You are on page 1of 36
Piping Inspection ~ Course With API 570 Exam Prep. Practice Exam Prepared by Ron VanArsdale Copyright by Inspection Training And Consulting, 2003 IT A C Inspection Training And Consulting SUE OUT WeDS! NAME: DATE: API 570 PRACTICE EXAM (Select The Best Answer) This is the "Open Book" portion of the exam. Feel free to use any of the following: API 570, API 574, ASME B31.3, ASME B16.5(a), ASME Section V, or ASME Section IX 1. Determine the MAWP of the following piping system, at the next inspection, based on the following: Design pressure/temperature: 100 psig/10 00°F Pipe description: NPS 2, S/80 A 106-B Outside diameter of pipe, D: Bersih Thickness determined from inspection: 190 in. Observed corrosion rate: ‘03 in/year Next planned inspection: 5 years MAWP = a 674 psig b. 823 psig 125 psig d. Metal loss exceeds the requirements for 5 year inspection interval 2. What is the pressure desi sign thickness of NPS10, A516 Gr. 65 Type 22 pipe that operates at 1,200 psi/75\ a b. ce d 432" 48" Not enough information given ITAC API 570 Practice Exam, Spring, 2003 Page 1 ITAC A leak test is an alternative to inspection of buried piping. What is the minimum liquid pressure to adequately conduct this test? a 1.1/2 times the MAWP b. 1.1/4 times the MAWP c 10% greater than MAWP d. Actual MAWP For a single-wall material thickness, over 0.375" through 0.50", what is the hole-type designation for a source side penetrameter? a 15 b. 17 c 20 ida: Give the corresponding “P” number for SA 414 Grade A material. Geen Decne: Ges ides 1B: On a Class 1500 NPS 4 blind flange, what is the minimum thickness permitted? a 1.12" b. 1.88" ae 2.12" d. 2.88" For 1 1/4 inch thick carbon steel, what is the recommended preheat temperature? a 300°F bre 23, Cereal d. None ITAC API570 Practice Exam, Spring, 2003 Page 2 ITAC 8 Determine the MAWP of the following piping system, at the next inspection, based on the following: Design pressure/temperature: 100 psig/100°F Pipe description: NPS 20, Std A 106-B Outside diameter of pipe, D: 20 in, Thickness determined from inspection: 280 in. Observed corrosion rate: :02 inyear Next planned inspection: 5 years MAWP = a 160 psig b. 550 psig c 728 psig d. 125 psig 9. Whats the inspection interval for buried piping without cathodic protection, if the soil resistivity is 6,500 ohm-om? x 10 years b. 15 years c 5 years d. Whenever a leak is suspected 10. Whats the maximum length allowed for individual slag trapped in a weld in a Severe Cyclic Conditions piping system? = a ->T,X3 bs TW3 Gagaast divas! 11. Whatis the design thickness of NPS 2 1/2 A106B pipe that operates at 25psi/200°F? a .275” b. 100" 002" d. Not enough information given TTAC API570 Practice Exam, Spring, 2003 Page 3 12, 13. 14, ITAC With respect to Category D service, what is the maximum allowable undercut for a branch connection? a Zero (no evident imperfections) b. << 1/82 inch a arop What is the most common method used to manufacture tubing? a Riveted b. — Seamlessly drawn a Wire drawn d. Forged ITAC API 570 Practice Exam Spring - 2003 Page 20 s 88. 89. 90. ot 92. 