You are on page 1of 17

Ivar Aasen Field Development Project pdQ

DEEPAK MITTAL

01-04-15

INCLUDE ANY CHANGES, DONE IN SWITCHBOARD ACTUALLY IMPLEMENTED & AS AGRED


DURING FAT.

02I

23.02.2015

Issued for Construction

EStad

DD

SW

01E

26.05.2014

Issued for Review

DD

HFO

SW

Rev.

Date

Prepared
by

Reviewed
by

Approved

by

Reason for Issue

690V PROCESS SWBD - CIRCUIT AND TERMINATION DIAGRAM

INCOMING ACB FROM 82ET0200A

Package Title: EICT Package

Area
Code:

System

Code:

M140

82

Project No.:

C-00011

Purchase Order No:

S09011

No. of
Pages :

Project Tag Numbers:

82EN0200

17

Supplier Document Number:

Rev.

51PO-04193.230-K-201-01

02I

Project Document Number:

Proj Rev.

-00

DN02-S09011-E-XK-3201-01

02I

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED


This drawing was produced electronically
and requires no signature.
It may not be amended manually

Index

Item

Description

Page

1.

Table Of Content

2.

Main Air Circuit Breaker Overview

3.

690/110VAC Voltage Transformer

4.

Multi Instrument PAC 3200

5.

230VAC UPS Intake & Outgoing Miniature Circuit Breakers

6.

Main Air Circuit Breaker Motor Drive & Spare Contacts

7.

Closing Coil & Signal Lamps

8.

Shunt Trip Coil

9.

Under Voltage Trip Coil

10.

Siprotec Protection Relay

10

11.

Siprotec Binary Inputs

11

12.

Siprotec Binary Inputs

12

13.

Interlock to 11kV SWBD, ESD/PSD Trip Relay & Fault Contact

13

14.

Arc detection peripheral unit 1

14

15.

Arc detection peripheral unit 2

1 5

16.

Arc detection central unit

16

ALL DRAWING REFERENCES ARE

PREFIXED: DN02-S09011-E-XKIvar Aasen_LV


SENTRON
3201-01

FOR EXTERNAL TERMINATIONS, REF.:

690V PROCESS SWBD - BLOCK AND TERMINATION DIAGRAM

DOC. NO.: DN02-S09011-E-XI-3201

AND TERMINATION DIAGRAMS FOR THE RESPECTIVE PACKAGES

ELECTRICAL PROTECTION & METERING SINGEL LINE

DIAGRAM 690 V PROCESS SWBD 82EN0200

DOC. NO.: DN02-SM-E-XJ-0054-01

ELECTRICAL KEY OVERALL SINGEL LINE INTERLOCK

DIAGRAM NORMAL POWER DISTRIBUTION

DOC. NO.: DN02-SM-E-XJ-0061 -01

FOR EQUIPMENT DETAILS, REF.:

690V PROCESS SWBD - EQUIPMENT LIST

DOC. NO.: DN02-S09011-E-LA-3201

Acceptance Code:

1
.
.

.
.

.
.
DD

SW

01E
ISSUED FOR REVIEW

26.05.201 4 DD

HFO

SW

Description

Made by

Date

Chc. by

SMOE

82EN0200A

S09011

=82EN0200

Scale

Siemens Dwg. No.:

M140

NTS

51PO-04193.230-K-201-01

Mustang

Installation: Ivar Aasen Field

Development Project - PDQ Platform

System:

DWG Size Drawing No.:

Rev:

82

A4

02I
1

Wood Group

Appr. by

P.O.Number

Tag no.

Signature:

Area:

DET NORSKE
23.02.201 5 EStad

Date:

690V PROCESS SWBD


CIRCUIT AND TERMINATION DIAGRAM

INCOMING ACB FROM 82ET0200A


Table Of Content

02I
ISSUED FOR CONSTRUCTION

Issue

Drawing Title:

Supplier

DN02-S09011-E-XK-3201-01

+01A1R2

Sheet:

Sheets:

16

<>

<8>

MAIN BUSBAR A - 690V AC, 60Hz

L1

L2
L3

No. / Text

MOTOR DRIVE

CLOSING COIL

TRIP COILS

F1 : SHUNT, F4 UVT

FIRST SET MAIN C.B.

AUXILIARY CONTACTS

SECOND SET MAIN C.B.

AUXILIARY CONTACTS

READY TO CLOSE CONTACT

TRIP SIGNAL SWITCH

MAIN CIRCUIT

MAIN C.B. POSITIONS IN GUIDEFRAME.

THE SWITCHES OPERATES ONLY;

IN OUT POSITION : -S30

IN TEST POSITION : -S31,-S32

IN CONNECTED POSITION :

-S33, -S34 & -S35

10

CT'S FOR SWBD MEASURING

/1 3.2

/1 3.2
X7:3

X7:1

/1 3.1
X7:4

X7:6

/1 3.1

/1 2.2
X6:6

X5:6

X5:4

<7>

/6.2

/8.2
X5:10

X6:2

/7.6

=3203-01/9.2

/1 1 .6

/1 1 .5
X6:12

X6:10

X5:12

X5:13

/9.6

/9.6

/8.2
X6:13

/1 3.1

P2
P1

S2

L1.1

/3.1

L2.1
/3.1

L3.1

/3.1

-X40

<10>
-T01
-T02

-T03

4000/1 A, cl 1 , 5 VA

S1

S1

S1

P2
P1

S2

Q1

X7:2

X7:5

X6:5

/1 2.2

/6.2

=3202-01/7.4

S23

S22

/1 3.2

S20

X5:5

X5:3

X5:9

S4

/8.2

/7.7

X5:7

X6:3

/7.6

X6:1

/1 1 .6

=3203-01/9.2

X6:11

X6:9

/9.6

S3

S2

S1

X5:11

X5:14

/9.6

/8.2

X5:2

/6.1

F4
U <

/1 1 .5

F1

X6:14

Y1

X6:8

<6>

"MECH
ON"
"MECH

OFF" S11

/7.1

SEALED

/7.1
X6:7

/6.1

<5>

=3202-01/7.4

<4>

L1

L2

L3

-Q01

4000A

/7.7

<3>

X5:8

<2>

X6:4

<1>

SEALED

This drawing was produced electronically


and requires no signature.
It may not be amended manually

X5:1

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED

P2
P1

S2

01

02

03

I1 /4.3

I2 /4.3

I3 /4.3

04

I0 /4.3

-PE

-X39

<11>

-T04

-T05

-T06

S1

4000/1 A, cl 5P30, 5 VA
S1

S1

P2
P1

S2

P2
P1

S2

P2
P1

S2

CT'S FOR SWBD PROTECTION

(I>, I>>, Ip)

