Professional Documents
Culture Documents
93CC212
93FA047
93GB70001
93GB70002
93GB70003
96BC0469
S36A389
MCBB0524
17CB001
31BD003
93DB083
93GB012
93GB025
93GB20001
96FC151
MCHQU27
01AB002
02AC001
03BA010
03CA003
40DA035
40DB024
40IA001
DESCRIPCION
UNID
CANTIDAD
PRECIO
UNITARIO
Bs
MITIGACION AMBIENTAL SB
CINTA PLASTICA DE SEGURIDAD
LETRINA
PASOS PEATONALES
SEALIZACION DE SEGURIDAD DE MADERA
SEALIZACION DE SEGURIDAD DE PVC
LIMPIEZA GENERAL
CONTENEDORES DE BASURA
ML
PZA
PZA
PZA
PZA
GLB
PZA
800.00
1.07
1.00
1,479.86
4.00
117.67
10.00
352.57
15.00
229.88
1.00
2,194.61
3.00
245.39
Costo Modulo
MEJORAMIENTO DE TANQUE
PINTURA AL ACEITE SOBRE CARPINTERIA METALICA
ESCALERA METALICA
ACCESORIOS TANQUE ALMACENAMIENTO
MEDIDOR DE NIVELES TANQUES DE H20
PINTURA LATEX
IMPERMEABILIZACION DE TANQUE C/SIKA TOP
LIMPIEZA DE TANQUE
M2
ML
GLB
GLB
M2
M2
GLB
2.10
134.03
3.00
288.72
1.00
6,339.97
1.00
1,602.86
360.00
30.78
356.50
93.14
1.00
276.18
Costo Modulo
MEJORAMIENTO RED
REPLANTEO Y CONTROL DE TUBERIAS
EXCAVACION DE 0-2 M SUELO SEMIDURO
RELLENO MANUAL CON TIERRA CERNIDA(SIN MATERIAL DE
RELLENO Y COMPACTADO (TIERRA COMUN)
PROV. Y TENDIDO TUBERIA PVC 2 PULG -CLASE 9 (ESPIG
PROV.Y TENDIDO TUBERIA PVC 1 1/2PULG-CLASE 9(JU
PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.
ML
M3
M3
M3
ML
ML
ML
2411.00
1446.60
940.29
506.31
1314.00
1097.00
2411.00
1.02
40.73
35.67
25.21
18.53
14.57
0.20
40JA001
93FB395
93GB201
96CC185
ML
PZA
GLB
PZA
2411.00
0.29
54.00
1,199.30
1.00
5,325.87
112.00
722.35
Costo Modulo
MLPZ5002
RED DE DISTRIBUCION
01AB002
REPLANTEO Y CONTROL DE TUBERIAS
02AC001
EXCAVACION DE 0-2 M SUELO SEMIDURO
03BA010
RELLENO MANUAL CON TIERRA CERNIDA(SIN MATERIAL DE
03CA003
RELLENO Y COMPACTADO (TIERRA COMUN)
40DA003 PROV. Y TENDIDO TUBERIA PVC 1 PULG - ESQ.40 (ESPIG
40DA004 PROV. Y TENDIDO TUBERIA PVC 1 1/2 PULG -ESQ.40 (ES
40DA035 PROV. Y TENDIDO TUBERIA PVC 2 PULG -CLASE 9 (ESPIG
40DA036 PROV. Y TENDIDO TUBERIA PVC 2 1/2 PULG - CLASE 9 (
40DA037 PROV. Y TENDIDO TUBERIA PVC 3 PULG - CLASE 9 (ESPI
40DA038 PROV. Y TENDIDO TUBERIA PVC 4 PULG - CLASE 9 ( ESP
40IA001
PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.
40JA001
DESINFECCION DE TUBERIAS (HASTA D = 4 PULG )
41BC025
PEDESTAL Y BASE PARA PILETA H?A?
42BC008
CAMARA DE LLAVES
93BC1007 ACCESORIO RED DE DISTRIBUCION
93BC15000 PASO DE QUEBRADA DE 50 M
93CB616
PASO DE QUEBRADA TIPO I
93FB395
CONEX. DOM. C/MEDIDOR (INCL. EXC. Y RELL)
93GB309 POZO DE INFILTRACION 1 M3 (SEG. DISE?O)
93GD034 HORMIGON CICLOPEO PARA ANCLAJES
MSCZ0024
01AB002
02AC001
03BA010
03CA003
40DA038
40IA001
40JA001
42BC008
93GB263
93GD034
MSCZ0138
01AD001
02AC001
03CB002
ML
M3
M3
M3
ML
ML
ML
ML
ML
ML
ML
ML
PZA
PZA
GLB
GLB
GLB
PZA
PZA
M3
12862.00
1.02
6413.30
40.73
2309.30
35.67
4104.00
25.21
3122.00
12.99
926.00
19.15
2200.00
18.94
270.00
26.66
3764.00
35.15
2580.00
53.91
12862.00
0.20
12862.00
0.29
34.00
709.55
8.00
787.24
1.00
5,325.87
1.00
29,227.57
1.00
38571.72
34.00
1185.07
34.00
328.76
0.45
916.29
Costo Modulo
ADUCCION
REPLANTEO Y CONTROL DE TUBERIAS
EXCAVACION DE 0-2 M SUELO SEMIDURO
RELLENO MANUAL CON TIERRA CERNIDA(SIN MATERIAL DE
RELLENO Y COMPACTADO (TIERRA COMUN)
PROV. Y TENDIDO TUBERIA PVC 4 PULG - CLASE 9 ( ESP
PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.
DESINFECCION DE TUBERIAS (HASTA D = 4 PULG )
CAMARA DE LLAVES
ACCESORIOS DE ADUCCION
HORMIGON CICLOPEO PARA ANCLAJES
ML
M3
M3
M3
ML
ML
ML
PZA
GLB
M3
280.00
1.02
168.00
40.73
58.80
35.67
109.20
25.21
280.00
53.91
280.00
0.2
0.29
280.00
787.24
2.00
5913.49
1.00
0.80
916.29
Costo Modulo
ML
M3
M3
100.00
15.70
1.20
4.73
40.73
42.87
93AB422
93BC10003
93CA049
93FB163
M3
M3
ML
M2
14.00
0.60
95.00
11.20
Costo
916.29
3283.24
350.49
408.98
Modulo
MSCZ0207
93BC816
93GB055
93GB056
93GB186
96BB0119
96GF70064
MSCZ0250
01AC001
02AC001
06BA011
06BA014
31BD003
93AB407
93AD562
93BC677
93DB104
93DB105
93DB134
93GB012
93GB013
93GB025
93GB20001
96EC258
96FC015
MSCZ181
01AB001
02AC001
03BA010
03CA003
40DA038
40FA008
40IA001
40JA001
42BC008
93BC961
GLB
HR
HR
GLB
GLB
GLB
M2
M3
M3
M3
ML
PZA
M3
GLB
PZA
M3
M2
GLB
M3
M2
M2
M2
M2
81.00
67.00
13.45
16.12
5.50
2.00
7.00
1.00
1.00
10.78
70.56
1.00
100.00
65.60
152.88
152.88
65.60
Costo
23.51
40.73
4451.53
4733.48
288.72
342.53
42.87
6339.97
3525.27
4265.61
80.62
1606.61
13.98
30.93
93.41
69.91
58.16
Modulo
ML
M3
M3
M3
ML
ML
ML
ML
PZA
GLB
840.00
504.00
176.40
327.60
720.00
120.00
411.00
411.00
2.00
1.00
1.02
40.73
35.67
25.21
53.91
212.86
0.2
0.29
787.24
4967.23
1.00
7503.94
15.00
341.91
15.00
414.55
1.00
270.08
1.00
1507.83
1.00
87043.54
Costo Modulo
93GD034
M3
0.60
916.29
Costo Modulo
MSCZ645
ACTIVIDADES PRELIMINARES
INSTALACION DE FAENAS
PROV. Y COLOC. PLACA DE ENTEGA FPS
MOVILIZACION Y DESMOVILIZACION
LETRERO DE OBRAS
GLB
PZA
GLB
PZA
1.00
1.00
1.00
2.00
01FA003
93GB187
93GC013
93GD047
4604.26
631.05
3735.54
1088.79
Costo Modulo
Costo Total
MODIFICATORIO N1
Plazo
Fecha inicio
Conclusion
ADOS
CONTRATO MODIFICATORIO
INCREMENTOS
PRECIO TOTAL
Bs
CANT.
P. PARCIAL
Bs.
DECREMENTOS
CANT.