93. ITAC A piping inspector employed by the owner operator shall have a an API653 certification b. an AWS CWI certification & anAPI510 certification d. not less than 10 years experience dealing with piping Repair materials shall be verified for conformance to the applicable code and shall be compatible with the original material by the a inspector b. piping engineer repair organization d. the purchasing department The letter “B” is placed on radiographic film holder for what reason? a To determine if back scatter radiation is exposing the film b. To show the distance from the source of radiation to the weld To function as a location marker for the radiograph d. To designate whether the penetrameter is on the film side or the back side A visual examination of performance test coupons shall @ show complete joint penetration and complete fusion of weld metal and base metal b. show no more than 1/3t inadequate penetration show no more than 1/3t nonfusion d. be allowed one 8/32" crater crack Piping systems that are not located in high activity areas and do not significantly vaporize are designated as : a Class 3 b. Class 2 c Class1 d. — Ownerluser designated system Of the following examples, which one may cause a leak in a threaded joint? a —_Back-welding the fiting Lack of thread lubricant b & ——_Under-pressuring the part d. Changing the direction of flow in the piping system ITAC API 570 Practice Exam Spring - 2003 Page 21 94, 95. 96. 97. 98. 99. ITAC Penetrameters are normally placed on the side of the part being examined. a source b. film. c weld d. reverse What is the maximum thickness measurement inspection interval for an injection point? a 3 years b. 5 years c 10 years d. By Class Exemptions for preheating and postweld heat treatment must be approved by the piping engineer inspector applicable standard, AP! 570 repair procedure ance A welder qualified to weld in accordance with one qualified WPS is also qualified to weld a —_using the same welding process within the limits of the essential variables b. any other qualified weld procedure c using a different welding process of a qualified weld procedure d. any WPS developed and tested by the welder’s employer The formula t = PD/2SE computes the required piping thickness b. maximum piping thickness & minimum piping thickness d. average piping thickness What document may be used as a guide when examiners are being qualified by their employer? ASME Section IX ASME Section V ASNT SNT-TC-1A API 570 aecp TTAC API 570 Practice Exam Spring - 2003 Page 22 100. 101. 102. 103. 104, 105. ITAC The minimum allowable thickness of a piping component shall be based on @ pressure, mechanical and structural considerations b. __ previous experience of the owner & _corrosiveness of the product only d. availability of piping materials ‘What is the prescribed alignment for the inside surfaces of circumferential welds to be groove welded? a +or- 1/16” b. +or- 1/32" Within the dimensional limits in the WPS. d. The fabricator’s discretion Why should a leaking threaded joint not be tightened while the system is in service? a Thecraftsman should not be near the threaded connection b. Rust or corrosion might be holding the pressure & The joint might be unscrewed d. crackin a thread root might fail The repair organization shall maintain records of welding procedures and welder qualifications and make the records available to the inspector a Prior to the start of welding b. any time during welding after completion of welding d. when the repair organization releases the information A transverse crack was discovered in the root pass of a completed weld on the outside of a Category D Fluid Service piping system during a PT test. Which of the following statements is most accurate? a The weld is acceptable b. The PT test should be repeated c The welder should be requalified d. The PT test will not show this type of discontinuity from the outside The transmitted film density through the radiographic image of the body of the appropriate hole penetrameter and the area of interest shall be minimum for radiographs made with a gamma ray source. pyVo arom a b. G d. ITAC API 570 Practice Exam Spring - 2003 Page 23, 106. 107. 108. 109. 110. 111 ITAC Care should be taken not to during a pressure test. a allow any inert gas into the system b. —_use waterin the system & _ over-pressure the system d. —_under-pressure the system In evaluating blisters and laminations in piping, assessments should be performed in accordance with a APIRP 579, Section 7 b. API RP 2207, Section 2 c — API598, Section 1 d. ASME B16.5 An area defined by a circle having a diameter not greater than 2 inches for a line diameter not exceeding 10 inches, in which thickness readings may be averaged is: a TML b. WEMT. c Test point d. Averaging point The liquid penetrant examination method is an effective means for detecting _ a internal discontinuities of a weld b. surface discontinuities of a weld both internal and surface discontinuities of a weld d. ‘subsurface discontinuities of a weld To evaluate the effects of fire damage, an assessment should be performed in accordance with a APIRP 579, Section 11 b. API RP 2207, Section 2 G — API598, Section 1 d. ASME B16.5 The repair organization shall use welders and welding operators qualified in accordance with the code to which the piping was built or alternatively a ASME B 31.3 b. ASME Section V ec AWSD 1.4 d. API 1104 ITAC API 570 Practice Exam Spring - 2003 Page 24 112. 113. 114, 115. 116. 117. ITAC When an entire piping assembly is to be heat treated, but it will not fit into the fumace, what action should be taken? a Heat treat in more than one heat, with a 1' overlap b. Heat treat as much as possible and hardness test the untreated area ¢ Radiograph the untreated area d, MT the untreated area What is the maximum allowable deviation for the ammeter on each piece of magnetizing equipment? a 30% b. 10% ce 20% d. 15% A qualified welder may seal weld a threaded joint it a. the jointis leaking b. the joint has straight threads only & __thejointhas tapered threads only d. all exposed threads are cover Actively engaged as an authorized piping inspector shall be defined as a minimum of of time spent performing inspection activities. a 20% b. 30% & 40% d. 50% An inspector is evaluating a radiograph, a light image of a "B" appears on a darker background of the radiograph, the @ radiograph shall be considered unacceptable b. radiograph should not be rejected a “B" is for identification of the welder d. "B's for identification of the weld All piping system repair and alteration welding shall be done in accordance with: a ASME BPV IX b. ASME B31.G a API 570 d. The code to which the system was built ITAC API 570 Practice Exam Spring - 2003 Page 25 118. 119. 120. 121 122. 123. ITAC A piping system started with a wall thickness of .375 inches. Over a five year period the wall thickness is now .1 inch. Whatis the long term corrosion rate? a —_.055 inches per year b. 005 inches per year & ‘550 inches per year d. _ Notenough information given Given the above information, what is the short term corrosion rate of the above piping system? a .058 inches per year b. 005 inches per year 550 inches per year d. _ Notenough information given When testing cast iron pipe, which of the following methods should not be used? a. Radiographic test b. Leak test < Ultrasonic test d. Hammer test Lower levels of soil resistivity are: a _ Less corrosive than higher resistivity soils. b. More corrosive than higher resistivity soils. & Has noeffect on corrosion. d. More desirable because of increased electrolyte, When may welding not be performed? a Ifthe weld area is frosted or wet b. __ Ifthe weld area is above 120° F Ifthe weld area is in an inert atmosphere d. If the weld area is not in direct sunlight The minimum required pipe wall thickness or retirement thickness shall be based on Pressure, mechanical and structural considerations using the appropriate design formulae and. code allowable stress assumption stress nil-weight ductility stress CTOD stress aecp ITAC API 570 Practice Exam Spring - 2003 Page 26 124, nN 125. 126. 127. ~ 128. 129. ITAC The weld ripples of reinforcement of butt-welded joints shall be _ before radiography. a removed b. ground flush, with grinding direction parallel to the weld ground flush, with grinding direction perpendicular to the weld d. removed ifirregulanties mask discontinuities In lieu of the required heat treatment after welding, what may be used as an alternative? a —_Normalizing/annealing b. Quenching c Air Hardening d. Strain Harmonics A piping system has a corrosion rate of .074 inches per year; the actual wall thickness fs 370 inches and the minimum required thickness 1.1 inch, ‘What the remaining life a 36.48 years b. 364.8 years © 3.6 years d. 3.6 months The inspector shall approve all repair and alteration work at designated times, referred i SS cereeerteceeeee a hold points b. —_ work'stop points c inspection delay points d. inspector's discretion Who is authorized to make a tack weld? a Aqualified welder b. Ahelper G A fitter d. The welding foreman The acronym CUI refers to Corrosion Under Insulation Cold Under-ground In-service piping Corrosion Under Inside flow Carpet Under Infrastructure aecp ITAC API 570 Practice Exam Spring - 2003 Page 27 130. 131 132. 133, 134, 135. ITAC API570 was developed to provide for the inspection of in-service process piping. a. recommendations b. suggestions & general guidelines d. —_ anindustry standard During an MT examination, shall be performed on each area. a 100% coverage at the required sensitivity b. _accalibration of each piece of magnetizing equipment c at least three separate examinations d. prod spacing of at least 10° ‘An API authorized piping inspector certificate is valid for__ years from its date of issuance. aod b. 3 icuna5 d. unlimited Peening of the weld is prohibited on what part of the weld? a Root and final pass b. Intermediate passes & Along the toe of the weld d. Within 1" of the weld area The outside diameter of piping in high-temperature service, about 800°F, should be measured to check for a creep b. diameter enlargement c swelling d. internal product build-up A specialized valve generally used in erosive or high-temperature service is a valve. swing check b. slide c plug d. globe ITAC API 570 Practice Exam Spring - 2003 Page 28 136. 137. » 138. 139. 140. 141. 142. ITAC Cracks caused by vibration, thermal eyeing, thermal expansion problems and environmental cracking are considered a _in-service cracks b. material cracks a delayed cracks d. HAZ cracks Who has the responsibilty for qualifying welding procedures? a Each employer b. Each subcontractor c Eachwelder d. Each contractor ADC yoke shall have a lifting power of at least a Slbs. b. Bibs. © 10 Ibs. d 40 Ibs. The inspection of. is covered by API 570. a new construction b. _newtank construction & _ in-service piping d. in-service vessels Hammer testing of piping is a common practice; however, which of the following should never be hammered? a Castiron piping b. Caustic piping @ All welded piping d. Bothaand Aboveground piping is subject to atmospheric corrosion. What is buried piping subject to? a Erosion b. Anodic reaction c Soil electrolytes d. Soil corrosion When can welding procedures qualified by other than the employer be used? a When there is specific approval of the inspector b. When the job contract gives authorization & When the procedure is used only one time d, When the production weld is radiographed ITAC API 570 Practice Exam Spring - 2003 Page 29 143. 144. 145. 146. 147. 148. 149. ITAC The type of joints generally limited to piping in noneritical service NPS 2 and smaller is, a butt welded b. brazed c threaded d. clamped Welding repairs of cracks that occurred in-service should not be attempted without prior consultation with the a piping engineer b. inspector only c plant manager d. welding foreman The preferred medium for pneumatic testing of small lines or systems is ery b. water c inert gas d. hydrogen Without the benefit of an impact test, what is the minimum operating temperature for A-106 Grade B material used in a Category D Fluid Service? a 20°F b. -20°C ce 20°F di Or The valve used to automatically prevent backflow is, valve. a gate b. slide ce lobe d. Ball check All proposed methods of design, execution, materials, welding procedures, ‘examination and testing must be approved by the a __ inspector or piping engineer b. inspector only c plant manager d. new construction contracts In piping systems, the most easily detected problem during operation is pipe wall thickness pipe wall thinness pipe coating condition leaks aece ITAC API 570 Practice Exam Spring - 2003 Page 30 ITAC 150. The three well-known methods of determining soil resistivity are, soil bar, soll box and a AC Bridge b. six pin method c _ holiday pipe survey d. —_wenner (4-pin) method ITAC API 570 Practice Exam Spring - 2003 Page 31 = I T A C Inspection Training And Consulting Piping Inspection Course - With API 570 Exam Prep. Practice Exam Answer Key Prepared by: Ron VanArsdale Copyright by Inspection Training And Consulting, 2003, Inspection Training And Consulting API 570 Prep. Exam Answer Key 4. d_ (Pg. 7-1, Par. 7.2) API 570 Solution: Use formula 2SEVD 2.x 20.000 (1.0) .190 - (2 x.15)] Values added 2.375 40,000 X 1 X [190 - (.30)] Values added 2.375 Cannot subtract .30 from .190; s0 the answer is “<" 2b (Pg. 47, Par. 11.1) APIS74 t PD/2SE t 10.7 2 (13,900) (1) 12.900 27,800 46 (Pg. 9-2, Par. 9.2.7) API 570 (P9. 27, Par. Table T-276) ASME Sec V (Pg. 89, Par. QW/QB-422) ASME IX (Pg. 111, Table 24) ASME B16.5a (Po. 67, Table 330.1.1) ASME B31.3, (Pg. 7-1, Par. 7.2) API'570 olution: 2SEVD poosco 3. 4. 5. 6. 7. 