON SKID ...

Page 44 of 64

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

PTJ102 INSTALL ANODES FOR MUD MAT

7 14-Feb-12

21-Feb-12

19-Jan-12

26-Jan-12

PTJ102 INSTALL ANODES FOR SUMP CASSOIN

1 21-Feb-12

21-Feb-12

26-Jan-12

26-Jan-12

82 31-Aug-11

05-Dec-11

31-Aug-11

05-Dec-11

82 31-Aug-11

05-Dec-11

31-Aug-11

05-Dec-11

6 31-Aug-11

06-Sep-11

31-Aug-11

06-Sep-11

PTJ986 CUTTING & EDGE PREPARATION OF BOUNCY TANK SUPPOR...

12 31-Aug-11

13-Sep-11

31-Aug-11

13-Sep-11

PTJ987 ROLLING OF BOUNCY TANK PLATE

20 07-Sep-11

29-Sep-11

07-Sep-11

29-Sep-11

PTJ988 SEAM WELD & REROLLING OF BOUNCY TANK PLATE

24 12-Sep-11

10-Oct-11

12-Sep-11

10-Oct-11

PTJ989 ERECTION OF SUPPORTS & STIFFENERS PLATE WITH BOUN...

24 11-Oct-11

07-Nov-11

11-Oct-11

07-Nov-11

PTJ99

10 08-Nov-11

19-Nov-11

08-Nov-11

19-Nov-11

24 08-Nov-11

05-Dec-11

08-Nov-11

05-Dec-11

82 31-Aug-11

05-Dec-11

31-Aug-11

05-Dec-11

6 31-Aug-11

06-Sep-11

31-Aug-11

06-Sep-11

PTJ993 CUTTING & EDGE PREPARATION OF BOUNCY TANK SUPPOR...

12 31-Aug-11

13-Sep-11

31-Aug-11

13-Sep-11

PTJ994 ROLLING OF BOUNCY TANK PLATE

20 07-Sep-11

29-Sep-11

07-Sep-11

29-Sep-11

PTJ995 SEAM WELD & REROLLING OF BOUNCY TANK PLATE

24 12-Sep-11

10-Oct-11

12-Sep-11

10-Oct-11

PTJ996 ERECTION OF SUPPORTS & STIFFENERS PLATE WITH BOUN...

24 11-Oct-11

07-Nov-11

11-Oct-11

07-Nov-11

PTJ998 ERECTION OF BOUNCY TANK WITH LEGS

10 08-Nov-11

19-Nov-11

08-Nov-11

19-Nov-11

PTJ997 GIRTH WELD OF BOUNCY TANK

24 08-Nov-11

05-Dec-11

08-Nov-11

05-Dec-11

82 31-Aug-11

05-Dec-11

31-Aug-11

05-Dec-11

6 31-Aug-11

06-Sep-11

31-Aug-11

06-Sep-11

PTJ100 CUTTING & EDGE PREPARATION OF BOUNCY TANK SUPPRT...

12 31-Aug-11

13-Sep-11

31-Aug-11

13-Sep-11

PTJ100 ROLLING OF BOUNCY TANK PLATE

20 07-Sep-11

29-Sep-11

07-Sep-11

29-Sep-11

PTJ100 SEAM WELD & REROLLING OF BOUNCY TANK PLATE

24 12-Sep-11

10-Oct-11

12-Sep-11

10-Oct-11

PTJ100 ERECTION OF SUPPORTS & STIFFENERS PLATE WITH BOUN...

24 11-Oct-11

07-Nov-11

11-Oct-11

07-Nov-11

PTJ100 ERECTION OF BOUNCY TANK WITH LEGS

10 08-Nov-11

19-Nov-11

08-Nov-11

19-Nov-11

PTJ100 GIRTH WELD OF BOUNCY TANK

24 08-Nov-11

05-Dec-11

08-Nov-11

05-Dec-11

82 31-Aug-11

05-Dec-11

31-Aug-11

05-Dec-11

BOUNCY TANKS
AT LEG A1
PTJ985 CUTTING & EDGE PREPARATION OF BOUNCY TANK PLATE

ERECTION OF BOUNCY TANK WITH LEGS

PTJ990 GIRTH WELD OF BOUNCY TANK


AT LEG A2
PTJ992 CUTTING & EDGE PREPARATION OF BOUNCY TANK PLATE

AT LEG B1
PTJ999 CUTTING & EDGE PREPARATION OF BOUNCY TANK PLATE

AT LEG B2

Finish

Page 45 of 64

2011
A M J Jul A S O N D

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

6 31-Aug-11

06-Sep-11

31-Aug-11

06-Sep-11

PTJ100 CUTTING & EDGE PREPARATION OF BOUNCY TANK SUPPOR...

12 31-Aug-11

13-Sep-11

31-Aug-11

13-Sep-11

PTJ100 ROLLING OF BOUNCY TANK PLATE

20 07-Sep-11

29-Sep-11

07-Sep-11

29-Sep-11

PTJ10

SEAM WELD & REROLLING OF BOUNCY TANK PLATE

24 12-Sep-11

10-Oct-11

12-Sep-11

10-Oct-11

PTJ10

ERECTION OF SUPPORTS& STIFFENERS PLATE WITH BOUN...

24 11-Oct-11

07-Nov-11

11-Oct-11

07-Nov-11

PTJ10

ERECTION OF BOUNCY TANK WITH LEGS

10 08-Nov-11

19-Nov-11

08-Nov-11

19-Nov-11

PTJ10

GIRTH WELD OF BOUNCY TANK

24 08-Nov-11

05-Dec-11

08-Nov-11

05-Dec-11

35 01-Jan-12

09-Feb-12

06-Dec-11

15-Jan-12

PTJ107 BALASTING INSTALLATION

20 01-Jan-12

23-Jan-12

06-Dec-11

28-Dec-11

PTJ109 GROUTING INSTALLATION ON ROW 1

20 01-Jan-12

23-Jan-12

06-Dec-11

28-Dec-11

PTJ109 GROUTING INSTALLATION ON ROW 2

20 18-Jan-12

09-Feb-12

24-Dec-11

15-Jan-12

120 22-Sep-11

09-Feb-12

08-Sep-11

26-Jan-12

120 22-Sep-11

09-Feb-12

08-Sep-11

26-Jan-12

32 31-Aug-11

08-Oct-11

31-Aug-11

08-Oct-11

PTJ107 INSTALLATION AIDS FABRICATION

22 31-Aug-11

25-Sep-11

31-Aug-11

25-Sep-11

PTJ107 INSTALLATION AIDS INSTALLATION

10 26-Sep-11

08-Oct-11

26-Sep-11

08-Oct-11

17 31-Dec-11

18-Jan-12

03-Nov-11

22-Nov-11

PTJ9300 FITUP OF PREBENT CONDUCTOR

8 31-Dec-11

08-Jan-12

03-Nov-11

12-Nov-11

PTJ9310 WELDING OF PREBENT CONDUCTOR

9 09-Jan-12

18-Jan-12

13-Nov-11

22-Nov-11

141 03-Oct-11

15-Mar-12

03-Oct-11

15-Mar-12

PTJ10320 SPLASH PAINTING FOR MISC. (H.R, STAIRS, ...ETC)

7 03-Oct-11

11-Oct-11

03-Oct-11

11-Oct-11

PTJ10300 SPLASH PAINTING FOR ROW A

7 05-Dec-11

12-Dec-11

03-Oct-11

12-Oct-11

PTJ10310 SPLASH PAINTING FOR ROW B

7 10-Dec-11

17-Dec-11

09-Oct-11

17-Oct-11

PTJ10340 ATMOSPHERIC PAINTING FOR TOP ELEV

7 14-Dec-11

21-Dec-11

18-Oct-11

25-Oct-11

PTJ10280 SPLASH PAINTING FOR ROW 1

7 16-Jan-12

23-Jan-12

21-Dec-11

28-Dec-11

PTJ10290 SPLASH PAINTING FOR ROW 2

7 08-Feb-12

15-Feb-12

14-Jan-12

21-Jan-12

14 05-Feb-12

20-Feb-12

10-Jan-12

25-Jan-12

5 11-Mar-12

15-Mar-12

11-Mar-12

15-Mar-12

PTJ100 CUTTING & EDGE PREPARATION OF BOUNCY TANK PLATE

BALLASTING & GROUTING SYSTEM


BALLAS

GRILLAGE & SEA FASTENING


GRILLAG
PTJ108 GRILLAGE & SEA FASTENING FABRICATION
INSTALLATION AIDS
INSTALL

PREBENT CONDUCTOR
PREBEN

PAINTING

PTJ10260 SPLASH PAINTING FOR BOAT LAND


PTJ10270 SPLASH PAINTING FOR BARGE BUMPER

Finish

Page 46 of 64

2011
A M J Jul A S O N D

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

28 13-Feb-12

15-Mar-12

13-Feb-12

15-Mar-12

10 11-Feb-12

21-Feb-12

16-Jan-12

26-Jan-12

PTJ10990 RISER HYDRO TEST

10 11-Feb-12

21-Feb-12

16-Jan-12

26-Jan-12

PTJ11000 BALLASTING SYSTEM TEST

10 11-Feb-12

21-Feb-12

16-Jan-12

26-Jan-12

PTJ11010 GROUTING SYSTEM TEST

10 11-Feb-12

21-Feb-12

16-Jan-12

26-Jan-12

17-Dec-11

15-Apr-11 A

17-Nov-11

PTJ10330 PILE MARKING


INSPECTION, TESTING & PRE-COMMISIONING
INSPECT

PILES FAB
FABRICATION
PTJ2030

Piiles fabrication start

PTJ10380 Piiles fabrication finish


AT LEG A1

123 02-Jul-11
0 02-Jul-11
0

Finish

15-Apr-11 A
17-Dec-11

17-Nov-11

31-Aug-11

15-Apr-11 A

28-Jul-11

PTJ10420 Automatic welding 6 joints

24 06-Jul-11

02-Aug-11

24-Apr-11 A

11-Jun-11 A

PTJ10430 back weld manual 6 joints

16 16-Jul-11

02-Aug-11

02-May-11 A

12-Jun-11 A

PTJ10390 Manual fitup & welding 6 joints

23 02-Jul-11

28-Jul-11

15-Apr-11 A

06-Jul-11

PTJ10410 Welding beads (41 joints)

10 03-Aug-11

14-Aug-11

04-May-11 A

19-Jul-11

PTJ10400 Fitup & welding for manual joint (2 joints)

10 20-Aug-11

31-Aug-11

17-Jul-11

28-Jul-11

61 02-Jul-11

04-Oct-11

25-Jun-11

05-Sep-11

PTJ10440 Manual fitup & welding automatic 6 joints

24 02-Jul-11

28-Jul-11

25-Jun-11

21-Jul-11

PTJ10460 back weld manual 6 joints

16 18-Aug-11

06-Sep-11

19-Jul-11

07-Aug-11

PTJ10450 Automatic welding 6 joints

24 10-Aug-11

07-Sep-11

11-Jul-11

08-Aug-11

PTJ10480 Welding beads (41 joints)

10 08-Sep-11

19-Sep-11

08-Aug-11

20-Aug-11

PTJ10470 Fitup & welding for manual joint (2 joints)

10 24-Sep-11

04-Oct-11

23-Aug-11

05-Sep-11

87 02-Jul-11

12-Nov-11

02-May-11 A

13-Oct-11

PTJ10490 Manual fitup & welding automatic 6 joints

23 02-Jul-11

28-Jul-11

02-May-11 A

14-Jul-11

PTJ10500 Automatic welding 6 joints

24 15-Sep-11

13-Oct-11

15-Aug-11

13-Sep-11

PTJ10510 back weld manual 6 joints

16 26-Sep-11

15-Oct-11

25-Aug-11

14-Sep-11

PTJ10530 Welding beads (41 joints)

10 15-Oct-11

25-Oct-11

06-Jun-11 A

22-Sep-11

PTJ10520 Fitup & welding for manual joint (2 joints)

10 01-Nov-11

12-Nov-11

01-Oct-11

13-Oct-11

123 02-Jul-11

17-Dec-11

25-Jun-11

17-Nov-11

24 02-Jul-11

28-Jul-11

25-Jun-11

21-Jul-11

AT LEG B1

AT LEG B2
PTJ10540 Manual fitup & welding automatic 6 joints

2011
A M J Jul A S O N D

39 02-Jul-11

AT LEG A2

Page 47 of 64

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

PTJ10550 Automatic welding 6 joints

24 22-Oct-11

17-Nov-11

20-Sep-11

19-Oct-11

PTJ10560 back weld manual 6 joints

16 01-Nov-11

19-Nov-11

01-Oct-11

20-Oct-11

PTJ10580 Welding beads (41 joints)

10 19-Nov-11

29-Nov-11

19-Oct-11

31-Oct-11

PTJ10570 Fitup & welding for manual joint (2 joints)

10 06-Dec-11

17-Dec-11

06-Nov-11

17-Nov-11

79 16-Jul-11

03-Oct-11

02-Apr-11 A

17-Jul-11

PRE-DRILLING TEMPLATE
PRE-DRIL
PTD000

Pre-drilling template fabrication start

0 16-Jul-11

Finish

02-Apr-11 A

5 16-Jul-11

20-Jul-11

02-Apr-11 A

07-Apr-11 A

PTJ10820 welding & NDT of bottom plate

6 02-Aug-11

08-Aug-11

03-May-11 A

25-May-11 A

PTJ10830 cutting, rolling and assembly of outer frame

6 02-Aug-11

08-Aug-11

03-May-11 A

25-May-11 A

01-Aug-11

16-Apr-11 A

25-May-11 A

5 09-Aug-11

14-Aug-11

10-May-11 A

25-Jun-11

PTJ10850 fabrication of beams ( built up section )

10 15-Aug-11

25-Aug-11

16-May-11 A

25-Jun-11

PTJ10860 installation of beams with bottom frame

5 27-Aug-11

04-Sep-11

14-May-11 A

27-Jun-11

PTJ10870 cutting of conductor pipe

2 05-Sep-11

06-Sep-11

08-May-11 A

28-Jun-11

PTJ10920 fabrication of pad eyes

5 05-Sep-11

10-Sep-11

08-May-11 A

02-Jul-11

PTJ10880 fabrication & installation of shims plates

4 07-Sep-11

11-Sep-11

11-May-11 A

02-Jul-11

PTJ10890 installation of conductor pipe

5 12-Sep-11

17-Sep-11

15-May-11 A

05-Jul-11

PTJ10930 installation of pad eyes

5 11-Sep-11

15-Sep-11

02-Jul-11

07-Jul-11

PTJ10910 installation of cones

7 18-Sep-11

25-Sep-11

21-May-11 A

09-Jul-11

10 14-Sep-11

25-Sep-11

27-Jun-11

09-Jul-11

PTJ10840 welding & NDT of outer frame

PTJ10940 fabrication of lifting tool


PTJ2010

Pre-drilling template fabrication finish

PTJ10950 painting of template


W.P.5: DEC
DECK & TSF FABRICATION
DECK FABRICATION
FAB
General Activities
A

14 16-Jul-11

03-Oct-11

17-Jul-11

7 26-Sep-11

03-Oct-11

09-Jul-11

17-Jul-11

271 31-Mar-11

03-May-12

31-Mar-11 A

01-May-12

271 31-Mar-11

03-May-12

31-Mar-11 A

01-May-12

268 28-May-11

29-Apr-12

03-Apr-11 A

26-Apr-12

PTJ2040 Deck primary structure fabrication start

0 28-May-11

03-Apr-11 A

PTJ2160 Deck secondray structure fabrication start

0 31-Aug-11

19-May-11 A

PTJ1150 Static equipment (by petrojet)