SPARE TERMINALS FOR CONNECTING

OF EXTERNAL CT FOR EARTHFAULT

DETECTION (OPTION)

12
4

F20_I0

04

/1 0.1

-PE

2
4
-S35

-S34

-X67

<12>

-S33

-S32

2
4

2
4

2
4

CONNECTED

.
.

/1 1 .3

=3202-01/7.5

.
.

DET NORSKE

02I
ISSUED FOR CONSTRUCTION

23.02.201 5 EStad

DD

SW

01E
ISSUED FOR REVIEW

26.05.201 4 DD

HFO

SW

Issue

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

IE1

/1 0.1

IE2

/1 0.1

EXTERNAL CABLE

L2

L3

-PE

Acceptance Code:

Drawing Title:

Supplier

01
02
03

04

11/0,72kV TRANSF.

L1

-X41

Tag no.: 82ET0200A

.
.

BUS DUCT

PE

=3203-01/9.3

/1 1 .4

/7.1

/1 1 .4

-S31
1

-S30

TEST
2
4

2
4

OUT

Ivar Aasen_LV
SENTRON
3201-01

<9> ACB POSITIONS

01
F20_I1

/1 0.1

02
F20_I2

11
/1 0.1
03
F20_I3

/1 0.1

Date:

P.O.Number

Tag no.

82EN0200A

Signature:

S09011

=82EN0200

690V PROCESS SWBD


CIRCUIT AND TERMINATION DIAGRAM

INCOMING ACB FROM 82ET0200A


Main Air Circuit Breaker Overview

Area:

Scale

Siemens Dwg. No.:

M140

NTS

51PO-04193.230-K-201-01

Installation: Ivar Aasen Field

Development Project - PDQ Platform

System:

DWG Size Drawing No.:

Rev:

Sheet:

82

A4

02I

DN02-S09011-E-XK-3201-01

+01A1R2

Sheets:

16

<1>

/2.7

No. / Text

L1.2

/4.1

690V INCOMING VOLTAGE

L2.2

/4.1

L2.1

L3.2

/4.1

690/110VAC TRANSFORMER

I >

I >

I >

13
21
33
41

L3.1

/2.7

SHORT CIRCUIT PROOF CABLES

0,11A-0,16A

Set 0,11A

/1 2.2
/6.3
/6.3
/6.4

14
22
34
42

-Q02

B
A

-VT01

690

PE

110
3

110

n
a

Ivar Aasen_LV
SENTRON
3201 -01

<>

L1.1

/2.7

<2>

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED


This drawing was produced electronically
and requires no signature.
It may not be amended manually

dn da

-X43

01

2U

/1 0.1

02

2V

/1 0.1

03

2W

/1 0.1

04

Acceptance Code:

1
.
.

.
.

DD

SW

01 E
ISSUED FOR REVIEW

26.05.201 4 DD

HFO

SW

Description

Made by

Date

Chc. by

SMOE

82EN0200A

S09011

=82EN0200

Scale

Siemens Dwg. No.:

M140

NTS

51PO-04193.230-K-201-01

Mustang

Installation: Ivar Aasen Field

Development Project - PDQ Platform

System:

DWG Size Drawing No.:

Rev:

82

A4

02I
3

Wood Group

Appr. by

P.O.Number

Tag no.

Signature:

Area:

DET NORSKE

23.02.201 5 EStad

Drawing Title:

Date:

690V PROCESS SWBD

CIRCUIT AND TERMINATION DIAGRAM

INCOMING ACB FROM 82ET0200A


690/110VAC Voltage Transformer

02I
ISSUED FOR CONSTRUCTION

Issue

Supplier

DN02-S09011-E-XK-3201-01

+01A1R2

Sheet:

Sheets:

16

<>

<1>

14
22
34
42
6
W

I >

I >

I >

690 VAC VOLTAGE CABLE SIDE

MULTI INSTRUMENT

/1 2.2
/6.4
/6.5
/6.2

0,11A-0,16A

Set 0,11A

No. / Text

13
21
33
41

-Q03

SHORT CIRCUIT PROOF CABLES

690 V AC

L1.2

/3.3

L2.2

/3.3

L3.2

/3.3

-VT02

690 V / 110 V

Copyright (C) Siemens AS All rights reserved

This drawing was produced electronically


and requires no signature.
It may not be amended manually.

-X44

01

02

03

04

V1

V2

V3

VN

PE

DI-

11

12

13

<2>

Ivar Aasen_LV
SENTRON
3201 -01

DI+

DI

-P01

SENTRON PAC 3200

7KM21 1 2-0BA00-3AA0

1L1 .1
1L1.2

DO-

DO+

DO

F20:C1

/1 0.6

L/+

AUX supply

F20:C2

/1 0.6

N/-

1L2.1 1L2.2 1L3.1


1L3.2

I1

/2.7

I2

/2.7

I3

/2.7

E
I0

/2.7

Acceptance Code:

1
.
.

.
.

