Professional Documents
Culture Documents
12
200
9
Observations
1- Housekeeping:
1.1Fire hazard from compiled rubbish
and polythene sheets.
04
Priori
ty/
Risk
H,M,L
H
12
200
9
Time
Scale
(Immediate
,1Week,etc
)
Immediat
e
2 Days
3Days
1 Week
H
3 Days
1 Week
M
1.4Food waste materials lead to hygienic
hazards of flies, varmints and even
snakes.
1 Month
3 Days
Observations
2 Environmental hazards:
2.1Disposal of concrete on the ground
which pollute the ground.
04
Priori
ty/
Risk
H,M,L
M
12
200
9
Time
Scale
(Immediate
,1Week,etc
)
1 week
H
-Immediately stop the spillage.
-a quick maintenance for air
compressor should be maintained
-Insure regular maintenance for
equipments.
Regularly
Immediat
e
Immediat
e
1 Day
1 Month
M
-Site cleaning methods and
eliminating of waste should be done.
-induction training of the
environmental and biological hazards
should take place.
-Material segregation methods to be
used.
-Wear of suitable Personal Protective
Equipments (P.P.E.)
2 Days
2 Weeks
1 Week
Immediat
e
Observations
3 Physical Hazards:
3.1Working at height on scaffolding
without guard rail, without faade
bracing and not fully covered with
timber boards (or other material like
aluminum).
3.2Too steep timber ladder without
handrails lead to the upper part of
scaffolding parallel to shuttering for
concrete walls of the bridge which
can lead to fall from height.
04
Priori
ty/
Risk
H,M,L
H
3.3Electrical shock can happen from
generating of an electrical drill with
damaged wires and using a domestic
socket connection for 220 volts
electrical current.
12
200
9
Time
Scale
(Immediate
,1Week,etc
)
Immediat
e
1 Day
Immediat
e
1 Day
1 week
1 Week
Immediat
e
Immediat
e
1 Day
Monthly
H
3.4Good practice: High voltage cable
over the new diversion - towards
Alain is maintained with goal
posting with net under the electric
liens and the area is barricaded to
protect movement under the electric
high voltage lines.
3.5Protruding steel bars from wall
shuttering under the scaffolding
Immediat
e
Immediat
e
Immediat
e
1 Day
capped.
-Bars should be bent to prevent
sharp edge of steel.
Observations
4 Chemical hazards:
4.1People ignite fire near the polymer
bitumen container which is a fire
hazard due to chemical substances.
04
Priori
ty/
Risk
H,M,L
12
200
9
Time
Scale
(Immediate
,1Week,etc
)
Immediat
e
1 week
1 Day
Monthly
Immediat
e
Immediat
e
3 Days
Observations
5 Physical hazards:
5.1Assembly point on work area is not
assigned which may lead workers to
be stroked by vehicles as they are in
hurry to catch the buses at the end of
the working day.
5.2The stability of stones of the
demolished old wall wings of the road
in the under pass (for joining of the
new road walls) is not insured which
can lead to fallen objects hazard.
04
Priori
ty/
Risk
H,M,L
12
200
9
Time
Scale
(Immediate
,1Week,etc
)
Immediat
e
1 week
3 Days
Immediat
e
1 Week
1 Month
1 Week
Immediat
e
2 Weeks
L
5.4Unstable mobile water tank is parked
near the road side in the sloped area
which cam move or overturned
towards the working are and can
cause injuries
3 days
2 Weeks
Observations
04
Priori
ty/
Risk
H,M,L
12
200
9
Time
Scale
(Immediate
,1Week,etc
)
Good practices:
H
6.2The use of concrete barriers near
deep excavations can prevent of
falling, and use of barriers in a good
manner in diversions will control the
traffic movement.
1 week
Immediat
e
Immediat
e
M
6.3Ramble strips, in addition to traffic
signs (speed limits signs), on the road
near diversions, T shaped junctions or
before round about; in critical turns;
are placed.
Immediat
e
1 week
3 Weeks
M
Immediat
Observations
04
Priori
ty/
Risk
H,M,L
12
200
9
Time
Scale
(Immediate
,1Week,etc
)
Physical hazards
Immediat
e
1 Week
1 Week
2 Weeks
Immediat
e
1 Week
Monthly
04 / 12 /
2009
Under pass No. 5
2:30 pm.
Introduction:
As safety is one of the important issues in our life and is the first
issue people should take care of it, the government is take the
safety into the considerations of the country legislations and law.
The municipalities and the environmental agency, as regulatory
authorities, held the safety issue and put it as apriority that
should be adopted in all the country firms. The safety manual of
Abu Dhabi and Alain municipalities is the witness of this care.
Based on the priority of safety, health and environment and on
the inspection done date on 04th. Of December 2009, on the road
site which is Dualing and improve traffic safety on Alain
Nahil road; I had found good practice and number of issues
need a risk carried by those issues.
Summary
The aim of this inspection is to highlight the health, safety and
environmental issues and to discover whether it is good practice
or violations and to decide which recommendations are to be
taken as remedial actions to be done. It is found that the main
issue is the one way road without Intermediate Island which is
the main risk, for this reason the municipality decides about this
project which is Dualing and improves traffic safety on Alain
Nahil road, to cover this dangerous issue. The compliance with
health, safety and environment is clearly observed through the
good barricading; well designed diversions and the precautions
taken under the high voltage electric line by maintain goal posts
with net and barricading the area. Through the site inspections I
observe some violations mainly on the under pass no.5 which
are: the scaffolding which is incomplete; the side wall of the
under pass without support to protect workers from the falling
objects which are big stones on the road side. As Alain water
table is very close to the ground level and there is many sources
of drinkable water in different areas in Alain hence Alain is known
as the oasis city; so as I observe there is spillage of oil from the
compressor this may be one of the reasons which contaminate
the water; same as the concrete disposal on the site. On the
other side the high hazard from electric shock is persist there
with the use of electrical equipments with damaged electric
wires connected to domestic sockets.
Observations
1- The scaffolds on site are incomplete without full boarding,
without hand rails, without secured access and without faade
bracing (item no.3.1 in page 3 of the observations). The
contractor used only two no. of boards 20cm. wide about 50 cm
thick (no way to take accurate dimensions because of
incomplete scaffolds). This one of the most hazardous issues and
most of the workers suffer from this type of hazards which is the
fall from height.
The recommendations to these hazards is to be carried by the
contractor should stop the work on the scaffolding immediately
and bring competent scaffold erector as to contract with
specified scaffolds contractor; the sub-contractor should
complete the scaffolding by placing top and middle handrails, full
scaffold boarding with standard timber boards and insure a
practically reasonable access according to the standards. The
worker on site should have knowledge of how to deal with
scaffolding; this can be done by training for company workers.
The const to this action may not be high as if someone fell
down lost his life or even injured this may cost not less than
Dhs.250,000. The repair of scaffolding my not cost more than
Dhs.15,000 include the administrative costs.
The legislations, as refer to the Abu Dhabi or Alain municipality
manual, shows the standard methods, numbers and dimensions