You are on page 1of 11

2015

BUILDING MATERIAL PRICES

No. Category of Material

1.

SABAH - KOTA KINABALU

Unit

Pay
Terms

2015(RM)
Jan

Feb

Mar

Apr

May

June

July

Aug

Sept

Oct

Nov

Dec

Cement

1.1 Ordinary Portland Cement, 50 kg bag

Bag

60 Del

18.00

18.33

18.33

20.14

19.61

19.08

19.08

19.08

1.2 Ordinary Portland Cement in Bulk

MT

60 Del

360.00

366.67

366.67

402.80

392.20

381.60

381.60

381.60

MT

60 Del

55.00

54.33

54.33

57.59

56.53

56.53

56.53

56.53

3.1 Normal River Sand- Ex

MT

30 Ex

43.33

43.00

43.00

45.58

44.17

44.17

44.17

44.17

3.2 Fine River Sand for Plastering -Ex

MT

30 Ex

47.33

46.67

46.67

49.47

48.76

48.76

48.76

48.76

3.3 Normal Mining Sand

MT

30 Ex

3.4 Fine Mining Sand for Plastering

MT

30 Ex

MT

60 Del

2.

Aggregate

2.1 Granite Aggregate 3/4"


3.

4.

Sand

Steel Reinforcement

4.1 Mild Steel Round Bar R10, MS1646

2,200.00 2,166.67 2,233.33 2,402.67 2,226.00 2,190.67 2,120.00 2,120.00

* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.

Page 1/11

2015

BUILDING MATERIAL PRICES

No. Category of Material

SABAH - KOTA KINABALU

Unit

Pay
Terms

2015(RM)
Jan

Feb

Mar

Apr

May

June

July

Aug

Sept

Oct

Nov

Dec

4.2 Mild Steel Round Bar R12, MS1646

MT

60 Del

2,150.00 2,116.67 2,166.67 2,314.33 2,173.00 2,137.67 2,067.00 2,067.00

4.3 Mild Steel Round Bar R16, MS1646

MT

60 Del

2,150.00 2,116.67 2,166.67 2,314.33 2,173.00 2,137.67 2,067.00 2,067.00

4.4 High Tensile Deformed Bar-Y10, MS146

MT

60 Del

2,200.00 2,166.67 2,233.33 2,402.67 2,226.00 2,190.67 2,120.00 2,120.00

4.5 High Tensile Deformed Bar-Y12, MS146

MT

60 Del

2,200.00 2,166.67 2,233.33 2,402.67 2,226.00 2,190.67 2,120.00 2,120.00

4.6 High Tensile Deformed Bar-Y16, MS146

MT

60 Del

2,100.00 2,066.67 2,133.33 2,296.67 2,120.00 2,084.67 2,014.00 2,014.00

4.7 High Tensile Deformed Bar-Y20, MS146

MT

60 Del

2,100.00 2,066.67 2,133.33 2,296.67 2,120.00 2,084.67 2,014.00 2,014.00

4.8 High Tensile Deformed Bar-Y25, MS146

MT

60 Del

2,100.00 2,066.67 2,133.33 2,296.67 2,120.00 2,084.67 2,014.00 2,014.00

4.9 High Tensile Deformed Bar-Y32, MS146

MT

60 Del

2,100.00 2,066.67 2,133.33 2,296.67 2,120.00 2,084.67 2,014.00 2,014.00

4.10 BRC A6, MS145

m2

30 Del

7.83

7.83

7.83

8.48

8.48

8.48

8.66

8.83

4.11 BRC A7, MS145

m2

30 Del

8.67

8.67

8.67

9.36

9.36

9.36

9.36

9.54

4.12 BRC A8, MS145

m2

30 Del

11.17

11.17

11.17

12.19

12.19

12.19

12.37

12.72

4.13 BRC A9, MS145

m2

30 Del

14.33

14.33

14.33

15.55

15.55

15.55

15.55

15.90

* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.

