Scope of Services
The following scope of services has 3 phases includes:
Phase 1: Preliminaries
Phase 2: Designs
Phase 3: Construction Management
Phase 1
Preliminary Works
Conduct Compaction Test of existing slab
Conduct warehouse visual defects inspection
Proposed scope of works approved by the Client
Phase 2
Analysis & Design the re-slab of the existing slab
o Gathering of Data (Machinery Specification & others) for loading purposes.
o Investigate fill compaction capacity.
o Investigate & re-design existing concrete ramp.
o Generate structural surface modelling & analysis of the ground slab using Staad
o Provide manual structural design calculation generated using Excel Program.
o Prepare & compile one (1) set of structural analysis & design report.
Investigation of Tilted Slab lay out
o Investigate ground surface for compactness.
o Conduct concrete compressive test to existing concrete tilted slab using NonDestructiveTesting (NDT) Concrete Test Hammer.
o Conduct crack mapping investigation to existing concrete tilted slab.
o Prepare investigation report.
Phase 3
Develop and submit Proposed Project Timeline for Clients approval, to be included:
o Clear of materials from the warehouse
o Dismantle and re-assemble of machine
o Preparing of existing slab and re-slab start from the machine area
o Re-slab of whole warehouse slab including front vehicle entrance ramp
o Fixing warehouse defects
o Moving of 26 tilted slabs from Nukualofa to the site
Conduct tender process included but not limited to:
o Submit Proposed Contractors to be invited to tender for Clients approval
o Prepare Tender Documents
o Invitation to Tender
o Tender Evaluation Report
o Prepare Construction Specifications
o Prepare a Construction Cost Estimate no Bills of Quantity prepared in this proposal or
o Prepare Contract Document
Construction Management and Contract Administration included but not limited to: