t KERALA STATE ELECTRICITY BOARD ‘ABSTRACT Cost-data for Transmission works ~ sanction accorded ~ Orders issued ‘Corporate Office (Planning wing) 5.0. (FM) No.2586 /2008(CPIR&P/PIg-1/RECI2008 - 09) dated 23.10.2008 Thinwananthapuram Read: Note No.CP/R&P/Plg 1/REC/2008-09 dated 13.10.2008 of Chief Engineer (Corporate Planning) ORDER The cost data for the transmission works was last prepared during 2004.05 in the prescribed format as per the guide line of REC. Considering the escalation in price of ‘equipments and labour, revision of cost data was necessary. A new cost data has been prepared based on the cost of material as taken from the latest purchase orders issued by KSEB and was brought to the notice of the Board, Having considered the recommendation of Chief Engineer (Corporate Planning), the Board has decided to accord sanction to the transmission Cost data. The approved cost data is appended to this order. — Orders are issued accordingly. ~~ : iho By order of the Board To AY / \o" \o M. suber ot » r \ | Secretary Chief Engineer (Corporate Planning) | { XQ Chief Engineer (HRM) Ss Chief Engineer (Trans) system operation Copy to : The Director MIS / Deputy Chief Engineers of all Transmission Circies / TA to Chairman / TA to Member (Trans.) / TA to Member (Distribution) / TA to Member (Generation) / PA to Member (Finance) / Public Relations Officer / Senior CA to Secretary / Fair Copy Superintendent Forwarded By Oras sh No. Rates for Transmission Works ICONSTRUCTION OF 1 KM 33 KV SINGLE CIRCUIT LINE USING ACSR DOG CONDUCTOR ANO| [A TYPE POLES AT A MAXIMUM SPAN OF 80 tt |CONSTAUCTION OF 1 KM 32 KV DOUBLE CIRCUIT LINE USING ACER 006 CONDUCTOR 2 |aNOA TYPE POLES AT A MAXIMUM SPAN OF 80 M ‘8 3. [CONSTRUCTION OF 1KM 39KV SINGLE CIRCUIT LINE USING LATTICE POLES WITH] 9) MAXIMUM SPAN S5Mtr, ‘4. [CONSTRUCTION OF 1kM 33KV DOUBLE CIRCUIT LINE USING LATTICE POLES: ‘s058 [WITH MAXIMUM SPAN S6Mtr. _. 5 [convert 66 kv LINE 0.110 KV OC LINE . iz 8 CONSTRUCTION OF 1KMAIOKVOCLINE 7.23 7 |CONSTRUCTION OF 1 KM 220 KV DC LINE 11643 18 |consTRUCTION OF 2 Nos 66 KV FEEDER BAYS AT THE EXISTING SUBSTATION 16780 4 JeonsTRUCTION OF 2 Noe 110 KV FEEDER BAYS AT THE EXISTING SUBSTATION ters 10 |consTRUCTION OF 2 NOS 220 KV FEEDER BAYS sass 11. [CONSTRUCTION OF 2 Nos TRANSFORMER BAYS OF 66/11 KV, 2X 10MVA TRANSFORMER | sos 05 IIN EXISTING SUBSTATION 432, [CONSTRUCTION OF 2 Nos TRANSFORMER BAYS OF 110/11 KV, 2X12.5MVA, were [TRANSFORMER IN EXISTING SUBSTATION 13, [CONSTRUCTION OF 2 Nos 110 KV BAYS AND FOR THE INSTALATION OF 110/33 KV,2X16 | go7 55 IMVA TRANSFORMERS & 4 Nos 33 KV FEEDERS IN EXISTING 110 KV