TYPICAL BUILDING CONSTRUCTION PROJECT WORKERS PRODUCTION PLANNING

DATA FOR BUILDING WORKS


Gang size
Outp
ut
SI.
per
Skille
Unskill
No
Activities
Units
day
d
ed
.
(8HR
S)
1 Excavation in ordinary soil (manually)
CM
2
7
2 Backfilling with earth (manually)
CM
3
15
3 Concrete mixing and pouring in place
CM
2
10
17
Making, fixing and removing of fairface
4
SM
2
1
10
formwork
Making, fixing and removing of ordinary
11.5
5
SM
2
1
formwork
0
6 Reinforcement making and fixing
MT
2
1
0.30
7 B.R.C fabric cutting and fixing
SM
2
1
165
8 Bitumen paints (2 coats)
SM
2
40
9 Blockwork and plaster (including up to 4)
a. Solid blockwork
SM
2
2
15
b. Hollow blockwork
SM
2
2
17
c. Fairface blockwork
SM
2
2
12
d. Internal plaster(single coat)
SM
2
2
30
e. Internal plaster (double coat)
SM
2
2
20
f. External plaster (single coat)
SM
2
2
20
g. External plaster
SM
2
2
15
h. Screed in flooring (upto 75mm thk)
SM
2
2
20
i. Erection of scaffolding (above 4m upto
SM
2
35
15m nt)
j. Dismantling of scaffolding
SM
2
100
10 Tiling work
a. Ceramic wall tiles
SM
1
1
6
b. Ceramic floor tiles with cement back
SM
1
1
7.50
c. Ceramic tiles with adhesive backing
SM
1
1
7.50
d. Mosaic tile work
SM
1
1
9
e. Mosaic skirting
SM
1
1
27
f. P.V.C tile work with adhesive
SM
1
1
45
g. P.V.C tile work with adhesive
SM
1
1
60
h. P.V.C steps
No.
1
1
5
i. Mosaic steps making
No.
1
1
5
j. Mosaic steps fixing
No.
1
1
6
11 Situ flooring
SM
1
1
2.5
Situ skirting
RM
1
1
8.75
Situ steps
RM
1
1
1.5
12 Threshold fixing
No.
1
1
12
13 Sanitary accessory fixing
No.
1
1
10
(including cutting of fixed tile if necessary)

14
15

Marble work (floor)


Painting:
a. 2 Coats of Snowcem
b. 3Coats of emulsion
c. 4 Coats of enamel paint

SM

10

SM
SM
SM

1
1
1

24
12
10