.
.
DD

SW

01E
ISSUED FOR REVIEW

26.05.201 4 DD

HFO

SW

Description

Made by

Date

Chc. by

SMOE

82EN0200A

S09011

=82EN0200

Scale

Siemens Dwg. No.:

M140

NTS

51PO-04193.230-K-201-01

Mustang

Installation: Ivar Aasen Field

Development Project - PDQ Platform

System:

DWG Size Drawing No.:

Rev:

82

A4

02I
4

Wood Group

Appr. by

P.O.Number

Tag no.

Signature:

Area:

DET NORSKE
23.02.201 5 EStad

Date:

690V PROCESS SWBD

CIRCUIT AND TERMINATION DIAGRAM

INCOMING ACB FROM 82ET0200A


Multi Instrument PAC 3200

02I
ISSUED FOR CONSTRUCTION

Issue

Drawing Title:

Supplier

DN02-S09011-E-XK-3201-01

+01A1R2

Sheet:

Sheets:

16

<1>

<2>

<3>

<4>

<6>

<5>

<8>

<7>

I >
4

13
21
/1 2.2
/6.5

I >
2

2A

F02:2

/6.1

F03:2

/7.1

F04:2

/1 0.6

F05:2

/8.2

F06:2

/1 6.1

F07:2
/9.1

F02:4

/6.1

F03:4

/7.1

F04:4

/1 0.6

F05:4

/8.2

F06:4

/1 6.1

F07:4

/9.1

-U01
AC

230V AC/24V DC

24VDC SUPPLY TO C.B.

PROTECTION DEVICE BINARY INPUTS

230VAC AUX.SUPPLY TO C.B.

MOTOR DRIVE

230VAC AUX SUPPLY TO C.B.

CONTROL

230VAC AUX SUPPLY TO C.B.

PROTECTION DEVICE/

MULTI INTRUMENT

230VAC AUX SUPPLY TO

C.B. SHUNT TRIP COIL

230VAC AUX SUPPLY TO

ARC DETECTION DEVICE

DC

L+

14
22

13
21
14
22

13
21

I > I >

-F07

/1 2.2
/6.5

2A

I >

I >

-F06

/1 2.2
/6.5

14
22

13
21

2A

I >

-F05

/1 2.2
/6.4

14
22

1
I >

2A

14
22
I >

-F04

/1 2.2
/6.4

I >
2

-F03

2A

13
21

13
21
14
22

3
4

I > I >

PE

2A

/1 2.2
/6.3

I > I >

L1

-F02

/1 2.2
/6.3

14
22

13
21

230VAC DUAL UPS AUX.SUPPLY

UPS/L2/82EN0200+01

=3210-01/2.2

3A

No. / Text

230V AC

UPS/L1/82EN0200+01

=3210-01/2.2

-F01

-X60

230VAC AUX SUPPLY TO

C.B. UVT TRIP COIL

0V

This drawing was produced electronically


and requires no signature.
It may not be amended manually

<>

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED

0V_1

/1 1 .2

Ivar Aasen_LV
SENTRON
3201 -01

2
24V+_1
/1 1 .2

+24V DC

-X60

24V+_2

/1 2.1

Acceptance Code:

1
.
.

.
.
DD

SW

01E
ISSUED FOR REVIEW

26.05.201 4 DD

HFO

SW

Description

Made by

Date

Chc. by

SMOE

Area:

Scale

Siemens Dwg. No.:

230VAC UPS Intake & Outgoing Miniature Circuit Breakers

M140

NTS

51PO-04193.230-K-201-01

Mustang

Installation: Ivar Aasen Field

Development Project - PDQ Platform

System:

DWG Size Drawing No.:

Rev:

Sheet:

82

A4

02I

Wood Group

Appr. by

P.O.Number

Tag no.

Signature:

690V PROCESS SWBD

CIRCUIT AND TERMINATION DIAGRAM

INCOMING ACB FROM 82ET0200A

DET NORSKE
23.02.201 5 EStad

Date:

82EN0200A

02I
ISSUED FOR CONSTRUCTION

Issue

Drawing Title:

Supplier

S09011

=82EN0200

DN02-S09011-E-XK-3201-01

+01A1R2

Sheets:

16

<1>

<>

<2>

230V AC

No. / Text

MAIN C.B. MOTOR DRIVE

F02:2

/5.2

12

11

10

SPARE AUXILIARY CONTACTS

33

-Q03
/4.2

-Q03

/4.2

22

42

22

21

-Q02
/3.2

34

-Q02
/3.2
34

-Q02
/3.2

-Q01 -S4

/2.2

41

21

33

X5:6

-X100

28

27

26

25

24

23

22

21

20

19

18

17

16

15

13

-X1 00

14

X5:5

22

21
22

-F07

/5.7

-F06
/5.6
22

22

-F05
/5.5

21

21

21

21

-F04
/5.4
22

42

-F03
/5.3

X5:1

-F02
/5.2
22

-F01
/5.1
22

-Q03
/4.2

21

21

41

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED


This drawing was produced electronically
and requires no signature.
It may not be amended manually

/2.2

S11

X5:2

Ivar Aasen_LV
SENTRON
3201-01

-Q01

F02:4

/5.2

Acceptance Code:

1
.
.

.
.

DET NORSKE

02I

ISSUED FOR CONSTRUCTION

23.02.201 5 EStad

DD

SW

01 E

ISSUED FOR REVIEW

26.05.201 4 DD

HFO

SW

Issue

Drawing Title:

Supplier

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Date:

P.O.Number

Tag no.