120 10-Aug-11

07-Dec-11

2011
A M J Jul A S O N D

PTJ10810 cutting & assembly of bottom plate

PTJ10900 fabrication of cones

Page 48 of 64

10-Aug-11

07-Dec-11*

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

PTJ1160 Piping & E&I supports (by petrojet)

30 20-Nov-11

20-Dec-11

18-Nov-11

17-Dec-11

PTJ2060 Deck pre-commisioning

40 12-Feb-12

29-Mar-12

11-Feb-12

27-Mar-12

PTJ2065 Crane assembly and erection

20 03-Apr-12

26-Apr-12

19-Mar-12

10-Apr-12

1 26-Apr-12

28-Apr-12

11-Apr-12

11-Apr-12

26 29-Mar-12

29-Apr-12

28-Mar-12

26-Apr-12

327 31-Mar-11

03-May-12

31-Mar-11 A

17-Apr-12

46 31-Mar-11

22-May-11

31-Mar-11 A

31-May-11 A

PTD100 Cutting & Assembly

20 31-Mar-11

25-Apr-11

31-Mar-11 A

27-Apr-11 A

PTD100 Welding & NDT

28 18-Apr-11

22-May-11

19-Apr-11 A

31-May-11 A

199 28-May-11

14-Jan-12

25-May-11 A

14-Jan-12

PTJD10 Profiling Template

4 28-May-11

31-May-11

25-May-11 A

27-Jun-11

PTD103 Assembly

6 28-Dec-11

03-Jan-12

28-Dec-11

03-Jan-12

12 01-Jan-12

14-Jan-12

01-Jan-12

14-Jan-12

145 28-May-11

21-Nov-11

28-Apr-11 A

14-Nov-11

26 28-May-11

26-Jun-11

28-Apr-11 A

30-Jun-11

PTD10 Cutting & Assembly

16 28-May-11

14-Jun-11

28-Apr-11 A

30-May-11 A

PTD10 Welding & NDT

22 01-Jun-11

26-Jun-11

01-May-11 A

30-Jun-11

70 28-May-11

26-Jul-11

28-Apr-11 A

16-Aug-11

PTD10 Cutting & Assembly

36 28-May-11

07-Jul-11

28-Apr-11 A

06-Jun-11 A

PTD10 Welding & NDT

46 04-Jun-11

26-Jul-11

25-Jun-11

16-Aug-11

Secondary Beams Fabrication


Second

28 31-Aug-11

10-Oct-11

19-May-11 A

02-Oct-11

PTD10 Cutting & Assembly

22 31-Aug-11

25-Sep-11

19-May-11 A

06-Sep-11

PTD11 Welding & NDT

28 07-Sep-11

10-Oct-11

31-Aug-11

02-Oct-11

36 11-Oct-11

21-Nov-11

03-Oct-11

14-Nov-11

PTD11 Cutting & Assembly

20 11-Oct-11

02-Nov-11

03-Oct-11

26-Oct-11

PTD11 Welding & NDT

24 25-Oct-11

21-Nov-11

18-Oct-11

14-Nov-11

10 31-Aug-11

19-Sep-11

19-May-11 A

13-Sep-11

7 31-Aug-11

07-Sep-11

19-May-11 A

04-Sep-11

PTJ2220 Deck weighing


PTJ2090 Deck commisioning
Deck Structure
Stru
Fabrication
Deck Leg
Legs Fabrication

Braces Below
B
Cellar

PTD104 Welding & NDT


Cellar De
Deck Fabrication (+11.000)
Joints Fabrication
F

Main Be
Beams Fabrication

Embossed Plates
Emboss

PLAN AT EL. + 9.200


Main Be
Beams Fabrication

Finish

Page 49 of 64

2011
A M J Jul A S O N D

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

PTD17 Cutting & Assembly

3 31-Aug-11

03-Sep-11

19-May-11 A

31-Aug-11

PTD17 Welding & NDT

4 04-Sep-11

07-Sep-11

21-May-11 A

04-Sep-11

Secondary Beams Fabrication


Second

7 08-Sep-11

13-Sep-11

19-May-11 A

07-Sep-11

PTD17 Cutting & Assembly

2 08-Sep-11

10-Sep-11

19-May-11 A

04-Sep-11

PTD17 Welding & NDT

3 11-Sep-11

13-Sep-11

04-Sep-11

07-Sep-11

5 14-Sep-11

19-Sep-11

07-Sep-11

13-Sep-11

PTD17 Cutting & Assembly

2 14-Sep-11

15-Sep-11

07-Sep-11

10-Sep-11

PTD17 Welding & NDT

3 17-Sep-11

19-Sep-11

10-Sep-11

13-Sep-11

25 31-Aug-11

13-Oct-11

19-May-11 A

01-Oct-11

10 31-Aug-11

20-Sep-11

19-May-11 A

12-Sep-11

8 31-Aug-11

08-Sep-11

19-May-11 A

31-Aug-11

10 10-Sep-11

20-Sep-11

31-Aug-11

12-Sep-11

Secondary Beams Fabrication


Second

8 21-Sep-11

02-Oct-11

18-Jun-11 A

20-Sep-11

PTD16 Cutting & Assembly

4 21-Sep-11

25-Sep-11

18-Jun-11 A

13-Sep-11

PTD16 Welding & NDT

6 26-Sep-11

02-Oct-11

13-Sep-11

20-Sep-11

9 03-Oct-11

13-Oct-11

20-Sep-11

01-Oct-11

PTD16 Cutting & Assembly

4 03-Oct-11

08-Oct-11

20-Sep-11

25-Sep-11

PTD16 Welding & NDT

5 09-Oct-11

13-Oct-11

25-Sep-11

01-Oct-11

55 31-Aug-11

03-Nov-11

31-Aug-11

03-Nov-11

11 31-Aug-11

12-Sep-11

31-Aug-11

12-Sep-11

5 31-Aug-11

05-Sep-11

31-Aug-11

05-Sep-11

GRATING
GRATIN

PLAN AT EL. + 9.700


Main Be
Beams Fabrication
PTD16 Cutting & Assembly
PTD16 Welding & NDT

GRATING
GRATIN

WELL HEAD
H
MEZZANINE AT (+ 16.000)
Joints Fabrication
F
PTD15 Cutting & Assembly
PTD15 Welding & NDT

Finish

6 06-Sep-11

12-Sep-11

06-Sep-11

12-Sep-11

08-Oct-11

13-Sep-11

08-Oct-11

9 13-Sep-11

22-Sep-11

13-Sep-11

22-Sep-11

12 24-Sep-11

08-Oct-11

24-Sep-11

08-Oct-11

Secondary Beams Fabrication


Second

12 09-Oct-11

22-Oct-11

09-Oct-11

22-Oct-11

PTD15 Cutting & Assembly

5 09-Oct-11

13-Oct-11

09-Oct-11

13-Oct-11

PTD15 Welding & NDT

7 15-Oct-11

22-Oct-11

15-Oct-11

22-Oct-11

PTD15 Cutting & Assembly


PTD15 Welding & NDT

2011
A M J Jul A S O N D

21 13-Sep-11

Main Be
Beams Fabrication

Page 50 of 64

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

11 23-Oct-11

03-Nov-11

23-Oct-11

03-Nov-11

PTD15 Cutting & Assembly

5 23-Oct-11

27-Oct-11

23-Oct-11

27-Oct-11

PTD16 Welding & NDT

6 29-Oct-11

03-Nov-11

29-Oct-11

03-Nov-11

128 28-May-11

22-Nov-11

25-Jun-11

22-Nov-11

PTD113 Profiling Template

14 28-May-11

12-Jun-11

25-Jun-11

10-Jul-11

PTD114 Assembly

24 02-Oct-11

30-Oct-11

02-Oct-11

30-Oct-11

PTD115 Welding & NDT

32 17-Oct-11

22-Nov-11

17-Oct-11

22-Nov-11

131 28-May-11

05-Nov-11

28-Apr-11 A

29-Oct-11

46 28-May-11

19-Jul-11

28-Apr-11 A

06-Jul-11

PTD11 Cutting & Assembly

20 28-May-11

19-Jun-11

28-Apr-11 A

31-May-11 A

PTD11 Welding & NDT

26 20-Jun-11

19-Jul-11

07-May-11 A

06-Jul-11

70 30-May-11

16-Aug-11

30-Apr-11 A

18-Aug-11

PTD11 Cutting & Assembly

36 30-May-11

10-Jul-11

30-Apr-11 A

03-Jul-11

PTD11 Welding & NDT

48 22-Jun-11

16-Aug-11

25-Jun-11

18-Aug-11

Secondary Beams Fabrication


Second

26 31-Aug-11

08-Oct-11

21-May-11 A

29-Sep-11

PTD12 Cutting & Assembly

20 31-Aug-11

22-Sep-11

21-May-11 A

12-Sep-11

PTD12 Welding & NDT

26 07-Sep-11

08-Oct-11

31-Aug-11

29-Sep-11

37 22-Sep-11

05-Nov-11

15-Sep-11

29-Oct-11

PTD12 Cutting & Assembly

20 22-Sep-11

16-Oct-11

15-Sep-11

09-Oct-11

PTD12 Welding & NDT

24 09-Oct-11

05-Nov-11

01-Oct-11

29-Oct-11

Braces & Legs Above Main

185 28-May-11

28-Jan-12

25-Jun-11

28-Jan-12

PTD124 Profiling Template

8 28-May-11

05-Jun-11

25-Jun-11

03-Jul-11

PTD125 Assembly

8 15-Jan-12

23-Jan-12

15-Jan-12

23-Jan-12

10 17-Jan-12

28-Jan-12

17-Jan-12

28-Jan-12

164 28-May-11

12-Dec-11

25-May-11 A

17-Nov-11

PTD127 Profiling Template

22 28-May-11

21-Jun-11

25-May-11 A

26-Jun-11

PTD128 Assembly

40 16-Oct-11

30-Nov-11

13-Jun-11 A

12-Oct-11

PTD129 Welding & NDT

35 02-Nov-11

12-Dec-11

09-Oct-11

17-Nov-11

GRATING
GRATIN

Braces & Legs between Cellar and Main

Main Dec
Deck Fabrication (+17.000)
Joints Fabrication
F

Main Be
Beams Fabrication

Embossed Plates
Emboss

PTD126 Welding & NDT


Braces Below
B
Heli Deck

Finish

Page 51 of 64

2011
A M J Jul A S O N D

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

90 07-Aug-11

12-Dec-11

07-May-11 A

21-Nov-11

24 07-Aug-11

06-Sep-11

07-May-11 A

22-Aug-11

8 07-Aug-11

15-Aug-11

07-May-11 A

14-Jun-11 A

12 23-Aug-11

06-Sep-11

18-Jun-11 A

22-Aug-11

24 16-Aug-11

20-Sep-11

16-May-11 A

06-Sep-11

PTD13 Cutting & Assembly

14 16-Aug-11

04-Sep-11

16-May-11 A

23-Jun-11 A

PTD13 Welding & NDT

24 23-Aug-11

20-Sep-11

09-Aug-11

06-Sep-11

Secondary Beams Fabrication


Second

32 31-Aug-11

15-Oct-11

21-May-11 A

08-Oct-11

PTD13 Cutting & Assembly

24 31-Aug-11

27-Sep-11

21-May-11 A

13-Sep-11

PTD13 Welding & NDT

32 07-Sep-11

15-Oct-11

31-Aug-11

08-Oct-11

29 10-Oct-11

12-Nov-11

02-Oct-11

05-Nov-11

PTD13 Cutting & Assembly

18 10-Oct-11

30-Oct-11

02-Oct-11

23-Oct-11

PTD13 Welding & NDT

24 16-Oct-11

12-Nov-11

09-Oct-11

05-Nov-11

14 13-Nov-11

28-Nov-11

06-Nov-11

21-Nov-11

PTD13 Cutting & Assembly

6 13-Nov-11

19-Nov-11

06-Nov-11

12-Nov-11

PTD13 Welding & NDT

8 20-Nov-11

28-Nov-11

13-Nov-11

21-Nov-11

14 13-Nov-11

12-Dec-11

06-Nov-11

21-Nov-11

PTD14 Cutting & Assembly

6 13-Nov-11

19-Nov-11

06-Nov-11

12-Nov-11

PTD14 Welding & NDT

8 04-Dec-11

12-Dec-11

13-Nov-11

21-Nov-11

Misellaneuos
Misellane

153 10-Nov-11

03-May-12

23-Oct-11

17-Apr-12

Installation
Installat

117 04-Dec-11

03-May-12

04-Dec-11

17-Apr-12

Heli Dec
Deck Fabrication (+29.125)
Joints Fabrication
F
PTD13 Cutting & Assembly
PTD13 Welding & NDT
Main Be
Beams Fabrication

Covering Plates
Coverin

Gutter

Landing Area

Finish

Page 52 of 64

2011
A M J Jul A S O N D

PTMD

Monorail Beam

10 04-Dec-11

14-Dec-11

04-Dec-11

14-Dec-11

PTMD

Safety Net

16 27-Dec-11

14-Jan-12

06-Dec-11

24-Dec-11

PTMD

Crane Boom Rest

2 15-Jan-12

16-Jan-12

15-Jan-12

16-Jan-12

PTMD

Name Plate

4 15-Jan-12

18-Jan-12

15-Jan-12

18-Jan-12

PTMD

Handrails & Cups

24 25-Dec-11

21-Jan-12

25-Dec-11

21-Jan-12

PTMD

Hatches

8 15-Jan-12

23-Jan-12

15-Jan-12

23-Jan-12

PTMD

Fire Wall

12 15-Jan-12

28-Jan-12

15-Jan-12

28-Jan-12

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name
PTMD

Stairs & Walkways

PTMD

Pad Eyes

Fabrication
Fabrica

Original BL Project
Duration Start

BL Project
Finish

Start

Finish

15 15-Jan-12

31-Jan-12

15-Jan-12

31-Jan-12

5 28-Apr-12

03-May-12

12-Apr-12

17-Apr-12

148 10-Nov-11

28-Apr-12

23-Oct-11

11-Apr-12

Safety Net

28 13-Nov-11

14-Dec-11

23-Oct-11

23-Nov-11

PTMD

Monorail Beam

10 22-Nov-11

03-Dec-11

22-Nov-11

03-Dec-11

PTMD

Handrails & Cups

24 10-Nov-11

07-Dec-11

10-Nov-11

07-Dec-11

PTMD

Name Plate

8 25-Dec-11

02-Jan-12

25-Dec-11

02-Jan-12

PTMD

Hatches

20 14-Dec-11

05-Jan-12

14-Dec-11

05-Jan-12

PTMD

Crane Boom Rest

6 31-Dec-11

05-Jan-12

31-Dec-11

05-Jan-12

PTMD

Fire Wall

18 17-Dec-11

05-Jan-12

17-Dec-11

05-Jan-12

PTMD

Stairs & Walkways

24 26-Dec-11

22-Jan-12

26-Dec-11

22-Jan-12

PTMD

Pad Eyes

6 21-Apr-12

28-Apr-12

05-Apr-12

11-Apr-12

68 29-Jan-12

17-Apr-12

28-Jan-12

15-Apr-12

PTD150 Cutting & Assembly

20 29-Jan-12

21-Feb-12

28-Jan-12

19-Feb-12

PTD151 Welding & NDT

32 21-Feb-12

29-Mar-12

20-Feb-12

27-Mar-12

2 15-Apr-12

17-Apr-12

14-Apr-12

15-Apr-12

173 28-May-11

14-Jan-12

25-Jun-11

14-Jan-12

24 28-May-11

23-Jun-11

25-Jun-11

21-Jul-11

24 28-May-11

23-Jun-11

25-Jun-11

21-Jul-11

2 08-Dec-11

10-Dec-11

08-Dec-11

10-Dec-11

2 08-Dec-11

10-Dec-11

08-Dec-11

10-Dec-11

PTD152 Trial Fit


Deck Assembly
Ass
Skid Beams
Be
& Shoes Preparation
PTD14 Skid Beams & Shoes Preparation
Lifting Deck
D
Legs Over Skid Beams & Skid Shoes
PTD14 Lifting Deck Legs Over Skid Beams & Skid Shoes
Lifting Cellar
C
Deck Over Deck Legs

