You are on page 1of 48

PRESUPUESTO

OBRA

: REHABILITACION DE LAGUNAS FACULTATIVAS EXISTENTES

PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE CASMA


FORMULA 01 : REHABILITACION DE LAGUNAS FACULTATIVAS EXISTENTES
LUGAR

: BUENA VISTA

DEPARTAMENTO : ANCASH

ITEM

COSTO AL : 30/01/2012

DESCRIPCION

UND

01.01.00

Excavacin de zanjas h=2.00mts. de profundidad y 0.90 mt. de ancho

Ml

01.04.00

Tubera PVC-UF de 200 mm S-25 C/ANILLO DE JEBE

Ml

01.01.01

Relleno compactado c/material propio en capas de 20 cm. c/compactador vibratorio

Ml

01.04.01

Pista de concreto e= 0.20, fc=210 kg/cm2

M2

01.04.01

Eliminacin Desmonte D= 5 Km.

M3

COSTO DIRECTO
Gastos Generales Fijos(5%)
Gastos Generales Variables (10%)
Utilidad (10%)

Sub Total
IGV

Total

METRADO

PRECIO

PARCIAL

TOTAL

UNIT

3,127.30

60.35

188,732.56

3,127.30

28.23

88,283.68

3,127.30

42.35

132,441.16

1,563.65

57.98

90,660.43

1,042.44

12.32

12,842.86

512,960.69

512,960.69
25,648.03
51,296.07
51,296.07

641,200.86
115,416.16

756,617.02

Partida

Unidad

Excavacin de zanjas h=2.00mts. de profundidad y 0.90 mt. de ancho


: Ml

Rendimiento :

I.U.

2.00 Ml/DIA

DESCRIPCIN

UND

CUADRILLA

CANTIDAD

PRECIO

MANO DE OBRA

47

CAPATAZ

HH

0.10

0.4000

18.6

47

PEON

HH

1.00

4.0000

12.51

5.0000

57.48

EQUIPO
37

HERRAMIENTAS MANUALES

%MO

Partida

Tubera PVC-UF de 200 mm S-25 C/ANILLO DE JEBE

Unidad

: Ml

Rendimiento :

I.U.

160.00 Ml/DIA

DESCRIPCIN

UND

CUADRILLA

CANTIDAD

PRECIO

MANO DE OBRA
47

CAPATAZ

HH

0.10

0.0050

18.6

47

OPERARIO

HH

1.00

0.0500

16.18

47

OFICIAL

HH

1.00

0.0500

13.88

47

PEON

HH

1.00

0.0500

12.51

MATERIALES
72

Tubera PVC-UF de 200 mm S-25 C/ANILLO DE JEBE x 6.00 ML

UND

0.1974

130

LUBRICANTE

GLN

0.0020

120

5.0000

2.22

EQUIPO
37

HERRAMIENTAS MANUALES

%MO

Partida

Relleno compactado c/material propio en capas de 20 cm. c/compactador vibrator

Unidad

: Ml

Rendimiento :

IU

25.00 Ml/DIA

DESCRIPCIN

UND

CUADRILLA

CANTIDAD

PRECIO

MANO DE OBRA

47

CAPATAZ

HH

0.40

0.1280

18.6

47

OFICIAL

HH

2.00

0.6400

13.88

47

PEON

HH

4.00

1.2800

12.51

MATERIALES

39

AGUA

M3

0.0400

7.00

EQUIPO
37

48

HERRAMIENTAS MANUALES

%MO

PLANCHA COMPACTADORA MANUAL 8HP, 300 KG

Partida

Unidad

HM

27.27

0.3200

42.00

Pista de concreto e= 0.20, fc=210 kg/cm2


: M2

Rendimiento :

IU

5.0000

70.00 M2/DIA

DESCRIPCIN

UND

CUADRILLA

CANTIDAD

PRECIO

MANO DE OBRA

47

CAPATAZ

HH

0.10

0.0114

18.6

47

OPERARIO

HH

2.00

0.2286

16.18

47

OFICIAL

HH

1.00

0.1143

13.88

47

PEON

HH

1.00

0.1143

12.51

MATERIALES

5
5
21
39

PIEDRA DE 1/2"

M3

0.1685

40.00

ARENA GRUESA

M3

0.1322

40.00

CEMENTO PORTLAND TIPO I (42.5KG)

BOL

1.8000

18.50

AGUA

M3

0.0480

7.00

EQUIPO
37

49
48

HERRAMIENTAS MANUALES

%MO

5.0000

6.93

VIBRADORA

HM

1.00

0.1143

14.00

MEZCLADORA CONCRETO TAMBOR 11P3 - 18HP HM

1.00

0.1143

30.00

Partida

Unidad

Eliminacin Desmonte D= 5 Km.