P. PARCIAL
Bs.
856.00
1,479.86
470.68
3,525.70
3,448.20
2,194.61
736.17
12,711.22
800.00
1.07
1.00
1,479.86
4.00
117.67
10.00
352.57
15.00
229.88
1.00
2,194.61
3.00
245.39
Costo Modulo C.M.
281.46
866.16
6,339.97
1,602.86
11,080.80
33,204.41
276.18
53,651.84
2.10
134.03
3.00
288.72
1.00
6,339.97
1.00
1,602.86
204.25
30.78
266.13
93.14
1.00
276.18
Costo Modulo C.M.
2,459.22
58,920.02
33,540.14
12,764.08
24,348.42
15,983.29
482.20
697.68
1,449.20
1,067.68
-155.75
-90.37
-4,793.99
-8,417.06
-885.65
-753.87
-134.19
-36,072.52
-26,890.54
-3,382.93
-751.52
-10,949.65
711.63
26,853.68
213.54
3,108.68
560.95
186.42
372.12
2,763.20
345.48
3,478.68
1.02
40.73
35.67
25.21
18.53
14.57
0.20
699.19
64,762.20
5,325.87
80,903.20
300,187.83
1,067.68
309.63
-54.00
-64,762.20
3,478.68
0.29
0.00
1,199.30
1.00
5,325.87
112.00
722.35
Costo Modulo C.M.
13,119.24
261,213.71
82,372.73
103,461.84
40,554.78
17,732.90
41,668.00
7,198.20
132,304.60
139,087.80
2,572.40
3,729.98
24,124.70
6,297.92
5,325.87
29,227.57
38,571.72
40,292.38
11,177.84
412.33
1,000,446.51
1,800.79
457.75
1,836.81
18,644.16
822.67
1,567.79
27.00
121.00
20,739.51
20,365.59
517.05
2,291.74
5.00
76.00
1,810.79
1,810.79
175.75
4,097.16
362.16
525.13
-441.54
-15,749.73
-4.00
-106.64
-1.00
-34.00
-38,571.72
-40,292.38
-0.05
-45.81
285.60
6,842.64
2,097.40
2,752.93
15,094.80
56.00
81.20
1,574.48
5,913.49
733.03
35,431.57
-280.00
-168.00
-58.80
-109.20
-83.00
-60.00
-60.00
-285.60
-6842.64
-2097.396
-2752.932
-4474.53
-12
-17.4
473.00
639.46
51.44
-40.00
-189.20
0.66
3.42
26.88
146.79
14,662.79
1.02
6,871.05
40.73
1,867.76
35.67
4,926.67
25.21
4,689.79
12.99
953.00
19.15
2,321.00
18.94
266.00
26.66
3,769.00
35.15
2,656.00
53.91
14,672.79
0.20
14,672.79
0.29
34.00
709.55
8.00
787.24
1.00
5,325.87
1.00
29,227.57
0.00
38,571.72
0.00
1,185.07
34.00
328.76
0.40
916.29
Costo Modulo C.M.
0.00
1.02
0.00
40.73
0.00
35.67
0.00
25.21
197.00
53.91
220.00
0.20
220.00
0.29
2.00
787.24
1.00
5,913.49
0.80
916.29
Costo Modulo C.M.
60.00
16.36
4.62
4.73
40.73
42.87
12,828.06
1,969.94
33,296.55
4,580.58
53,839.03
-7.32
-0.27
-39.00
-3.20
-6707.24
-886.47
-13669.11
-1308.74
6.68
916.29
0.33
3,283.24
56.00
350.49
8.00
408.98
Costo Modulo C.M.
7,503.94
5,128.65
6,218.25
270.08
1,507.83
87,043.54
107,672.29
1,904.31
2,728.91
59,873.08
76,303.70
1,587.96
685.06
300.09
6,339.97
3,525.27
45,983.28
5,688.55
1,606.61
1,398.00
2,029.01
14,280.52
10,687.84
3,815.30
238,737.46
856.80
20,527.92
6,292.19
8,258.80
38,815.20
25,543.20
82.20
119.19
1,574.48
4,967.23
1.00
7,503.94
15.00
341.91
15.00
414.55
1.00
270.08
1.00
1,507.83
1.00
87,043.54
Costo Modulo C.M.
18.88
768.98
3.52
1016.29
1.03
83.04
0.78
67.18
10.90
2077.88
5.00
-9.48
-222.87
-0.20
-946.70
-2.14
-91.74
-0.71
-3028.58
-6.84
-0.80
-638.92
-55.93
-356.04
-133.24
-222.79
-14501.51
-4752.67
-5616.54
-97.00
-20647.42
5.10
102.00
5498.82
434.00
434.00
86.8
125.86
71.52
23.51
85.88
40.73
13.45
4,451.53
15.92
4,733.48
9.02
288.72
2.00
342.53
4.86
42.87
1.00
6,339.97
1.00
3,525.27
10.07
4,265.61
71.59
80.62
1.00
1,606.61
100.78
13.98
132.78
30.93
146.04
93.41
152.08
69.91
65.60
58.16
Costo Modulo C.M.
845.00
147.96
43.16
104.81
822.00
23.00
845.00
845.00
2.00
1.00
1.02
40.73
35.67
25.21
53.91
212.86
0.20
0.29
787.24
4,967.23
549.77
107,586.98
4,604.26
631.05
3,735.54
2,177.58
-0.23
0.37
916.29
Costo Modulo C.M.
1.00
1.00
1.00
2.00
4,604.26
631.05
3,735.54
1,088.79
11,148.43
1,921,413.16
Costo C.M.Total
180
12/1/2015
5/29/2016
Monto C.
Modificatorio Bs.
856.00
1,479.86
470.68
3,525.70
3,448.20
2,194.61
736.17
12,711.22
281.46
866.16
6,339.97
1,602.86
6,286.82
24,787.35
276.18
40,440.80
3,170.85
22,847.49
6,649.60
9,381.15
51,202.10
5,033.64
695.74
1,008.82
0.00
5,325.87
80,903.20
186,218.46
14,956.05
279,857.87
66,623.00
124,201.35
60,920.37
18,249.95
43,959.74
7,091.56
132,480.35
143,184.96
2,934.56
4,255.11
24,124.70
6,297.92
5,325.87
29,227.57
0.00
0.00
11,177.84
366.52
975,235.29
0.00
0.00
0.00
0.00
10,620.27
44.00
63.80
1,574.48
5,913.49
733.03
18,949.07
283.80
666.34
198.06
6,120.82
1,083.47
19,627.44
3,271.84
31,251.77
7,503.94
5,128.65
6,218.25
270.08
1,507.83
87,043.54
107,672.29
1,681.44
3,497.89
59,873.08
75,357.00
2,604.25
685.06
208.35
6,339.97
3,525.27
42,954.69
5,771.59
1,606.61
1,408.90
4,106.89
13,641.60
10,631.91
3,815.30
237,709.80
861.90
6,026.41
1,539.52
2,642.26
44,314.02
4,895.78
169.00
245.05
1,574.48
4,967.23
339.03
67,574.68
4,604.26
631.05
3,735.54
2,177.58
11,148.43
1,688,911.81
MITIGACION AMBIENTAL SB
CINTA PLASTICA DE SEGURIDAD
LETRINA
PASOS PEATONALES
SEALIZACION DE SEGURIDAD DE MADERA
SEALIZACION DE SEGURIDAD DE PVC
LIMPIEZA GENERAL
CONTENEDORES DE BASURA
DESCRIPCION
MEJORAMIENTO DE TANQUE
PINTURA AL ACEITE SOBRE CARPINTERIA METALICA
ESCALERA METALICA
ACCESORIOS TANQUE ALMACENAMIENTO
MEDIDOR DE NIVELES TANQUES DE H20
PINTURA LATEX
IMPERMEABILIZACION DE TANQUE C/SIKA TOP
LIMPIEZA DE TANQUE
DESCRIPCION
MEJORAMIENTO RED
REPLANTEO Y CONTROL DE TUBERIAS
EXCAVACION DE 0-2 M SUELO SEMIDURO
RELLENO MANUAL CON TIERRA CERNIDA(SIN MATERIAL DE
RELLENO Y COMPACTADO (TIERRA COMUN)
PROV. Y TENDIDO TUBERIA PVC 2 PULG -CLASE 9 (ESPIG
PROV.Y TENDIDO TUBERIA PVC 1 1/2PULG-CLASE 9(JU
PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.