82EN0200A

Signature:

S09011

=82EN0200

690V PROCESS SWBD


CIRCUIT AND TERMINATION DIAGRAM

INCOMING ACB FROM 82ET0200A

Area:

Scale

Siemens Dwg. No.:

Main Air Circuit Breaker Motor Drive & Spare Contacts

M140

NTS

51PO-04193.230-K-201-01

Installation: Ivar Aasen Field

Development Project - PDQ Platform

System:

DWG Size Drawing No.:

Rev:

Sheet:

82

A4

02I

DN02-S09011-E-XK-3201-01

+01A1R2

Sheets:

16

<1>

<6>

<7>

<8>

F03:2

/5.3 -X30

<>

<9>

No. / Text

MAIN C.B. CLOSING LOOP

230V AC

C.B. CLOSE LOCAL & REMOTE

LOCAL : C.B. OPERATION PANEL

REMOTE : SAS

2
EXTERNAL CABLE

=80EH0011A

2
4

+15

-S31

/2.1

X6:4

-Q0X

C11

BO1

C9

5
INTERLOCK FROM OTHER C.B.

INCOMER B

BO5

11

E5

6
REMOTE BYPASS INTERLOCK 2/3

12

BUSTIE

INCOMER B

C.B. CLOSED

SIGNAL LAMP

C.B. OPEN

SIGNAL LAMP

-H03

X1

X1

-H02

15

F03:4

/5.3

Acceptance Code:

1
.
.

.
.

.
.

Drawing Title:

Supplier

DET NORSKE

02I

ISSUED FOR CONSTRUCTION

23.02.201 5 EStad

DD

SW

01E

ISSUED FOR REVIEW

26.05.201 4 DD

HFO

SW

Issue

Description

18

17

-X30

X2

X2

X2

X6:8

14

-H01

-X30

CUBICLE NO.: +02A1R2

-X30

16

X1

-X30

CUBICLE NO.:+03A1R2

-X30

13

Y1

32

2
4
-S33

28 X5:3

/2.2

C.B. CLOSE LOCAL

SIGNAL LAMP, ACTIVATED

ONLY FOR 2/3 CHANGE OVER SEQUENCE

26

2
4

-Q01

-X30

-Q01

=3202-01/2.2
-S4

27 X6:1

-S33

=3203-01/2.2

X6:2
X6:7

-X30

-Q01

=3203-01/2.2 -S2

-X30

X5:4

-X30

29

<5>

28

<4>

=3202-01/2.2

C10

-X30

10

-F20

/1 0.2

INTERLOCK FROM OTHER C.B.

BUS TIE

X5:7

E6

EXTERNAL CABLE

-Q01

/2.2 -S3

-S2

X6:3

<2>

C13

C12

<3>

-F20

/1 0.2

C14

-F20
/1 0.2

BO2

-X30

3
CLOSING PERMISIVES

FROM UPSTREAM 11kV FEEDER

X5:8

-Q01

/2.2

Ivar Aasen_LV
SENTRON
3201 -01

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED


This drawing was produced electronically
and requires no signature.
It may not be amended manually

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Date:

P.O.Number

Tag no.

82EN0200A

Signature:

S09011

=82EN0200

690V PROCESS SWBD

CIRCUIT AND TERMINATION DIAGRAM

INCOMING ACB FROM 82ET0200A

Closing Coil & Signal Lamps

M140
NTS
51PO-04193.230-K-201-01

Installation: Ivar Aasen Field

Development Project - PDQ Platform

System:

DWG Size Drawing No.:

Rev:

Sheet:

82

A4

02I

Area:

Scale

Siemens Dwg. No.:

DN02-S09011-E-XK-3201-01

+01A1R2

Sheets:

16

<1>

3
<3>

<4>

<3>

<5>

<7>

<6>

<>

<8>

C.B. OPEN VIA SHUNT COIL

(50ms)

C.B. OPEN LOCAL & REMOTE

LOCAL : C.B. OPERATION PANEL

REMOTE : SAS

C.B. OPEN

FROM ARC DETECTION UNIT

INSIDE INC. C.B. A

C.B. OPEN INTERTRIP FROM

UPSTREAM 11kV FEEDER

C.B. OPEN

FROM ARC DETECTION UNIT

INSIDE INC. C.B. B

C.B. OPEN

BY LOAD SHEDDING

TRIP COIL SUPERVISION

TRIP COIL SUPERVISION

19

8
A1
A2

X2:1 6

-X46

02

-F30

-Q0X

-R1

-K13
/1 3.7

IN

X2:15

-F32

/1 5.2

E3

BO4

-F20

/1 0.2

31 X1:9

X2:15

-F31

/1 4.2

X2:1 6

E4

-X30

<2>

01

12
14

INC. B

-K4

<U>

/.6

33k

11

+02A1R2

X1:10 30

EXTERNAL CABLE

+15
=80EH0011A

=3202-01/16.2

-X46

-X80

16

15

14

EXTERNAL CABLE

12

10

-X80

13

-X30

11

-Q01

/2.2 S3

-R2

-R3.1

4,7k

1,5k

X5:9

21

-X30

22

-R3.2

47k

X6:13

No. / Text

20

230V AC

F05:2

/5.5 -X30

X5:10

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED


This drawing was produced electronically
and requires no signature.
It may not be amended manually

-R3.3

1 ,5k

-Q01

/2.2

-R4

-R5

F1

1k

-X30

24

F05:4

/5.5

25

X6:14

23

Ivar Aasen_LV
SENTRON
3201 -01

4,7k

-K4

14

/1 2.6 11

12

Acceptance Code:

1
.
.

.
.

DET NORSKE

23.02.201 5 EStad

DD

SW

01E
ISSUED FOR REVIEW

26.05.201 4 DD

HFO

SW

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Drawing Title:

82EN0200A

Installation: Ivar Aasen Field

Development Project - PDQ Platform

P.O.Number

Tag no.