15 11-Dec-11

27-Dec-11

11-Dec-11

27-Dec-11

PTD14 Lifting

1 11-Dec-11

11-Dec-11

11-Dec-11

11-Dec-11

PTD14 Assembly

6 12-Dec-11

18-Dec-11

12-Dec-11

18-Dec-11

PTD14 Welding & NDT

8 19-Dec-11

27-Dec-11

19-Dec-11

27-Dec-11

4 28-Dec-11

01-Jan-12

28-Dec-11

01-Jan-12

PTD17 Lifting

1 28-Dec-11

28-Dec-11

28-Dec-11

28-Dec-11

PTD17 Assembly

1 29-Dec-11

29-Dec-11

29-Dec-11

29-Dec-11

lifting of plan at + 9.2

2011
A M J Jul A S O N D

PTMD

Deck Flare
Fla

Page 53 of 64

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

2 31-Dec-11

01-Jan-12

31-Dec-11

01-Jan-12

4 28-Dec-11

01-Jan-12

28-Dec-11

01-Jan-12

PTD16 Lifting

1 28-Dec-11

28-Dec-11

28-Dec-11

28-Dec-11

PTD16 Assembly

1 29-Dec-11

29-Dec-11

29-Dec-11

29-Dec-11

PTD16 Welding & NDT

2 31-Dec-11

01-Jan-12

31-Dec-11

01-Jan-12

4 28-Dec-11

01-Jan-12

28-Dec-11

01-Jan-12

PTD17 Lifting

1 28-Dec-11

28-Dec-11

28-Dec-11

28-Dec-11

PTD18 Assembly

1 29-Dec-11

29-Dec-11

29-Dec-11

29-Dec-11

PTD18 Welding & NDT

2 31-Dec-11

01-Jan-12

31-Dec-11

01-Jan-12

11 02-Jan-12

14-Jan-12

02-Jan-12

14-Jan-12

PTD14 Lifting

1 02-Jan-12

02-Jan-12

02-Jan-12

02-Jan-12

PTD14 Assembly

5 03-Jan-12

08-Jan-12

03-Jan-12

08-Jan-12

PTD14 Welding & NDT

7 07-Jan-12

14-Jan-12

07-Jan-12

14-Jan-12

181 20-Sep-11

15-Apr-12

13-Sep-11

12-Apr-12

PTD17 Welding & NDT


lifting of plan at + 9.7

lifting of mezzanine deck at + 16

Lifting Main
M
Deck Over cellar Deck

Atmosphric Painting
Atmosphr

Finish

Page 54 of 64

2011
A M J Jul A S O N D

PT1110

Plane at + 9.2

5 20-Sep-11

25-Sep-11

13-Sep-11

19-Sep-11

PT1120

Plane at + 9.7

5 15-Oct-11

19-Oct-11

01-Oct-11

08-Oct-11

PT1130

Wellhead mezzanine

10 05-Nov-11

15-Nov-11

05-Nov-11

15-Nov-11

PT1050

Heli Deck & Braces Below Heli

12 13-Dec-11

26-Dec-11

22-Nov-11

05-Dec-11

PT1010

Deck Legs

6 01-Dec-11

07-Dec-11

01-Dec-11

07-Dec-11

PT1020

Braces Below Cellar

5 05-Dec-11

10-Dec-11

05-Dec-11

10-Dec-11

PT1030

Cellar Deck & Braces Above Cellar

15 23-Nov-11

10-Dec-11

23-Nov-11

10-Dec-11

PT1080

Piping Support

PT1040

Main Deck

PT1045

Braces Above Main

PT1090

9 06-Dec-11

17-Dec-11

06-Dec-11

17-Dec-11

15 15-Dec-11

01-Jan-12

15-Dec-11

01-Jan-12

5 09-Jan-12

14-Jan-12

09-Jan-12

14-Jan-12

Cable Trays Supports

10 15-Jan-12

26-Jan-12

16-Jan-12

26-Jan-12

PT1060

Miscellaneous (Stairs,H/R,...etc)

14 12-Jan-12

28-Jan-12

12-Jan-12

28-Jan-12

PT1070

Piping painting

14 19-Jan-12

05-Feb-12

19-Jan-12

04-Feb-12

PT1100

Deck Flare

14 29-Mar-12

15-Apr-12

28-Mar-12

12-Apr-12

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Anti Skid Painting


P
PT1000

Heli Deck

E&I

Original BL Project
Duration Start

BL Project
Finish

Start

7 25-Apr-12

03-May-12

24-Apr-12

01-May-12

7 25-Apr-12

03-May-12

24-Apr-12

01-May-12

80 16-Dec-11

11-Mar-12

21-Dec-11

09-Mar-12

PTJ2080

E & I Work start

0 16-Dec-11

PTJ2100

E & I Work finish

E&I (onsh
(onshore)

Finish

21-Dec-11
11-Mar-12

09-Mar-12

11-Mar-12

21-Dec-11

09-Mar-12

72 16-Dec-11

02-Mar-12

21-Dec-11

01-Mar-12

Cable Trays
T
Supports

51 20-Dec-11

09-Feb-12

21-Dec-11

09-Feb-12

E&I100 Fabrication

26 20-Dec-11

15-Jan-12

21-Dec-11

15-Jan-12

E&I101 Installation

14 26-Jan-12

09-Feb-12

27-Jan-12

09-Feb-12

26 24-Jan-12

19-Feb-12

24-Jan-12

18-Feb-12

26 24-Jan-12

19-Feb-12

24-Jan-12

18-Feb-12

38 16-Dec-11

23-Jan-12

21-Dec-11

27-Jan-12

38 16-Dec-11

23-Jan-12

21-Dec-11

27-Jan-12

25 31-Dec-11

25-Jan-12

05-Jan-12

29-Jan-12

25 31-Dec-11

25-Jan-12

05-Jan-12

29-Jan-12

15 16-Dec-11

31-Dec-11

21-Dec-11

04-Jan-12

15 16-Dec-11

31-Dec-11

21-Dec-11

04-Jan-12

14 17-Feb-12

02-Mar-12

17-Feb-12

01-Mar-12

14 17-Feb-12

02-Mar-12

17-Feb-12

01-Mar-12

12 17-Feb-12

29-Feb-12

17-Feb-12

28-Feb-12

12 17-Feb-12

29-Feb-12

17-Feb-12

28-Feb-12

25 01-Feb-12

26-Feb-12

01-Feb-12

25-Feb-12

25 01-Feb-12

26-Feb-12

01-Feb-12

25-Feb-12

80 20-Dec-11

11-Mar-12

21-Dec-11

09-Mar-12

Cable Trays
T
Supports

51 20-Dec-11

09-Feb-12

21-Dec-11

09-Feb-12

E&I109 Fabrication

26 20-Dec-11

15-Jan-12

21-Dec-11

15-Jan-12

E&I110 Installation

14 26-Jan-12

09-Feb-12

27-Jan-12

09-Feb-12

Cable Trays
T
E&I102 Installation
Conduit Activities
E&I103 Installation
Lighting Activities
E&I104 Lighting Activities
Navigation Aids
Navigat
E&I105 Navigation Aids
Earthing Activities
E&I106 Earthing Activities
Power & Small Equip. Inst.
E&I107 Power & Small Equip. Inst.
Cable Laying
L
& Termination
E&I108 Cable Laying & Termination
Instrumentation
Instrume

2011
A M J Jul A S O N D

80 16-Dec-11

Electrical

Page 55 of 64

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

26 24-Jan-12

19-Feb-12

24-Jan-12

18-Feb-12

26 24-Jan-12

19-Feb-12

24-Jan-12

18-Feb-12

20 12-Feb-12

03-Mar-12

11-Feb-12

01-Mar-12

20 12-Feb-12

03-Mar-12

11-Feb-12

01-Mar-12

16 20-Feb-12

07-Mar-12

19-Feb-12

05-Mar-12

16 20-Feb-12

07-Mar-12

19-Feb-12

05-Mar-12

18 09-Feb-12

27-Feb-12

10-Feb-12

27-Feb-12

18 09-Feb-12

27-Feb-12

10-Feb-12

27-Feb-12

20 09-Feb-12

29-Feb-12

10-Feb-12

29-Feb-12

20 09-Feb-12

29-Feb-12

10-Feb-12

29-Feb-12

10 27-Feb-12

08-Mar-12

26-Feb-12

06-Mar-12

10 27-Feb-12

08-Mar-12

26-Feb-12

06-Mar-12

8 26-Feb-12

05-Mar-12

25-Feb-12

03-Mar-12

E&I117 Air Gas Header

8 26-Feb-12

05-Mar-12

25-Feb-12

03-Mar-12

Cable Laying
L
& Termination

25 14-Feb-12

10-Mar-12

13-Feb-12

08-Mar-12

25 14-Feb-12

10-Mar-12

13-Feb-12

08-Mar-12

8 03-Mar-12

11-Mar-12

02-Mar-12

09-Mar-12

8 03-Mar-12

11-Mar-12

02-Mar-12

09-Mar-12

8 03-Mar-12

11-Mar-12

02-Mar-12

09-Mar-12

8 03-Mar-12

11-Mar-12

02-Mar-12

09-Mar-12

72 07-Dec-11

17-Feb-12

07-Dec-11

16-Feb-12

Cable Trays
T
E&I111 Installation
Tubing Activities
A
E&I112 Installation
HCU & Local Panels Activities
E&I113 HCU & Local Panels Activities
Fusible Plug & ESD Puch Bottons
E&I114 Fusible Plug & ESD Puch Bottons
J. Box A
Activities
E&I115 J. Box Activities
Instrument Installation & Calibration
Instrum
E&I116 Instrument Installation & Calibration
Air Gas Header

E&I118 Cable Laying & Termination


Fire & G
Gas activities
E&I119 Fire & Gas activities
Telecommunication System
Telecom
E&I120 Telecommunication System
EQUIPMENT
EQUIPMEN
PTJ2070

Equipment installation start

0 23-Dec-11

PTJ2130

Equipment installation finish

Equipement Installation (onshore)


Equipeme

Finish

Page 56 of 64

2011
A M J Jul A S O N D

18-Jan-12
17-Feb-12

16-Feb-12

72 07-Dec-11

17-Feb-12

07-Dec-11

16-Feb-12

TSF1110 Installation of production manifold module on celler deck

4 07-Dec-11

10-Dec-11

07-Dec-11*

10-Dec-11

TSF1100 Installation of E & I module on main deck

4 07-Jan-12

10-Jan-12

07-Jan-12*

10-Jan-12

TSF1090 Equipment Installation on Heli Deck

4 23-Dec-11

27-Dec-11

18-Jan-12

21-Jan-12

TSF1060 Equipment Installation Below Cellar Deck

4 13-Feb-12

17-Feb-12

13-Feb-12

16-Feb-12

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

TSF1070 Equipment Installation on Cellar Deck

15 02-Feb-12

17-Feb-12

02-Feb-12

16-Feb-12

TSF1080 Equipment Installation on Main Deck

15 02-Feb-12

17-Feb-12

02-Feb-12

16-Feb-12

113 20-Nov-11

13-Mar-12

20-Nov-11

11-Mar-12

PIPING
PTJ2050

Piping & piping support fabrication start

0 20-Nov-11

PTJ2110

Piping & piping support erection finish

C.S Piping Fab. & Erec., Valves Erection (onshore)

Finish

20-Nov-11
13-Mar-12

11-Mar-12

13-Mar-12

20-Nov-11

11-Mar-12

TSF1010 Piping Supports Fabrication

22 20-Nov-11

12-Dec-11

20-Nov-11

11-Dec-11

TSF1000 Piping Fabrication

70 20-Nov-11

29-Jan-12

20-Nov-11

28-Jan-12

TSF1020 Piping Erection

35 28-Jan-12

03-Mar-12

27-Jan-12

01-Mar-12

TSF1030 Piping Supports Erection

20 12-Feb-12

03-Mar-12

11-Feb-12

01-Mar-12

TSF1040 Valve Installation

15 17-Feb-12

03-Mar-12

16-Feb-12

01-Mar-12

PTJ2120 Piping hydrotest

21 21-Feb-12

13-Mar-12

20-Feb-12

11-Mar-12

44 23-Feb-12

25-Apr-12

23-Feb-12

25-Apr-12

44 23-Feb-12

25-Apr-12

23-Feb-12

25-Apr-12

23 24-Mar-12

25-Apr-12

24-Mar-12

25-Apr-12

BEFORE METROLOGY

21 24-Mar-12

23-Apr-12

24-Mar-12

23-Apr-12

PIPE LINE
LI
& BENDS

21 24-Mar-12

23-Apr-12

24-Mar-12

23-Apr-12

SS690 SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

2 24-Mar-12

26-Mar-12

24-Mar-12

26-Mar-12

SS700 CUTTING & BEVELING BEFORE METROLOGY

3 26-Mar-12

29-Mar-12

26-Mar-12

29-Mar-12

SS710 FIT UP FOR LINE PIPE & BENDS BEFORE METROLOGY

5 29-Mar-12

04-Apr-12

29-Mar-12

04-Apr-12

SS720 WELDING & NDT FOR LINE PIPE & BENDS BEFORE METROL...