DESINFECCION DE TUBERIAS (HASTA D = 4 PULG )
CONEX. DOM. C/MEDIDOR (INCL. EXC. Y RELL)
UNID
ML
PZA
PZA
PZA
PZA
GLB
PZA
UNID
M2
ML
GLB
GLB
M2
M2
GLB
UNID
ML
M3
M3
M3
ML
ML
ML
ML
PZA
CANTIDAD
800.00
1.00
4.00
10.00
15.00
1.00
3.00
CANTIDAD
2.10
3.00
1.00
1.00
360.00
356.50
1.00
CANTIDAD
2411.00
1446.60
940.29
506.31
1314.00
1097.00
2411.00
2411.00
54.00
PRECIO
UNITARIO
Bs
1.07
1,479.86
117.67
352.57
229.88
2,194.61
245.39
PRECIO
UNITARIO
Bs
134.03
288.72
6,339.97
1,602.86
30.78
93.14
276.18
PRECIO
UNITARIO
Bs
1.02
40.73
35.67
25.21
18.53
14.57
0.20
0.29
1,199.30
DESCRIPCION
ACTIVIDAES NUEVO PARA EL MODULO MEJORAMIENTO RED
PROV. Y TENDIDO TUBERIA PVC 1 PULG - ESQ.40 (ESPIG
CAMARA DE CORTE 4"
CAMARA DE CORTE 3"
CAMARA DE CORTE 2"
PROV. Y TENDIDO TUBERIA PVC 1/2 PULG - ESQ.40
PROV. Y TENDIDO TUBERIA PVC 3/2 PULG - ESQ.40
CONEXIN DOMICILIARIA CON MEDIDOR 1/2" Y GRIFO"
PASO DE QUEBRADA DE 18 M
TUBERIA FG 2"
HIPOCLORADOR
GLB
PZA
UNID
ML
PZA
PZA
PZA
ML
ML
PZA
GLB
ML
PZA
1.00
112.00
CANTIDAD
5,325.87
722.35
PRECIO
UNITARIO
Bs
12.99
5,907.02
3,815.20
2,701.36
9.75
11.16
805.40
11,068.46
83.310
3525.27
DESCRIPCION
RED DE DISTRIBUCION
REPLANTEO Y CONTROL DE TUBERIAS
EXCAVACION DE 0-2 M SUELO SEMIDURO
RELLENO MANUAL CON TIERRA CERNIDA(SIN MATERIAL DE
RELLENO Y COMPACTADO (TIERRA COMUN)
PROV. Y TENDIDO TUBERIA PVC 1 PULG - ESQ.40 (ESPIG
PROV. Y TENDIDO TUBERIA PVC 1 1/2 PULG -ESQ.40 (ES
PROV. Y TENDIDO TUBERIA PVC 2 PULG -CLASE 9 (ESPIG
PROV. Y TENDIDO TUBERIA PVC 2 1/2 PULG - CLASE 9 (
PROV. Y TENDIDO TUBERIA PVC 3 PULG - CLASE 9 (ESPI
PROV. Y TENDIDO TUBERIA PVC 4 PULG - CLASE 9 ( ESP
PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.
DESINFECCION DE TUBERIAS (HASTA D = 4 PULG )
PEDESTAL Y BASE PARA PILETA H?A?
CAMARA DE LLAVES
ACCESORIO RED DE DISTRIBUCION
PASO DE QUEBRADA DE 50 M
PASO DE QUEBRADA TIPO I
CONEX. DOM. C/MEDIDOR (INCL. EXC. Y RELL)
POZO DE INFILTRACION 1 M3 (SEG. DISE?O)
HORMIGON CICLOPEO PARA ANCLAJES
DESCRIPCION
ACTIVIDAD DE NUEVA CREACION
PROV. Y TENDIDO TUBERIA PVC 1/2 PULG - ESQ.40
PROV. Y TENDIDO TUBERIA PVC 3/4 PULG - ESQ.40
CONEXIN DOMICILIARIA CON MEDIDOR 1/2" Y GRIFO"
PROV. Y TENDIDO TUBERIA FG D=4
DESCRIPCION
ADUCCION
REPLANTEO Y CONTROL DE TUBERIAS
EXCAVACION DE 0-2 M SUELO SEMIDURO
UNID
ML
M3
M3
M3
ML
ML
ML
ML
ML
ML
ML
ML
PZA
PZA
GLB
GLB
GLB
PZA
PZA
M3
UNID
CANTIDAD
12862.00
6413.30
2309.30
4104.00
3122.00
926.00
2200.00
270.00
3764.00
2580.00
12862.00
12862.00
34.00
8.00
1.00
1.00
1.00
34.00
34.00
0.45
CANTIDAD
ML
M3
1.02
40.73
35.67
25.21
12.99
19.15
18.94
26.66
35.15
53.91
0.20
0.29
709.55
787.24
5,325.87
29,227.57
38571.72
1185.07
328.76
916.29
PRECIO
UNITARIO
Bs
9.75
11.16
805.40
212.86
ML
ML
GLB
ML
UNID
PRECIO
UNITARIO
Bs
CANTIDAD
280.00
168.00
PRECIO
UNITARIO
Bs
1.02
40.73
DESCRIPCION
ACTIVIDAD DE NUEVA CREACION IMPULSION POZO TANQUE
PROV. Y TENDIDO DE TUBERIA F.G. D=4 PULG_x000D_
DESCRIPCION
CERCO PERIMETRAL DE MALLA OLIMPICA
REPLANTEO (MURO DE CERCO)
EXCAVACION DE 0-2 M SUELO SEMIDURO
RELLENO COMPACTADO MANUAL-NO INCLUYE MATERIAL DE R
CIMIENTO DE H.C. 1:3:4 60% PIEDRA (CERCO P.)
COLUMNAS DE HO AO (S/D)
CERCO PERIMETRAL C/MALLA OLIMPICA SEG/DIS?O.
PUERTA DE MALLA OLIMPICA PARA CERCO PERIMETRAL
M3
M3
ML
ML
ML
PZA
GLB
M3
UNID
58.80
109.20
280.00
280.00
280.00
2.00
1.00
0.80
CANTIDAD
ML
M3
M3
M3
M3
ML
M2
0.29
787.24
5913.49
916.29
PRECIO
UNITARIO
Bs
212.86
ML
UNID
35.67
25.21
53.91
0.2
CANTIDAD
100.00
15.70
1.20
14.00
0.60
95.00
11.20
PRECIO
UNITARIO
Bs
4.73
40.73
42.87
916.29
3283.24
350.49
408.98
DESCRIPCION
LIMPIEZA Y EQUIPAMIENTO DE POZO
MOVILIZACION Y DESMOVILIZACION PERF DE POZO
LIMPIEZA PRELIMINAR POZO PERFORADO
DESARROLLO POR PISTONEO Y AIR LIFT
DESINFECCION DE POZO AGUA
DESINSTALACIN Y EXTRACCN BOMBA SUMERGIBLE
PROV E INST. BOMBA SUMERGIBLE 20 HP C/ACCESORIOS
DESCRIPCION
TANQUE DE ALM. DE HA SEMIENTERRADO
REPLANTEO DE ESTRUCTURAS Y EDIFICACIONES
EXCAVACION DE 0-2 M SUELO SEMIDURO
HORMIGON ARMADO LOSA DE FONDO 1:2:3 (H2O)
HORMIGON ARMADO PARA MUROS ESTRUCTURAS DE H2O
ESCALERA METALICA
TAPA METALICA DE 70X70 CM
RELLENO COMUN COMPACTADO
ACCESORIOS DE TANQUE
HIPOCLORADOR
HORMIGON ARMADO LOSA TAPA TANQUE DE AGUA.
ZAMPEADO DE PIEDRA
MEDIDOR DE NIVELES TANQUES DE H20
PRUEBA DE ESTANQUEIDAD Y DESINFECCION TANQUES
PINTURA LATEX
IMPERMEABILIZACION DE TANQUE C/SIKA TOP
REVOQUE CON SIKA IMPERMEABILIZANTE (TANQUE)
REVOQUE EXTERIOR
DESCRIPCION
UNID
CANTIDAD
1.00
15.00
15.00
1.00
1.00
1.00
GLB
HR
HR
GLB
GLB
GLB
UNID
CANTIDAD
81.00
67.00
13.45
16.12
5.50
2.00
7.00
1.00
1.00
10.78
70.56
1.00
100.00
65.60
152.88
152.88
65.60
M2
M3
M3
M3
ML
PZA
M3
GLB
PZA
M3
M2
GLB
M3
M2
M2
M2
M2
UNID
CANTIDAD
DESCRIPCION
UNID
CANTIDAD
PRECIO
UNITARIO
Bs
7503.94
341.91
414.55
270.08
1507.83
87043.54
PRECIO
UNITARIO
Bs
23.51
40.73
4451.53
4733.48
288.72
342.53
42.87
6339.97
3525.27
4265.61
80.62
1606.61
13.98
30.93
93.41
69.91
58.16
PRECIO
UNITARIO
Bs
447.27
PRECIO
UNITARIO
Bs
DESCRIPCION
IMPULSION POZO TANQUE
REPLANTEO Y CONTROL DE LINEAS DE TUBERIA
EXCAVACION DE 0-2 M SUELO SEMIDURO
RELLENO MANUAL CON TIERRA CERNIDA(SIN MATERIAL DE
RELLENO Y COMPACTADO (TIERRA COMUN)
PROV. Y TENDIDO TUBERIA PVC 4 PULG - CLASE 9 ( ESP
PROV. Y TENDIDO DE TUBERIA F.G. D=4 PULG
PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.