: M2

Rendimiento :

IU

350.00 M2/DIA

DESCRIPCIN

UND

CUADRILLA

CANTIDAD

PRECIO

MANO DE OBRA

47

CAPATAZ

HH

0.10

0.0023

18.6

47

PEON

HH

1.00

0.0200

12.51

3.0000

0.29

EQUIPO
37

49
48

HERRAMIENTAS MANUALES

%MO

CARGADOR FRONTAL SOBRE LLANTAS 2.5 m3 HM

1.00

0.0229

150.00

CAMIN VOLQUETE 6x4 DE 12 M3 275HP

3.00

0.0686

125.00

HM

dad y 0.90 mt. de ancho

P.U.

60.35

PARCIAL

SUB TOTAL

7.44
50.04

57.48

2.87
2.87

P.U.

28.23

PARCIAL

SUB TOTAL

0.09
0.81
0.69
0.63

2.22

25.66
0.24

25.90

0.11
-

0.11

as de 20 cm. c/compactador vibratorio

P.U.

42.35

PARCIAL

2.38

SUB TOTAL

18.6

8.88

13.88

16.01

27.27

0.28

0.28

1.36
13.44

P.U.

14.80

57.98

PARCIAL

SUB TOTAL

0.21
3.70
1.59
1.43

6.93

6.74
5.29
33.30
0.34

45.67

0.35
1.60
3.43

P.U.

5.38

12.32

PARCIAL

0.04

SUB TOTAL

12.51

16.18

0.25

0.29

0.01
3.44
8.58

12.03

PRESUPUESTO
OBRA

: REHABILITACION DE LAGUNAS FACULTATIVAS EXISTENTES

PROPIETARIO : MUNICIPALIDAD PROVINCIAL DE CASMA


FORMULA 01 : REHABILITACION DE LAGUNAS FACULTATIVAS EXISTENTES
LUGAR

: BUENA VISTA

ITEM

DEPARTAMENTO : ANCASH

DESCRIPCION

COSTO AL : 30/01/2013

UND

METRADO

PRECIO
UNIT

01.01.00

Excavacin de zanjas h=2.00mts. de profundidad y 0.90 mt. de anc

Ml

3,127.60

60.35

01.04.00

Tubera PVC-UF de 200 mm S-25 C/ANILLO DE JEBE

Ml

3,127.60

28.23

01.01.01

Relleno compactado c/material propio en capas de 20 cm. c/compact Ml

3,127.60

42.35

01.04.01

Pista de concreto e= 0.20, fc=210 kg/cm2

1,563.60

57.98

01.04.01

Eliminacin Desmonte D= 5 Km.

1,042.60

12.32

M2
M3

COSTO DIRECTO

117,989.77

Gastos Generales Fijos(3%)


Gastos Generales Variables (10%)
Utilidad (10%)

Sub Total
IGV

Total

K= 0.449 Jr/Jo

0.333333

11

8
0.026775

FORMULA POLINOMICA

PARCIAL

TOTAL

MANO DE
OBRA
47
M.O.

21

Tubera
PVC-UF

CEMENTO

05
PIEDRA
1/2"
ARENA

512,999.03

512,999.03

283,145.47

80,254.22

52,067.88

18,810.11

283,145.47

80,254.22

52,067.88

18,810.11

0.449

0.127

0.083

0.030

0.449

0.127

0.083

0.032

88,292.15
132,453.86
90,657.53

0.187

72

179,774.45
6,943.27
85,289.65
10,835.75
302.35

188,750.66

12,844.83

MATERIALES

80,254.22
52,067.88

18,810.11

15,389.97
51,299.90
51,299.90

630,988.80
113,577.98

744,566.78

0.115

0.083
0.032
0.115

72.17%
27.83%

449 Jr/Jo + 0.127 Tr/To + 0.115 CAr/CAo +0.122

3.66666667

298.786181 1792.71708683

EQUIPO Y HERRAMIENTAS
1

39

Lubricante

Agua

750.62
875.73
531.62

37

48
49
PLANCHAS
HERRAM_M
MEZCLADOR VIBRADORA
ANUALES
A
8,976.21
344.04
4,253.54
547.26
10.43

42,034.94
5,363.15
8,945.51

39
GG y UU

2,501.76
3,586.54

117,989.77
750.62

1,407.35

14,131.48

56,343.60

6,088.30

117,989.77

750.62

1,407.35

14,131.48

56,343.60

6,088.30

117,989.77

0.001

0.002

0.022

0.089

0.010

0.187

0.122

+0.122 Er/Eo +0.187 GGUr/GGUo

0.187

188,750.66
88,292.15
132,453.86
90,657.53
12,844.83

0.00
0.00
0.00
0.00
0.00

512,999.03

0.00

630,988.80
1.000
1.000

0.00

FORMULA POLINMICA

K= 0.449 Jr/Jo + 0.127 Tr/To + 0.115 C


MON

IU

47

MANO DE OBRA

17
21
43
03

BLOQUE Y LADRILLO

ACERO DE CONSTRUCCION

B
C
M
A

48

MAQUINARIA Y EQUIPO NACI

ME

39

INDICE GENERAL DE PRECIO

GGU

3
4

ELEMENTO

SIMB

CEMENTO PORTLAND TIPO I


MADERA NACIONAL PARA ENCO

0.727
0.051

0.055

COEFICIENTE DE REAJUSTE MENSUAL (K)