8 04-Apr-12

14-Apr-12

04-Apr-12

14-Apr-12

SS740 FIT UP FLANGES AND FITTING WITH LINE PIPE

2 16-Apr-12

18-Apr-12

16-Apr-12

18-Apr-12

SS730 COATING OF BENDS

6 14-Apr-12

21-Apr-12

14-Apr-12

21-Apr-12

SS750 WELDING & NDT FOR FLANGES WITH LINE PIPE

2 18-Apr-12

21-Apr-12

18-Apr-12

21-Apr-12

SS760 APPLY SHRINKABLE SLEEVE

2 21-Apr-12

23-Apr-12

21-Apr-12

23-Apr-12

11 15-Apr-12

25-Apr-12

15-Apr-12

25-Apr-12

SETH PLEM
PLE & EXISTING TUNA PLEM
SPOOL N
NO. S1 (CLOSING) ( P.L - S2 )

AFTER M
METROLOGY
SS770

RECEVING METROLOGY

0 15-Apr-12

SS780

FIT UP AFTER METROLOGY

3 15-Apr-12

15-Apr-12
17-Apr-12

2011
A M J Jul A S O N D

113 20-Nov-11

W.P.6: PIPELINE
PIPE
SPOOLS FABRICATION

Page 57 of 64

15-Apr-12

17-Apr-12

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

Finish

WELDING & NDT AFTER METROLOGY

4 17-Apr-12

21-Apr-12

17-Apr-12

21-Apr-12

SS800

PIGGING & HYDRO TEST

2 21-Apr-12

23-Apr-12

21-Apr-12

23-Apr-12

SS810

APPLY SHRINKABLE SLEEVE

1 23-Apr-12

24-Apr-12

23-Apr-12

24-Apr-12

SS820

LIFTING TEST

1 24-Apr-12

25-Apr-12

24-Apr-12

25-Apr-12

SPOOL N
NO. S2 ( S1 - S3 )

21 23-Feb-12

24-Mar-12

23-Feb-12

24-Mar-12

21 23-Feb-12

24-Mar-12

23-Feb-12

24-Mar-12

SS830

SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

2 23-Feb-12

25-Feb-12

23-Feb-12

25-Feb-12

SS840

CUTTING & BEVELING

3 26-Feb-12

28-Feb-12

26-Feb-12

28-Feb-12

SS850

FIT UP FOR LINE PIPE & BENDS

5 29-Feb-12

05-Mar-12

29-Feb-12

05-Mar-12

SS860

WELDING & NDT FOR LINE PIPE & BENDS

8 06-Mar-12

14-Mar-12

06-Mar-12

14-Mar-12

SS880

FIT UP FLANGES AND FITTING WITH LINE PIPE

2 18-Mar-12

19-Mar-12

18-Mar-12

19-Mar-12

SS870

COATING OF BENDS

6 15-Mar-12

21-Mar-12

15-Mar-12

21-Mar-12

SS890

WELDING & NDT FOR FLANGES WITH LINE PIPE

2 20-Mar-12

21-Mar-12

20-Mar-12

21-Mar-12

SS900

APPLY SHRINKABLE SLEEVE

2 22-Mar-12

23-Mar-12

22-Mar-12

23-Mar-12

SS910

PIGGING & HYDRO TEST

2 22-Mar-12

23-Mar-12

22-Mar-12

23-Mar-12

SS920

LIFTING TEST

1 24-Mar-12

24-Mar-12

24-Mar-12

24-Mar-12

SPOOL N
NO. S3 (CLOSING) ( S2 - S4 )

23 24-Mar-12

25-Apr-12

24-Mar-12

25-Apr-12

BEFORE METROLOGY

21 24-Mar-12

23-Apr-12

24-Mar-12

23-Apr-12

PIPE LINE
LI
& BENDS

21 24-Mar-12

23-Apr-12

24-Mar-12

23-Apr-12

SS930 SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

2 24-Mar-12

26-Mar-12

24-Mar-12

26-Mar-12

SS940 CUTTING & BEVELING BEFORE METROLOGY

3 26-Mar-12

29-Mar-12

26-Mar-12

29-Mar-12

SS950 FIT UP FOR LINE PIPE & BENDS BEFORE METROLOGY

5 29-Mar-12

04-Apr-12

29-Mar-12

04-Apr-12

SS960 WELDING & NDT FOR LINE PIPE & BENDS BEFORE METROL...

8 04-Apr-12

14-Apr-12

04-Apr-12

14-Apr-12

SS980 FIT UP FLANGES AND FITTING WITH LINE PIPE

2 16-Apr-12

18-Apr-12

16-Apr-12

18-Apr-12

SS970 COATING OF BENDS

6 14-Apr-12

21-Apr-12

14-Apr-12

21-Apr-12

SS990 WELDING & NDT FOR FLANGES WITH LINE PIPE

2 18-Apr-12

21-Apr-12

18-Apr-12

21-Apr-12

SS1000 APPLY SHRINKABLE SLEEVE

2 21-Apr-12

23-Apr-12

21-Apr-12

23-Apr-12

11 15-Apr-12

25-Apr-12

15-Apr-12

25-Apr-12

AFTER M
METROLOGY

2011
A M J Jul A S O N D

SS790

PIPE LINE
LIN & BENDS

Page 58 of 64

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

Finish

0 15-Apr-12

SS1020 FIT UP AFTER METROLOGY

3 15-Apr-12

17-Apr-12

15-Apr-12

17-Apr-12

SS1030 WELDING & NDT AFTER METROLOGY

4 17-Apr-12

21-Apr-12

17-Apr-12

21-Apr-12

SS1040 PIGGING & HYDRO TEST

2 21-Apr-12

23-Apr-12

21-Apr-12

23-Apr-12

SS1050 APPLY SHRINKABLE SLEEVE

1 23-Apr-12

24-Apr-12

23-Apr-12

24-Apr-12

SS1060 LIFTING TEST

1 24-Apr-12

25-Apr-12

24-Apr-12

25-Apr-12

21 23-Feb-12

24-Mar-12

23-Feb-12

24-Mar-12

21 23-Feb-12

24-Mar-12

23-Feb-12

24-Mar-12

SS1070 SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

2 23-Feb-12

25-Feb-12

23-Feb-12

25-Feb-12

SS1080 CUTTING & BEVELING

3 26-Feb-12

28-Feb-12

26-Feb-12

28-Feb-12

SS1090 FIT UP FOR LINE PIPE & BENDS

5 29-Feb-12

05-Mar-12

29-Feb-12

05-Mar-12

SS1100 WELDING & NDT FOR LINE PIPE & BENDS

8 06-Mar-12

14-Mar-12

06-Mar-12

14-Mar-12

SS1120 FIT UP FLANGES AND FITTING WITH LINE PIPE

2 18-Mar-12

19-Mar-12

18-Mar-12

19-Mar-12

SS1110 COATING OF BENDS

6 15-Mar-12

21-Mar-12

15-Mar-12

21-Mar-12

SS1130 WELDING & NDT FOR FLANGES WITH LINE PIPE

2 20-Mar-12

21-Mar-12

20-Mar-12

21-Mar-12

SS1140 APPLY SHRINKABLE SLEEVE

2 22-Mar-12

23-Mar-12

22-Mar-12

23-Mar-12

SS1150 PIGGING & HYDRO TEST

2 22-Mar-12

23-Mar-12

22-Mar-12

23-Mar-12

SS1160 LIFTING TEST

1 24-Mar-12

24-Mar-12

24-Mar-12

24-Mar-12

21 23-Feb-12

24-Mar-12

23-Feb-12

24-Mar-12

21 23-Feb-12

24-Mar-12

23-Feb-12

24-Mar-12

SS1170 SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

2 23-Feb-12

25-Feb-12

23-Feb-12

25-Feb-12

SS1180 CUTTING & BEVELING

3 26-Feb-12

28-Feb-12

26-Feb-12

28-Feb-12

SS1190 FIT UP FOR LINE PIPE & BENDS

5 29-Feb-12

05-Mar-12

29-Feb-12

05-Mar-12

SS1200 WELDING & NDT FOR LINE PIPE & BENDS

8 06-Mar-12

14-Mar-12

06-Mar-12

14-Mar-12

SS1220 FIT UP FLANGES AND FITTING WITH LINE PIPE

2 18-Mar-12

19-Mar-12

18-Mar-12

19-Mar-12

SS1210 COATING OF BENDS

6 15-Mar-12

21-Mar-12

15-Mar-12

21-Mar-12

SS1230 WELDING & NDT FOR FLANGES WITH LINE PIPE

2 20-Mar-12

21-Mar-12

20-Mar-12

21-Mar-12

SS1240 APPLY SHRINKABLE SLEEVE

2 22-Mar-12

23-Mar-12

22-Mar-12

23-Mar-12

PIPE LINE
LIN & BENDS

SPOOL N
NO. S5 ( SETH PLEM - S6 )
PIPE LINE
LIN & BENDS

2011
A M J Jul A S O N D

SS1010 RECEVING METROLOGY

SPOOL N
NO. S4 ( S4 - SETH PLEM )

Page 59 of 64

15-Apr-12

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

SS1250 PIGGING & HYDRO TEST

2 22-Mar-12

23-Mar-12

22-Mar-12

23-Mar-12

SS1260 LIFTING TEST

1 24-Mar-12

24-Mar-12

24-Mar-12

24-Mar-12

23 24-Mar-12

25-Apr-12

24-Mar-12

25-Apr-12

BEFORE METROLOGY

21 24-Mar-12

23-Apr-12

24-Mar-12

23-Apr-12

PIPE LINE
LI
& BENDS

21 24-Mar-12

23-Apr-12

24-Mar-12

23-Apr-12

SS1270 SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

2 24-Mar-12

26-Mar-12

24-Mar-12

26-Mar-12

SS1280 CUTTING & BEVELING BEFORE METROLOGY

3 26-Mar-12

29-Mar-12

26-Mar-12

29-Mar-12

SS1290 FIT UP FOR LINE PIPE & BENDS BEFORE METROLOGY

5 29-Mar-12

04-Apr-12

29-Mar-12

04-Apr-12

SS1300 WELDING & NDT FOR LINE PIPE & BENDS BEFORE METROL...

8 04-Apr-12

14-Apr-12

04-Apr-12

14-Apr-12

SS1320 FIT UP FLANGES AND FITTING WITH LINE PIPE

2 16-Apr-12

18-Apr-12

16-Apr-12

18-Apr-12

SS1310 COATING OF BENDS

6 14-Apr-12

21-Apr-12

14-Apr-12

21-Apr-12

SS1330 WELDING & NDT FOR FLANGES WITH LINE PIPE

2 18-Apr-12

21-Apr-12

18-Apr-12

21-Apr-12

SS1340 APPLY SHRINKABLE SLEEVE

2 21-Apr-12

23-Apr-12

21-Apr-12

23-Apr-12

11 15-Apr-12

25-Apr-12

15-Apr-12

25-Apr-12

SPOOL N
NO. S6 (CLOSING) ( S5 - TUNA PLEM )

AFTER M
METROLOGY

Finish

0 15-Apr-12

SS1360 FIT UP AFTER METROLOGY

3 15-Apr-12

17-Apr-12

15-Apr-12

17-Apr-12

SS1370 WELDING & NDT AFTER METROLOGY

4 17-Apr-12

21-Apr-12

17-Apr-12

21-Apr-12

SS1380 PIGGING & HYDRO TEST

2 21-Apr-12

23-Apr-12

21-Apr-12

23-Apr-12

SS1390 APPLY SHRINKABLE SLEEVE

1 23-Apr-12

24-Apr-12

23-Apr-12

24-Apr-12

SS1400 LIFTING TEST

1 24-Apr-12

25-Apr-12

24-Apr-12

25-Apr-12

44 23-Feb-12

25-Apr-12

23-Feb-12

25-Apr-12

21 23-Feb-12

24-Mar-12

23-Feb-12

24-Mar-12

21 23-Feb-12

24-Mar-12

23-Feb-12

24-Mar-12

SPOOL N
NO. S3 ( SSIV -S4 )
PIPE LINE
LIN & BENDS

2011
A M J Jul A S O N D

SS1350 RECEVING METROLOGY

SETH P/F & NEW SSIV

Page 60 of 64

15-Apr-12

SS250

SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

2 23-Feb-12

25-Feb-12

23-Feb-12

25-Feb-12

SS260

CUTTING & BEVELING

3 26-Feb-12

28-Feb-12

26-Feb-12

28-Feb-12

SS270

FIT UP FOR LINE PIPE & BENDS

5 29-Feb-12

05-Mar-12

29-Feb-12

05-Mar-12

SS280

WELDING & NDT FOR LINE PIPE & BENDS

8 06-Mar-12

14-Mar-12

06-Mar-12

14-Mar-12

SS300

FIT UP FLANGES AND FITTING WITH LINE PIPE

2 18-Mar-12

19-Mar-12

18-Mar-12

19-Mar-12

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

Finish

COATING OF BENDS

6 15-Mar-12

21-Mar-12

15-Mar-12

21-Mar-12

SS310

WELDING & NDT FOR FLANGES WITH LINE PIPE

2 20-Mar-12

21-Mar-12

20-Mar-12

21-Mar-12

SS320

APPLY SHRINKABLE SLEEVE

2 22-Mar-12

23-Mar-12

22-Mar-12

23-Mar-12

SS330

PIGGING & HYDRO TEST

2 22-Mar-12

23-Mar-12

22-Mar-12

23-Mar-12

SS340

LIFTING TEST

1 24-Mar-12

24-Mar-12

24-Mar-12

24-Mar-12

21 23-Feb-12

24-Mar-12

23-Feb-12

24-Mar-12

21 23-Feb-12

24-Mar-12

23-Feb-12

24-Mar-12

PIPE LINE
LIN & BENDS
SS150

SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

2 23-Feb-12

25-Feb-12

23-Feb-12

25-Feb-12

SS160

CUTTING & BEVELING

3 26-Feb-12

28-Feb-12

26-Feb-12

28-Feb-12

SS170

FIT UP FOR LINE PIPE & BENDS

5 29-Feb-12

05-Mar-12

29-Feb-12

05-Mar-12

SS180

WELDING & NDT FOR LINE PIPE & BENDS

8 06-Mar-12

14-Mar-12

06-Mar-12

14-Mar-12

SS200

FIT UP FLANGES AND FITTING WITH LINE PIPE

2 18-Mar-12

19-Mar-12

18-Mar-12

19-Mar-12

SS190

COATING OF BENDS

6 15-Mar-12

21-Mar-12

15-Mar-12

21-Mar-12

SS210

WELDING & NDT FOR FLANGES WITH LINE PIPE

2 20-Mar-12

21-Mar-12

20-Mar-12

21-Mar-12

SS220

APPLY SHRINKABLE SLEEVE

2 22-Mar-12

23-Mar-12

22-Mar-12

23-Mar-12

SS230

PIGGING & HYDRO TEST

2 22-Mar-12

23-Mar-12

22-Mar-12

23-Mar-12

SS240

LIFTING TEST

1 24-Mar-12

24-Mar-12

24-Mar-12

24-Mar-12

SPOOL N
NO. S4 ( S3 - S5 )

21 23-Feb-12

24-Mar-12

23-Feb-12

24-Mar-12

21 23-Feb-12

24-Mar-12

23-Feb-12

24-Mar-12

PIPE LINE
LIN & BENDS

2011
A M J Jul A S O N D

SS290

SPOOL N
NO. S2 ( S1 - SSIV )