Page 2/11

2015

BUILDING MATERIAL PRICES

No. Category of Material

4.14 BRC A10, MS145

SABAH - KOTA KINABALU

Unit

Pay
Terms

2015(RM)
Jan

Feb

Mar

Apr

May

June

July

Aug

Sept

Oct

Nov

Dec

17.67

17.67

19.26

19.26

19.26

19.26

m2

30 Del

17.67

19.79

5.1 Ready Mix Concrete - Normal Mix - Grade15, Granite

m3

30 Del

283.33 286.67 286.67 303.87 300.33 296.80 296.80 296.80

5.2 Ready Mix Concrete - Normal Mix - Grade 20, Granite

m3

30 Del

293.33 296.67 296.67 314.47 310.93 307.40 307.40 307.40

5.3 Ready Mix Concrete - Normal Mix - Grade25, Granite

m3

30 Del

313.33 316.67 316.67 335.67 332.13 328.60 328.60 328.60

5.4 Ready Mix Concrete - Normal Mix - Grade 30, Granite

m3

30 Del

323.33 326.67 326.67 346.27 342.73 339.20 339.20 339.20

5.5 Ready Mix Concrete - Normal Mix - Grade 35, Granite

m3

30 Del

343.33 346.67 346.67 367.47 363.93 360.40 360.40 360.40

6.1 Common Clay Bricks - Pallet

piece

30 Del

0.37

0.37

0.37

0.39

0.39

0.39

0.39

0.39

6.2 Cement Sand Bricks - Pallet

piece

30 Del

0.30

0.30

0.30

0.32

0.32

0.32

0.32

0.32

6.3 Smooth Face Facing Brick, Red

piece

30 Del

0.75

0.75

0.75

0.80

0.80

0.80

0.80

0.80

5.

6.

Ready Mixed Concrete

Bricks

* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.

Page 3/11

2015

BUILDING MATERIAL PRICES

No. Category of Material

7.

SABAH - KOTA KINABALU

Unit

Pay
Terms

2015(RM)
Jan

Feb

Mar

Apr

May

June

July

Aug

Sept

Oct

Nov

Dec

Roofing

7.1 Interlocking Concrete Tiles - Standard Duotone Colour 420mm x 330mm

piece

60 Del

1.77

1.77

1.77

1.91

1.91

1.91

1.91

1.98

7.2 MS Decking - Step Roofing M350 G24, 0.53mm TCT, Clean Colourbond

m2

30 Del

72.33

72.33

72.33

76.67

76.67

76.67

76.67

79.15

7.3

MS Decking - Ajiya AP Rib Hi-Tensile G26, 0.47mm TCT, Clean


Colourbond (Comercial)

m2

30 Del

60.67

60.67

60.67

64.31

63.95

63.95

63.95

67.13

7.4

MS Decking - Ajiya AP Rib Hi- Tensile G24, 0.53mm TCT, Clean


Colourbond (Comercial)

m2

60 Del

71.67

71.67

71.67

75.97

75.97

75.97

75.97

78.44

7.5

MS Decking - Ajiya Euro Step Roofing M350 G28, 0.40mm TCT, Clean
Colourbond

m2

60 Del

47.33

47.33

47.33

50.17

50.17

50.17

50.17

52.29

7.6

MS Decking - Ajiya Euro Step Roofing M350 G26, 0.47mm TCT, Clean
Colourbond

m2

60 Del

61.00

61.00

61.00

64.66

64.66

64.66

64.66

67.13

7.7

MS Decking - Ajiya AP Rib Hi-Tensile G28, 0.40mm TCT, Clean


Colourbond (Comercial)

m2

60 Del

49.67

49.67

49.67

52.65

52.65

52.65

52.65

54.77

7.8 MS Decking-Lysaght Colourbond-Spandex Hi- Ten 0.47mm TCT

m2

60 Del

57.00

57.00

57.00

60.42

60.42

60.42

60.42

62.19

7.9 MS Decking-Lysaght Colourbond-Trimdex Hi-Ten 0.47mm TCT

m2

60 Del

45.33

45.33

45.33

48.05

48.05

48.05

48.05

50.53

7.10 MS Decking-Lysaght Colourbond-Kliplok Hi-Ten 0.53mm TCT

m2

60 Del

54.67

54.67

54.67

57.95

57.95

57.95

57.95

60.07

sheet

30 Del

35.00

35.00

35.00

37.10

37.10

37.10

37.10

39.57

7.11

Corrugated Roofing Sheet-76mm Double Width, 1065mm x 2440mm x


4mm (Hume/Malex/UAC)

* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.
Page 4/11

2015

BUILDING MATERIAL PRICES

No. Category of Material

SABAH - KOTA KINABALU

Unit

Pay
Terms

2015(RM)
Jan

Feb

Mar

Apr

May

June

July

Aug

Sept

Oct

Nov

Dec

8.

Walls & Floor Tiles

8.1

Glazed Ceramic Floor Tiles, Standard light Colour,200mm x 200mm x


8mm - Grade 1

piece

60 Del

2.00

2.00

2.00

2.12

2.12

2.12

2.12

2.33

8.2

Glazed Ceramic Floor Tiles, Standard light Colour,300mm x 300mm x


8mm - Grade 1

piece

60 Del

2.93

2.93

2.93

3.11

3.11

3.11

3.11

3.25

8.3

Plain Homogeneous Floor Tiles, Standard light Colour, 200mm x 200mm


x 8mm - Grade 1

piece

60 Del

3.10

3.10

3.10

3.29

3.29

3.29

3.29

3.50

8.4

Plain Homogeneous Floor Tiles, Standard light Colour, 300mm x 300mm


x 8mm - Grade 1

piece

60 Del

4.43

4.43

4.43

4.70

4.70

4.70

4.70

4.91

8.5

Glazed Ceramic Wall Tiles, Standard light Colour, 200mm x 200mm x


6mm - Grade 1

piece

60 Del

1.80

1.80

1.80

1.91

1.91

1.91

1.91

2.08

8.6

Glazed Ceramic Wall Tiles, Standard light Colour, 200mm x 250mm x


6mm - Grade 1

piece

60 Del

2.03

2.03

2.03

2.16

2.16

2.16

2.16

2.30

9.

Ceiling Board

9.1

Plain Cellulose Fibre Ceiling Sheet,610mm x 1220mm x3.2mm


(UAC/MALEX/HUME)

sheet

60 Del

6.30

6.30

6.30

6.68

6.68

6.68

6.68

6.78

9.2

Plain Cellulose Fibre Ceiling Sheet,610mm x 1220mm x 4.5mm


(UAC/MALEX/HUME)

sheet

60 Del

8.17

8.17

8.17

8.66

8.66

8.66

8.66

8.94

9.3 Plain Gysum Board, 610mm x 1220mm x 9.5mm, (Boral/Armstrong)

sheet

60 Del

8.23

8.23

8.23

8.73

8.73

8.73

8.73

9.15

* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.

Page 5/11

2015

No.

BUILDING MATERIAL PRICES

Category of Material

SABAH - KOTA KINABALU

Unit

Pay
Terms

2015(RM)
Jan

Feb

Mar

Apr

May

June

July

Aug

Sept

Oct

Nov

Dec

10.