Zona 04:

La obra se incia el 01 de Junio del 2015


731,357.90 Sin I.G.V

Se le otorga del Adelanto el 03 de Junio del 2015


A.Directo 10%

VALORIZACION 1

73,135.79 Sin I.G.V


VALORIZACION MES DE JUNIO 2015
38,575.30 Sin I.G.V

REAJUSTE:
V
Kreal
R:
VALORIZACION BRUTA

K real

1.004
38,575.30
1.004
154.3012
38,729.60

0.167
1.000

Tacna

M.Contratado

COEF

AMORTIZACION
V
A.D
A.M.:

38,575.30
10%
3857.53

DEDUCCIONES
Ka
Kreal(v)
A.D.
M.C:
V:
D:
VALORIZACION NETA
IGV 18%
V. A PAGAR AL CONTRA.

1.005
1.004
73,135.79
731,357.90
38,575.30
-3.8383383085
34,875.91
6277.6637168955
41,153.57

D=(A.D.)/C V(K/K

ULA POLINMICA

7 Tr/To + 0.115 CAr/CAo +0.122 Er/Eo +0.187 GGU


Oct-14

Io

Jun-15
Ir

Jul-15
K

Ir

100.000%

523.70

523.15

0.726

523.15

0.726

11.765%
58.863%
31.373%
49.091%

840.58

858.34

0.006

853.64

0.006

423.83

423.83

0.030

423.83

0.030

622.21

609.65

0.016 612.29

0.016

491.87

496.56

0.027

458.09

0.025

50.909%

343.61

356.20

0.029

357.00

0.029

100.000%

404.55

415.20

0.171

417.07

0.172

K=

1.005

1.004

D=(A.D.)/C V(K/Ka -1)

VALORIZACION DE OBRA
OBRA
VIVENDA UNIFAMILIA
FECHA
:

+0.187 GGUr/GGUo

CONTRATISTA

PARTIDA

DESCRIPCIN

01

MOVIMIENTO DE TIERRAS

01.01.

NIVELACION DE TERRENO

01.01.01

Nivelacion

01.02.

EXCAVACIONES

01.02.01

EXCAVACIONES SIMPLES

01.02.01.01

Excavacion de Cisterna

01.02.01.02

Excavacion de Zanjas

01.03.

RELLENOS

01.03.01

Relleno y compactado con materia

01.04.

NIVELACION INTERIOR Y APIS

1.05

ELIMINACION DE MATERIAL E

OBRAS DE CONCRETO SIMPLE

02.01.

CIMIENTO CORRIDO 1:10 +30% P

02.02.

SOLADO 1:12

02.03.

SOBRECIMIENTOS

02.03.01

Concreto Mezcla 1:8 +25% PG < 3

02.03.02

Encofrado y Desencofrado

02.04.

FALSO PISO

CONCRETO ARMADO

03.01.

ZAPATAS

03.01.01

Concreto en zapatas f'c=210 kg/c

03.01.02

ACERO GRADO 60 EN ZAPATAS

03.02.

VIGAS DE CIMENTACION

03.02.01

Concreto vigas de cimentacin f'

03.02.02

Encofrado y Desencofrado de viga

03.02.03

ACERO GRADO 60 EN VIGAS D

03.03.

COLUMNAS

03.03.01

Concreto en columnas f'c=210 kg

03.03.02

Encofradoy desencofrado

03.03.03

ACERO GRADO 60 EN COLUMN

03.04.

VIGAS

03.04.01

Concreto en Vigas f'c=210 kg/cm2

03.04.02

Encofrado y desencofrado

03.04.03

ACERO GRADO 60 EN VIGAS

03.05.

LOSA ALIGERADA E=0.20

03.05.01

Concreto f'c= 210 kg/cm2

03.05.02

Encofrado y desencofrado

03.05.03

Ladrillo 30 x 30 x 15

03.05.04

ACERO GRADO 60 EN LOSA AL

03.06.

ESCALERAS

03.06.01

Concreto en Escaleras fc=210 kg

03.06.02

Encofrado Y Desencofrado

03.06.03

ACERO GRADO 60 EN ESCALE

03.07.

CISTERNAS SUBTERRANEAS

03.07.01

Concreto f'c=210 kg/cm2

03.07.02

Encofrado Y Desencofrado

03.07.03

ACERO GRADO 60 EN CISTER

COSTO DIRECTO

PORCENTAJE DE AVANCE

COSTO DIRECTO
GASTOS GENERALES FIJOS 5%
GASTOS GENERALES VARIABL
UTILIDAD 5%
SUBTOTAL
IGV 18%
PRESUPUESTO TOTAL

VALORIZACION DE OBR

N DE OBRA
ENDA UNIFAMILIAR

UND

PRESUPUESTO BASE
P.UNIT.
METRADO

S/.