690V PROCESS SWBD

CIRCUIT AND TERMINATION DIAGRAM

INCOMING ACB FROM 82ET0200A

Shunt Trip Coil

02I
ISSUED FOR CONSTRUCTION

Issue

Supplier

Date:

Signature:

S09011

=82EN0200

Area:

Scale

Siemens Dwg. No.:

M140

NTS

51PO-04193.230-K-201-01

System:

DWG Size Drawing No.:

Rev:

Sheet:

82

A4

02I

DN02-S09011-E-XK-3201-01

+01A1R2

Sheets:

16

<3>

<1>

<4>

<5>

<6>

<7>

<8>

<>

<9>

230V AC

15

14

-X46

10

-X90

11

No. / Text

F07:2

/5.7

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED

C.B. OPEN VIA UVT COIL

(73ms)

C.B. OPEN LOCAL & REMOTE

LOCAL : C.B. OPERATION PANEL

REMOTE : SAS

C.B. OPEN BY ESD TRIP

C.B. OPEN INTERTRIP FROM

UPSTREAM 11kV FEEDER

C.B. OPEN BY PSD TRIP

C.B. OPEN

BY LOAD SHEDDING

C.B. OPEN

SPARE TRIP

C.B. OPEN

SPARE TRIP

C.B. OPEN

SPARE TRIP

10

C.B. UNDER VOLTAGE TRIP COIL

X5:1 3 & 14 : MOMENTARY TRIP

X5:11 &12 : DELAY 0,2-3,2 SEC

EXTERNAL CABLE

+15

=80EH0011A

13

-K12

/13.5

E1

13

BO3

<2>

21

-Q0X

-K11

/13.4

-F20

/1 0.2

-K1 3

/1 3.7

14

14

E2

22
24

03

-X46

04

EXTERNAL CABLE

12

-X90

16

13

This drawing was produced electronically


and requires no signature.
It may not be amended manually

-Q01
-Q01

/2.2

F4

U<

E
X5:11

Ivar Aasen_LV
SENTRON
3201-01

INCLUDE A JUMPER TO BYPASS K11 & K12 RELAY CONTACTS, AS CB TRIPS AT ESD2
AT 11KV.PSD IS NOT USED AT INCOMER.
INCLUDE A NOTE TO SAY, JUMPER TO BE REMOVED, IF ESD/PSD USED.

X5:12

X5:13

X5:14

<10>

F07:4

/5.7

Acceptance Code:

1
.
.

.
.

DET NORSKE

02I

ISSUED FOR CONSTRUCTION

23.02.201 5 EStad

DD

SW

01E

ISSUED FOR REVIEW

26.05.201 4
DD

HFO

SW

Issue

Supplier

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Drawing Title:

Date:

P.O.Number

Tag no.

82EN0200A

Signature:

S09011

=82EN0200

690V PROCESS SWBD


CIRCUIT AND TERMINATION DIAGRAM

INCOMING ACB FROM 82ET0200A


Under Voltage Trip Coil

Area:

Scale

Siemens Dwg. No.:

M140

NTS

51 PO-041 93.230-K-201 -01

Installation: Ivar Aasen Field

Development Project - PDQ Platform

System:

DWG Size Drawing No.:

Rev:

Sheet:

82

A4

02I

DN02-S09011-E-XK-3201-01

+01A1R2

Sheets:

1 6

2U

/3.4

2V

/3.4

-X45

01

-X85

82EN200_2U_BUS A

=3203-01/3.6

02

82EN200_2V_BUS A

=3203-01/3.6

03

F04:2

/5.4

04

F04:4

/5.4

2W

/3.4

IE1

/2.7

IE2

/2.7

DC L+
(AC)
LDC

COMMUNICATION PORT

B
System/service
interface
IEC 61850
IEC 61 870-5-103
Profibus DP
Modbus RTU
DNP 3.0

Ethernet Interface
DIGSI 4
RJ45

EL
OPT

Earthing at
rear of housing

Live Status Contact

Enter

Power Supply

BI11

BI10

BI9

BI8

BI7

BI6

BI5

Run

Error

BO5

BO4

BO3

BO2

BI4

OPERATION PANEL

Esc

BO1

BI3

BI1

VC, VN, Vsyn,VX

VA, VAB,Vph-n
VB, VBC

IN, INS

IC

SIPROTEC 7SJ8081

IA

BI2

-F20

C2

C1

D13
/1 2.6
D14
/1 2.6

/1 2.6

F20_I0

D12

/1 1 .3
/1 1 .3
/1 1 .4
/1 1 .4
/1 1 .4
/1 1 .4
/1 1 .5
/1 1 .5
/1 1 .6
/1 1 .6
/1 2.2
/1 2.2
/1 2.3
/1 2.3
/1 2.4

F20_I1

F1
F2
F3
F4
F5
F6
F7
F8

/2.7

F20:C2

/4.5

C3
C4
C5
C6
C7
C8
D1
D2
D3
D4
D5
D6
D7
D8
D9

/2.7

F20_I2

E13
E14

F20:C1

/4.5

F20_I3

E9
E11
E12

/2.7

D10
/1 2.4
D11
/1 2.4

EL

OPT

PE

B4

B3

B2

B1

E7
/1 3.6
E10
/1 3.6
E8
/1 3.6

E
C10
/7.5
C11
/7.5
C9
/7.5
C12
/7.4
C14
/7.4
C13
/7.4
E2
/9.1
E1
/9.1
E4
/8.2
E3
/8.2
E6
/7.1
E5
/7.1

Ivar Aasen_LV
SENTRON
3201-01

82EN0200 BUS A VOLTAGE

FOR SYNC. CHECK

/2.7

This drawing was produced electronically


and requires no signature.
It may not be amended manually

IB, IN2

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED

COMMUNICATION TOPOLOGY

Acceptance Code:

REF.DWG.NO.: DN02-S09011-E-XI-3202-01

1
.
.

.
.

.
.

Drawing Title:

Supplier

DD

SW

01E
ISSUED FOR REVIEW

26.05.201 4 DD

HFO

SW

Issue
Description

Made by

Date

Chc. by

SMOE

82EN0200A

S09011

=82EN0200

Scale

Siemens Dwg. No.:

M140

NTS

51PO-04193.230-K-201-01

Mustang

Installation: Ivar Aasen Field

Development Project - PDQ Platform

System:

DWG Size Drawing No.:

Rev:

82

A4

02I
10

Wood Group

Appr. by

P.O.Number

Tag no.

