You are on page 1of 2

India’s Future Energy Needs and

Market
• India’s Installed • 1,26,839 • Out of 5,93,000
Capacity 2006 MW villages about
1,54,000 remain to
be electrified
POWER SECTOR REFORMS IN
HARYANA AND ROAD AHEAD

• To Achieve the
targeted GDP of 8%,
energy demand is
expected to grow
• India’s Energy @5% - 6%
need by 2030 • 4,00,000
MW
• 5,00,000 • With 5% growth
MW
• With 6% growth

• The market
potential

• USD 300
• At Rs. 3/- per KWH
Billion cost.

1
India’s Future Energy Needs and
Market
• Coal based Power • CAPEX • Coal availability
Plants - $ 1.1 million • GHG Emissions
• OPEX • Waste Disposal
- Rs. 2.30 / KWH
• High OPEX
POWER SECTOR REFORMS IN
HARYANA AND ROAD AHEAD

• CAPEX
• Availability
• Gas Turbines based - $ 1 Million
plants • OPEX constrains
- Rs. 11/KHW • GHG Emissions
(Diesel)
- Rs. 5.0/KWH
(Gas) • High Capital
cost
• Fuel availability
• Nuclear Power • CAPEX
• Waste dumping
based Plants - $ 10 million
• OPEX
- Rs. 0.9 / KWH

• Limited Areas
• High Capital
• CAPEX
Cost
• Wind power based - $ 4.6 million
• OPEX • Can feed Grid
plants
- Rs. 4.7 / kwh as
secondary
source 2

You might also like