SUBSTTION 14 [INSTALLATION OF 2X 20 MVA 110/66 KV TRANSFORMER IN EXISTING SUBSTATION T0368 6 JUPGRADATION OF 66 KV SUBSTATION WITH 2 NOS 110 KV FEEDER BAYS & INSTALLATION JOF 2x 12.5 MVA 110/11 KV TRANSFORMER & 6 NOS 11 KV FEEDER WITH SWITCH GEAR 623.03 UPGRADATION OF 110 KV SUBSTATION TO 220 KV SUBSTATION WITH 2 NOS. 220 KV 1 | FEEDER BAYS, BY INSTALLING 2 X 100 MVA, 270/110 KY TRANSFORMER AND 2 NOS 410K¥ 2599.39 EEDER BAYS 47, [CONSTRUCTION OF 33/11 KV SUBSTATION BY INSTALLING 2X 5 MVA, 33/11 KV prea2 |TRANSFORMERS AND 2 NOS OF 33 KV FEEDER BAYS: 12 [CONSTRUCTION OF 110 KV SUBSTATION WITH 2Nos.110 KV FEEDER BAYS BY 7228 INSTALLALLING 2X 12.5 MVA, 110/11 KV TRANSFORMERS. |consTRUCTION OF 220 KV SUBSTATION WITH 2NOS. 220 KV FEEDER BAYS, BY I 49 INSTALLING 2 X 100 MVA, 220/110 KV TRANSFORMER AND 2 X 12.5 MVA 110/11 KV Isa7a.88 [TRANSFORMERS WITH 2 NOS. 110 KV FEEDER BAYS: 1 1) COST DATA FOR THE CONSTRUCTION OF 1 XM 33 KV SYNOLE CIRCUIT LING USING ACSF. (00G CONDUCTOR AND A TYPE POLES AT A MAXIMUM SPAN OF 66 Mb Ram Fe. Amount £ Perticutore ory oy ee 1 326 Type Feoncaied Poles te 6 Gas "+00 2. Cross Arm wn Acces ts oat oat 3. Baek Clamp wit Bot & Nut z 14 a.ndos oot 4 Siw Sat oo: 28 cose O18 5 Insulators ond hardware accaseores 4S ore ot {Sees tancated Poles foc road coeeng 3 ‘ oe a 7 ACSR Dog Contuttor xa as 0.608 160 wai gy sisi tr poles re “Sipe Earning Con Excthing, Owciger tan, we —""Ls oe Labour Gripe 199 “eure, Salen Tax & Tearaforing Ht ‘Contingenciag 9 78% Tree Cuting Comoereation Qverend Charge 3) COST OF DATA FOR THE DONETRUCTION OF 1 KaE22 KY DOUBLE CIRCUIT UME USING ACSA (00d CONDUCTOR AND A TYPE POLES ATA MAXWY 'll SPAN OF 90 MF a ReteRa. Amount No. Particular OF Lakhs RaLanne 112M, AcType Patricand Poles 8 028 +00 2. Crows arm wih accessories owe 88 oo 3 Back Ciemp wit Bor & Nut 42) poneas 08 Sat 7 8.0040 os oe 0.30 4 on 330 a3” osos 320 i sa a! os 2.00 Pipe Eanting Coll Earning, Danger Somrd, et, 08 O08 Labour Charge 10% . 118 Inauance, Salen Tex & Transporting 19% 7” 118, ‘Ganingencian 3.78% . 4s _ 080 2 148 1 0.004 9.004 10.08 3) DATA FOR THE CONSTRUCTION OF 1KM 33KV SINGLE CIRCUIT LINE USING LATTICE POLES WITH MAXIMUM SPAN S600, a Rete Amount in Ne Particetsre, aa en eke The Leics pate Cie . _No. . oe 18.48 2 ACSA Dog conector ‘Gn a5 6.608 180 3 Jrwulatora ang nandiare frogs 2 ta . + 04a. 4¢'Crowu acm win secanucriog ve ts eg “Total Coat af Materia) v4.38 Pipe sarting/ cod earthing ane danger board ang 4s oor Lecour charge 10%, 104 Ingurance, Sales Tox, Transporting 10% tae \ Contingencies 3.75% ' | \ a) “Tre cating compensation . | nt) ‘Overhead charges 