Signature:

Area:

DET NORSKE
23.02.201 5 EStad

Date:

690V PROCESS SWBD


CIRCUIT AND TERMINATION DIAGRAM

INCOMING ACB FROM 82ET0200A


Siprotec Protection Relay

02I
ISSUED FOR CONSTRUCTION

DN02-S09011-E-XK-3201-01

+01A1R2

Sheet:

Sheets:

16

< >
No. / Text

<1>

<2>

<3>

<5>

<4>

24V+_1
/5.1

C.B IN CONNECTED POSITION

C.B. IN DISCONNECTED POSITION

2
4
-S32

/2.1

-Q01

/2.2 -S1

-Q01

/2.2 -S1

C.B. IN TEST POSITION

C.B. OFF

1 = OFF

C.B. ON

1=ON

X6:11

X6:9

-S30

/2.1

-S35

/2.2

2
4

2
4

X6:12

X6:10

-X35

C
D3

-F20

/1 0.2

BI5

D4

D2

C8

BI2

C6

C4

-F20

/1 0.2

BI4

-F20
/1 0.2
BI3

-F20

/1 0.2

-F20

/1 0.2

D1

C7

C5

C3

BI1

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED


This drawing was produced electronically
and requires no signature.
It may not be amended manually

Ivar Aasen_LV
SENTRON
3201 -01

0V_1

/5.1

0V_2

/1 2.1

Acceptance Code:

1
.
.

.
.

.
.

DET NORSKE

02I
ISSUED FOR CONSTRUCTION

23.02.201 5 EStad

DD

SW

01E
ISSUED FOR REVIEW

26.05.201 4 DD

HFO

SW

Issue

Drawing Title:

Supplier

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Date:

P.O.Number

Tag no.

82EN0200A

Signature:

S09011

=82EN0200

690V PROCESS SWBD

CIRCUIT AND TERMINATION DIAGRAM

INCOMING ACB FROM 82ET0200A


Siprotec Binary Inputs

Area:

Scale

Siemens Dwg. No.:

M140

NTS

51PO-04193.230-K-201-01

Installation: Ivar Aasen Field

Development Project - PDQ Platform

System:

DWG Size Drawing No.:

Rev:

82

A4

02I
11

DN02-S09011-E-XK-3201-01

+01A1R2

Sheet:

Sheets:

16

<>

<1>

<2>

<3>

<5>

<4>

No. / Text

<6>

C.B READY TO CLOSE

13

24V+_2

/5.2

CONTROL VOLTAGE FAULT

-F01

/5.1

-KA1

-K11

/13.4
=3210-01/2.4

C.B. TRIP BY ESD/PSD/

LOAD SHEDDING

UPS SUPPLY OK

C.B. TRIP SIGNAL FROM 2/3

TRIP SELECTOR SWITCH

TRIP COIL SUPERVISION OK

12
14
11

=3203-01 /12.4

16

1
2

-K4

/8.6

17

12
14

33

-S06

-X35

32
34

14

-X35

31

13

13

13

14

-K13

/1 3.7

-X35

-F06

/5.6

12

-K12

-KB1

/13.5
=3210-01/2.4

15

13
13

-X35

-F05

/5.5

-X35

24

34

14

-Q03

-F04

/5.4

BUSTIE

+03A1R2

23

14

-X35

14

X6:6

-Q01

/2.2 S20

BUSTIE

11

+03A1R2

-F03

/5.3

=3203-01/3.2

13

12
14

23

13

11

24

-F02

/5.2

11

-X35

-X35

10

14

INHIBIT SYNC. CHECK

14

-X35

X6:5

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED


This drawing was produced electronically
and requires no signature.
It may not be amended manually

14

-F07

/5.7

BI10

D13

D12

D10
BI9

D11

D14

D8

14

D6

BI8

BI7

BI6

-Q03

/4.2

-F20

/1 0.2

-F20

/1 0.2

13

-F20

/1 0.2

Ivar Aasen_LV
SENTRON
3201-01

D7

13

D5

-Q02

/3.2

D9

14

-F20
/1 0.2

BI11

E
0V_2

/1 1 .6

Acceptance Code:

1
.
.

.
.

DET NORSKE

02I

ISSUED FOR CONSTRUCTION

23.02.201 5 EStad

DD

SW

01 E

ISSUED FOR REVIEW

26.05.201 4 DD

HFO

SW

Issue

Drawing Title:

Supplier

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Date:

P.O.Number

Tag no.

82EN0200A

Signature:

S09011

=82EN0200

690V PROCESS SWBD


CIRCUIT AND TERMINATION DIAGRAM

INCOMING ACB FROM 82ET0200A


Siprotec Binary Inputs

Area:

Scale

Siemens Dwg. No.:

M140

NTS

51PO-04193.230-K-201-01

Installation: Ivar Aasen Field

Development Project - PDQ Platform

System:

DWG Size Drawing No.:

Rev:

Sheet:

82

A4

02I

12

DN02-S09011-E-XK-3201-01

+01A1R2

Sheets:

16

<1>

<2>

<4>

<3>

<5>

<6>

No. / Text

SPARE CB
TRIPPED
C.B. TRIPED SIGNAL TO

SIGNAL TO
UPSTREAM 11kV FEEDER
11Kv FEEDER

<7>

C.B. TRIP COMMAND

(FROM ARC DETECTION UNIT)

TO UPSTREAM 11kV FEEDER A

C.B. TRIP COMMAND

(FROM ARC DETECTION UNIT)