Page 61 of 64

SS350

SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

2 23-Feb-12

25-Feb-12

23-Feb-12

25-Feb-12

SS360

CUTTING & BEVELING

3 26-Feb-12

28-Feb-12

26-Feb-12

28-Feb-12

SS370

FIT UP FOR LINE PIPE & BENDS

5 29-Feb-12

05-Mar-12

29-Feb-12

05-Mar-12

SS380

WELDING & NDT FOR LINE PIPE & BENDS

8 06-Mar-12

14-Mar-12

06-Mar-12

14-Mar-12

SS400

FIT UP FLANGES AND FITTING WITH LINE PIPE

2 18-Mar-12

19-Mar-12

18-Mar-12

19-Mar-12

SS390

COATING OF BENDS

6 15-Mar-12

21-Mar-12

15-Mar-12

21-Mar-12

SS410

WELDING & NDT FOR FLANGES WITH LINE PIPE

2 20-Mar-12

21-Mar-12

20-Mar-12

21-Mar-12

SS420

APPLY SHRINKABLE SLEEVE

2 22-Mar-12

23-Mar-12

22-Mar-12

23-Mar-12

SS430

PIGGING & HYDRO TEST

2 22-Mar-12

23-Mar-12

22-Mar-12

23-Mar-12

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

LIFTING TEST

1 24-Mar-12

24-Mar-12

24-Mar-12

24-Mar-12

SPOOL N
NO. S5 ( S4 - S6 )

21 23-Feb-12

24-Mar-12

23-Feb-12

24-Mar-12

21 23-Feb-12

24-Mar-12

23-Feb-12

24-Mar-12

SS440

PIPE LINE
LIN & BENDS

Finish

SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

2 23-Feb-12

25-Feb-12

23-Feb-12

25-Feb-12

SS460

CUTTING & BEVELING

3 26-Feb-12

28-Feb-12

26-Feb-12

28-Feb-12

SS470

FIT UP FOR LINE PIPE & BENDS

5 29-Feb-12

05-Mar-12

29-Feb-12

05-Mar-12

SS480

WELDING & NDT FOR LINE PIPE & BENDS

8 06-Mar-12

14-Mar-12

06-Mar-12

14-Mar-12

SS500

FIT UP FLANGES AND FITTING WITH LINE PIPE

2 18-Mar-12

19-Mar-12

18-Mar-12

19-Mar-12

SS490

COATING OF BENDS

6 15-Mar-12

21-Mar-12

15-Mar-12

21-Mar-12

SS510

WELDING & NDT FOR FLANGES WITH LINE PIPE

2 20-Mar-12

21-Mar-12

20-Mar-12

21-Mar-12

SS520

APPLY SHRINKABLE SLEEVE

2 22-Mar-12

23-Mar-12

22-Mar-12

23-Mar-12

SS530

PIGGING & HYDRO TEST

2 22-Mar-12

23-Mar-12

22-Mar-12

23-Mar-12

SS540

LIFTING TEST

1 24-Mar-12

24-Mar-12

24-Mar-12

24-Mar-12

23 24-Mar-12

25-Apr-12

24-Mar-12

25-Apr-12

BEFORE METROLOGY

21 24-Mar-12

23-Apr-12

24-Mar-12

23-Apr-12

PIPE LINE
LI
& BENDS

21 24-Mar-12

23-Apr-12

24-Mar-12

23-Apr-12

2 24-Mar-12

26-Mar-12

24-Mar-12

26-Mar-12

SS020 CUTTING & BEVELING BEFORE METROLOGY

3 26-Mar-12

29-Mar-12

26-Mar-12

29-Mar-12

SS030 FIT UP FOR LINE PIPE & BENDS BEFORE METROLOGY

5 29-Mar-12

04-Apr-12

29-Mar-12

04-Apr-12

SS040 WELDING & NDT FOR LINE PIPE & BENDS BEFORE METROL...

8 04-Apr-12

14-Apr-12

04-Apr-12

14-Apr-12

SS060 FIT UP FLANGES AND FITTING WITH LINE PIPE

2 16-Apr-12

18-Apr-12

16-Apr-12

18-Apr-12

SS050 COATING OF BENDS

6 14-Apr-12

21-Apr-12

14-Apr-12

21-Apr-12

SS070 WELDING & NDT FOR FLANGES WITH LINE PIPE

2 18-Apr-12

21-Apr-12

18-Apr-12

21-Apr-12

SS080 APPLY SHRINKABLE SLEEVE

2 21-Apr-12

23-Apr-12

21-Apr-12

23-Apr-12

11 15-Apr-12

25-Apr-12

15-Apr-12

25-Apr-12

SS 10

SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

AFTER M
METROLOGY

2011
A M J Jul A S O N D

SS450

SPOOL N
NO. S1 (CLOSING) ( P.L - SETH PLEM )

Page 62 of 64

SS090

RECEVING METROLOGY

0 15-Apr-12

15-Apr-12

SS100

FIT UP AFTER METROLOGY

3 15-Apr-12

17-Apr-12

15-Apr-12

17-Apr-12

SS110

WELDING & NDT AFTER METROLOGY

4 17-Apr-12

21-Apr-12

17-Apr-12

21-Apr-12

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

Finish

PIGGING & HYDRO TEST

2 21-Apr-12

23-Apr-12

21-Apr-12

23-Apr-12

SS130

APPLY SHRINKABLE SLEEVE

1 23-Apr-12

24-Apr-12

23-Apr-12

24-Apr-12

SS140

LIFTING TEST

1 24-Apr-12

25-Apr-12

24-Apr-12

25-Apr-12

23 24-Mar-12

25-Apr-12

24-Mar-12

25-Apr-12

BEFORE METROLOGY

21 24-Mar-12

23-Apr-12

24-Mar-12

23-Apr-12

PIPE LINE
LI
& BENDS

21 24-Mar-12

23-Apr-12

24-Mar-12

23-Apr-12

SS550 SPOOLS & BENDS PLACED ON SUITABLE SUPPORTS

2 24-Mar-12

26-Mar-12

24-Mar-12

26-Mar-12

SS560 CUTTING & BEVELING BEFORE METROLOGY

3 26-Mar-12

29-Mar-12

26-Mar-12

29-Mar-12

SS570 FIT UP FOR LINE PIPE & BENDS BEFORE METROLOGY

5 29-Mar-12

04-Apr-12

29-Mar-12

04-Apr-12

SS580 WELDING & NDT FOR LINE PIPE & BENDS BEFORE METROL...

8 04-Apr-12

14-Apr-12

04-Apr-12

14-Apr-12

SS600 FIT UP FLANGES AND FITTING WITH LINE PIPE

2 16-Apr-12

18-Apr-12

16-Apr-12

18-Apr-12

SS590 COATING OF BENDS

6 14-Apr-12

21-Apr-12

14-Apr-12

21-Apr-12

SS610 WELDING & NDT FOR FLANGES WITH LINE PIPE

2 18-Apr-12

21-Apr-12

18-Apr-12

21-Apr-12

SS620 APPLY SHRINKABLE SLEEVE

2 21-Apr-12

23-Apr-12

21-Apr-12

23-Apr-12

11 15-Apr-12

25-Apr-12

15-Apr-12

25-Apr-12

AFTER M
METROLOGY
SS630

RECEVING METROLOGY

0 15-Apr-12

SS640

FIT UP AFTER METROLOGY

3 15-Apr-12

17-Apr-12

15-Apr-12

17-Apr-12

SS650

WELDING & NDT AFTER METROLOGY

4 17-Apr-12

21-Apr-12

17-Apr-12

21-Apr-12

SS660

PIGGING & HYDRO TEST

2 21-Apr-12

23-Apr-12

21-Apr-12

23-Apr-12

SS670

APPLY SHRINKABLE SLEEVE

1 23-Apr-12

24-Apr-12

23-Apr-12

24-Apr-12

SS680

LIFTING TEST

1 24-Apr-12

25-Apr-12

24-Apr-12

25-Apr-12

61 21-Feb-12

29-Mar-12

26-Jan-12

27-Mar-12

W.P.7: CER
CERTIFICATION

15-Apr-12

PTJ1130

Jacket completion certificate

21-Feb-12

26-Jan-12

PTJ1090

Deck completion certificate

29-Mar-12

27-Mar-12

W.P.8: LOA
LOAD-OUT, SEA-FASTENING, TRANSPORTATION & INSTALLATION
PTJ1070

Pre-drilling template seafastening and load out

PTJ1050

Jacket & Piles seafastening and load out

PTJ1170

Sub Sea Spools Load out first trip

2011
A M J Jul A S O N D

SS120

SPOOL N
NO. S6 (CLOSING) ( S5 - SETH P/F )

Page 63 of 64

204 18-Oct-11

10-May-12

18-Oct-11

08-May-12

7 18-Oct-11

24-Oct-11

18-Oct-11

24-Oct-11*

15 17-Mar-12

31-Mar-12

17-Mar-12

31-Mar-12*

7 25-Mar-12

31-Mar-12

25-Mar-12

31-Mar-12

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
UPDATED SCHEDULE AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

Finish

Sub Sea Spools Load out second trip for closing spools

7 25-Apr-12

02-May-12

25-Apr-12

02-May-12*

PTJ1060

Deck seafastening and load out

7 03-May-12

10-May-12

02-May-12

08-May-12*

31 17-May-12

17-Jun-12

16-May-12

15-Jun-12

31 17-May-12

17-Jun-12

16-May-12

15-Jun-12

PTJ1140

TSF Offshore hook-up activities

2011
A M J Jul A S O N D

PTJ1180

W.P.9: OFF
OFFSHORE HOOK-UP, COMMISSIONING AND ASSISTANCE TO STA...

Page 64 of 64

2012
F M A M J JulA

PAGE 28 OF 33

PTB

SETH OFFSHORE DEVELOPMENT EPC PROJECT


PLANNING PORTION IN THE MONTHLY PROGRESS REPORT

Egypt

Rev. (0)
Jun 2011

4.4. CRITICAL AND NEAR CRITICAL ACTIVITIES

GFL 003-0405

3467-200

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
CRITICAL AND NEAR CRITICAL ACTIVITIES AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

SETH OFFSHORE
OFFS
EPC PROJECT UPDATED SCHEDULE
CONTRACTUAL MILESTONES
CONTRACT

BL Project
Finish

Start

Finish

311 11-May-11

31-Jul-12

26-Apr-11 A

31-Jul-12

122 01-Apr-12

31-Jul-12

31-Mar-12

31-Jul-12

Deck Mechanical Completion

01-Apr-12

31-Mar-12*

ART6.4.1

Deck and Flare Ready for Load out

01-May-12

30-Apr-12*

A2

Project completion

31-Jul-12

31-Jul-12*

199 11-May-11

05-Apr-12

26-Apr-11 A

21-Feb-12

164 11-May-11

21-Dec-11

26-Apr-11 A

02-Jan-12

PROCESS

163 11-May-11

21-Dec-11

26-Apr-11 A

02-Jan-12

Drawings

7 05-Sep-11

14-Sep-11

05-Sep-11

13-Sep-11

7 05-Sep-11

14-Sep-11

05-Sep-11

13-Sep-11

25 11-May-11

14-Jun-11

26-Apr-11 A

05-Jul-11

25 11-May-11

W.P.2: ENG
ENGINEERING

A1570

P&ID's IFC

TER's
A2610

Fire protection system TER

Vendor pr
prints review
A2730

Fire protection system Vendor prints review

PIPING
Drawings
A1670

Plot Plan IFC

A1680

ISO's

INSTRUMENTATION
INSTRUME
TER's
A3450

Choke valves TER

Vendor pr
prints review
A3610

Choke valves Vendor prints review

MECHANICAL
MECHANIC
Vendor pr
prints review

14-Jun-11

26-Apr-11 A

05-Jul-11

100 24-Jul-11

21-Dec-11

03-Aug-11

02-Jan-12

100 24-Jul-11

21-Dec-11

03-Aug-11

02-Jan-12

42 14-Sep-11

20-Nov-11

14-Sep-11

17-Nov-11

42 14-Sep-11

20-Nov-11

14-Sep-11

17-Nov-11

5 14-Sep-11

21-Sep-11

14-Sep-11

20-Sep-11

10 31-Oct-11

20-Nov-11

31-Oct-11

17-Nov-11

144 18-May-11

24-Nov-11

26-Apr-11 A

13-Dec-11

20 18-May-11

15-Jun-11

26-Apr-11 A

05-Jul-11

20 18-May-11

15-Jun-11

26-Apr-11 A

05-Jul-11

80 25-Jul-11

24-Nov-11

11-Aug-11

13-Dec-11

80 25-Jul-11

24-Nov-11

11-Aug-11

13-Dec-11

81 26-Jul-11

28-Nov-11

14-Aug-11

14-Dec-11

81 26-Jul-11

28-Nov-11

14-Aug-11

14-Dec-11

Primary Baseline

Start Date:28-Mar-11
Finish Date:31-Jul-12
Critical Re... Data Date:25-Jun-11

Actual Work

Baseline ...

Remaining Level of Effort

Remaining...

2011
A M J Jul A S O N D

ART6.3

ENPPI

Page 1 of 5

2012
F M A M J JulA

By: Haytham A.Rahman


Date
25-May-11

Revision
Rev.0

Checked
A.Maghawry

Approved
A.Fathy

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
CRITICAL AND NEAR CRITICAL ACTIVITIES AS OF 25-JUNE-11
Activity ID

Activity Name

A6330

Receiving final weights and dimensions for mechanical equipment

A3770

Service water pump Vendor prints review

OFFSHORE
OFFSHOR
Model
A5360

Finalize PDS Modeling For Topsides based on Tecnomare IFC dw...

W.P.3: PROCUREMENT
PRO
SERVICES & MATERIAL SUPPLY
EQUIPMENT
EQUIPMEN
ENPPI LO
LONG LEAD ITEMS (Cranes ,Chemical unjec.,Fire protec. , Survival M...
PURCHASING
PURCHA
A5330

Fire protection system Issue Fax of commitment

FABRICATION
FABRICA
A3930

Fire protection system Fabrication up to release for shipment

SHIPPING
SHIPPIN

Original BL Project
Duration Start

BL Project
Finish

0 20-Sep-11

Start

Finish

80 26-Jul-11

28-Nov-11

14-Aug-11

14-Dec-11

15 24-Oct-11

20-Nov-11

24-Oct-11

17-Nov-11

15 24-Oct-11

20-Nov-11

24-Oct-11

17-Nov-11

15 24-Oct-11

20-Nov-11

24-Oct-11

17-Nov-11

164 19-Jun-11

05-Apr-12

25-Jun-11

21-Feb-12

148 19-Jun-11

12-Feb-12

06-Jul-11

11-Feb-12

148 19-Jun-11

12-Feb-12

06-Jul-11

11-Feb-12

9 19-Jun-11

07-Jul-11

06-Jul-11

18-Jul-11

9 19-Jun-11

07-Jul-11

06-Jul-11

18-Jul-11

170 08-Jul-11

03-Jan-12

19-Jul-11

04-Jan-12

170 08-Jul-11

03-Jan-12

19-Jul-11

04-Jan-12

45 29-Dec-11

12-Feb-12

29-Dec-11

11-Feb-12

A3990

Fire protection system Shipping

21 04-Jan-12

24-Jan-12

08-Jan-12

28-Jan-12

A2120

Custom clearance & inland transportation (Multi phase flow ,Che...