DESINFECCION DE TUBERIAS (HASTA D = 4 PULG )
CAMARA DE LLAVES
ACCESORIOS IMPULSION
HORMIGON CICLOPEO PARA ANCLAJES
DESCRIPCION
ACTIVIDAD DE NUEVA CREACION IMPULSION POZO TANQUE
PROV. Y TENDIDO DE TUBERIA F.G. D=4 PULG_x000D_
DESCRIPCION
ACTIVIDADES PRELIMINARES
INSTALACION DE FAENAS
PROV. Y COLOC. PLACA DE ENTEGA FPS
MOVILIZACION Y DESMOVILIZACION
LETRERO DE OBRAS
UNID
ML
M3
M3
M3
ML
ML
ML
ML
PZA
GLB
M3
UNID
CANTIDAD
840.00
504.00
176.40
327.60
720.00
120.00
411.00
411.00
2.00
1.00
0.60
CANTIDAD
GLB
PZA
GLB
PZA
1.02
40.73
35.67
25.21
53.91
212.86
0.2
0.29
787.24
4967.23
916.29
PRECIO
UNITARIO
Bs
212.86
ML
UNID
PRECIO
UNITARIO
Bs
CANTIDAD
1.00
1.00
1.00
2.00
PRECIO
UNITARIO
Bs
4604.26
631.05
3735.54
1088.79
CONTRATO
MODIFICATORIO
RIZADOS
PRECIO TOTAL
Bs
856.00
1,479.86
470.68
3,525.70
3,448.20
2,194.61
736.17
PRECIO TOTAL
Bs
281.46
866.16
6,339.97
1,602.86
11,080.80
33,204.41
276.18
PRECIO TOTAL
Bs
2,459.22
58,920.02
33,540.14
12,764.08
24,348.42
15,983.29
482.20
699.19
64,762.20
CANTIDAD
C.M.
800.00
1.00
4.00
10.00
15.00
1.00
3.00
CANTIDAD
C.M.
2.10
3.00
1.00
1.00
204.25
266.13
1.00
CANTIDAD
C.M.
3,108.68
560.95
186.42
372.12
2,763.20
345.48
3,478.68
3,478.68
0.00
PRECIO
TOTAL Bs.
856.00
1,479.86
470.68
3,525.70
3,448.20
2,194.61
736.17
PRECIO
TOTAL Bs.
281.46
866.16
6,339.97
1,602.86
6,286.82
24,787.35
276.18
PRECIO
TOTAL Bs.
3,170.85
22,847.49
6,649.60
9,381.15
51,202.10
5,033.64
695.74
1,008.82
0.00
5,325.87
80,903.20
PRECIO TOTAL
Bs
1.00
112.00
CANTIDAD
C.M.
370.00
1.00
3.00
4.00
860.00
139.00
128.00
1.00
32.00
1.00
5,325.87
80,903.20
PRECIO
TOTAL Bs.
4,806.30
5,907.02
11,445.60
10,805.44
8,385.00
1,551.24
103,091.20
11,068.46
2,665.92
###
3,525.27
PRECIO TOTAL
Bs
13,119.24
261,213.71
82,372.73
103,461.84
40,554.78
17,732.90
41,668.00
7,198.20
132,304.60
139,087.80
2,572.40
3,729.98
24,124.70
6,297.92
5,325.87
29,227.57
38,571.72
40,292.38
11,177.84
412.33
PRECIO TOTAL
Bs
CANTIDAD
C.M.
14,662.79
6,871.05
1,867.76
4,926.67
4,689.79
953.00
2,321.00
266.00
3,769.00
2,656.00
14,672.79
14,672.79
34.00
8.00
1.00
1.00
0.00
0.00
34.00
0.40
CANTIDAD
C.M.
816.34
600.00
34.00
23.00
PRECIO TOTAL
Bs
285.60
6,842.64
CANTIDAD
C.M.
0.00
0.00
PRECIO
TOTAL Bs.
14,956.05
279,857.87
###
66,623.00
124,201.35
60,920.37
18,249.95
43,959.74
7,091.56
132,480.35
143,184.96
2,934.56
4,255.11
24,124.70
6,297.92
5,325.87
29,227.57
0.00
0.00
11,177.84
366.52
PRECIO
TOTAL Bs.
7,959.32
6,696.00
27,383.60
4,895.78
PRECIO
TOTAL Bs.
0.00
0.00
2,097.40
2,752.93
15,094.80
56.00
81.20
1,574.48
5,913.49
733.03
PRECIO TOTAL
Bs
0.00
0.00
197.00
220.00
220.00
2.00
1.00
0.80
CANTIDAD
C.M.
23.00
PRECIO TOTAL
Bs
473.00
639.46
51.44
12,828.06
1,969.94
33,296.55
4,580.58
CANTIDAD
C.M.
60.00
16.36
4.62
6.68
0.33
56.00
8.00
0.00
0.00
10,620.27
44.00
63.80
1,574.48
5,913.49
733.03
PRECIO
TOTAL Bs.
###
4,895.78
PRECIO
TOTAL Bs.
283.80
666.34
198.06
6,120.82
1,083.47
19,627.44
3,271.84
PRECIO TOTAL
Bs
7,503.94
5,128.65
6,218.25
270.08
1,507.83
87,043.54
PRECIO TOTAL
Bs
1,904.31
2,728.91
59,873.08
76,303.70
1,587.96
685.06
300.09
6,339.97
3,525.27
45,983.28
5,688.55
1,606.61
1,398.00
2,029.01
14,280.52
10,687.84
3,815.30
PRECIO TOTAL
Bs
CANTIDAD
C.M.
1.00
15.00
15.00
1.00
1.00
1.00
CANTIDAD
C.M.
71.52
85.88
13.45
15.92
9.02
2.00
4.86
1.00
1.00
10.07
71.59
1.00
100.78
132.78
146.04
152.08
65.60
CANTIDAD
C.M.
28.00
PRECIO TOTAL
Bs
CANTIDAD
C.M.
PRECIO
TOTAL Bs.
7,503.94
5,128.65
6,218.25
270.08
1,507.83
87,043.54
PRECIO
TOTAL Bs.
1,681.44
3,497.89
59,873.08
75,357.00
2,604.25
685.06
208.35
6,339.97
3,525.27
42,954.69
5,771.59
1,606.61
1,408.90
4,106.89
13,641.60
10,631.91
3,815.30
PRECIO
TOTAL Bs.
###
12,523.56
PRECIO
TOTAL Bs.
PRECIO TOTAL
Bs
856.80
20,527.92
6,292.19
8,258.80
38,815.20
25,543.20
82.20
119.19
1,574.48
4,967.23
549.77
PRECIO TOTAL
Bs
CANTIDAD
C.M.
845.00
147.96
43.16
104.81
822.00
23.00
845.00
845.00
2.00
1.00
0.37
CANTIDAD
C.M.
23.00
PRECIO TOTAL
Bs
4,604.26
631.05
3,735.54
2,177.58
CANTIDAD
C.M.
1.00
1.00
1.00
2.00
PRECIO
TOTAL Bs.
861.90
6,026.41
1,539.52
2,642.26
44,314.02
4,895.78
169.00
245.05
1,574.48
4,967.23
339.03 #
PRECIO
TOTAL Bs.
4,895.78
PRECIO
TOTAL Bs.
4,604.26
631.05
3,735.54
2,177.58
DESCRIPCION
UNID
CANTIDAD
UNID
CANTIDAD
INCREMEN. DECREMEN.
CANT.
CANT.