Plumbing Works

10.1

Galvanised Iron Pipes, Class A 20mm Diameter (Maruichi),


MS863

6m run

60 Del

76.67

76.67

76.67

81.27

81.27

81.27

81.27

81.27

10.2

Galvanised Iron Pipes, Class B 25mm Diameter (Maruichi),


MS863

6m run

60 Del

80.67

80.67

80.67

85.51

85.51

85.51

85.51

85.51

10.3

Galvanised Iron Pipes, Class C 25mm Diameter (Maruichi),


MS863

6m run

60 Del

84.33

84.33

84.33

89.39

89.39

89.39

89.39

89.39

10.4

PVC Pressure Pipes Class D Grey Colour - 50mm Diameter


(paling) , MS628

4m run

60 Del

14.33

14.33

14.33

15.19

15.55

15.55

15.55

15.55

10.5

PVC Pressure Pipes Class E Grey Colour - 25mm Diameter


(paling) , MS628

6m run

60 Del

17.17

17.17

17.17

18.20

18.20

18.20

18.20

18.20

10.6

PVC Pressure Pipes Class E Grey Colour - 50mm Diameter


(Dulon) , MS628

6m run

60 Del

38.33

38.33

38.33

40.99

40.99

40.99

40.99

40.99

10.7 HDPE Pipe PN 16 - 25mm Diameter, MS 1058

100m roll

60 Del

304.67

304.67

304.67

322.95

322.95

322.95

322.95

321.18

10.8 HDPE Pipe PN 16 - 50mm Diameter, MS 1058

100m roll

60 Del

1,083.33 1,083.33 1,083.33 1,148.33 1,148.33 1,148.33 1,148.33 1,113.00

10.9 ABS Pipe PN 15 Class E - 20mm, MS1419

5.8m run

60 Del

18.17

18.17

18.17

19.26

19.26

19.26

19.26

19.26

10.10 ABS Pipe PN 15 Class E - 25mm, MS1419

5.8m run

60 Del

24.33

24.33

24.33

25.79

25.79

25.79

25.79

25.79

* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.

Page 6/11

2015

BUILDING MATERIAL PRICES

No. Category of Material

SABAH - KOTA KINABALU

Unit

Pay
Terms

2015(RM)
Jan

Feb

Mar

Apr

May

June

July

Aug

Sept

Oct

Nov

Dec

259.33

259.33

274.89

274.89

274.89

274.89

274.89

11. Sanitary Fitting


11.1

Polyethylene water tank (Polytank), Circular- 200 gallons, MS


1225-weida equivelant

number

60 Del

259.33

11.2

Fibre reinforced plastic sectional tank - 1000 litre / 220 gallons,


Mui Tank. 6 Panels

6 panels

60 Del

2,083.33 2,083.33 2,083.33 2,208.33 2,208.33 2,208.33 2,208.33 2,208.33

11.3

Wash Hand Basin-560mm x 406mm, white colour, Jacqueline


WB, Claytan

set

60 Del

77.67

77.67

77.67

82.33

82.33

82.33

82.33

82.33

11.4

Water Closet Western Type- Windsor with push button 6L


cistern, standard colour,Johnson-Windsor 140

set

60 Del

610.00

610.00

610.00

646.60

646.60

646.60

646.60

646.60

11.5

Water Closet Western Type- WC 644, white colour without


cistern, claytan

item

60 Del

233.33

233.33

233.33

247.33

247.33

247.33

247.33

247.33

11.6

Water Closet Eastern Type- Bengal ACBL-000 without cistern,


white colour, johnson-suisse

item

60 Del

85.00

85.00

85.00

90.10

90.10

90.10

90.10

90.10

11.7

Urinal Bowl, santana 320 c/w hanger, flange, ceramic waste &
cleaning set, johnson-suisse

item

60 Del

481.67

481.67

481.67

514.10

514.10

514.10

514.10

514.10

11.8

Stainless Steel Sinks - Single Bowl Single Drainer- Lay On Type,


42"x18"

item

60 Del

78.00

78.00

78.00

84.09

84.09

84.09

84.09

84.09

5 litre

60 Del

103.00

103.00

103.00

109.18

109.18

109.18

109.18

110.24

5 litre

60 Del

115.67

115.67

115.67

125.43

125.43

125.43

125.43

130.73

12. Paints
12.1 Paint-ICI dulux standard colour-Undercoat speed
12.2

Paint-ICI dulux standard colour-external acrylic emulsion,


weathershield

* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.
Page 7/11

2015

No.