45 29-Dec-11

12-Feb-12

29-Dec-11

11-Feb-12

A5190

Fire protection system Custom clearance & inland transportation

14 25-Jan-12

07-Feb-12

29-Jan-12

11-Feb-12

156 19-Jun-11

05-Apr-12

06-Jul-11

21-Feb-12

15 19-Jun-11

10-Jul-11

06-Jul-11

26-Jul-11

15 19-Jun-11

10-Jul-11

06-Jul-11

26-Jul-11

210 10-Jul-11

05-Apr-12

27-Jul-11

21-Feb-12

210 10-Jul-11

05-Apr-12

27-Jul-11

21-Feb-12

200 20-Jun-11

06-Jan-12

25-Jun-11

10-Jan-12

200 20-Jun-11

06-Jan-12

25-Jun-11

10-Jan-12

200 20-Jun-11

06-Jan-12

25-Jun-11

10-Jan-12

35 10-Oct-11

14-Nov-11

10-Oct-11

13-Nov-11

E&I BULK
PURCHASING
PURCHA
A5040

Choke valves Issue Fax of commitments

FABRICATION
FABRICA
A4500

Choke valves Fabrication up to release for shipment

PIPING BULK
BU
FABRICATION
FABRICA
A1950

piping Bulk Fabrication up to release for shipment

SHIPPING
A1960

1st batch of the piping Bulk Shipping

21 10-Oct-11

31-Oct-11

10-Oct-11

30-Oct-11

A1970

1st batch of the piping Bulk Custom clearance & inland transport...

14 31-Oct-11

14-Nov-11

31-Oct-11

13-Nov-11

22 21-Sep-11

24-Oct-11

21-Sep-11

23-Oct-11

TECNOMARE
TECNOMAR

2011
A M J Jul A S O N D

21-Sep-11

Page 2 of 5

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
CRITICAL AND NEAR CRITICAL ACTIVITIES AS OF 25-JUNE-11
Activity ID

Activity Name

TECNOMARE DRIVING MILESTONES


TECNOMAR
STRUCTURAL
STRUCTU
17

input - deck final plot plan & equipment list (ENPPI)

W.P.2: ENG
ENGINEERING
STRUCTURAL
STRUCTU
DECK DETAIL
DE
DESIGN
44

Deck equipment supports & AFC dwg and MTO

PETROJET
PETROJET DRIVING MILESTONES
PROCUREMENT
PROCURE

Original BL Project
Duration Start

BL Project
Finish

Start

0 21-Sep-11

21-Sep-11

21-Sep-11

21-Sep-11

0 21-Sep-11

21-Sep-11

21-Sep-11

21-Sep-11

0 21-Sep-11

Finish

22 21-Sep-11

24-Oct-11

21-Sep-11

23-Oct-11

22 21-Sep-11

24-Oct-11

21-Sep-11

23-Oct-11

22 21-Sep-11

24-Oct-11

21-Sep-11

23-Oct-11

22 21-Sep-11

24-Oct-11

21-Sep-11

23-Oct-11

169 31-Aug-11

10-May-12

31-Aug-11

08-May-12

165 31-Aug-11

12-Feb-12

31-Aug-11

11-Feb-12

165 31-Aug-11

12-Feb-12

31-Aug-11

11-Feb-12

PTJ1020

Structural material 5 th batch (jacket secondary & deck secondary)...

0 31-Aug-11

31-Aug-11*

PTJ1080

Piping bulk material (1st batch) (ENPPI)

0 14-Nov-11

14-Nov-11

PTJ1120

Equipment (100%) (PTB)

24-Jan-12

24-Jan-12*

PTJ4010

Equipment by (100%) (ENPPI)

12-Feb-12

11-Feb-12

0 15-Sep-11

15-Sep-11

15-Sep-11

15-Sep-11

0 15-Sep-11

15-Sep-11

15-Sep-11

15-Sep-11

15-Sep-11

W.P.2: ENG
ENGINEERING
TSF
PTJ2240

Rec final weight & dimension for static equipment

W.P.4: SUBSTRUCTURES
SUB
(PILES, JACKET & PDT) FABRICATION
JACKET STRUCTURE
S
FABRICATION
PAINTING
PTJ10270 SPLASH PAINTING FOR BARGE BUMPER
PTJ10330 PILE MARKING

15-Sep-11*

28 13-Feb-12

15-Mar-12

13-Feb-12

15-Mar-12

28 13-Feb-12

15-Mar-12

13-Feb-12

15-Mar-12

28 13-Feb-12

15-Mar-12

13-Feb-12

15-Mar-12

5 11-Mar-12

15-Mar-12

11-Mar-12

15-Mar-12

28 13-Feb-12

15-Mar-12

13-Feb-12

15-Mar-12

114 20-Nov-11

03-May-12

20-Nov-11

01-May-12

89 19-Jan-12

03-May-12

19-Jan-12

01-May-12

66 12-Feb-12

29-Apr-12

11-Feb-12

26-Apr-12

PTJ2060 Deck pre-commisioning

40 12-Feb-12

29-Mar-12

11-Feb-12

27-Mar-12

PTJ2090 Deck commisioning

26 29-Mar-12

29-Apr-12

28-Mar-12

26-Apr-12

68 29-Jan-12

17-Apr-12

28-Jan-12

15-Apr-12

W.P.5: DEC
DECK & TSF FABRICATION
DECK FABRICATION
FAB
General Activities
A

Deck Structure
Stru
Fabrication

2011
A M J Jul A S O N D

21-Sep-11

Page 3 of 5

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
CRITICAL AND NEAR CRITICAL ACTIVITIES AS OF 25-JUNE-11
Activity ID

Activity Name

Original BL Project
Duration Start

BL Project
Finish

Start

68 29-Jan-12

17-Apr-12

28-Jan-12

15-Apr-12

PTD150 Cutting & Assembly

20 29-Jan-12

21-Feb-12

28-Jan-12

19-Feb-12

PTD151 Welding & NDT

32 21-Feb-12

29-Mar-12

20-Feb-12

27-Mar-12

PTD152 Trial Fit

2 15-Apr-12

17-Apr-12

14-Apr-12

15-Apr-12

Atmosphric Painting
Atmosphr

73 19-Jan-12

15-Apr-12

19-Jan-12

12-Apr-12

Deck Flare
Fla

Finish

Piping painting

14 19-Jan-12

05-Feb-12

19-Jan-12

04-Feb-12

PT1100

Deck Flare

14 29-Mar-12

15-Apr-12

28-Mar-12

12-Apr-12

7 25-Apr-12

03-May-12

24-Apr-12

01-May-12

7 25-Apr-12

03-May-12

24-Apr-12

01-May-12

72 07-Dec-11

17-Feb-12

07-Dec-11

16-Feb-12

72 07-Dec-11

17-Feb-12

07-Dec-11

16-Feb-12

TSF1110 Installation of production manifold module on celler deck

4 07-Dec-11

10-Dec-11

07-Dec-11*

10-Dec-11

TSF1100 Installation of E & I module on main deck

4 07-Jan-12

10-Jan-12

07-Jan-12*

10-Jan-12

TSF1060 Equipment Installation Below Cellar Deck

4 13-Feb-12

17-Feb-12

13-Feb-12

16-Feb-12

TSF1070 Equipment Installation on Cellar Deck

15 02-Feb-12

17-Feb-12

02-Feb-12

16-Feb-12

TSF1080 Equipment Installation on Main Deck

15 02-Feb-12

17-Feb-12

02-Feb-12

16-Feb-12

113 20-Nov-11

13-Mar-12

20-Nov-11

11-Mar-12

Anti Skid Painting


P
PT1000

Heli Deck

EQUIPMENT
EQUIPMEN
Equipement Installation (onshore)
Equipeme

PIPING
PTJ2050

Piping & piping support fabrication start

0 20-Nov-11

C.S Piping Fab. & Erec., Valves Erection (onshore)

113 20-Nov-11

13-Mar-12

20-Nov-11

11-Mar-12

TSF1000 Piping Fabrication

70 20-Nov-11

29-Jan-12

20-Nov-11

28-Jan-12

TSF1020 Piping Erection

35 28-Jan-12

03-Mar-12

27-Jan-12

01-Mar-12

TSF1040 Valve Installation

15 17-Feb-12

03-Mar-12

16-Feb-12

01-Mar-12

PTJ2120 Piping hydrotest

21 21-Feb-12

13-Mar-12

20-Feb-12

11-Mar-12

0 29-Mar-12

29-Mar-12

27-Mar-12

27-Mar-12

29-Mar-12

W.P.7: CER
CERTIFICATION
PTJ1090

Deck completion certificate

W.P.8: LOA
LOAD-OUT, SEA-FASTENING, TRANSPORTATION & INSTALLATION
PTJ1070

Pre-drilling template seafastening and load out

PTJ1050

Jacket & Piles seafastening and load out

2011
A M J Jul A S O N D

PT1070

20-Nov-11

27-Mar-12

204 18-Oct-11

10-May-12

18-Oct-11

08-May-12

7 18-Oct-11

24-Oct-11

18-Oct-11

24-Oct-11*

15 17-Mar-12

31-Mar-12

17-Mar-12

31-Mar-12*

Page 4 of 5

2012
F M A M J JulA

3467-200, PETROBEL
SETH DEVELOPMENT EPC PROJECT
CRITICAL AND NEAR CRITICAL ACTIVITIES AS OF 25-JUNE-11
Activity ID
PTJ1060

Activity Name
Deck seafastening and load out

Original BL Project
Duration Start

BL Project
Finish

Start

7 03-May-12

10-May-12

02-May-12

Finish

2011
A M J Jul A S O N D

08-May-12*

Page 5 of 5

2012
F M A M J JulA

PAGE 29 OF 33

PTB

SETH OFFSHORE DEVELOPMENT EPC PROJECT


PLANNING PORTION IN THE MONTHLY PROGRESS REPORT

Egypt

Rev. (0)
Jun 2011

4.5. ONE MONTH LOOKAHEAD SCHEDULE

GFL 003-0405

3467-200

Project No.: 3467-200

Lookahead Report

SETH Offshore EPC Project


Dates
Milestone

Planned

Expected

* Relative
Weight

Milestone
Value

As Of :

25-Jun-11

Forecast Date :

25-Jul-11

Planned
Actual
Progress% Progress%

ENPPI
W.P.2 DETAILED ENGINEERING
PROCESS TECHNOLOGY DIVISION
REPORTS / TECHNICAL LIST
Basis of design
Final

11-Jun-11

07-Jul-11

12-Jun-11

12-Jul-11

100.00%

70.00%

1.94%

70.00%

20.00%

3.06%

100.00%

20.00%

3.06%

100.00%

20.00%

3.06%

100.00%

20.00%

0.83%

0.00%

0.00%

0.83%

0.00%

0.00%

5.28%

0.00%

0.00%

30

Process & Utilities report


Design

1.94%

50

TER
Flame arrestor TER
Finish

23-Jun-11

21-Jul-11

80

Fire Fighting package TER


Finish

09-Jun-11

05-Jul-11

80

Safety equipment and life saving TER


Finish

12-Jun-11

07-Jul-11

80

MRP
Chemical injection package MRP
Start

10-Jul-11

03-Jul-11

20

For Purchase

17-Jul-11

07-Jul-11

80

Fire Fighting package MRP


Start

05-Jul-11

20-Jul-11

20

For Purchase

11-Jul-11

21-Jul-11

80

VENDOR PRINTS REVIEW


Chemical injection package
Start

25-Jul-11

25-Jul-11

20

* Weights of Activities are calculated relative to (PROCESS TECHNOLOGY DIVISION)


Tuesday, July 05, 2011

Page 1 of 12

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Lookahead Report

SETH Offshore EPC Project


Dates
Milestone

Planned

Expected

* Relative
Weight

Milestone
Value

As Of :

25-Jun-11

Forecast Date :

25-Jul-11

Planned
Actual
Progress% Progress%

ENPPI
W.P.2 DETAILED ENGINEERING
INSTRUMENTATION & CONTROLS ENGINEERING DEPARTMENT
DRAWING
Electrical hook-up Drawing
Start

19-May-11

12-Jul-11

20

Design

26-May-11

19-Jul-11

50

Hydraulic instruments layouts


Start

05-May-11

06-Jul-11

20

Design

12-May-11

13-Jul-11

50

Hydraulic instruments Tube Routing layouts


Start

12-May-11

05-Jul-11

20

Design

19-May-11

12-Jul-11

50

1.58%

70.00%

0.00%

1.32%

70.00%

0.00%

1.32%

70.00%

0.00%

2.63%

100.00%

20.00%

1.84%

20.00%

20.00%

2.11%

20.00%

0.00%

2.11%

20.00%

20.00%

2.11%

100.00%

0.00%

2.11%

20.00%

20.00%

2.11%

20.00%

0.00%

1.05%

0.00%

0.00%

TER
Choke valve TER
Finish

12-Jun-11

05-Jul-11

80

Loose Instrument TER


Finish

26-Jun-11

24-Jul-11

80

Sand & Corrosion probes TER


Start

16-Jun-11

11-Jul-11

20

Instrument & Mechanical bulk material TER


Finish

03-Jul-11

14-Jul-11

80

Instrument cable and cable glandsTER


Start

06-Jun-11

10-Jul-11

20

Inst. Junction Box TER


Finish

07-Jul-11

21-Jul-11

80

Instrument cable trays TER


Start

14-Jun-11

03-Jul-11

20

MRP
Electro Hydraulic Well Head panel MRP
Start

04-Jul-11

13-Jul-11

20

For Purchase

11-Jul-11

14-Jul-11

80

* Weights of Activities are calculated relative to (INSTRUMENTATION & CONTROLS ENGINEERING DEPARTME
Tuesday, July 05, 2011

Page 2 of 12

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Lookahead Report

SETH Offshore EPC Project


Dates
Milestone

Planned

Expected

* Relative
Weight

Milestone
Value

As Of :

25-Jun-11

Forecast Date :

25-Jul-11

Planned
Actual
Progress% Progress%

ENPPI
W.P.2 DETAILED ENGINEERING
INSTRUMENTATION & CONTROLS ENGINEERING DEPARTMENT
MRP
HIPPS System MRP
Start

28-Jun-11

07-Jul-11

20

For Purchase

05-Jul-11

13-Jul-11

80

Wing valve MRP


Start

06-Jul-11

24-Jul-11

1.05%

0.00%

0.00%

1.05%

0.00%

0.00%

3.95%

0.00%

0.00%

3.42%

0.00%

0.00%

3.68%

0.00%

0.00%

20

VENDOR PRINTS REVIEW


HIPPS Vendor prints review
Start

13-Jul-11

24-Jul-11

20

Electro hydraulic wellhead control panel Vendor prints review


Start

25-Jul-11

21-Jul-11

20

Multi phase flow meter Vendor prints review


Start

25-Jul-11

20-Jul-11

20

* Weights of Activities are calculated relative to (INSTRUMENTATION & CONTROLS ENGINEERING DEPARTME
Tuesday, July 05, 2011

Page 3 of 12

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Lookahead Report

SETH Offshore EPC Project


Dates
Milestone

Planned

Expected

* Relative
Weight

Milestone
Value

As Of :

25-Jun-11

Forecast Date :

25-Jul-11

Planned
Actual
Progress% Progress%

ENPPI
W.P.2 DETAILED ENGINEERING
PIPING ENGINEERING DIVISION
TER
Injection fitting TER
Start

25-May-11

04-Jul-11

20

Finish

15-Jun-11

24-Jul-11

80

Insulation joint Injection fitting TER


Finish

09-Jun-11

21-Jul-11

2.73%

100.00%

0.00%

2.73%

100.00%

20.00%

1.82%

20.00%

0.00%

3.64%

0.00%

0.00%

4.55%

100.00%

70.00%

80

MRP
Piping bulk MRP
Start

19-Jun-11

05-Jul-11

20

For Purchase

26-Jun-11

07-Jul-11

80

VENDOR PRINTS REVIEW


Piping bulk Vendor prints review
Start

04-Jul-11

20-Jul-11

20

Specification
Piping material classes
Final

13-Jun-11

14-Jul-11

30

* Weights of Activities are calculated relative to (PIPING ENGINEERING DIVISION)


Tuesday, July 05, 2011

Page 4 of 12

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Lookahead Report

SETH Offshore EPC Project


Dates
Milestone

Planned

Expected

* Relative
Weight

Milestone
Value

As Of :

25-Jun-11

Forecast Date :

25-Jul-11

Planned
Actual
Progress% Progress%

ENPPI
W.P.2 DETAILED ENGINEERING
ELECTRICAL ENGINEERING DIVISION
DRAWING
Single line diagram
Start

23-May-11

14-Jul-11

20

Design

30-May-11

21-Jul-11

50

2.00%

70.00%

0.00%

1.33%

70.00%

0.00%

2.33%

70.00%

0.00%

8.33%

20.00%

20.00%

4.33%

20.00%

0.00%

4.33%

20.00%

0.00%

2.00%

0.00%

0.00%

2.00%

0.00%

0.00%

2.50%

0.00%

0.00%

2.50%

0.00%

0.00%

REPORTS / TECHNICAL LIST


Electrical cable list
Start

08-Jun-11

10-Jul-11

20

Design

15-Jun-11

17-Jul-11

50

Power system study


Start

15-May-11

30-Jun-11

20

Design

24-May-11

14-Jul-11

50

TER
Navigational aids system TER
Finish

27-Jun-11

10-Jul-11

80

Lighting material TER


Start

08-Jun-11

10-Jul-11

20

Earthing material TER


Start

20-Jun-11

10-Jul-11

20

MRP
Electrical cables MRP
Start

13-Jul-11

10-Jul-11

20

For Purchase

20-Jul-11

14-Jul-11

80

Electrical Cable trays MRP


Start

10-Jul-11

30-Jun-11

20

For Purchase

17-Jul-11

30-Jun-11

80

VENDOR PRINTS REVIEW


Electrical Cable trays Vendor prints review
Start

25-Jul-11

18-Jul-11

20

Electrical Cables Vendor prints review


Start

01-Aug-11

21-Jul-11

20

* Weights of Activities are calculated relative to (ELECTRICAL ENGINEERING DIVISION)


Tuesday, July 05, 2011

Page 5 of 12

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Lookahead Report

SETH Offshore EPC Project


Dates
Milestone

Planned

Expected

* Relative
Weight

Milestone
Value

As Of :

25-Jun-11

Forecast Date :

25-Jul-11

Planned
Actual
Progress% Progress%

ENPPI
W.P.2 DETAILED ENGINEERING
ELECTRICAL ENGINEERING DIVISION
VENDOR PRINTS REVIEW

* Weights of Activities are calculated relative to (ELECTRICAL ENGINEERING DIVISION)


Tuesday, July 05, 2011

Page 6 of 12

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Lookahead Report

SETH Offshore EPC Project


Dates
Milestone

Planned

Expected

* Relative
Weight

Milestone
Value

As Of :

25-Jun-11

Forecast Date :

25-Jul-11

Planned
Actual
Progress% Progress%

ENPPI
W.P.2 DETAILED ENGINEERING
OFFSHORE ENGINEERING DIVISION
DRAWING
Cable trays supports for deck plan at el. +9700 T.O.S.
Start

28-Jun-11

03-Jul-11

20

Design

05-Jul-11

10-Jul-11

50

Cable trays supports for cellar deck plan at el. +13500 T.O.S.
Start

28-Jun-11

03-Jul-11

20

Design

05-Jul-11

10-Jul-11

50

Cable trays supports for mezzanine deck plan at el. +16000 T.


Start

28-Jun-11

03-Jul-11

20

Design

05-Jul-11

10-Jul-11

50

Cable trays supports for main deck plan at el. +20500 T.O.S.
Start

28-Jun-11

03-Jul-11

20

Design

05-Jul-11

10-Jul-11

50

Cable trays supports for Helideck plan at el. +26500 T.O.S.


Start

28-Jun-11

03-Jul-11

20

Design

05-Jul-11

10-Jul-11

50

10.00%

0.00%

0.00%

10.00%

0.00%

0.00%

10.00%

0.00%

0.00%

10.00%

0.00%

0.00%

10.00%

0.00%

0.00%

15.00%

20.00%

20.00%

5.00%

0.00%

0.00%

TER
Survival module TER
Finish

28-Jun-11

03-Jul-11

80

MRP
Survival module MRP
Start

20-Jul-11

25-Jul-11

20

* Weights of Activities are calculated relative to (OFFSHORE ENGINEERING DIVISION)


Tuesday, July 05, 2011

Page 7 of 12

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Lookahead Report

SETH Offshore EPC Project


Dates
Milestone

Planned

Expected

* Relative
Weight

Milestone
Value

As Of :

25-Jun-11

Forecast Date :

25-Jul-11

Planned
Actual
Progress% Progress%

ENPPI
W.P.2 DETAILED ENGINEERING
MECHANICAL ENGINEERING DEPARTMENT
TER
Service water pump TER
Finish

07-Jun-11

03-Jul-11

10.00%

100.00%

20.00%

7.78%

0.00%

0.00%

80

VENDOR PRINTS REVIEW


Turret crane crane Vendor prints review
Start

19-Jul-11

13-Jul-11

20

* Weights of Activities are calculated relative to (MECHANICAL ENGINEERING DEPARTMENT)


Tuesday, July 05, 2011

Page 8 of 12

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Lookahead Report

SETH Offshore EPC Project


Dates
Milestone

Planned

Expected

* Relative
Weight

Milestone
Value

As Of :

25-Jun-11

Forecast Date :

25-Jul-11

Planned
Actual
Progress% Progress%

ENPPI
W.P.3 PROCUREMENT SERVICES
FOREIGN PURCHASING DEPARTMENT
COMMODITIES ONE BY ONE
Safety equipment and life saving
Comm. offers open

12-Jun-11

17-Jul-11

20

Bid tab

26-Jun-11

24-Jul-11

10

Chemical injection package


F.O.C.

10-Jul-11

30-Jun-11

20

P.O.

24-Jul-11

10-Jul-11

10

Fire Fighting package


Comm. offers open

14-Jun-11

10-Jul-11

20

Bid tab

28-Jun-11

14-Jul-11

10

F.O.C.

04-Jul-11

20-Jul-11

20

P.O.

18-Jul-11

24-Jul-11

10

Piping bulk
P.O.

03-Jul-11

07-Jul-11

23-May-11

04-Jul-11

20-Jun-11

07-Jul-11

08-Jun-11

07-Jul-11

24-Jul-11

07-Jul-11

F.O.C.

13-Jul-11

03-Jul-11

20

P.O.

27-Jul-11

10-Jul-11

10

Navigation aids system


27-Jun-11

17-Jul-11

03-Jul-11

21-Jul-11

60.00%

40.00%

3.73%

90.00%

90.00%

3.26%

60.00%

20.00%

3.49%

40.00%

20.00%

3.49%

40.00%

20.00%

3.73%

60.00%

90.00%

3.49%

60.00%

70.00%

3.49%

40.00%

40.00%

3.49%

40.00%

40.00%

20

* Weights of Activities are calculated relative to (FOREIGN PURCHASING DEPARTMENT)


Tuesday, July 05, 2011

3.49%

20

Instrument & Mechanical bulk material


Comm. offers open

70.00%

10

Electrical Cables

Comm. offers open

60.00%

20

Electrical Cable trays


P.O.

4.19%

20

Lighting material
Tech. offers open

40.00%

20

Earthing material
Tech. offers open

60.00%

10

Injection fitting
Tech. offers open

3.26%

Page 9 of 12

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Lookahead Report

SETH Offshore EPC Project


Dates
Milestone

Planned

Expected

Milestone
Value

* Relative
Weight

As Of :

25-Jun-11

Forecast Date :

25-Jul-11

Planned
Actual
Progress% Progress%

ENPPI
W.P.3 PROCUREMENT SERVICES
FOREIGN PURCHASING DEPARTMENT
COMMODITIES ONE BY ONE
HIPPS
F.O.C.

28-Jun-11

06-Jul-11

20

P.O.

12-Jul-11

14-Jul-11

10

Choke valves
Comm. offers open

14-Jun-11

12-Jul-11

20

Bid tab

28-Jun-11

20-Jul-11

10

Instrument cable trays


Tech. offers open

14-Jun-11

04-Jul-11

Comm. offers open

06-Jun-11

30-Jun-11

20

Bid tab

20-Jun-11

06-Jul-11

10

F.O.C.

04-Jul-11

12-Jul-11

20

P.O.

14-Jul-11

18-Jul-11

10

Wing valves
Comm. offers open

08-Jun-11

03-Jul-11

20

Bid tab

22-Jun-11

10-Jul-11

10

F.O.C.

06-Jul-11

21-Jul-11

20

Instrument cable and cable glands


06-Jun-11

07-Jul-11

16-Jun-11

10-Jul-11

24-Jul-11

03-Jul-11

60.00%

40.00%

3.49%

40.00%

0.00%

3.54%

70.00%

40.00%

3.54%

70.00%

40.00%

3.49%

60.00%

20.00%

3.49%

40.00%

0.00%

3.73%

60.00%

90.00%

3.49%

60.00%

40.00%

3.73%

40.00%

40.00%

10

Service water pump


Comm. offers open

13-Jun-11

10-Jul-11

20

Bid tab

27-Jun-11

18-Jul-11

10

F.O.C.

11-Jul-11

25-Jul-11

20

Survival module
Comm. offers open

29-Jun-11

10-Jul-11

20

Bid tab

13-Jul-11

18-Jul-11

10

F.O.C.

19-Jul-11

24-Jul-11

20

* Weights of Activities are calculated relative to (FOREIGN PURCHASING DEPARTMENT)


Tuesday, July 05, 2011

3.73%

20

Multi phase flow meter


P.O.

70.00%

20

Sand & Corrosion probes


Tech. offers open

70.00%

20

Electro hydraulic wellhead control panel

Tech. offers open

4.19%

Page 10 of 12

Layout No. 1
Data'Nes Systems, Release 2.21

Project No.: 3467-200

Lookahead Report

SETH Offshore EPC Project


Dates
Milestone

Planned

Expected

Milestone
Value

* Relative
Weight

As Of :

25-Jun-11

Forecast Date :

25-Jul-11

Planned
Actual
Progress% Progress%

ENPPI
W.P.3 PROCUREMENT SERVICES
EXPEDITING DEPART.
COMMODITIES ONE BY ONE
Chemical injection package
Start

10-Jul-11

05-Jul-11

05-Jul-11

20-Jul-11

10-Jul-11

06-Jul-11

17-Jul-11

06-Jul-11

28-Jun-11

07-Jul-11

10-Jul-11

12-Jul-11

06-Jul-11

24-Jul-11

0.00%

0.00%

2.33%

0.00%

0.00%

4.66%

0.00%

0.00%

3.73%

0.00%

0.00%

3.26%

0.00%

0.00%

10

Layout No. 1

* Weights of Activities are calculated relative to (EXPEDITING DEPART.)


Tuesday, July 05, 2011

1.86%

10

Wing valves
Start

0.00%

10

Electro hydraulic wellhead control panel


Start

0.00%

20

HIPPS
Start

3.73%

20

Electrical Cables
Start

0.00%

10

Electrical Cable trays


Start

0.00%

10

Fire Fighting package


Start

4.66%

Page 11 of 12

Data'Nes Systems, Release 2.21

Project No.: 3467-200

Lookahead Report

SETH Offshore EPC Project


Dates
Milestone

Planned

Expected

Milestone
Value

* Relative
Weight

As Of :

25-Jun-11

Forecast Date :

25-Jul-11

Planned
Actual
Progress% Progress%

ENPPI
W.P.5 DECK AND TSF SUPPLY & FABRICATION
METERIAL SUPPLY
COMMODITIES ONE BY ONE
Chemical injection package
P.O.

24-Jul-11

10-Jul-11

18-Jul-11

24-Jul-11

03-Jul-11

07-Jul-11

24-Jul-11

07-Jul-11

27-Jul-11

10-Jul-11

12-Jul-11

14-Jul-11

18-Jul-11

18-Jul-11

24-Jul-11

03-Jul-11

03-Jul-11

07-Jul-11

03-Jul-11

07-Jul-11

0.00%

0.00%

1.49%

0.00%

0.00%

7.71%

0.00%

0.00%

5.41%

0.00%

0.00%

10.97%

0.00%

0.00%

8.70%

0.00%

0.00%

5.22%

0.00%

0.00%

35

Layout No. 1

* Weights of Activities are calculated relative to (METERIAL SUPPLY)


Tuesday, July 05, 2011

2.78%

35

Piping bulk 2nd batch


P.O.

0.00%

15

Piping bulk 1st batch


P.O.

0.00%

15

Multi phase flow meter


P.O.

3.48%

15

Electro hydraulic wellhead control panel


P.O.

0.00%

35

HIPPS
P.O.

0.00%

35

Electrical Cables
P.O.

1.94%

35

Electrical Cable trays


P.O.

0.00%

15

Piping bulk 3rd batch


P.O.

0.00%

15

Fire Fighting package


P.O.