MEJORAMIENTO DE TANQUE
DESCRIPCION
PINTURA LATEX
M2
DESCRIPCION
IMPERMEABILIZACION DE TANQUE C/SIKA TOP
MEJORAMIENTO RED
DESCRIPCION
REPLANTEO Y CONTROL DE TUBERIAS
DESCRIPCION
EXCAVACION DE 0-2 M SUELO SEMIDURO
DESCRIPCION
RELLENO MANUAL CON TIERRA CERNIDA(SIN MATERIAL DE
DESCRIPCION
RELLENO Y COMPACTADO (TIERRA COMUN)
DESCRIPCION
PROV. Y TENDIDO TUBERIA PVC 2 PULG -CLASE 9 (ESPIG
DESCRIPCION
PROV.Y TENDIDO TUBERIA PVC 1 1/2PULG-CLASE 9(JU
DESCRIPCION
PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.
DESCRIPCION
DESINFECCION DE TUBERIAS (HASTA D = 4 PULG )
DESCRIPCION
CONEX. DOM. C/MEDIDOR (INCL. EXC. Y RELL)
ACTIVIDAES NUEVO PARA EL MODULO MEJORAMIENTO RED
UNID
M2
UNID
ML
UNID
M3
UNID
M3
UNID
M3
UNID
ML
UNID
ML
UNID
ML
UNID
ML
UNID
PZA
INCREMEN. DECREMEN.
CANT.
CANT.
360.00
-155.75
INCREMEN. DECREMEN.
CANTIDAD
CANT.
CANT.
356.50
-90.37
INCREMEN. DECREMEN.
CANT.
CANT.
2411.00
697.68
INCREMEN. DECREMEN.
CANTIDAD
CANT.
CANT.
1446.60
-885.65
INCREMEN. DECREMEN.
CANTIDAD
CANT.
CANT.
940.29
-753.87
INCREMEN. DECREMEN.
CANTIDAD
CANT.
CANT.
506.31
-134.19
INCREMEN. DECREMEN.
CANTIDAD
CANT.
CANT.
1314.00
1,449.20
INCREMEN. DECREMEN.
CANTIDAD
CANT.
CANT.
1097.00
-751.52
INCREMEN. DECREMEN.
CANTIDAD
CANT.
CANT.
2411.00
1,067.68
INCREMEN. DECREMEN.
CANTIDAD
CANT.
CANT.
2411.00
1,067.68
INCREMEN. DECREMEN.
CANTIDAD
CANT.
CANT.
54.00
-54.00
CANTIDAD
DESCRIPCION
PROV. Y TENDIDO TUBERIA PVC 1 PULG - ESQ.40 (ESPIG
DESCRIPCION
CAMARA DE CORTE 4"
UNID
CANTIDAD
ML
UNID
CANTIDAD
PZA
DESCRIPCION
CAMARA DE CORTE 3"
UNID
CANTIDAD
PZA
DESCRIPCION
CAMARA DE CORTE 2"
UNID
CANTIDAD
PZA
DESCRIPCION
PROV. Y TENDIDO TUBERIA PVC 1/2 PULG - ESQ.40
DESCRIPCION
PROV. Y TENDIDO TUBERIA PVC 3/2 PULG - ESQ.40
DESCRIPCION
CONEXIN DOMICILIARIA CON MEDIDOR 1/2" Y GRIFO"
DESCRIPCION
PASO DE QUEBRADA DE 18 M
UNID
CANTIDAD
ML
UNID
CANTIDAD
ML
UNID
CANTIDAD
PZA
UNID
CANTIDAD
GLB
DESCRIPCION
UNID
CANTIDAD
INCREMEN.
CANT.
370.00
INCREMEN.
CANT.
1.00
INCREMEN.
CANT.
3.00
INCREMEN.
CANT.
4.00
INCREMEN.
CANT.
860.00
INCREMEN.
CANT.
139.00
INCREMEN.
CANT.
128.00
INCREMEN.
CANT.
1.00
INCREMEN.
CANT.
DECREMEN.
CANT.
DECREMEN.
CANT.
DECREMEN.
CANT.
DECREMEN.
CANT.
DECREMEN.
CANT.
DECREMEN.
CANT.
DECREMEN.
CANT.
DECREMEN.
CANT.
DECREMEN.
CANT.
TUBERIA FG 2"
ML
DESCRIPCION
HIPOCLORADOR
RED DE DISTRIBUCION
UNID
CANTIDAD
PZA
DESCRIPCION
REPLANTEO Y CONTROL DE TUBERIAS
DESCRIPCION
EXCAVACION DE 0-2 M SUELO SEMIDURO
DESCRIPCION
RELLENO MANUAL CON TIERRA CERNIDA(SIN MATERIAL DE
DESCRIPCION
RELLENO Y COMPACTADO (TIERRA COMUN)
DESCRIPCION
PROV. Y TENDIDO TUBERIA PVC 1 PULG - ESQ.40 (ESPIG
DESCRIPCION
PROV. Y TENDIDO TUBERIA PVC 1 1/2 PULG -ESQ.40 (ES
DESCRIPCION
PROV. Y TENDIDO TUBERIA PVC 2 PULG -CLASE 9 (ESPIG
DESCRIPCION
PROV. Y TENDIDO TUBERIA PVC 2 1/2 PULG - CLASE 9 (
DESCRIPCION
PROV. Y TENDIDO TUBERIA PVC 3 PULG - CLASE 9 (ESPI
DESCRIPCION
PROV. Y TENDIDO TUBERIA PVC 4 PULG - CLASE 9 ( ESP
DESCRIPCION
PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.
UNID
ML
UNID
M3
UNID
M3
UNID
M3
UNID
ML
UNID
ML
UNID
ML
UNID
ML
UNID
ML
UNID
ML
UNID
ML
32.00
INCREMEN. DECREMEN.
CANT.
CANT.
1
INCREMEN. DECREMEN.
CANT.
CANT.
12862.00
1,800.79
INCREMEN. DECREMEN.
CANTIDAD
CANT.
CANT.
6413.30
457.75
INCREMEN. DECREMEN.
CANTIDAD
CANT.
CANT.
2309.30
-441.54
INCREMEN. DECREMEN.
CANTIDAD
CANT.
CANT.
4104.00
822.67
INCREMEN. DECREMEN.
CANTIDAD
CANT.
CANT.
3122.00
1,567.79
INCREMEN. DECREMEN.
CANTIDAD
CANT.
CANT.
926.00
27.00
INCREMEN. DECREMEN.
CANTIDAD
CANT.
CANT.
2200.00
121.00
INCREMEN. DECREMEN.
CANTIDAD
CANT.
CANT.
270.00
-4.00
INCREMEN. DECREMEN.
CANTIDAD
CANT.
CANT.
3764.00
5.00
INCREMEN. DECREMEN.
CANTIDAD
CANT.
CANT.
2580.00
76.00
INCREMEN. DECREMEN.
CANTIDAD
CANT.
CANT.
12862.00
1,810.79
CANTIDAD
DESCRIPCION
DESINFECCION DE TUBERIAS (HASTA D = 4 PULG )
DESCRIPCION
PASO DE QUEBRADA TIPO I
UNID
ML
UNID
GLB
DESCRIPCION
CONEX. DOM. C/MEDIDOR (INCL. EXC. Y RELL)
DESCRIPCION
HORMIGON CICLOPEO PARA ANCLAJES
ACTIVIDAD DE NUEVA CREACION
DESCRIPCION
PROV. Y TENDIDO TUBERIA PVC 1/2 PULG - ESQ.40
DESCRIPCION
PROV. Y TENDIDO TUBERIA PVC 3/4 PULG - ESQ.40
DESCRIPCION
CONEXIN DOMICILIARIA CON MEDIDOR 1/2" Y GRIFO"
DESCRIPCION
PROV. Y TENDIDO TUBERIA FG D=4
ADUCCION
UNID
PZA
UNID
M3
UNID
INCREMEN. DECREMEN.
CANT.
CANT.
12862.00
1,810.79
INCREMEN. DECREMEN.
CANTIDAD
CANT.
CANT.
1.00
-1.00
INCREMEN. DECREMEN.
CANTIDAD
CANT.
CANT.
34.00
-34.00
INCREMEN. DECREMEN.
CANTIDAD
CANT.
CANT.
0.45
-0.05
CANTIDAD
CANTIDAD
ML
UNID
CANTIDAD
ML
UNID
CANTIDAD
GLB
UNID
ML
CANTIDAD
INCREMEN.
CANT.
816.34
INCREMEN.
CANT.
600.00
INCREMEN.
CANT.
34.00
INCREMEN.
CANT.
23.00
DECREMEN.
CANT.
DECREMEN.
CANT.
DECREMEN.
CANT.
DECREMEN.
CANT.
DESCRIPCION
REPLANTEO Y CONTROL DE TUBERIAS
DESCRIPCION
EXCAVACION DE 0-2 M SUELO SEMIDURO
DESCRIPCION
RELLENO MANUAL CON TIERRA CERNIDA(SIN MATERIAL DE
DESCRIPCION
RELLENO Y COMPACTADO (TIERRA COMUN)
DESCRIPCION
PROV. Y TENDIDO TUBERIA PVC 4 PULG - CLASE 9 ( ESP
DESCRIPCION
PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.
DESCRIPCION
DESINFECCION DE TUBERIAS (HASTA D = 4 PULG )
ACTIVIDAD DE NUEVA CREACION IMPULSION POZO TANQUE
DESCRIPCION
PROV. Y TENDIDO DE TUBERIA F.G. D=4 PULG_x000D_
CERCO PERIMETRAL DE MALLA OLIMPICA
DESCRIPCION
REPLANTEO (MURO DE CERCO)
DESCRIPCION
EXCAVACION DE 0-2 M SUELO SEMIDURO
DESCRIPCION
RELLENO COMPACTADO MANUAL-NO INCLUYE MATERIAL DE R
DESCRIPCION
CIMIENTO DE H.C. 1:3:4 60% PIEDRA (CERCO P.)
UNID
ML
UNID
M3
UNID
M3
UNID
M3
UNID
ML
UNID
ML
UNID
ML
UNID
CANTIDAD
280.00
CANTIDAD
168.00
CANTIDAD
58.80
CANTIDAD
109.20
CANTIDAD
280.00
CANTIDAD
280.00
CANTIDAD
280.00
CANTIDAD
ML
UNID
ML
UNID
M3
UNID
M3
UNID
M3
CANTIDAD
100.00
CANTIDAD
15.70
CANTIDAD
1.20
CANTIDAD
14.00
INCREMEN. DECREMEN.
CANT.
CANT.
-280.00
INCREMEN. DECREMEN.
CANT.
CANT.
-168.00
INCREMEN. DECREMEN.
CANT.
CANT.
-58.80
INCREMEN. DECREMEN.
CANT.
CANT.
-109.20
INCREMEN. DECREMEN.
CANT.
CANT.
-83.00
INCREMEN. DECREMEN.
CANT.
CANT.
-60.00
INCREMEN. DECREMEN.
CANT.
CANT.
-60.00
INCREMEN. DECREMEN.
CANT.
CANT.
23.00
INCREMEN. DECREMEN.
CANT.
CANT.
-40.00
INCREMEN. DECREMEN.
CANT.
CANT.
0.66
INCREMEN. DECREMEN.
CANT.
CANT.
3.42
INCREMEN. DECREMEN.
CANT.
CANT.
-7.32
DESCRIPCION
COLUMNAS DE HO AO (S/D)
M3
DESCRIPCION
CERCO PERIMETRAL C/MALLA OLIMPICA SEG/DIS?O.
DESCRIPCION
PUERTA DE MALLA OLIMPICA PARA CERCO PERIMETRAL
TANQUE DE ALM. DE HA SEMIENTERRADO
DESCRIPCION
REPLANTEO DE ESTRUCTURAS Y EDIFICACIONES
DESCRIPCION
EXCAVACION DE 0-2 M SUELO SEMIDURO
DESCRIPCION
HORMIGON ARMADO PARA MUROS ESTRUCTURAS DE H2O
DESCRIPCION
ESCALERA METALICA
UNID
UNID
ML
UNID
M2
UNID
M2
UNID
M3
UNID
M3
UNID
ML
INCREMEN. DECREMEN.
CANT.
CANT.
0.60
-0.27
INCREMEN. DECREMEN.
CANTIDAD
CANT.
CANT.
95.00
-39.00
INCREMEN. DECREMEN.
CANTIDAD
CANT.
CANT.
11.20
-3.20
CANTIDAD
CANTIDAD
81.00
CANTIDAD
67.00
CANTIDAD
16.12
CANTIDAD
5.50
INCREMEN. DECREMEN.
CANT.
CANT.
-9.48
INCREMEN. DECREMEN.
CANT.
CANT.
18.88
INCREMEN. DECREMEN.
CANT.
CANT.
-0.20
INCREMEN. DECREMEN.
CANT.
CANT.
3.52
DESCRIPCION
RELLENO COMUN COMPACTADO
DESCRIPCION
HORMIGON ARMADO LOSA TAPA TANQUE DE AGUA.
DESCRIPCION
ZAMPEADO DE PIEDRA
UNID
CANTIDAD
7.00
M3
UNID
CANTIDAD
10.78
M3
UNID
CANTIDAD
70.56
M2
DESCRIPCION
PRUEBA DE ESTANQUEIDAD Y DESINFECCION TANQUES
DESCRIPCION
PINTURA LATEX
UNID
CANTIDAD
100.00
M3
UNID
CANTIDAD
65.60
M2
DESCRIPCION
IMPERMEABILIZACION DE TANQUE C/SIKA TOP
DESCRIPCION
UNID
CANTIDAD
152.88
M2
UNID
CANTIDAD
DESCRIPCION
ACCESO A TANQUE
UNID
HR
152.88
CANTIDAD
INCREMEN. DECREMEN.
CANT.
CANT.
-2.14
INCREMEN. DECREMEN.
CANT.
CANT.
-0.71
INCREMEN. DECREMEN.
CANT.
CANT.
1.03
INCREMEN. DECREMEN.
CANT.
CANT.
0.78
INCREMEN. DECREMEN.
CANT.
CANT.
67.18
INCREMEN. DECREMEN.
CANT.
CANT.
-6.84
INCREMEN. DECREMEN.
CANT.
CANT.
-0.80
INCREMEN. DECREMEN.
CANT.
CANT.
28.00
DESCRIPCION
REPLANTEO Y CONTROL DE LINEAS DE TUBERIA
DESCRIPCION
EXCAVACION DE 0-2 M SUELO SEMIDURO
DESCRIPCION
RELLENO MANUAL CON TIERRA CERNIDA(SIN MATERIAL DE
DESCRIPCION
RELLENO Y COMPACTADO (TIERRA COMUN)
DESCRIPCION
PROV. Y TENDIDO TUBERIA PVC 4 PULG - CLASE 9 ( ESP
DESCRIPCION
PROV. Y TENDIDO DE TUBERIA F.G. D=4 PULG
DESCRIPCION
PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.
DESCRIPCION
DESINFECCION DE TUBERIAS (HASTA D = 4 PULG )
DESCRIPCION
HORMIGON CICLOPEO PARA ANCLAJES
ACTIVIDAD DE NUEVA CREACION IMPULSION POZO TANQUE
DESCRIPCION
PROV. Y TENDIDO DE TUBERIA F.G. D=4 PULG_x000D_
UNID
ML
UNID
M3
UNID
M3
UNID
M3
UNID
ML
UNID
ML
UNID
ML
UNID
ML
UNID
M3
UNID
ML
INCREMEN. DECREMEN.
CANT.
CANT.
840.00
5.00
INCREMEN. DECREMEN.
CANTIDAD
CANT.
CANT.
504.00
-356.04
INCREMEN. DECREMEN.
CANTIDAD
CANT.
CANT.
176.40
-133.24
INCREMEN. DECREMEN.
CANTIDAD
CANT.
CANT.
327.60
-222.79
INCREMEN. DECREMEN.
CANTIDAD
CANT.
CANT.
720.00
102.00
INCREMEN. DECREMEN.
CANTIDAD
CANT.
CANT.
120.00
-97.00
INCREMEN. DECREMEN.
CANTIDAD
CANT.
CANT.
411.00
434.00
INCREMEN. DECREMEN.
CANTIDAD
CANT.
CANT.
411.00
434.00
INCREMEN. DECREMEN.
CANTIDAD
CANT.
CANT.
0.60
-0.23
CANTIDAD
CANTIDAD
INCREMEN. DECREMEN.
CANT.
CANT.
23.00
CANTIDAD
C.M.
CANTIDAD
C.M.
204.25
CANTIDAD
C.M.
266.13
CANTIDAD
C.M.
3,108.68
CANTIDAD
C.M.
560.95
CANTIDAD
C.M.
186.42
CANTIDAD
C.M.
372.12
CANTIDAD
C.M.
2,763.20
CANTIDAD
C.M.
345.48
CANTIDAD
C.M.
3,478.68
CANTIDAD
C.M.
3,478.68
CANTIDAD
C.M.
0.00
CANTIDAD
C.M.
370.00
CANTIDAD
C.M.