BUILDING MATERIAL PRICES

Category of Material

SABAH - KOTA KINABALU

Unit

Pay
Terms

2015(RM)
Jan

Feb

Mar

Apr

May

June

July

Aug

Sept

Oct

Nov

Dec

12.3

Paint-ICI dulux standard colour-internal emulsion luxury, water


base, pearl glo

5 litre

60 Del

106.67

106.67

106.67

114.48

114.48

114.48

114.48

118.37

12.4

Paint-ICI dulux standard colour-internal emulsion luxury, water


base, pentalite

5 litre

60 Del

101.00

101.00

101.00

107.06

107.06

107.06

107.06

110.59

12.5

Paint-ICI dulux standard colour-timber/wood, timbertone, clear


glossy

5 litre

60 Del

104.00

104.00

104.00

110.24

110.24

110.24

110.24

112.36

12.6 Paint-Nippon standard colour-undercoat, 9000 undercoat

5 litre

60 Del

65.00

65.00

65.00

68.90

68.90

68.90

68.90

72.08

12.7 Paint-Nippon standard colour-timber/wood, timber finish

5 litre

60 Del

83.00

83.00

83.00

87.98

87.98

87.98

87.98

89.75

12.8 Paint-Nippon standard colour-gloss oil based, 9000 gloss finish

5 litre

60 Del

90.00

90.00

90.00

95.40

95.40

95.40

95.40

97.17

12.9

Paint-Nippon standard colour-internal emulsion luxury,


waterbase, satin glo

5 litre

60 Del

101.33

101.33

101.33

107.41

107.41

107.41

107.41

108.83

12.10

Paint-Nippon-internal emulsion waterbase finish, standard


colour-super matex

7 litre

60 Del

50.67

50.67

50.67

53.71

53.71

53.71

53.71

55.47

12.11

Paint-Nippon standard colour-external acrylic emulsion,


weatherbond

5 litre

60 Del

112.00

112.00

112.00

118.72

118.72

118.72

118.72

121.19

12.12 Paint - ICI Dulux Standard Colour Gloss Oilbased, Gloss Finish

5 Litres

60 Del

125.00

125.00

125.00

132.50

132.50

132.50

132.50

136.03

MT

60 Del

3,016.67 3,016.67 3,016.67 3,197.67 3,197.67 3,197.67 3,197.67 3,091.67

13.