10% coe} | aa! Foundation flat pole @ Rs 1800 \ } zn ” Grand Total! t I ) abe 4) DATA FOR THE CONSTRUCTION OF 1KM 33KV DOURE CIRCUIT LINE USING LATTICE LES WITH MAXIMUM SPAN SSM su. ‘amount in No. + Latice pole © 98 2 AGSR Dog conductor 3 Inauatore and harewae i 5 Stone arm win accessories ‘Total Cost of Material = Pipa vartinplot earthing and danger board ‘sing " its Labour cvarge 10% . epoca Salen Tak, Transpcaig, 10%, Contingencies 3.75% Be Earth Wire Earth Wire accessories: \fpaulatore & Hardware Neri Te |, Roun ‘Spares 3% Erection & Commissioning 10% Tnavrance, Sales Tax & Transportating 10%, Contingencies 3.75% o03, - To i i 69.82 pant ‘ \ Dismantling charges for old 68 KV Line with 1 1 + transporting charges nee 2.00 2. Deprecated value of id (iis joe AR i - i ee {382 | ovemead chaiges 2 a a Tree Cuting Compensation i 1000 se 1 6808 1 i 5) ABSTRACT ESTIMAT Particulare Lakhs Lakhs “Tower _. 2. Mr 25 078 18.75 “Tower accessorigs” > Ls ons Power Conductor (Wel) > ku 60s 088 3.53 Power Conductor accessories _ ts 025 Earth Wire aa 102 029 0.30 Earth Wire accessories ts, 2.04 7) ABSTRACT ESTIMATE FOR THE CONSTRUCTION OF 1 KM 220 KV DC LINE Rate Rs, Amount Rs. Lakhs Lakhs, __ 30.00, + inauatos & ee "Spares 3% Creston 8 Gort ‘Insurance, Sales Tax ‘Surveys '8) ABSTRACT ESTIMATE FOR CONSTRUCTION OF 2 Nos 66 KV FEEDER BAYS AT THE EXISTING SUBSTATION _ > Rate Re, ~ Amount Rs. Particulars dae 7 13.88. a 522 {66 KV Lightening Arrestor 144 ‘66 KV Bus isolator : 428 166 KV Line Isciator 2.70 166 KV Potential Transformer + 3.90 98 . 212 Insulator & Hardware fitings a 2.00 Earthing arrangements . 10,00 ‘Spares 3% . Erection & Commissioning 10% ~~~ Inia, ais Tax Tape ‘Contingencies 3.75% ‘Overnead Charges 9) ABSTRACT ESTIMATE FOR CONSTRUCTION OF 2, Particulare 1" 1HOKV Circuit Breaker (SF 6)” 2-110 KV Current Transformer, 3 /MOKV Lightening Avrestor 4. MOKV Bus isolator 5 “MOKV Line Isolator 6 110 KV Potential Transformer 7 ‘Feeder contr & Relay Pans! 8 Kundan Conductor for Bus ara 9 “Ineulator & Hardware ftings 410 Earthing arrangements 11 ‘Control Cable of various sizes 12 Fabvicated steo! structure 19 Bus Arrangement Total. ‘civil Work “Cable Trench & Foundation ot struct "Spares 3% Erection & Commissioning 10% 2 Ingurance, Sales Tax & Tranepsrting 10% ‘Contingencies 3.75% Overnead Charges ae Particulare "220 KV Gicut Breaker (SF 8), 2 "220KV Current Transformer 3-220 KV Lightening Arestor 44-220 KV Potental Transformer = 5 220KV Bus isolator - 6 20KV Line lector win Ear Sieh > 7 Feoeder Conte! & Relay Panel (Duplex Tys6) 6,” Kurdah conductor for us erangs 9° Insulator & Hardware ftings 40 “Earthng arrangements 11 ‘Control Cable of various sizes 42 Fabricated ot 43. Bus Arrangement Total _SUBSTATION, ~8- obese “10 KV FEEDER GAYS Ar THe EX TING| Rite Re, TAmount Re. Lakhs; Lakhs 7.85 18.70 138 oat | 475 20 KY FEEDER BAYS. “T Rate Rs. |Amount Re. Lakhs 37.86 23.34 3.12 20.14 176 6.88! 