PRESUP.

ANTERIOR

S/.

METRADO

m2

144.38

0.56

80.85

0.00

m3

37.5

21.00

787.50

0.00

m3

73.17

21.00

1,536.57

0.00

m3
m2
m3

13.54
144.38
97.13

27.21
3.76
16.49

368.42
542.87
1,601.67

0.00
0.00
0.00

m3
m2

24.12
29.82

155.38
20.14

3,747.77
600.57

0.00
0.00

m3
m2
m2

4.04
65.44
102.98

220.53
38.02
24.63

890.94
2,488.03
2,536.40

0.00
0.00
0.00

m3
kg

8.88
153.16

287.09
4.13

2,549.36
632.55

0.00
0.00

m3
m2
kg

1.19
11.86
249.58

301.50
38.02
4.13

358.79
450.92
1,030.77

0.00
0.00
0.00

m3
m2
kg

7.44
141.97
1,318.00

358.37
38.02
4.13

2,666.27
5,397.70
5,443.34

0.00
0.00
0.00

TO SIMPLE

m3
m2
kg

12.67
78.99
1,746.28

297.24
38.02
4.13

3,766.03
3,003.20
7,212.14

0.00
0.00
0.00

m3
m2
m3
kg

14.44
165.05
1,375.36
811.2

293.09
38.02
304.49
4.13

4,232.22
6,275.20
418,783.37
3,350.26

0.00
0.00
0.00
0.00

m3
m2
kg

3.17
23.55
305.95

300.09
38.02
4.13

951.29
895.37
1,263.57

0.00
0.00
0.00

m3
m2
kg

2.42
36.31
294.44

418.40
38.02
4.13

1,012.53
1,380.51
1,216.04

0.00
0.00
0.00

STO DIRECTO

CENTAJE DE AVANCE % A

TO DIRECTO
TOS GENERALES FIJOS 5%
TOS GENERALES VARIABLES 10%

SUPUESTO TOTAL

487,053.02
100.00%
487,053.02
24,352.65
48,705.30
24,352.65
584,463.62
105,203.45
============
689,667.07

ACION DE OBRA N 01

AVANCES
ACTUAL

ANTERIOR
VALOR S/.

METRADO

VALOR S/.

ACUMULADO
METRADO

VALOR S/.

0.00

144.38

80.85

144.38

80.85

100.00%

0.00

37.50

787.50

37.50

787.50

100.00%

0.00

73.17

1,536.57

73.17

1,536.57

100.00%

0.00
0.00
0.00

8.74
110.34
80.23

237.82
414.88
1,322.99

8.74
110.34
80.23

237.82
414.88
1,322.99

64.55%
76.42%
82.60%

0.00
0.00

19.60
29.82

3,045.45
600.57

19.60
29.82

3,045.45
600.57

81.26%
100.00%

0.00
0.00
0.00

0.00
65.44
0.00

0.00
2,488.03
0.00

0.00
65.44
0.00

0.00
2,488.03
0.00

0.00%
100.00%
0.00%

0.00
0.00

8.88
153.16

2,549.36
632.55

8.88
153.16

2,549.36
632.55

100.00%
100.00%

0.00
0.00
0.00

1.19
11.86
249.58

358.79
450.92
1,030.77

1.19
11.86
249.58

358.79
450.92
1,030.77

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
141.97
1318.00

0.00
5,397.70
5,443.34

0.00
141.97
1,318.00

0.00
5,397.70
5,443.34

0.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00%
0.00%
0.00%
0.00%

0.00
0.00
0.00

0.00
23.55
305.95

0.00
895.37
1,263.57

0.00
23.55
305.95

0.00
895.37
1,263.57

0.00%
100.00%
100.00%

0.00
0.00
0.00

2.42
36.31
294.44

1,012.53
1,380.51
1,216.04

2.42
36.31
294.44

1,012.53
1,380.51
1,216.04

100.00%
100.00%
100.00%

0.00
0.00%

32,146.09
6.60%
32,146.09
1,607.30
3,214.61
1,607.30
38,575.30
6,943.55
============
45,518.85

32,146.09
6.60%
32,146.09
1,607.30
3,214.61
1,607.30
38,575.30
6,943.55
============
45,518.85

SALDOS
METRADO

VALOR S/.

PROGRAMADO
%

METRADO

VALOR S/.