TO UPSTREAM 11kV FEEDER B

A1

ESD TRIP

DE-ENERGIZED TO TRIP, +24VDC

SIL3

PSD TRIP

DE-ENERGIZED TO TRIP, +24VDC

SIL3

-K13

/.7

A2

E8

E7

E10

-K12

/.5

7SJ8081

A1 (+)
Y1

-K11

/.4

-X65

-X70

FAULT FROM SIPROTEC

HW COMMON SIGNAL FROM EACH SWBD

(SPARE SIGNAL)

EXTERNAL

CABLE

EXTERNAL

CABLE

EXTERNAL

CABLE

=80EH0011A

+16

=80EH0011B

ESD NODE

LOAD SHEDDING

EXTERNAL

CABLE

LOAD

SHEDDING

+15

1
2
3

-X65

-X65

-X66

-F20

/1 0.2

A2 (-)
Y2

X1:14

A1 (+)
Y1

X1 :13

-F30

/1 6.2

A2 (-)
Y2

X1 :11

-F30

/1 6.2

X1:12

X7:1

-Q01

/2.2 S23

X7:5

-Q01

/2.2
S22

X7:2

X7:3

X7:4

EXTERNAL

CABLE

PSD NODE

-X

-X
Ivar Aasen_LV
SENTRON
3201-01

<>

X7:6

Copyright(C) Siemens Oil & Gas Offshore AS ALL RIGHTS RESERVED


This drawing was produced electronically
and requires no signature.
It may not be amended manually

IINTERTRIP FROM 690V TO 11kV TO BE REMOVED.

-K13

-K11

ESD/PSD RELAYS ARE NOT UTILISED, INCLUDE A JUMPER.FOR PROCESS SWITCHBOARD


INCOMER TRIPS AT ESD2, WHICH IS TRIPPED AT 11kV.

14
/9.2

24
/1 2.4

14
/8.5 12

11

24
/9.4 22

21

34
/1 2.4 32

31

-K12

13

14
/9.4

24
/1 2.4

23

13

23

Acceptance Code:

1
.
.

.
.

DET NORSKE

23.02.201 5 EStad

DD

SW

01E
ISSUED FOR REVIEW

26.05.201 4 DD

HFO

SW

Description

Made by

Date

Chc. by

SMOE

Interlock to 1 1 kV SWBD, ESD/PSD Trip Relay & Fault Contact


M140

Wood Group

Mustang

Appr. by

82EN0200A
Area:

Installation: Ivar Aasen Field

Development Project - PDQ Platform

Date:

P.O.Number

Tag no.

690V PROCESS SWBD

CIRCUIT AND TERMINATION DIAGRAM

INCOMING ACB FROM 82ET0200A

02I
ISSUED FOR CONSTRUCTION

Issue

Drawing Title:

Supplier

Scale

Signature:

S09011

=82EN0200

Siemens Dwg. No.:

NTS
51PO-04193.230-K-201-01

+01A1R2

System:

DWG Size Drawing No.:

Rev:

Sheet:

82

A4

02I

13

DN02-S09011-E-XK-3201-01

Sheets:

16

<>

Arc detection peripheral unit

Mounted in top compartment

of cubicle

Optic sensor

inside cubicles

busbar view

ARC DETECTION UNIT BUS Cables

X1

OFF

CH.07

CH.08

CH.09

ON

CH.10

ON

PE

OFF

Trip T1

DO +24VDC

X2

CH.05
CH.06
ARC CHANNELS

DO GND

ERROR

DI GND

TRIP

Serial A

COM

Serial B

ACT

CAN-L

POWER

+24V

OK

CH.04

CH.03

DI (24-48VDC)

CH.02

CH.01

CAN-H

VAMP 10L

OFF

OFF

COM1

OFF

COM2

COM2

COM1

X2:16

/8.2

X2:15
/8.2

X2:1 4

X2:13

X2:12

X2:11

X2:1 0

X2:9

X2:8

X2:7

X2:6

X2:5

X2:4

X2:3

X2:2

OFF

PE

X1:20

X1:19

+19

-E01

X1:18

+17
-E01
2
1
X1:17

X1:16

X1:15

X1:14

X1 :9

X1:8

X1:7

X1:6

X1:5

X1:4

+15
-E01
1
2

DIP-switches

-F31

GND

X1 :3

X1:1

X1:2

<1>

+13
-E01
1
2

+11
-E01
1
2

X1:13

+09

-E01

1
2

X1:12

+07
-E01
1
2

X1:11

+05

-E01

1
2

X1:10

+03
-E01
1
2

+01
-E01
1
2

No. / Text

<2>

X2:1

This drawing was produced electronically


and requires no signature.
It may not be amended manually.

Copyright (C) Siemens AS All rights reserved

<3>

ARC_BUS_2

/1 5.5

ARC_BUS_1

/1 6.1

D
VMP1_GND

/1 6.1

Ivar Aasen_LV
SENTRON
3201 -01

VMP1_+24V

/1 6.1

Acceptance Code:

1
.
.

.
.

DET NORSKE

02I

ISSUED FOR CONSTRUCTION

23.02.201 5 EStad

DD

SW

01E

ISSUED FOR REVIEW

26.05.201 4 DD

HFO

SW

Issue

Drawing Title:

Supplier

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Date:

P.O.Number

Tag no.