1.00
CANTIDAD
C.M.
3.00
CANTIDAD
C.M.
4.00
CANTIDAD
C.M.
860.00
CANTIDAD
C.M.
139.00
CANTIDAD
C.M.
128.00
CANTIDAD
C.M.
1.00
CANTIDAD
C.M.
32.00
CANTIDAD
C.M.
1.00
CANTIDAD
C.M.
14,662.79
CANTIDAD
C.M.
6,871.05
CANTIDAD
C.M.
1,867.76
CANTIDAD
C.M.
4,926.67
CANTIDAD
C.M.
4,689.79
CANTIDAD
C.M.
953.00
CANTIDAD
C.M.
2,321.00
CANTIDAD
C.M.
266.00
CANTIDAD
C.M.
3,769.00
CANTIDAD
C.M.
2,656.00
CANTIDAD
C.M.
14,672.79
CANTIDAD
C.M.
14,672.79
CANTIDAD
C.M.
0.00
CANTIDAD
C.M.
0.00
CANTIDAD
C.M.
0.40
CANTIDAD
C.M.
816.34
CANTIDAD
C.M.
600.00
CANTIDAD
C.M.
34.00
CANTIDAD
C.M.
23.00
CANTIDAD
C.M.
0.00
CANTIDAD
C.M.
0.00
CANTIDAD
C.M.
0.00
CANTIDAD
C.M.
0.00
CANTIDAD
C.M.
197.00
CANTIDAD
C.M.
220.00
CANTIDAD
C.M.
220.00
CANTIDAD
C.M.
23.00
CANTIDAD
C.M.
60.00
CANTIDAD
C.M.
16.36
CANTIDAD
C.M.
4.62
CANTIDAD
C.M.
6.68
CANTIDAD
C.M.
0.33
CANTIDAD
C.M.
56.00
CANTIDAD
C.M.
8.00
CANTIDAD
C.M.
71.52
CANTIDAD
C.M.
85.88
CANTIDAD
C.M.
15.92
CANTIDAD
C.M.
9.02
CANTIDAD
C.M.
4.86
CANTIDAD
C.M.
10.07
CANTIDAD
C.M.
71.59
CANTIDAD
C.M.
100.78
CANTIDAD
C.M.
132.78
CANTIDAD
C.M.
146.04
CANTIDAD
C.M.
152.08
CANTIDAD
C.M.
28.00
CANTIDAD
C.M.
845.00
CANTIDAD
C.M.
147.96
CANTIDAD
C.M.
43.16
CANTIDAD
C.M.
104.81
CANTIDAD
C.M.
822.00
CANTIDAD
C.M.
23.00
CANTIDAD
C.M.
845.00
CANTIDAD
C.M.
845.00
CANTIDAD
C.M.
0.37
CANTIDAD
C.M.
23.00
CONTRATO MODIFICATORIO N
Proyecto: AMPL. Y RENOV. SIST. AGUA POTABLE CHARAGUA (CHARAGUA)
Supervisor : Ing. EDGAR MORAN FLORES
93CC212
93FA047
93GB70001
93GB70002
93GB70003
96BC0469
S36A389
MCBB0524
17CB001
31BD003
93DB083
93GB012
93GB025
93GB20001
96FC151
MCHQU27
01AB002
02AC001
03BA010
03CA003
40DA035
40DB024
40IA001
DESCRIPCION
UNID
CANTIDAD
PRECIO
UNITARIO
Bs
MITIGACION AMBIENTAL SB
CINTA PLASTICA DE SEGURIDAD
LETRINA
PASOS PEATONALES
SEALIZACION DE SEGURIDAD DE MADERA
SEALIZACION DE SEGURIDAD DE PVC
LIMPIEZA GENERAL
CONTENEDORES DE BASURA
ML
PZA
PZA
PZA
PZA
GLB
PZA
800.00
1.07
1.00
1,479.86
4.00
117.67
10.00
352.57
15.00
229.88
1.00
2,194.61
3.00
245.39
Costo Modulo
MEJORAMIENTO DE TANQUE
PINTURA AL ACEITE SOBRE CARPINTERIA METALICA
ESCALERA METALICA
ACCESORIOS TANQUE ALMACENAMIENTO
MEDIDOR DE NIVELES TANQUES DE H20
PINTURA LATEX
IMPERMEABILIZACION DE TANQUE C/SIKA TOP
LIMPIEZA DE TANQUE
M2
ML
GLB
GLB
M2
M2
GLB
2.10
134.03
3.00
288.72
1.00
6,339.97
1.00
1,602.86
360.00
30.78
356.50
93.14
1.00
276.18
Costo Modulo
MEJORAMIENTO RED
REPLANTEO Y CONTROL DE TUBERIAS
EXCAVACION DE 0-2 M SUELO SEMIDURO
RELLENO MANUAL CON TIERRA CERNIDA(SIN MATERIAL DE
RELLENO Y COMPACTADO (TIERRA COMUN)
PROV. Y TENDIDO TUBERIA PVC 2 PULG -CLASE 9 (ESPIG
PROV.Y TENDIDO TUBERIA PVC 1 1/2PULG-CLASE 9(JU
PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.
ML
M3
M3
M3
ML
ML
ML
2411.00
1446.60
940.29
506.31
1314.00
1097.00
2411.00
1.02
40.73
35.67
25.21
18.53
14.57
0.20
40JA001
93FB395
93GB201
96CC185
40DA003
93DB104
ML
PZA
GLB
PZA
ML
PZA
PZA
PZA
ML
ML
PZA
GLB
ML
PZA
2411.00
54.00
1.00
112.00
0.29
1,199.30
5,325.87
722.35
12.99
5,907.02
3,815.20
2,701.36
9.75
11.16
805.40
11,068.46
83.310
3525.27
Costo Modulo
MLPZ5002
RED DE DISTRIBUCION
01AB002
REPLANTEO Y CONTROL DE TUBERIAS
02AC001
EXCAVACION DE 0-2 M SUELO SEMIDURO
03BA010
RELLENO MANUAL CON TIERRA CERNIDA(SIN MATERIAL DE
03CA003
RELLENO Y COMPACTADO (TIERRA COMUN)
40DA003 PROV. Y TENDIDO TUBERIA PVC 1 PULG - ESQ.40 (ESPIG
40DA004 PROV. Y TENDIDO TUBERIA PVC 1 1/2 PULG -ESQ.40 (ES
40DA035 PROV. Y TENDIDO TUBERIA PVC 2 PULG -CLASE 9 (ESPIG
40DA036 PROV. Y TENDIDO TUBERIA PVC 2 1/2 PULG - CLASE 9 (
40DA037 PROV. Y TENDIDO TUBERIA PVC 3 PULG - CLASE 9 (ESPI
40DA038 PROV. Y TENDIDO TUBERIA PVC 4 PULG - CLASE 9 ( ESP
40IA001
PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.
40JA001
DESINFECCION DE TUBERIAS (HASTA D = 4 PULG )
41BC025
PEDESTAL Y BASE PARA PILETA H?A?
42BC008
CAMARA DE LLAVES
93BC1007 ACCESORIO RED DE DISTRIBUCION
93BC15000 PASO DE QUEBRADA DE 50 M
93CB616
PASO DE QUEBRADA TIPO I
93FB395
CONEX. DOM. C/MEDIDOR (INCL. EXC. Y RELL)
93GB309 POZO DE INFILTRACION 1 M3 (SEG. DISE?O)
93GD034 HORMIGON CICLOPEO PARA ANCLAJES
ACTIVIDAD DE NUEVA CREACION
PROV. Y TENDIDO TUBERIA PVC 1/2 PULG - ESQ.40
PROV. Y TENDIDO TUBERIA PVC 3/4 PULG - ESQ.40
CONEXIN DOMICILIARIA CON MEDIDOR 1/2" Y GRIFO"
PROV. Y TENDIDO TUBERIA FG D=4
MSCZ0024
01AB002
02AC001
03BA010
03CA003
40DA038
40IA001
40JA001
42BC008
93GB263
93GD034
ADUCCION
REPLANTEO Y CONTROL DE TUBERIAS
EXCAVACION DE 0-2 M SUELO SEMIDURO
RELLENO MANUAL CON TIERRA CERNIDA(SIN MATERIAL DE
RELLENO Y COMPACTADO (TIERRA COMUN)
PROV. Y TENDIDO TUBERIA PVC 4 PULG - CLASE 9 ( ESP
PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.