0.00

0.00

0.00%

144.38

80.85

0.00

0.00

0.00%

37.5

787.50

0.00

0.00

0.00%

73.17

1,536.57

4.80
34.04
16.90

130.61
127.99
278.68

35.45%
23.58%
17.40%

13.54
144.38
97.13

368.42
542.87
1,601.67

4.52
0.00

702.32
0.00

18.74%
0.00%

24.12
29.82

3,747.77
600.57

4.04
0.00
102.98

890.94
0.00
2,536.40

100.00%
0.00%
100.00%

4.04
65.44
0.00

890.94
2,488.03
0.00

0.00
0.00

0.00
0.00

0.00%
0.00%

8.88
153.16

2,549.36
632.55

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

1.19
11.86
249.58

358.79
450.92
1,030.77

7.44
0.00
0.00

2,666.27
0.00
0.00

100.00%
0.00%
0.00%

7.44
141.97
1,318.00

2,666.27
5,397.70
5,443.34

12.67
78.99
1,746.28

3,766.03
3,003.20
7,212.14

100.00%
100.00%
100.00%

0.00
0.00
0.00

0.00
0.00
0.00

14.44
165.05
1,375.36
811.20

4,232.22
6,275.20
418,783.37
3,350.26

100.00%
100.00%
100.00%
100.00%

0.00
0.00
0.00
0.00

0.00
0.00
0.00
0.00

3.17
0.00
0.00

951.29
0.00
0.00

100.00%
0.00%
0.00%

0.00
23.55
305.95

0.00
895.37
1,263.57

0.00
0.00
0.00

0.00
0.00
0.00

0.00%
0.00%
0.00%

2.42
36.31
294.44

1,012.53
1,380.51
1,216.04

454,906.90
93.40%

36,942.88
8.10%

RESOLUCIN JEFATURAL N 329-2014-INEI


NDICES UNIFICADOS DE PRECIOS DEL MES DE OCTUBRE DEL 2014
REAS GEOGRFICAS
(Base : Julio 1992 = 100,0)

Cod.
01
03
05
07
09
11
13
17
19
21
23
27
31
33
37
39
41
43
45
49
51
53
55
57
59
61
65
69
71
73
77

1
827,20
491,87
442,41
618,10
259,32
214,31
1704,06
573,76
696,38
450,85
381,72
627,41
380,34
749,88
291,93
404,55
375,02
662,20
312,05
47 523,70
259,41
313,49
875,55
491,78
370,49
205,41
266,17
247,72
389,45
576,94
487,11
289,86

2
827,20
491,87
217,20
618,10
259,32
214,31
1704,06
667,13
696,38
354,05
381,72
627,41
380,34
749,88
291,93
404,55
375,02
586,19
312,05
523,70
259,41
313,49
875,55
491,78
370,49
205,41
266,17
247,72
327,82
576,94
487,11
289,86

3
827,20
491,87
394,56
618,10
259,32
214,31
1704,06
756,04
696,38
375,64
381,72
627,41
380,34
749,88
291,93
404,55
375,02
791,51
312,05
523,70
259,41
313,49
875,55
491,78
370,49
205,41
266,17
247,72
428,87
576,94
487,11
289,86

E OCTUBRE DEL 2014

Oct-14

4
827,20
491,87
612,92
618,10
259,32
214,31
1704,06
840,58
696,38
423,83
381,72
627,41
380,34
749,88
291,93
404,55
375,02
622,21
312,05
523,70
259,41
313,49
875,55
491,78
370,49
205,41
266,17
247,72
499,94
576,94
487,11
289,86

5
827,20
491,87
(*)
618,10
259,32
214,31
1704,06
695,10
696,38
375,64
381,72
627,41
380,34
749,88
291,93
404,55
375,02
806,95
312,05
523,70
259,41
313,49
875,55
491,78
370,49
205,41
266,17
247,72
269,39
576,94
487,11
289,86

6
827,20
491,87
654,09
618,10
259,32
214,31
1704,06
832,12
696,38
410,96
381,72
627,41
380,34
749,88
291,93
404,55
375,02
869,84
312,05
523,70
259,41
313,49
875,55
491,78
370,49
205,41
266,17
247,72
462,80
576,94
487,11
289,86

Cod.
02
04
06
08
10
12
14
16
18
20
22
24
26
28
30
32
34
38
40
42
44
46
48
50
52
54
56
60
62
64
66
68
70
72
78
80

1
498,06
525,43
834,53
822,98
386,96
307,74
268,85
352,48
284,55
2010,06
367,30
244,16
356,87
548,89
403,12
468,49
580,69
415,82
367,06
258,98
349,64
477,81
343,61
619,59
288,03
372,85
472,63
295,99
424,65
319,97
572,20
247,55
218,25
382,85
449,12
105,48

2
498,06
814,45
834,53
822,98
386,96
307,74
268,85
352,48
284,55
2010,06
367,30
244,16
356,87
548,89
403,12
468,49
580,69
913,06
390,18
258,98
349,64
477,81
343,61
619,59
288,03
372,85
472,63
295,99
424,65
319,97
572,20
247,55
218,25
382,85
449,12
105,48

