BREAKDOWN OF WORK ITEMS AND WEIGHTED

PERCENTAGE FOR PROPOSED RESIDENCE


WORK ITEMS

1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.

EXCAVATION
FOUNDATION & FOOTINGS
POST & COLUMN
GIRDERS & GIRTS
FLOOR JOIST & BRIDGING
TRUSSES, RAFTERS, PURLINS
CEILING, JOIST, ETC.
CEILING EAVES, SOFFITS
PLUMBING & SEWERS
ROOF, RIDGES & GUTTERS
SEPTIC VAULT
TILING & WAINSCOTING
FIXTURES & ACCESSORIES
SIDINGS
PARTITIONS
DOOR JAMBS, WINDOW HEADS
FLOORING, 1ST FLOOR
FLOORING, 2ND FLOOR
FINISHING HARDWARES
ELECTRICAL INSTALLATIONS
DOORS & WINDOWS
KITCHEN COUNTER, CABINETS
STAIR & HANDRAILS
PAINTING
T O TAL

TWO-STOREY

ONE-STOREY

PERCENT

PERCENT

3.30
2.00
6.57
2.33
2.19
3.05
2.16
3.70
2.95
7.14
1.89
1.31
0.84
12.29
5.90
4.47
2.30
2.50
1.32
3.63
9.90
5.05
8.98
4.23
-------100%
=====

5.65
3.35
5.42
0.67
5.12
2.41
8.90
4.94
11.80
3.16
2.20
1.41
10.20
5.63
3.75
3.38
1.20
3.04
8.33
5.58
3.86
-------100%
=====