4008, 638 560 10.00 10.00 38.00 40.00 220.12 a : Foungation of structure & Equipments Gaole ‘French ete wo 30 30.00 "Spares 2% ao 687 [Erection & Commissioning 10% 2281 __lIneurance, Sale Tax & Transportating 10%" 2231 359 428 (Ce [Power Tanatornar (HT0H7 KV), 198.08 7” Transtormee Contol & Relay Panel 7.30 8" Kandah Conductor 2a2 Insulator & Hardwae fitings +00 49 _Eorthing arrangements 2. 10.90 3360 eso 8.2 “ese 19 19 Pander Si Sar Wah NS Nor 4 2 ae | 14 500 mim2 XLPE 1 Gore Cable 1 479 . 15 300nim2 XLP3Core Cable 15 94 - 16 Cable End Teminstion Arrangement 2° 00Ns “ ~ “Teecton & Canistioning 10% ___nburance, Sales Tox & Tronsportatig 10% 3378 : Uy fot | 1286. 33.78 ee N | 12) ABSTRACT ESTIMATE FOR CONSTRUCTION OF Z Noe TRANSFORMER BAYS OF 110111 KV, 2 2AAR5 MA TRANSFORMER IN Ex ne. rticulare | Unit Partl- 140 KV Side Rate Re. |Amount Rs, Lake Lake 15.70 6.16| i) tohteune eer — 4 NeutalCT 8 (Bus solator” 6 Power Transtoinier (110/441 7__iTransformer Control P ‘8 'Kundah Conductor @ Insulator & Hardwe 40 ‘Earthing arrangemenis 14, Control Cable of various 42 Fabricated stee! structure “43 Bus Arrangement Total_ Part 41 KV Sido 10 Pane! Indoor Switch Gear with 2Ne Neutial ~ ore = 33.00) 44 1800 mma XLPE Core Cable _ ~ ‘i701 "45 '300 mm’ XLP'S Core Cable TH 44.10 16 'Cable End Termination Arrangement” i 0.36. Total Pann 62.26, “Total Cost of Materia! (Part + Par 0 fo | 4678" Part Il - Civil Works t@ Foundation of Equipments & Sructures Cable | Trench f ‘insurance, Sales Te } | \ 0° 3158 Contingencies 37 i wos 14.84 Overhead Cherges ! 31.58 Grand Total | 475.79 13) ABSTRACT ESTIMATE FOR CONSTRUCTION OF 2 Nos 110 KV BAYS AND FOR THE INSTALATION OF 110/33 KV, 2 X 16 MVA TRANSFORMERS & 4 Nos 33 KV FEEDERS IN EXISTING 140 KY SUBSTTION s. Rate Rs. Amount Rs. Particulars Unit ty Take Lakhs Part -110 KV Side 1) Circuit Breaker (SF 6) Set 2 785 15.70 2. {CutrentTransformer a Ne 6 136 2.18 3 Lightening Arresior ~ No 6 031 1.86 4 NeutralcT No. 2 0.18 oz 8 ‘Bus Isolator No 4 175 7.00 No. 2 138 (278.00 No 2 10.62 8 Kundah Conductor Te 242, 9 Insulator & Hardware ftings 250 4.25, 40 Eathing atrangements 11 Control Cable of various sizes 15 18 12 Fabricated steel structure 38 075 43 Bus arrangement 882 “7 Part -33V Side 714 | Cheuit Breer (SF 8) 6 | 226 48. CurentTrahstormer 18 42 48 Lightening Arrestor 18-013 2 Y 4 2 8 eer contl Pana 2 Sceghs ‘Spares 3% . 