RESOLUCIN JEFATURAL N 2

NDICES UNIFICADOS DE PRE


REAS GEOGRFIC
(Base : Julio 1992 = 100,0)

3
498,06
1007,57
834,53
822,98
386,96
307,74
268,85
352,48
284,55
2010,06
367,30
244,16
356,87
548,89
403,12
468,49
580,69
854,11
428,21
258,98
349,64
477,81
343,61
619,59
288,03
372,85
472,63
295,99
424,65
319,97
572,20
247,55
218,25
382,85
449,12
105,48

4
498,06
562,57
834,53
822,98
386,96
307,74
268,85
352,48
284,55
2010,06
367,30
244,16
356,87
532,29
403,12
468,49
580,69
542,54
294,62
258,98
349,64
477,81
343,61
619,59
288,03
372,85
472,63
295,99
424,65
319,97
572,20
247,55
218,25
382,85
449,12
105,48

5
498,06
322,41
834,53
822,98
386,96
307,74
268,85
352,48
284,55
2010,06
367,30
244,16
356,87
548,89
403,12
468,49
580,69
(*)
272,89
258,98
349,64
477,81
343,61
619,59
288,03
372,85
472,63
295,99
424,65
319,97
572,20
247,55
218,25
382,85
449,12
105,48

6
498,06
770,88
834,53
822,98
386,96
307,74
268,85
352,48
284,55
2010,06
367,30
244,16
356,87
548,89
403,12
468,49
580,69
678,40
331,41
258,98
349,64
477,81
343,61
619,59
288,03
372,85
472,63
295,99
424,65
319,97
572,20
247,55
218,25
382,85
449,12
105,48

Cod.
01
03
05
07
09
11
13
17
19
21
23
27
31
33
37
39
41
43
45
47
49
51
53
55
57
59
61
65
69
71
73
77

Jun-15

OLUCIN JEFATURAL N 255-2015-INEI

CES UNIFICADOS DE PRECIOS DEL MES DE JUNIO DEL 2015


EAS GEOGRFICAS
e : Julio 1992 = 100,0)

1
843.04
496.56
444.72
634.68
273.13
230.94
1396.39
580.34
725.03
460.35
395.70
682.46
398.91
804.16
299.68
415.20
380.09
677.84
311.27
523.15
283.41
292.14
644.41
481.80
341.48
223.78
259.86
238.62
389.45
627.55
528.07
297.82

2
843.04
496.56
219.12
634.68
273.13
230.94
1396.39
674.69
725.03
367.31
395.70
682.46
398.91
804.16
299.68
415.20
380.09
604.62
311.27
523.15
283.41
292.14
644.41
481.80
341.48
223.78
259.86
238.62
327.82
627.55
528.07
297.82

3
843.04
496.56
401.55
634.68
273.13
230.94
1396.39
745.27
725.03
389.65
395.70
682.46
398.91
804.16
299.68
415.20
380.09
810.32
311.27
523.15
283.41
292.14
644.41
481.80
341.48
223.78
259.86
238.62
428.87
627.55
528.07
297.82

4
843.04
496.56
608.30
634.68
273.13
230.94
1396.39
858.34
725.03
423.83
395.70
682.46
398.91
804.16
299.68
415.20
380.09
609.65
311.27
523.15
283.41
292.14
644.41
481.80
341.48
223.78
259.86
238.62
507.56
627.55
528.07
297.82

5
843.04
496.56
(*)
634.68
273.13
230.94
1396.39
702.59
725.03
389.65
395.70
682.46
398.91
804.16
299.68
415.20
380.09
873.19
311.27
523.15
283.41
292.14
644.41
481.80
341.48
223.78
259.86
238.62
269.39
627.55
528.07
297.82

6
843.04
496.56
661.04
634.68
273.13
230.94
1396.39
863.03
725.03
410.96
395.70
682.46
398.91
804.16
299.68
415.20
380.09
854.07
311.27
523.15
283.41
292.14
644.41
481.80
341.48
223.78
259.86
238.62
462.80
627.55
528.07
297.82

Cod.
02
04
06
08
10
12
14
16
18
20
22
24
26
28
30
32
34
38
40
42
44
46
48
50
52
54
56
60
62
64
66
68
70
72
78
80

1
502.54
521.08
874.97
852.27
395.77
326.97
269.48
352.48
296.80
1668.48
367.30
245.14
359.96
582.45
438.07
466.15
482.40
414.95
377.79
276.83
354.85
493.70
356.20
674.00
299.05
376.21
423.73
295.99
442.99
319.97
630.87
244.10
218.25
403.95
468.41
105.50

2
502.54
904.70
874.97
852.27
395.77
326.97
269.48
352.48
296.80
1668.48
367.30
245.14
359.96
582.45
438.07
466.15
482.40
969.03
390.18
276.83
354.85
493.70
356.20
674.00
299.05
376.21
423.73
295.99
442.99
319.97
630.87
244.10
218.25
403.95
468.41
105.50