82EN0200A

Signature:

S09011

=82EN0200

690V PROCESS SWBD

CIRCUIT AND TERMINATION DIAGRAM

INCOMING ACB FROM 82ET0200A


Arc detection peripheral unit 1

Area:

Scale

Siemens Dwg. No.:

M140

NTS

51PO-04193.230-K-201-01

Installation: Ivar Aasen Field

Development Project - PDQ Platform

System:

DWG Size Drawing No.:

Rev:

Sheet:

82

A4

02I

14

DN02-S09011-E-XK-3201-01

+01A1R2

Sheets:

16

<>

Arc detection peripheral unit

Mounted in top compartment

of cubicle

Optic sensor

inside cubicles

busbar view

ARC DETECTION UNIT BUS Cable

DIP-switches

-F32

X1

OFF

CH.07

CH.08

CH.09

ON

CH.10

ON

PE

OFF

Trip T1

DO +24VDC

GND

X2

CH.05
CH.06
ARC CHANNELS

DO GND

ERROR

DI GND

TRIP

Serial A

COM

Serial B

ACT

CAN-L

POWER

+24V

OK

CH.04

CH.03

DI (24-48VDC)

CH.02

CH.01

CAN-H

VAMP 10L

OFF

OFF

COM1

OFF

COM2

COM2

COM1

X2:16

/8.3

X2:15
/8.3

X2:14

X2:13

X2:12

X2:11

X2:10

X2:9

X2:8

X2:7

X2:6

X2:5

X2:4

X2:3

X2:2

OFF

PE

X1:20

X1:19

X1:18

X1:17

X1:16

X1:15

X1:9

X1:8

X1:7

X1:6

X1:5

X1 :4

X1:2

X1 :1

X1:3

<1>

X1:14

+29

-E01

1
X1:13

+27
-E01
2
1

X1:12

+25
-E01
2
1

X1:11

+23

-E01

1
2

X1:10

+21

-E01

1
2

No. / Text

<2>

X2:1

This drawing was produced electronically


and requires no signature.
It may not be amended manually.

Copyright (C) Siemens AS All rights reserved

<3>

ARC_BUS_2

/1 4.6

D
VMP2_GND

/1 6.1

Ivar Aasen_LV
SENTRON
3201-01

VMP2_+24V

/1 6.1

Acceptance Code:

1
.
.

.
.

DET NORSKE

02I

ISSUED FOR CONSTRUCTION

23.02.201 5 EStad

DD

SW

01E

ISSUED FOR REVIEW

26.05.201 4 DD

HFO

SW

Issue

Drawing Title:

Supplier

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Date:

P.O.Number

Tag no.

82EN0200A

Signature:

S09011

=82EN0200

690V PROCESS SWBD

CIRCUIT AND TERMINATION DIAGRAM

INCOMING ACB FROM 82ET0200A


Arc detection peripheral unit 2

Area:

Scale

Siemens Dwg. No.:

M140

NTS

51PO-04193.230-K-201-01

Installation: Ivar Aasen Field

Development Project - PDQ Platform

System:

DWG Size Drawing No.:

Rev:

Sheet:

82

A4

02I

15

DN02-S09011-E-XK-3201-01

+01A1R2

Sheets:

16

<>

ARC DETECTED SIGNAL


TO BUS TIE CB

TRIP COMMAND
TO INC. C.B. B

TRIP COMMAND
TO BUS TIE CB

TRIP COMMAND
TO 11kV UPSTREM FEEDER B

TRIP COMMAND
TO 11kV UPSTREM FEEDER A

No. / Text

Arc detection central unit

Mounted in instr

compartment door of cubicle

ARC DETECTION UNIT BUS Cable

I>INT.

I>EXT.

-X61

PE

X1:19

X1:18

X1:17

X1:16
=3203-01/15.5

X1:15
=3203-01/15.5

X1:14
/1 3.3

X1:13
/1 3.3

X1:12
/1 3.3

X1:11
/1 3.3

X1:20

PE

OFF

OFF

OFF

POWER SUPPLY

COM1

OFF

COM2

COM2

COM1

X3:18

X3:1 7

X3:16

X3:15

X3:14

X3:13

X3:12

X3:1 1

X3:10

X3:9

X3:8

X3:7

X3:6

X3:5

X3:4

X3:2

OFF

<2>

+24V DC

VMP1_GND

/1 4.3

ON

0V

RS_B

GND

X3

IF(NC)

IF(NO)
SELF-SUPERVISION

Us

TEMP

CURRENT

Trip T4
Trip Alarm

Us

TRIP 4

RS_A

TEMP SET

-X61

X1:10
=3202-01/8.4

Trip T1
Trip T2
Trip T3

GND

TRIP 3

GND

ERROR

Lb>OUT

INFO

La>OUT

TRIP 2

I>IN/OUT

COM

Lb>OUT

INSTALL

ON

La>IN

TRIP 1

OFF

CAN_L

POWER

ERROR CODE

DIP-switches

CAN_H

RUN

X3:3

-PE9

X1

VAMP 221

MAIN UNIT

+24V

-F30

X1:9
=3202-01/8.4

<1>

X1 :8
=3203-01 /1 0.3

X1:7
=3203-01/10.3

X3:1

This drawing was produced electronically


and requires no signature.
It may not be amended manually.

Copyright (C) Siemens AS All rights reserved

VMP1_+24V

/1 4.3

Ivar Aasen_LV
SENTRON
3201-01

VMP2_GND

/1 5.3

VMP2_+24V

/1 5.3

F06:2

/5.6

F06:4

/5.6

/1 4.6

ARC_BUS_1

Acceptance Code:

1
.
.

.
.

DET NORSKE

02I

ISSUED FOR CONSTRUCTION

23.02.201 5 EStad

DD

SW

01E

ISSUED FOR REVIEW

26.05.201 4 DD

HFO

SW

Issue

Drawing Title:

Supplier

Description

Made by

Date

Chc. by

SMOE

Wood Group

Mustang

Appr. by

Date:

P.O.Number

Tag no.

82EN0200A

Signature:

S09011

=82EN0200

690V PROCESS SWBD


CIRCUIT AND TERMINATION DIAGRAM

INCOMING ACB FROM 82ET0200A


Arc detection central unit

Area:

Scale

Siemens Dwg. No.:

M140

NTS

51PO-04193.230-K-201-01

Installation: Ivar Aasen Field

Development Project - PDQ Platform

System:

DWG Size Drawing No.:

Rev:

82

A4

02I
16

DN02-S09011-E-XK-3201-01

+01A1R2

Sheet:

Sheets: