You are on page 1of 4

INSTITUT LATIHAN JABATAN TENAGA MANUSIA

KEMENTERIAN SUMBER MANUSIA


MALAYSIA

KERTAS
KERTASTUGASAN
KERJA
(B01-02-02-LE1-AS3)

TAJUK KEMAHIRAN DAN


TAHAP

JURUELEKTRIK TAHAP 2 (SEMESTER 2)

No.DAN TAJUK MODUL

M02 THREE PHASE SYSTEM

No. DAN TAJUK


PENGALAMAN
PEMBELAJARAN
OBJEKTIF PRESTASI
AKHIRAN

LE1 PERFORM THREE PHASE FOUR LINE SYSTEM

PERFORM THREE PHASE FOUR LINE SYSTEM BY USING


APPOPRIATE TOOLS, MEASURING INSTRUMENT ETC SO
THAT THE POWER AND POWER FACTOR ARE
MEASURED AND CALCULATED ACCORDING TO THE
TYPES OF CONNECTIONS.

100

ISI KANDUNGAN
LE1 THREE PHASE SYSTEM

TASK 02.03 Perform three phase four line system

101

No. & TAJUK


PENGALAMAN
PEMBELAJARAN

LE1 THREE PHASE SYSTEM

No. & TAJUK


TUGASAN

Task 02.03 Perform three phase four line system

TEMPAT : Bilik Kuliah

TEMPOH : 1 jam

TAJUK :

Code No. :

B01-02-02-LE1-AS3

Muka : 1 drp. 2

PENGENALAN SISTEM TIGA FASA EMPAT-DAWAI

TUJUAN :
Kertas Tugasan ini adalah untuk menguji kefahaman mengenai hubungan fasa dan talian bagi arus
dan voltan dalam sistem 3 fasa.

SUMBER MAKLUMAT :
1.

B01-02-02-LE1-IS3 Perform three phase four line system.

2.

Abadul Ghani Mohd Sirat Teknologi Elektrik


Universiti Teknologi Malyasia,Kuala Lumpur.

3.

E.Huhes Teknologi Elektrik


Longman Malaysia Sdn. Bhd, Kuala Lumpur.

102

Code No. B01-02-02-LE1-AS3

Muka : 2

drp. 2

TUGASAN:

1.

Nyatakan hubungan fasa dan talian bagi voltan dalam sambungan bintang bagi sistem tiga fasa
empat talian.

2. Tiga galangan setiap satu mengandungi rintangan 15 ohm dan regangan aruhan 20ohm pada
sambungan bintang merentangi voltan 415 V , 3 fasa. Kirakan nilai :a.
b.

galangan.
arus talian.

3. Tiga rintangan yang sama nilai disambung dalam sambungan bintang pada bekalan 415 volt, tiga
fasa. Jika arus taliannya ialah 5 ampiar kirakan nilai rintangan.

103