3
502.54
1029.53
874.97
852.27
395.77
326.97
269.48
352.48
296.80
1668.48
367.30
245.14
359.96
582.45
438.07
466.15
482.40
865.62
436.06
276.83
354.85
493.70
356.20
674.00
299.05
376.21
423.73
295.99
442.99
319.97
630.87
244.10
218.25
403.95
468.41
105.50

4
502.54
595.76
874.97
852.27
395.77
326.97
269.48
352.48
296.80
1668.48
367.30
245.14
359.96
565.01
438.07
466.15
482.40
578.32
306.71
276.83
354.85
493.70
356.20
674.00
299.05
376.21
423.73
295.99
442.99
319.97
630.87
244.10
218.25
403.95
468.41
105.50

5
502.54
322.41
874.97
852.27
395.77
326.97
269.48
352.48
296.80
1668.48
367.30
245.14
359.96
582.45
438.07
466.15
482.40
(*)
272.89
276.83
354.85
493.70
356.20
674.00
299.05
376.21
423.73
295.99
442.99
319.97
630.87
244.10
218.25
403.95
468.41
105.50

RESOLUCIN JEFATURAL N 305-2015-INEI


NDICES UNIFICADOS DE PRECIOS DEL MES DE JULIO DEL 2015
REAS GEOGRFICAS
(Base : Julio 1992 = 100,0)

6
502.54
773.07
874.97
852.27
395.77
326.97
269.48
352.48
296.80
1668.48
367.30
245.14
359.96
582.45
438.07
466.15
482.40
683.94
331.41
276.83
354.85
493.70
356.20
674.00
299.05
376.21
423.73
295.99
442.99
319.97
630.87
244.10
218.25
403.95
468.41
105.50

Cod.
01
03
05
07
09
11
13
17
19
21
23
27
31
33
37
39
41
43
45
49
51
53
55
57
59
61
65
69
71
73
77

1
843.89
458.09
445.44
616.32
254.25
232.16
1396.39
579.38
683.83
459.40
395.70
686.98
399.30
808.31
298.50
417.07
382.26
680.84
312.13
47 523.15
285.08
284.78
643.75
503.15
336.28
224.01
241.53
234.32
389.45
631.72
531.03
298.99

2
843.89
458.09
219.12
616.32
254.25
232.16
1396.39
670.56
683.83
367.31
395.70
686.98
399.30
808.31
298.50
417.07
382.26
608.33
312.13
523.15
285.08
284.78
643.75
503.15
336.28
224.01
241.53
234.32
327.82
631.72
531.03
298.99

3
843.89
458.09
402.57
616.32
254.25
232.16
1396.39
745.53
683.83
389.65
395.70
686.98
399.30
808.31
298.50
417.07
382.26
808.03
312.13
523.15
285.08
284.78
643.75
503.15
336.28
224.01
241.53
234.32
428.87
631.72
531.03
298.99

(*) Sin Produccin.


Nota: El cuadro incluye los ndices unificados de cdigo: 30, 34, 39, 47
Resolucin Jefatural N 283-2015-INEI.

E JULIO DEL 2015

4
843.89
458.09
610.04
616.32
254.25
232.16
1396.39
853.64
683.83
423.83
395.70
686.98
399.30
808.31
298.50
417.07
382.26
612.29
312.13
523.15
285.08
284.78
643.75
503.15
336.28
224.01
241.53
234.32
507.56
631.72
531.03
298.99

5
843.89
458.09
(*)
616.32
254.25
232.16
1396.39
702.59
683.83
389.65
395.70
686.98
399.30
808.31
298.50
417.07
382.26
868.21
312.13
523.15
285.08
284.78
643.75
503.15
336.28
224.01
241.53
234.32
269.39
631.72
531.03
298.99

6
843.89
458.09
658.61
616.32
254.25
232.16
1396.39
860.50
683.83
410.96
395.70
686.98
399.30
808.31
298.50
417.07
382.26
860.56
312.13
523.15
285.08
284.78
643.75
503.15
336.28
224.01
241.53
234.32
462.80
631.72
531.03
298.99

Cod.
02
04
06
08
10
12
14
16
18
20
22
24
26
28
30
32
34
38
40
42
44
46
48
50
52
54
56
60
62
64
66
68
70
72
78
80

1
460.88
524.14
852.29
800.86
398.14
328.57
269.48
352.48
289.74
1659.99
367.30
244.63
360.82
586.32
442.52
466.15
486.71
417.84
377.79
277.84
356.08
495.13
357.00
678.46
300.06
376.21
415.57
295.99
443.93
319.97
635.06
245.97
218.25
405.28
469.94
105.76

de cdigo: 30, 34, 39, 47, 49 y 53 que fueron aprobados mediante

2
460.88
899.81
852.29
800.86
398.14
328.57
269.48
352.48
289.74
1659.99
367.30
244.63
360.82
586.32
442.52
466.15
486.71
965.91
391.20
277.84
356.08
495.13
357.00
678.46
300.06
376.21
415.57
295.99
443.93
319.97
635.06
245.97
218.25
405.28
469.94
105.76

3
460.88
1028.72
852.29
800.86
398.14
328.57
269.48
352.48
289.74
1659.99
367.30
244.63
360.82
586.32
442.52
466.15
486.71
870.71
436.06
277.84
356.08
495.13
357.00
678.46
300.06
376.21
415.57
295.99
443.93
319.97
635.06
245.97
218.25
405.28
469.94
105.76

4
460.88
599.12
852.29
800.86
398.14
328.57
269.48
352.48
289.74
1659.99
367.30
244.63
360.82
569.22
442.52
466.15
486.71
580.77
306.71
277.84
356.08
495.13
357.00
678.46
300.06
376.21
415.57
295.99
443.93
319.97
635.06
245.97
218.25
405.28
469.94
105.76

5
460.88
322.41
852.29
800.86
398.14
328.57
269.48
352.48
289.74
1659.99
367.30
244.63
360.82
586.32
442.52
466.15
486.71
(*)
272.89
277.84
356.08
495.13
357.00
678.46
300.06
376.21
415.57
295.99
443.93
319.97
635.06
245.97
218.25
405.28
469.94
105.76

6
460.88
772.94
852.29
800.86
398.14
328.57
269.48
352.48
289.74
1659.99
367.30
244.63
360.82
586.32
442.52
466.15
486.71
681.72
331.41
277.84
356.08
495.13
357.00
678.46
300.06
376.21
415.57
295.99
443.93
319.97
635.06
245.97
218.25
405.28
469.94
105.76

Capataz

S/. 18.60

Operario

S/. 16.18

Oficial

S/. 13.88

Pen

S/. 12.51

Excavacin de Zanja h=2.00mts. Rendimiento de 2.0 ml/da cuadrilla 0.1 cap + 1 pen

Partida

Tubera PVC-UF de 200 mm S-25 C/ANI

Rendimiento
I.U.

L/190 M/DIA

Costo unitario directo por : ML

Descripcin Insumo Unidad adrilla antidad Precio

Parcial

Mano de Obra
47

CAPATAZ

HH

0.1

47

OPERARIO

HH

47

OFICIAL

HH

47

PEON

HH

Materiales
72

UND C/ANILLO DE 0.1974


TUBERA PVC-UF de 200 mm S-25

130

LUBRICANTE

120

GLN

0.002

HERRAMIENTAS MANUALE %MO

Equipos
37

Partida

RELLENO CON MATERIAL PROPIO

Rend.

L/1100 ML/DIA

I.U.

Descripcin Insumo

Unidad

Mano de Obra
47

CAPATAZ

HH

47

OFICIAL

HH

47

PEON

HH

Materiales
30

AGUA

M3

Equipos
37

HERRAMIENTAS MANUALES

49

PLANCHA COMPACTADORA MANUAL 8HP, 300 KG

%MO
HM

Partida

PAVIMENTO RIGIDO E = 0.20 M. CONCRETO F'C=210 KG/CM2

Rend.

L/360 M2/DIA
I.U.

Descripcin Insumo

Costo unitario directo


Unidad

Mano de Obra
47

CAPATAZ

HH

47

OPERARIO

HH

47

OFICIAL

HH

47

PEON

HH

Materiales
5

PIEDRA DE 1/2"

M3

ARENA GRUESA

M3

21

CEMENTO PORTLAND TIPO I (42.5KG)

BOL

30

AGUA

M3

Equipos
37

HERRAMIENTAS MANUALES

49

VIBRADOR DE CONCRETO 4 HP 2.40"

HM

48

MEZCLADORA CONCRETO TAMBOR 18HP 11P3

HM

ELIMINACIN DE DESMONTE D= 5Km.

Partida
Rendimiento

. M3/DIA
I.U.

Descripcin Insumo
Mano de Obra

47

CAPATAZ

47

PEON
Equipos

37

HERRAMIENTAS MANUALES

49

CARGADOR FRONTAL SOBRE LLANTAS 2.5 m3 150HP

48

CAMIN VOLQUETE 6x4 DE 12 M3 275HP

%MO

Cuad

Cuadrilla

Cantidad

Precio

0.04

0.4
2
4

5
1

42

Costo unitario directo por : M2


Cuadrilla

Cantidad

Precio

0.1685

40

0.1322

40

1.8

18.5

0.048

0.1
2
1
1

5
1

14

30

Unidad

Cuadrilla

HH

0.1

HH

%MO

Cantidad

0.002

HM

HM

Parcial

Costo unitario directo por : ML


Parcial

Parcial

Costo unitario directo por: M3.


Precio

150
125

Parcial

You might also like