LOCATION
The project area is located in a narrow section of Indus river, about 3 km downstream of
Besham. Distance from Islamabad is about 240 km
3.OBJECTIVES/BENEFITS
To design a project of 4,000 MW hydropower Project to produce mean annual energy of 21,300
GWh for the national grid.
5.COMPLETION DATE
6.PROJECT COST
PC-II approved by CDWP on 18.06.2012 for Rs. 719.628 Million
7.SALIENT FEATURES
Installed Capacity
4,000 MW
21,300 GWh
Design Discharge
2,900 m3/s
Gross Head
185 m
28 km
8, Francis
US$ 6 Billion