8 Se (2 x 20,000) (1.0) |.280 - (2 x .10)] Value Substituted 20 £40,000) (.08) 20 3.200 20 160 9 a 10. b lige: t t (Pg. 9-2, Par, 9.2.7, Table 9-1) API570 (Pgs. 77-79, Table 341.3.2) ASME B31.3, (Pg. 47, Par.11.1 API574 PD2SE (25) (2.875) 2 (20,000) (1) t 7.875 40,000 t= 002" 120 — 20. (Pg. 78, Tbl. 941.32, Note (H)) ASME B31.3 13. (Pg. 85, Par. 345.4.2), ASME B31.3 SPST/S PT = 1.5 (100}(20.000) 10,800 PT = 3,000,000 10,800 PT =277.78 psi 14. a (Page 7-1, Par. 7.2) API 570 Solution: Use 2SEvD 6.625 (19,200) (.180) 6.625 3.456 6.625 MAWP = 521.66 or 522 psig 15. a (Pg. 49, Par. 323.3.2) ASME B31.3 16. d_ (Pg. 60, Par. 328.2.2(g) ASME 831.3 17. b__ (Pg. 196, Table E-1, Fig E-2) ASME B16.5a 18. a (Pg. 69-70, Table 331.1.1) ASME B31.3, 19. a _(P9.53, Fig. 7) ASME B16.5a (Pg. 142, Par. QW-452.1) ASME Sec IX 21. a (Pg. 6-3, Table 6-2) API 570 22. (Pg. 151, Par. Table QW-461.9) Sec IX 23. a (Pg. 72, Par. 332.4.1) ASME B31.3 24. a (Pg 7-1, Par7.2) API 570 Solution: Design Pressure/Temperature: 100 PSV/950°F Pipe Descript:: NPS 20 EFW (100% radiographed), 500" Wall, A-516 Grade 70, A-671 Outside Diameter of Pipe: 20 inches Allowable Stress: 4,500 psi Longitudinal Weld Efficiency: 1.0 Thickness Determined trom inspection: .370" Observed Corrosion Rate: .009 Next Planned Inspection: 5 years Estimated Corrosion By Next Inspection: .045 {TAC APIS7O Abb. Ara. Key, §:2008 Page| ITAC API 570 Prep. Exam Answer Key 29. a (Pg. 77, Table 341.3.2) ASME 831.3 =~ 30. a (Pg. 29, Par. T-285) ASME Sec. V 31. a (Pg. 69, Table 331.1.1) ASME B31.3 32. c (Pg. 69, Table 331.1.1) ASME B31.3 33. b (Pg. 15, Table 2) ASME B16.5a 34. c (Pg. 29, Table 2-2.5) ASME B16.5a 35. a (Pg. 66, Par. 330.1.4) ASME B31.3 MAWP = 2 (4,500)(1)(.28¢ 36. d (PQR and WPS: 20 37. b (PQR and WPS) MAWP = 2 (1260) 38. b (QW-451.1, Pg. 139) ASME Sec. IX 20 39. b (QW-451.1, Pg. 139) ASME Sec. IX 40 d_ (QW-451.1, Pg. 139) ASME Sec. IX MAWP = 2520 41. d (Pg. 31, Par. 3.12) API570 20 42. b (Pg. 47, Par. QW-300.3) ASME Sec IX 43, d-_ (PQ. ili, Forword) API 574 MAWP = 126 psi 44, a (Pg. 4, Par. 300.2(b) ASME 831.3 45. d- (Pg. 5-1, Par. 5.3.1) API570 25. b (Pg 7-1, Par 7.2) API 570 46. d (Pg. 33, Par. 10.1.2.2) API 574 Solution: 47. d= (Pg. 3-2, Par. 3.15) API 570 48. (Pg. 1-1, Par. 1.2.1) API570 Next Planned Inspection: 8 years 49. d_ (Pg. 34, Par. 311.2.4(a) ASME B31.3, Estimated Corrosion Loss by ~50. b (Pg. 151, Par. T-761) ASME Sec. V Next Inspection: 8x .009 = .072 51. dd (Apx. A Pg. A-1, Par. A.2) API 570 52. c (Pg. 6, Par. 300.2) ASME B31.3 MAWP = 2SEUD 53. a (Pg. 3-2, Par. 3.21) API 570 84. © (Pg, 22, Par. 1-233) ASME Seo V = 2(4,500)(1)1,970 - (2 x 072 35. (Pg. 12, Par. 301.6.1) ASME 831.3 20 56. a (Pg. 5-1, Par. 5.3.1) API570 57. d_ (Pg. 7-4, Par.7.6) API570 = = 144) 58. d (Pg. 5-3, Par. 5.3.3.1) API570 20 59. b (Pg. 9-2, Par. 92.7) API570 60. d (Pg. 8, Par. 4.3.3) API 574 = 2(4,500)(1)(.226) 61, b (Pg. 152, Par. T-762(b) ASME Sec V 20 62. b (Py. 5-5, Par. 5.3.9) API 570 — 63. a (Pg. 49, Par. QW-304) ASME Sec IX = 21917) 64. (P9.5-3, Par.5.3.3.1) APIS70, 20 65. b (Pg. 6-1, Par. 6.2.2) API570 66. ¢ (Pg. 1-1, Par. 1.9) API570 = 2034 67. a (Pg. 59, Par. 328.22) ASME B31.3 20 ——68. a (Pg. 65, Par. QW-410.9) ASME Sec. IX 69. (Pg. 5-7, Par.5.5.2) APL570 = 101.7 psi 70. d (Pg. 12, Par. 4.5.5) API 574 71. b (P9.9-2, Par. 9.2.6) API570 26. b (Pg. 7-1, Par. 7.2) API570 72 a (P9.5-9, Par. 5.9) API 570 27. a (Pgs. 69-70 Table 331.1.1) ASME B31.3.73 (Pg. 6, Par. QW-163) ASME Sec IX 28. a (Pg. 47, Par. 11.1) API574 74. a (Pg. 68, Par. 31.1.6) ASME B31.3 Solution: t= PD/2SE 75. (Pg. 8-1, Par. 8.1.3.1) API 570 76. a (Pg. 5-4, Par. 5.3.6) API570 oe 77. (Py. 56, Par. 5.4.4) APIS70 " 78. a (Pg. 