Steel & Metal Sections

13.1 Square hollow sections-12mm x 12mm x 1.0mm (0.357kg/m)

* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.
Page 8/11

2015

BUILDING MATERIAL PRICES

No. Category of Material

SABAH - KOTA KINABALU

Unit

Pay
Terms

2015(RM)
Jan

Feb

Mar

Apr

May

June

July

Aug

Sept

Oct

Nov

Dec

13.2 Square hollow sections- 50mm x 50mm x 3.0mm (4.38kg/m)

MT

60 Del

2,876.67 2,876.67 2,876.67 3,084.60 3,084.60 3,084.60 3,084.60 2,968.00

13.3 Square hollow sections- 150mm x 150mm x 4.45mm (20.5kg/m)

MT

60 Del

3,022.33 3,022.33 3,022.33 3,203.67 3,203.67 3,203.67 3,203.67 3,180.00

13.4 Universal beams-102mm x 102mm x 8.76mm (19.35kg/m)

MT

60 Del

1,182.67 1,182.67 1,182.67 1,253.63 1,253.63 3,373.63 3,374.69 3,387.05

13.5 Universal beams-400mm x 400mm (2.17kg/m)

MT

60 Del

1,813.33 1,813.33 1,813.33 1,922.13 1,922.13 3,778.90 3,672.90 3,708.23

13.6 Equal angles-38mm x 38mm x 3.8mm (2.17kg/m)

MT

60 Del

2,983.33 2,983.33 2,983.33 3,162.33 3,162.33 3,162.33 3,162.33 3,162.33

13.7 Equal angles-50mm x 50mm x 4mm (3.06kg/m)

MT

60 Del

3,050.00 3,050.00 3,050.00 3,233.00 3,233.00 3,233.00 3,233.00 3,233.00

piece

MT

1,583.33 1,583.33 1,583.33 1,678.33 1,643.00 1,643.00 1,643.00 1,749.00

15.1 GMS Heavy Hardwood, Balau 1

MT

1,866.67 1,966.67 1,966.67 2,084.67 2,279.00 2,614.67 2,650.00 2,720.67

15.2 GMS light Hardword, Dark Red Meranti

MT

3,066.67 3,100.00 3,266.67 3,498.00 3,498.00 3,674.67 3,674.67 3,763.00

14. Plywood
14.1 Plywood-shuttering board, 4 x 8 x 12 mm
14.2 Mixed Medium Hardword Papan Plank (GMS) 1" x 6"

77.33

77.33

77.33

81.97

82.33

82.33

82.33

84.80

15. Timber

* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.

Page 9/11

2015

BUILDING MATERIAL PRICES

No. Category of Material

SABAH - KOTA KINABALU

Unit

Pay
Terms

2015(RM)
Jan

Feb

Mar

Apr

May

June

July

Aug

Sept

Oct

Nov

Dec

15.3 GMS Medium Hardword, Kapur

MT

2,066.67 2,066.67 2,066.67 2,190.67 2,190.67 2,332.00 2,332.00 2,473.33

15.4 Scantling Medium Hardword, Kapur

MT

2,700.00 2,700.00 2,700.00 2,862.00 2,862.00 2,932.67 2,932.67 3,021.00

15.5 Scantling Mixed Medium Hardwood

MT

1,266.67 1,266.67 1,266.67 1,342.67 1,342.67 1,395.67 1,395.67 1,466.33

15.6 GMS Heavy Hardwood, Balau 2

MT

2,750.00 2,850.00 2,966.67 3,144.67 3,144.67 3,250.67 3,250.67 3,321.33

m2

45.33

45.33

45.33

48.05

48.05

48.05

48.05

55.12

16. Glass
16.1 Clear Float Glass 5mm Thk, Local/Imported
16.2

Figure/Obscured Glass 5mm Thk, Local/Imported, Inclusive


Cutting

m2

46.67

46.67

46.67

49.47

49.47

49.47

49.47

55.47

16.3

Tinted Float Glass 6mm Thk, Local / Imported, Inclusive of


Cutting

m2

67.67

67.67

67.67

71.73

71.73

71.73

71.73

77.03

17. Ironmongery
17.1

CL03-Duraset brand residential grade 3 cylindral knobsets PRIVACY-CL0363010

set

60 Del

40.00

40.00

40.00

43.11

43.11

43.11

43.11

46.99

17.2

CL03-Duraset brand residential grade 3 cylindral knobsets PATION-CL0363020

set

60 Del

48.00

48.00

48.00

50.88

50.88

50.88

50.88

52.29

17.3

CL03-Duraset brand residential grade 3 cylindral knobsets PASSAGE-CL0363030

set

60 Del

37.00

37.00

37.00

39.22

39.22

39.22

39.22

42.05

* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.
Page 10/11

2015

BUILDING MATERIAL PRICES

No. Category of Material

17.4 Concorde 102mm x 76mm x 2.0mm SS hinge SUS 304


17.5

CL03- Duraset Brand Residential Grade 3 Cylindrical Knobsets ENTRANCE - CL0363000 -

SABAH - KOTA KINABALU

Unit

Pay
Terms

2015(RM)
Jan

Feb

Mar

Apr

May

June

July

Aug

Sept

Oct

Nov

Dec

pair

60 Del

34.33

34.33

34.33

36.39

36.39

36.39

36.39

38.87

Per Set

60 Del

46.00

46.00

46.00

49.11

49.11

49.11

49.11

51.23

* Disclaimer: Potential users are reminded that the building materials price presented is by no means accurate but it is an average of the entire participating contractors in this survey exercise. Users will
have to use their professional judgement in order to get the best out of the information provided.

Page 11/11