12.68 Erection & Commissioning 0% . a 45.60 Sales Tax & Transporting 10% 7 48.60 17.10. 48.60 si. No. 1 ipart 1-110 KV Sid ARB ti ae ta a ie AVM KS on 14) ESTIMATE FOR INSTALLATION OF 2 X20 MVA 410166 KV, ‘TRANSFORMER IN EXISTING Particulare | | 1 !Cirut Breaker (SF'6) @ “Insulator & Hardware ftings 10 "1 2 13 5 :Power Transformer (110/68! 2 ‘Curent Transiorme "3 Lightening Arrestor 4 {Bus isolator Kunidah Conductor Earthing arrangements ‘Control Cable of various si Fobricated steel struc Bus Arrangement - Part Il- 66 KV Side ‘Circuit Breaker ‘Current Transformer Lightening Arrestor ‘Bus Isolator ‘Neutral CT “Kundah Conductor Eating arrangements Control Gable of various sizes _~ Fabricated steel structure Bus Arrangement Total ‘oundation of Equi ‘Insurance, Sales Tex & Contingencies 3.75% ‘Overhead Charges. otal Material Cost (Part |+ Patt) “Treneh in 140 KV and 68 KV side Pee SUBSTATIONS OC Nise pit a || Rate Re. Lakhe: Amount Ra. i, kakhe / 415) ABSTRACT OF UPGRADATION OF 86 KV SUBSTATION WITH 2 NOS 110 KV FEEDER BAYS & INSTALLATION OF 2 X 42.5 MVA 110/11 KV TRANSFORMER & 6 NOS 11 KV FEEDER WITH SWITCH _SEAR st saniculars Rate Rs, Amount Re: No. Partul Unit Oy ane” Laks Partt=140 KV Side 4 Circuit Breaker ( SF 6) ~ _ ‘Set 31.40 2 Current Transformer Lonoke 1622 3 Potential Tranetormer en 1560 4 Lightening Arestor a No 372 5 ‘Newtal Cr We 032 © Bea Islator No 1750 7 Power Transformer (110/11 KV) 42.5MVA "~~~ Ne 168.00 8 “Transformer Control Panel 1014 No 842 8 (Kuncan Concuctor 424 10 Feeder Control & Relay papel sor 150 r 10.00. 360 oa steel 2350 45 Bus Arangemen i784 Total : : 337.80 15 Part-11 KV Side ! 18 10Pane! indoor Switch Geor wih 2NCTe "| 4 23 3200 #7 eoomng Tare | cre Cae 4 “79 475 vs Ga 1410 24 | opis 036, 1 20 2000 bors nas 409.78 Pan t= civil Worka _ 4 Faindaton of Eatpmeie'& Srucures and Cable 5 1400 Boe Total ae - 74.00 ‘otal or Part & 1 4993 ares 3% ae 122 ~ Breton & Camiaaring 10 4 . as “nsbranicg; Sales Tax & Trensportaing 10% — 4098 TGemingercies 3.753% 1837 ~Ovemead Gharpes 4098 “Total LLDTE eas ‘iamanting Charges mo ‘560 ‘Depreciation Charges 570 eas “¥6) ABSTRACT ESTIMATE FOR THE UPGRADATION OF 110 KV SUBSTATION TO 220 KV’ SUBSTATION WITH 2 NOS. 220 KV FEEDER BAYS, BY INSTALLING 2 X 100 MVA, 220/110 KV _L TRANSFORMER AND 2 NOS 110 KV FEEDER BAYS st oe Rate Re. Amount Re. & articulare | Uni ay, Raters. Amount Pant. 220 KV side > 1 Chrult Breaker (SF 6) set 8 jess’ oes, 2. Gurrent Transtormer No 1% 3.89 70.02 3 ‘Potential Tranformes 2 489 58.28 __4 Lightening Artestor 12 ‘ose 624 5 Bustsolator 