71, Par. 331.2.3(a) ASME B31.3 t 3.024 79. b (Pg. 5-10, Par. 5.11) API570 27,520 80. b (Pg. 51, Par. QW-322.1(a) ASME IX 81. a (Pg. 8-3, Par. 8.3(a) API 570 t= 14" 82. b (Pg. 32, Par. 10.1.2.1) API574 IAC API 570 Abb. Ans. Key, $2008. Page 2 ITAC API 570 Prep. Exam Answer Key 83. b (Pg. 24, Par. T-275) ASME Sec. V 84. c (Pg. 5:6, Par. 5.6) API570 85. c (Pg. 6-1, Par. 6.2.1) API570 .375-.1 Values Substitued 86. b (Pg. 13, Par. QW-200.1(b) ASME IX 5 87. b (Pg.3, Par. 4.2) API 574 88. d (Pg. 75, Par. 340.4(b) ASME B31.3 S.T. Corrosion Rate: 0.06 89. a (Pg. 5-9, Par. 5.8) API570 90. a (Pg. 21, Par. T-223) ASME Sec. V. 120. d (Pg. 38, Par. 10.2.4) API 574 (Pg. 29, Par. T-284) ASME Sec. V 121, b (Pg. 9-1, Par. 9.1.4) API570 a1. a (Pg. 10, Par. QW-194) ASME Sec. IX. 122, a (Pg. 62, Par. 328.5.1(e) ASME B31.3 92. a (Pg. 6-1; Par. 6.2.3) API570 123. a (Pg. 7-2, Par. 7.3) API570 93. b (Pg. 36, Par. 10.2.1.5.3) API 574 124. d (Pg. 21, Par. T-222.2) ASME Sec V 94, a (Pg. 25, Par. T-277.1(a) ASME Sec. V 125. a (Pg. 71, Par. 331.2.1) ASME B31.3 95. a (Pg. 6-3, Table 6-1) API 570 126. c (Pg. 7-1, Par. 7.1.1) API 570) 96. a (Pg. 8-2, Par. 8.2.2.1) API 570 Solution: Use Remaining Lite Calculation 97. a (Pg. 49, Par. QW-304) ASME Sec IX 98. a (Pg. 47, Par. 11.1) API574 tactual -trequired 99. c¢ (Pg. 82, Par. 342.1) ASME B31.3 ‘corrosion rate 100. a (Pg. 7-2, Par. 7.3) API570 {inches (millimeters) per year] 101 c (Pg. 6, Par. 328.4.3(a)(1) ASME B31.3 102. 4 (Pg. 36, Par. 10.2.1.5.3) API574 370 103. a (Pg. 8-2, Par. 8.2.1) API570 ova Value Substivted 104. d (Pg. 77-79, Thi. 341.3.2) ASME B31.3 105. b (Pg. 28, Par. T-282.1) ASME Sec V Remaining life: 3.6 years 106. ¢ (Pg. 37, Par. 10.2.3) API 574 107. a (Pg. 7-2, Par. 7.4(b) API 570 427, @ (Pg. 8+1, Par. 8.1.2) API570 108. c (Pg. 3-3, Par. 3.48) API 570 128, a (Pg. 62, Par. 328.5.1(c) ASME B31.3 109. b |. 122, Par. T-600) ASME Sec V 429. a (PQ.5-3, Par, 5.3.3) API 570 410. a (Pg. 7-2, Par. 7.4.6) API 570 490. d (Pg. 19, Par. 5.4) API 574, 111. a (Pg. 8-2, Par. 8.2.1) API570 181. a (Pg. 134, Par. T-772) ASME Sec.V 112. a (Pg. 71, Par. 31.2.5) ASME B31.3 132, a (Pg.A-1 Par. A22) API570 113. b (Pg. 134, Par. T-761(c) ASME SecV 133, a (Pg, 62, Par. 328.5.1(d) ASME B31.3 114. G_ (Pg. 64, Par. 28.5.3) ASME 631.3 134. a (Pg, 36, Par. 10.2.1.8) API574 115. a (Pg. Act, Par. A5.2) API 570 135. b (P9.9, Par. 4.3.8) APIS74 116. a (Pg. 29, Par. T-284) ASME Sec. V 198. a (Pg. 8-1, Par. 8.1.2) API570 117. 6 (Pg. 8-2, Par. 82.1) API S70 197. a (PQ.59, Par. 328.2.2) ASME B31.3 118. a (Pg. 7-1, Par. 7.1.1) APL570 438. d (Pg. 134, Par. T-762(c) ASME Sec. V Solution: Use Long Term Corrosion Rate Calculation 439, ¢ (Pg, 4-1, Par. 1.1.1) API 570 140. d (Pg, 38, Par. 10.2.4) API 574 _____t initial -! actual 141, d_ (Pg. 9-1, Introduction) AP! 570 ‘time (yrs) between initial and 142. a (Pg. 59, Par. 28.2.2) ASME B31.3, actual inspections 143. ¢ (Pg. 11, Par. 4.5.2) API 574 444. a (Pg. 81, Par. 8.1.2) API570 SIS Values Substituted 445. ¢ (Pg. 37, Per.10.2.3) APIS74 5 148. (Pg. 80, Fig. 323.2.2) API B31.3. 147. d= (Pg. 9, Par. 4.3.8) API 574 LT Corrosion Rate: 0.06 148. a (Pg. 8-1, Par. 8.1.2) API 570 149. d (Pg. 30, Par. 10. 119. a (Pg. 7-1, Par. 7.1.1) API570 150. d (Pg. 38, Par. 10. Solution: Use Short Term Corrosion Rate Calculation ‘previous -! actual _ time (yrs) between previous and ‘actual inspections TAC APISTO Abb, Ans Key, $2008, Pape 3

You might also like