ITEM
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1
2
3
4
5
6
7
8
9
10
11
ESPECIFICAES
DIMETRO (MM)
EFICINCIA DA BOMBA (%)
NMERO DE BOMBAS
HORAS DE TRABALHO DA BOMBA / DIA
CUSTO DO KWH (R$ / H)
CUSTO DA DEMANDA ( R$/KW x MS)
DESCONTO ENERGIA (%)
CUSTO DA TUBULAO ( R$ / M)
CUSTO DE 1 CONJ. ELEVAT. ( R$)
JUROS ANUAL P/ CANALIZAO ( % )
JUROS ANUAL P/ CONJ EKEVAT. ( % )
PRAZO DE PAG. CANALIZ. (ANOS)
PRAZO DE PAG. CONJ. ELEV. (ANOS)
SOMATRIO DOS K LOCALIZ.
C (HAZEN W.)
VAZO (L/S)
COMPRIMENTO (M)
N.A. MONT (M)
N.A. JUS (M)
ALT GEOM (M) = HG
VELOCIDADE (M/S) =V
PERD. CARGA UNIT (M/M)
PERD. CARGA POR ATRITO H'F=J*L
PERD. CARGA LOCALIZ.
H"F= SOMA K*V/2G
ALT. MAN. TOT. (M) H=HG+H'F+H"F
POT. REQ. (CV) = P(1)
DIMETROS
350
75
2
22
0.04599
3.79
25
151.5
16,225.00
11.00
11.00
30.00
10.00
15
130
171
3,410.00
30.5
62.5
32
1.78
0.0082185066
28.03
400
75
2
22
0.04599
3.79
25
166.14
13,900.00
11.00
11.00
30.00
10.00
15
130
171
3,410.00
30.5
62.5
32
1.36
0.0042917369
14.63
450
75
2
22
0.04599
3.79
25
183.61
12,700.00
11.00
11.00
30.00
10.00
15
130
171
3,410.00
30.5
62.5
32
1.08
0.0024196385
8.25
500
75
2
22
0.04599
3.79
25
225.23
12,082.00
11.00
11.00
30.00
10.00
15
130
171
3,410.00
30.5
62.5
32
0.87
0.0014491636
4.94
2.42
1.42
0.88
0.58
62.44
189.82
48.05
146.07
41.13
125.05
37.52
114.07
12
13
14
15
92,206.08
51,114.42
516,615.00
32,450.00
70,956.68
39,334.81
566,537.40
27,800.00
60,744.14
33,673.50
626,110.10
25,400.00
55,408.40
30,715.63
768,034.30
24,164.00
16
1,298.00
1,112.00
1,016.00
966.56
17
59,423.43
65,165.74
72,018.06
88,342.84
18
5,510.06
4,720.48
4,312.96
4,103.08
19
117,345.91
110,333.03
111,020.52
124,128.11