2 204 3528 8 Line isolator” 2 3a 688 7 Power Teanstormér (220/110 KV), 100 MVA~ "| No. 2 ‘609 4200.00 28 AO HOT St" ne enone Ave 8 ‘Feeder control and “0.82 2 {Transformer Control Panel (Both 1 to82 “fo ikundah Conductor [17 11 ‘Insulator & Hardware ftings “10.50! “42 ‘Earthing arrangemenis 20.00 13 Conta! Gable of various sizes 0.00; {4 [Fabricated steel structure 6378) 15 [Neutral Crs % 0.42 18 Bus Arangment 7 __ 20.00 "Total 1627.88 ___Partin=440 KY Side.” 1788 Cieutt Breaker 3149) 2. Current Transtormet 3833 | 3. Ughtening Arestor 558) 4 = T4074) 3 A780) 8 Potential Trantor “a8 aso! + "Kundah Conductor for 424, 8 “Inevietor @ Hardworefings 175 9 “Control Cable of various sizes, S40 10 Fabricated see! structure : 22.860 14 'Eenning arrangements : 16.00. 42 (Neural crs ; 2.30) OW iBos Arrangment “otal Part l= civil Works ~ a Foundalion of Equipments & Situctie and Cable Trench Provision for control room extension Total Total Cost of Material (Part Spares 3% Erection & Commissioning 10% ‘jnsuronce, Sales Tax & Transportatng 10% | oo Soo tsar! ‘Contngencien 3.75% _ 6782) Overhead Charges 10% ~~ poe b> 480.07| Grand Total” 1 t | 2600. 47) ABSTRACT ESTIMATE FOR CONSTRUCTION MVA, 33/11 KV TRANSF! Particulars rt Lan ‘Land Part It - Civil Works _ t : Site leveling, road, compotnd wal, foundation . ‘work of yard equipment siructure, office cum store | building, control room, water suppIy.— = 1 lectritcation, PAT phone els. is | 1 5090 2’ Cable trenches ts uo 3.09 . - Poo 8800 Part l= Equipments 1 Busber rangement 4 2 Control cables 3 Steel Structures ‘hiss, 4 SSITKV (SNVA Transformer 5 ControlaRelay Panel for 33/14KV Transformer __ | t 8 33KV VCB with Control Pane! boone I A: 2240 Single Phase Pr ve oss beer i a2 8 2 8 S3KV Lightning Arestor No. 2 013 158 49 33KV Bus Isolator No. 5 063 318 41 33KV teolater with earth switch for ine No. 2 ora 148 12 Tavector meteri33KV Side of Transformer) No. 2 073 148 43.33KV neutral CT : No. 2 015 030 “t1sv sige a 44 A1KV, VCB with esntrol pane! No 2 28 5.60 15 '1tkV ODE ee No. 4 234 936 “46:11KV.PT (3 phous de - No... 2 oz 024 “A7TVIKV Lighting Arrestor No,” S18 O08 48 11KV, 2004, AS switen No: 4 0.05 48 11KV, 4008, AB awiten No. 2° 7 “009 20 14KV neutral CT. No. 2 048 ul "8! TTRVATEV, HOOKVA Transformer Lut oes ost 20 Alarm Panel — 4 033 033 21 AC Supply Panel 4 260 060 1 180 180 14074 a 400 azz 3; Etecton and Commissioning 10% — : : 1407 « .Alinsurance, Sales tax and Transporting 70% — 2 ini: 1407 379% 1835 — : 5571 Grand Total 278.02 18) ABSTRACT OF ESTIMATE FOR CONSTRUCTION PF 170 KV SUBSTATION WITH 2Nos.110 KV FEEDER BAYS BY INSTALLALLING 2 X 120 MVAMH10/14 KV TRANSFORMERS : on Rate Re, Amount Ra. ay Lakhs. Lakhs i lg cpg he 4 "Ste leveling & Roads wa 12.06 2. Fencing & Compound wail 18 15.00 3 Substation Bulging Donn 30 30.00, 4 "Water, Seritston & Electrification “is to 30.00 ‘5. (Gable Trenches and Foundation for Yard strucire " 74.00 @Equipments " . . 