9.06%

Page 12 of 12

Data'Nes Systems, Release 2.21

PAGE 30 OF 33

PTB

SETH OFFSHORE DEVELOPMENT EPC PROJECT


PLANNING PORTION IN THE MONTHLY PROGRESS REPORT

Egypt

Rev. (0)
Jun 2011

4.6. PROCUREMENT STATUS

GFL 003-0405

3467-200

PAGE 31 OF 33

PTB

SETH OFFSHORE DEVELOPMENT EPC PROJECT


PLANNING PORTION IN THE MONTHLY PROGRESS REPORT

Egypt

Rev. (0)
Jun 2011

4.6.1 ENPPI

GFL 003-0405

3467-200

Project: 3467-200 PTB

Procurement Status Repo

PETROBEL, EPC FOR SEITH OFFSHORE PLATFORM


MRQ

Commodity
Name

TER

F.O.C

P.O

As of:
Fab.
Upto
RFS

25-Jun

Shipping

Delivery at
Site

(Supplier)

Process
VENT STOCK TIPS PL

09-May-11

EXP

(112-04)

CHEMICAL
INJECTION
PACKAGE
(115-01)

FLAME
ARRESTORS

ACT

09-May-11

PL

06-Apr-11

27-Dec-11

10-Jan-12

26-Jul-11

23-Aug-11

11-Sep-11

26-Dec-11

16-Jan-12

30-Jan-12

19-Jun-11

10-Jul-11

24-Jul-11

06-Jan-12

27-Jan-12

10-Feb-12

30-Jun-11

10-Jul-11

27-Dec-11

17-Jan-12

31-Jan-12

01-Jun-11

PL

27-Apr-11

23-Jun-11

21-Jul-11

04-Aug-11

28-Nov-11

19-Dec-11

02-Jan-12

21-Jul-11

18-Aug-11

06-Sep-11

26-Dec-11

16-Jan-12

30-Jan-12

14-Jun-11

07-Jul-11

21-Jul-11

03-Jan-12

24-Jan-12

07-Feb-12

05-Jul-11

18-Jul-11

01-Aug-11

04-Jan-12

28-Jan-12

11-Feb-12

12-Jun-11

10-Jul-11

24-Jul-11

07-Dec-11

28-Dec-11

11-Jan-12

07-Jul-11

04-Aug-11

18-Aug-11

01-Jan-12

22-Jan-12

05-Feb-12

EXP

12-Apr-11

Tuesday, July 05, 2011

06-Dec-11

06-Apr-11

PL
FIRE
PROTECTION
EXP
SYSTEM PACKGE
ACT
(190-01)

(190-03)

17-Aug-11

ACT

17-Apr-11

LIFE SAVING
EQUIPMENT

03-Aug-11

EXP

ACT

(119-02)

04-Jul-11

PL

12-Apr-11

12-Apr-11

EXP
ACT

12-Apr-11

Page 1 of 7

PL: Planned
EXP: Expect
ACT: Actual

Project: 3467-200 PTB

Procurement Status Repo

PETROBEL, EPC FOR SEITH OFFSHORE PLATFORM


MRQ

Commodity
Name

TER

F.O.C

P.O

As of:
Fab.
Upto
RFS

25-Jun

Shipping

Delivery at
Site

(Supplier)
SURVIVAL
MODULE
(197-02)

28-Apr-11

28-Jun-11

19-Jul-11

02-Aug-11

26-Dec-11

16-Jan-12

30-Jan-12

03-Jul-11

24-Jul-11

07-Aug-11

31-Dec-11

21-Jan-12

04-Feb-12

07-Jun-11

11-Jul-11

25-Jul-11

28-Nov-11

19-Dec-11

04-Jan-12

03-Jul-11

27-Jul-11

10-Aug-11

14-Dec-11

04-Jan-12

20-Jan-12

PL

15-Dec-11

12-Jan-12

26-Jan-12

EXP

15-Dec-11

26-Jan-12

29-Dec-11

PL
EXP
ACT

14-Apr-11

PL

25-Apr-11

Mechanical
SERVICE WATER
PUMPS
(131-15)

DIESEL
GENERATOR
(135-03)

MONORAIL
CRANE
(137-01)

EXP
ACT

25-Apr-11

ACT

PL

28-Jul-11

06-Sep-11

04-Oct-11

17-Oct-11

01-Feb-12

22-Feb-12

07-Mar-12

EXP

28-Jul-11

06-Sep-11

04-Oct-11

17-Oct-11

01-Feb-12

22-Feb-12

07-Mar-12

13-Apr-11

12-Jun-11

10-Jul-11

24-Jul-11

06-Mar-12

20-Mar-12

03-Apr-12

19-Feb-12

04-Mar-12

18-Mar-12

ACT

TURRENT CRANE PL
EXP

(137-02)

Tuesday, July 05, 2011

ACT

10-Apr-11

04-May-11

29-May-11

21-Jun-11

Page 2 of 7

PL: Planned
EXP: Expect
ACT: Actual

Project: 3467-200 PTB

Procurement Status Repo

PETROBEL, EPC FOR SEITH OFFSHORE PLATFORM


MRQ

Commodity
Name

TER

F.O.C

P.O

As of:
Fab.
Upto
RFS

25-Jun

Shipping

Delivery at
Site

(Supplier)
MICROTURBINE

(172-01)

PL

15-Dec-11

12-Jan-12

26-Jan-12

EXP

15-Dec-11

26-Jan-12

29-Dec-11

24-Jul-11

18-Oct-11

08-Nov-11

22-Nov-11

12-Jul-11

02-Oct-11

23-Oct-11

06-Nov-11

ACT

Electrical
ELECTRICAL
CABLE TRAYS
(500-02)

NAVIGATIONAL
AIDS
(510-10)

E& I MODULE

(510-16)

ELECTRICAL
CABLES
(510-22)

Tuesday, July 05, 2011

PL

02-May-11

19-Jun-11

10-Jul-11

EXP
ACT

10-Apr-11

02-May-11

30-May-11

PL

16-May-11

27-Jun-11

18-Jul-11

02-Aug-11

05-Dec-11

26-Dec-11

09-Jan-12

10-Jul-11

31-Jul-11

15-Aug-11

18-Dec-11

08-Jan-12

22-Jan-12

PL

15-Dec-11

12-Jan-12

26-Jan-12

EXP

15-Dec-11

12-Jan-12

26-Jan-12

EXP
ACT

26-Apr-11

ACT

PL

09-May-11

20-Jun-11

EXP
ACT

10-Apr-11

13-Jul-11

27-Jul-11

04-Dec-11

25-Dec-11

08-Jan-12

03-Jul-11

10-Jul-11

22-Nov-11

13-Dec-11

27-Dec-11

29-May-11

Page 3 of 7

PL: Planned
EXP: Expect
ACT: Actual

Project: 3467-200 PTB

Procurement Status Repo

PETROBEL, EPC FOR SEITH OFFSHORE PLATFORM


MRQ

TER

F.O.C

P.O

02-Jun-11

06-Jul-11

27-Jul-11

22-Aug-11

04-Aug-11

25-Aug-11

18-Jul-11

As of:
Fab.
Upto
RFS

25-Jun

Shipping

Delivery at
Site

14-Dec-11

04-Jan-12

18-Jan-12

13-Sep-11

23-Dec-11

13-Jan-12

27-Jan-12

08-Aug-11

24-Aug-11

26-Dec-11

24-Jan-12

14-Feb-12

04-Aug-11

25-Aug-11

15-Sep-11

23-Dec-11

22-Jan-12

12-Feb-12

26-Jun-11

17-Jul-11

31-Jul-11

13-Jan-12

10-Feb-12

24-Feb-12

24-Jul-11

14-Aug-11

28-Aug-11

16-Jan-12

06-Feb-12

20-Feb-12

15-Dec-11

05-Jan-12

19-Jan-12

12-Dec-11

05-Jan-12

19-Jan-12

PL

15-Dec-11

12-Jan-12

26-Jan-12

EXP

15-Dec-11

05-Jan-12

19-Jan-12

Commodity
Name
(Supplier)
LIGHTING
MATERIAL
(529-01)

EARTHING
MATERIAL
(550-01)

PL
EXP
ACT

22-Jun-11

PL

06-Jun-11

EXP
ACT

20-Jun-11

PL

25-May-11

Instrument
LOOSE
INSTRUMENT
(210-01)

EXP
ACT

06-Jun-11

MANUAL VALVES PL
EXP

(212-01)

SHUTDOWN &
BLOWDOWN
VALVES
(212-04)

Tuesday, July 05, 2011

ACT

ACT

Page 4 of 7

PL: Planned
EXP: Expect
ACT: Actual

Project: 3467-200 PTB

Procurement Status Repo

PETROBEL, EPC FOR SEITH OFFSHORE PLATFORM


Commodity
Name

MRQ

TER

F.O.C

P.O

10-Apr-11

12-Jun-11

10-Jul-11

24-Jul-11

As of:
Fab.
Upto
RFS

25-Jun

Shipping

Delivery at
Site

06-Jan-12

27-Jan-12

10-Feb-12

03-Jul-11

21-Dec-11

11-Jan-12

25-Jan-12

(Supplier)
MULTIPHASE
FLOW METERS
(221-06)

CHOKE VALVES

PL
EXP
ACT

10-Apr-11

25-May-11

21-Jun-11

PL

13-Apr-11

15-Jun-11

10-Jul-11

24-Jul-11

05-Apr-12

26-Apr-12

05-Jul-11

26-Jul-11

09-Aug-11

21-Feb-12

11-Apr-12

13-Jun-11

11-Jul-11

25-Jul-11

06-Apr-12

27-Apr-12

11-May-12

21-Jul-11

04-Aug-11

17-Mar-12

07-Apr-12

21-Apr-12

12-Jul-11

26-Jul-11

08-Jan-12

29-Jan-12

12-Feb-12

05-Jul-11

19-Jul-11

01-Jan-12

22-Jan-12

05-Feb-12

28-Jun-11

12-Jul-11

24-Mar-12

14-Apr-12

28-Apr-12

06-Jul-11

14-Jul-11

17-Mar-12

07-Apr-12

21-Apr-12

EXP

(234-06)

WING VALVES

ACT

10-Apr-11

PL

13-Apr-11

EXP

(239-02)

WELLHEAD
CONTROL PANEL

ACT

10-Apr-11

15-Jun-11

PL

12-Apr-11

12-Jun-11

EXP
ACT

07-Apr-11

16-Jun-11

HIGH INTEGRITY PL
PRESSURE
EXP
PROTECTION
ACT
(252-14)

07-Apr-11

31-May-11

(252-10)

Tuesday, July 05, 2011

03-Apr-11

09-Jun-11

Page 5 of 7

PL: Planned
EXP: Expect
ACT: Actual

Project: 3467-200 PTB

Procurement Status Repo

PETROBEL, EPC FOR SEITH OFFSHORE PLATFORM


MRQ

TER

PL

01-Jun-11

07-Jul-11

01-Aug-11

15-Aug-11

EXP

26-Jun-11

04-Aug-11

25-Aug-11

02-Jun-11

03-Jul-11

Commodity
Name

F.O.C

P.O

As of:
Fab.
Upto
RFS

25-Jun

Shipping

Delivery at
Site

29-Dec-11

19-Jan-12

02-Feb-12

13-Sep-11

07-Jan-12

28-Jan-12

11-Feb-12

24-Jul-11

07-Aug-11

01-Nov-11

22-Nov-11

06-Dec-11

14-Jul-11

04-Aug-11

18-Aug-11

02-Nov-11

23-Nov-11

07-Dec-11

07-Jul-11

28-Jul-11

11-Aug-11

05-Nov-11

26-Nov-11

10-Dec-11

21-Jul-11

11-Aug-11

25-Aug-11

09-Nov-11

30-Nov-11

14-Dec-11

20-Jun-11

11-Jul-11

25-Jul-11

28-Nov-11

19-Dec-11

02-Jan-12

21-Jul-11

11-Aug-11

25-Aug-11

09-Dec-11

30-Dec-11

13-Jan-12

(Supplier)
SAND PROBES

(281-08)

ACT

INSTRUMENT/ME PL
CHANICAL BULK
EXP
MATERIAL
ACT
(291-01)

03-May-11

JUNCTION BOXES PL

09-Jun-11

EXP

(295-01)

INSTRUMENT
CABLES
(298-01)

INSTRUMENT
CABLE TRAYS /
CHANNELS
(298-03)

ACT

06-Jun-11

PL

23-May-11

EXP
ACT

23-Jun-11

PL

31-May-11

28-Jun-11

14-Jul-11

28-Jul-11

22-Oct-11

29-Oct-11

12-Nov-11

EXP

26-Jun-11

28-Jul-11

15-Aug-11

29-Aug-11

13-Nov-11

20-Nov-11

04-Dec-11

ACT

Piping
Tuesday, July 05, 2011

Page 6 of 7

PL: Planned
EXP: Expect
ACT: Actual

Project: 3467-200 PTB

Procurement Status Repo

PETROBEL, EPC FOR SEITH OFFSHORE PLATFORM


MRQ

Commodity
Name

TER

F.O.C

P.O

As of:
Fab.
Upto
RFS

25-Jun

Shipping

Delivery at
Site

(Supplier)
PIPING BULK
MATERIAL
(400-01)

INJECTION
FITTINGS
(400-02)

PL

07-Apr-11

31-May-11

20-Jun-11

EXP

04-Jul-11

06-Jan-12

27-Jan-12

10-Feb-12

07-Jul-11

10-Jan-12

31-Jan-12

14-Feb-12

ACT

07-Apr-11

17-May-11

22-Jun-11

PL

24-Apr-11

15-Jun-11

13-Jul-11

27-Jul-11

10-Dec-11

31-Dec-11

14-Jan-12

24-Jul-11

21-Aug-11

07-Sep-11

18-Jan-12

08-Feb-12

22-Feb-12

09-Jun-11

10-Jul-11

24-Jul-11

07-Dec-11

28-Dec-11

11-Jan-12

21-Jul-11

21-Aug-11

07-Sep-11

18-Jan-12

08-Feb-12

22-Feb-12

PL

15-Dec-11

12-Jan-12

26-Jan-12

EXP

15-Dec-11

12-Jan-12

26-Jan-12

EXP
ACT

24-Apr-11

PL

20-Apr-11

Pipeline
INSULATING
JOINTS (Pipeline)
(612-03)

PRODUCTION
MANIFOLD
(642-03)

Tuesday, July 05, 2011

EXP
ACT

29-May-11

ACT

Page 7 of 7

PL: Planned
EXP: Expect
ACT: Actual

PAGE 32 OF 33

PTB

SETH OFFSHORE DEVELOPMENT EPC PROJECT


PLANNING PORTION IN THE MONTHLY PROGRESS REPORT

Egypt

Rev. (0)
Jun 2011

4.6.2 TECNOMARE

GFL 003-0405

3467-200

SETHDEVELOPMENTPROJECT
ProcurementSummaryStatusReport
asofJune25th,2011
Sr.

Commodity

Phase

PLC/RTU

Forecast

Plan

GROUTSEALS

SHOCKCELLS

RFQ's
Tech.Open Tech.Report
IssuedDate
11Mar11

13Apr11

3May11

Comm.
Open

Comm.
Report

FaxOf
Comm.

MRPIssued

P.O.Date

11May11

17May11

30May11

30May11

30May11

Deliveryat
DeliveryEx
DeliveryFOB
site
Work
12Jan12

27Jan12

25Feb12
23Feb12

Actual

11Mar11

25Mar11

20Apr11

21Apr11

29Apr11

2May11

2May11

2May11

Plan

31Mar11

10Apr11

14Apr11

24Apr11

28Apr11

15May11

15May11

15May11

4Sep11

18Sep11

28Sep11

4Sep11

18Sep11

28Sep11

Forecast
Actual

15Mar11

5Apr11

14Apr11

14Apr11

26May11

26May11

26May11

26May11

Plan

31Mar11

29Apr11

9May11

17May11

25May11

30May11

30May11

30May11

21Mar11

14Apr11

4May11

9May11

6Jun11

9Jun11

9Jun11

9Jun11

Forecast