6 P&T Phone ef T 028, 0.26 - 14135 a.) aden _ ‘Stool strictures, fabricated galvenised structure 1 foe anacnyarce, Nae oabenised Mt “o 07s 30.00 2° 110 KV, 44 KV Bis bat airangemenia ~~ us 1784 1784 3 Eamhing Sysiom & Metal spreading of Yara” ts 2 1200 4 Nardightng Ls 4.00 TE Fire tgning equpivohis 2 2.00 5 Control Cable of various size ~ 1s ye +270 . Sub Total | a | 6036 rt Y 4 Power Transiomer, 110/41 KV, 12.5 NVA No 2) 168.00 2 Power Trensformer contol relay panel No 2 an 842 3 SF 6 Grcut Breaker Set al 785 3140 4 Current Transformer” Kundal Conductor.” ‘Lightening Arvestor HHOKV Feeder Covi & Relay Paral” 'Nouval CT ‘Bus Isolator Potential Transformer | Line Isolator with earth ewitel ‘Battery with Charger Insurance, Sales Tax 8 Transporting Contingencies 3.75% Gvethead Charges 10% ‘Grand Total +19) ABSTRAGT ESTIMATE FOR * YRUCTION OF 220 KV ‘sUBsTari iON WITH 2NOS. 220 VREEOENGAYS,BYINSTALL. 22 Va SB0110 RY TRANSFORMER AND 2 2 VMOEIQy TANG: RSWHH 2 NOS. NOY FEEDER BAY Panter Punt aay | RRGRS “Amount Re ite leveling & Roads 2 Fencing & Compoun: 33" Substation Bulging . Trench Be ts Sub Total bos Pantill-220 KV Side EE 1 Gieuit Breaker (SF 6) Se set 2 iGurrent Tanstormer No. 3 Potent “anformer = No. 4 ‘Lightening Avrestor 2 ofeene! 5 Bus leclator 1 Set 8 Line eolator Lt 7 Power Transformer (220/110 KV), 100MVA ~ | No 3 Feoder contra and Relay Panel No. Transformer Control Panel Beth sides) NO 40: Kundah Conductor . kn 1 Insuator & Hercwareftings : No 42 Eorthing arrangements ots 15 Control Gable of various sizes” Ke 14 Fabricated steel structure MT 18 Nevieal CTs. No, 38 Bus Arrangment fs ‘Sub Total Part IV - 140 KV Side 1. SF 6 Circuit Breaker including Pane! Set 2 110/14 KV 12.5 MVA Transformer No, 2. Transformer Control Pane! Ne. 4 Current Transformer - No 5 Lightening Arrestor . No 6 Feeder control and Relay Panel - No, 7 Bus Isolator No 8 Petentia! Tranformer No 9 Kundah Conductor for Bus arrangements ~~” Km 10 ‘Insuitor & Hardware fitings 7 No 11 Control Cabie of various sizes _ km 12 ‘Fabricated steel struct 13 “Eanthing arrangements _J4";Neutral CTs 4 ‘Part W114 KV Side 1 10 Parel Indoot Swich Gear with 2NC 1 2 $00 rim? XLPE 4 Core Cable 7 1 3 300 mm2 XLPE 3 Core Cable” 15 24 Contingencies 3.75% Overhead Charges 10% ~~ Grand Total

You might also like