DESINFECCION DE TUBERIAS (HASTA D = 4 PULG )
CAMARA DE LLAVES
ACCESORIOS DE ADUCCION
HORMIGON CICLOPEO PARA ANCLAJES
ML
M3
M3
M3
ML
ML
ML
ML
ML
ML
ML
ML
PZA
PZA
GLB
GLB
GLB
PZA
PZA
M3
ML
ML
GLB
ML
ML
M3
M3
M3
ML
ML
ML
PZA
GLB
M3
12862.00
6413.30
2309.30
4104.00
3122.00
926.00
2200.00
270.00
3764.00
2580.00
12862.00
12862.00
34.00
8.00
1.00
1.00
1.00
34.00
34.00
0.45
1.02
40.73
35.67
25.21
12.99
19.15
18.94
26.66
35.15
53.91
0.20
0.29
709.55
787.24
5,325.87
29,227.57
38571.72
1185.07
328.76
916.29
9.75
11.16
805.40
212.86
Costo Modulo
280.00
168.00
58.80
109.20
280.00
280.00
280.00
2.00
1.00
0.80
1.02
40.73
35.67
25.21
53.91
0.2
0.29
787.24
5913.49
916.29
MSCZ645
40FA008
ML
212.86
Costo Modulo
MSCZ0138
ML
M3
M3
M3
M3
ML
M2
100.00
15.70
1.20
14.00
0.60
95.00
11.20
Costo
4.73
40.73
42.87
916.29
3283.24
350.49
408.98
Modulo
MSCZ0207
93BC816
93GB055
93GB056
93GB186
96BB0119
96GF70064
MSCZ0250
01AC001
02AC001
06BA011
06BA014
31BD003
93AB407
93AD562
93BC677
93DB104
93DB105
93DB134
93GB012
93GB013
93GB025
93GB20001
96EC258
96FC015
MSCZ181
01AB001
02AC001
03BA010
03CA003
40DA038
40FA008
40IA001
40JA001
GLB
HR
HR
GLB
GLB
GLB
ML
M3
M3
M3
ML
ML
ML
ML
1.00
7503.94
15.00
341.91
15.00
414.55
1.00
270.08
1.00
1507.83
1.00
87043.54
Costo Modulo
81.00
67.00
13.45
16.12
5.50
2.00
7.00
1.00
1.00
10.78
70.56
1.00
100.00
65.60
152.88
152.88
65.60
23.51
40.73
4451.53
4733.48
288.72
342.53
42.87
6339.97
3525.27
4265.61
80.62
1606.61
13.98
30.93
93.41
69.91
58.16
447.27
Costo Modulo
840.00
504.00
176.40
327.60
720.00
120.00
411.00
411.00
1.02
40.73
35.67
25.21
53.91
212.86
0.2
0.29
42BC008
93BC961
93GD034
MSCZ645
40FA008
MSCZ645
01FA003
93GB187
93GC013
93GD047
CAMARA DE LLAVES
ACCESORIOS IMPULSION
HORMIGON CICLOPEO PARA ANCLAJES
ACTIVIDAD DE NUEVA CREACION IMPULSION POZO TANQUE
PROV. Y TENDIDO DE TUBERIA F.G. D=4 PULG_x000D_
ACTIVIDADES PRELIMINARES
INSTALACION DE FAENAS
PROV. Y COLOC. PLACA DE ENTEGA FPS
MOVILIZACION Y DESMOVILIZACION
LETRERO DE OBRAS
PZA
GLB
M3
ML
GLB
PZA
GLB
PZA
2.00
1.00
0.60
787.24
4967.23
916.29
212.86
Costo Modulo
1.00
1.00
1.00
2.00
4604.26
631.05
3735.54
1088.79
Costo Modulo
Costo Total
MODIFICATORIO N1
Plazo
Fecha inicio
Conclusion
ADOS
180
12/1/2015
5/29/2016
CONTRATO MODIFICATORIO
INCREMENTOS
PRECIO TOTAL
Bs
CANT.
P. PARCIAL
Bs.
DECREMENTOS
CANT.
P. PARCIAL
Bs.
CANTIDAD
C.M.
PRECIO TOTAL
Bs.
856.00
1,479.86
470.68
3,525.70
3,448.20
2,194.61
736.17
12,711.22
800.00
1.00
4.00
10.00
15.00
1.00
3.00
Costo Modulo C.M.
856.00
1,479.86
470.68
3,525.70
3,448.20
2,194.61
736.17
12,711.22
281.46
866.16
6,339.97
1,602.86
11,080.80
33,204.41
276.18
53,651.84
2.10
3.00
1.00
1.00
204.25
-4,793.99
266.13
-8,417.06
1.00
Costo Modulo C.M.
281.46
866.16
6,339.97
1,602.86
6,286.82
24,787.35
276.18
40,440.80
3,108.68
560.95
186.42
372.12
2,763.20
345.48
3,478.68
3,170.85
22,847.49
6,649.60
9,381.15
51,202.10
5,033.64
695.74
2,459.22
58,920.02
33,540.14
12,764.08
24,348.42
15,983.29
482.20
-155.75
-90.37
697.68
711.63
1,449.20
26,853.68
1,067.68
213.54
-885.65
-753.87
-134.19
-36,072.52
-26,890.54
-3,382.93
-751.52
-10,949.65
699.19
64,762.20
5,325.87
80,903.20
1,067.68
-54.00
370.00
1.00
3.00
4.00
860.00
139.00
128.00
1.00
32.00
1
300,187.83
3,478.68
0.00
1.00
112.00
1,008.82
0.00
5,325.87
80,903.20
370.00
1.00
3.00
4.00
860.00
139.00
128.00
1.00
32.00
1.00
Costo Modulo C.M.
4,806.30
5,907.02
11,445.60
10,805.44
8,385.00
1,551.24
103,091.20
11,068.46
2,665.92
3,525.27
349,469.91
309.63
4,806.30
5,907.02
11,445.60
10,805.44
8,385.00
1,551.24
103,091.20
11,068.46
2,665.92
3,525.27
-64,762.20
13,119.24
261,213.71
82,372.73
103,461.84
40,554.78
17,732.90
41,668.00
7,198.20
132,304.60
139,087.80
2,572.40
3,729.98
24,124.70
6,297.92
5,325.87
29,227.57
38,571.72
40,292.38
11,177.84
412.33
1,800.79
457.75
1,836.81
18,644.16
822.67
1,567.79
27.00
121.00
20,739.51
20,365.59
517.05
2,291.74
5.00
76.00
1,810.79
1,810.79
175.75
4,097.16
362.16
525.13
816.34
600.00
34.00
23.00
14,956.05
279,857.87
66,623.00
124,201.35
60,920.37
18,249.95
43,959.74
7,091.56
132,480.35
143,184.96
2,934.56
4,255.11
24,124.70
6,297.92
5,325.87
29,227.57
0.00
0.00
11,177.84
366.52
816.34
600.00
34.00
23.00
Costo Modulo C.M.
7,959.32
6,696.00
27,383.60
4,895.78
1,022,169.99
0.00
0.00
0.00
0.00
197.00
220.00
220.00
2.00
1.00
0.80
0.00
0.00
0.00
0.00
10,620.27
44.00
63.80
1,574.48
5,913.49
733.03
-441.54
-15,749.73
-4.00
-106.64
-1.00
-34.00
-38,571.72
-40,292.38
-0.05
-45.81
7,959.32
6,696.00
27,383.60
4,895.78
1,000,446.51
285.60
6,842.64
2,097.40
2,752.93
15,094.80
56.00
81.20
1,574.48
5,913.49
733.03
14,662.79
6,871.05
1,867.76
4,926.67
4,689.79
953.00
2,321.00
266.00
3,769.00
2,656.00
14,672.79
14,672.79
34.00
8.00
1.00
1.00
0.00
0.00
34.00
0.40
-280.00
-168.00
-58.80
-109.20
-83.00
-60.00
-60.00
-285.60
-6842.64
-2097.396
-2752.932
-4474.53
-12
-17.4
23.00
23.00
Costo Modulo C.M.
35,431.57
473.00
639.46
51.44
12,828.06
1,969.94
33,296.55
4,580.58
53,839.03
0.66
3.42
-40.00
-189.20
-7.32
-0.27
-39.00
-3.20
-6707.24
-886.47
-13669.11
-1308.74
Costo
26.88
146.79
60.00
16.36
4.62
6.68
0.33
56.00
8.00
Modulo C.M.
4,895.78
23,844.85
283.80
666.34
198.06
6,120.82
1,083.47
19,627.44
3,271.84
31,251.77
7,503.94
5,128.65
6,218.25
270.08
1,507.83
87,043.54
107,672.29
1,904.31
2,728.91
59,873.08
76,303.70
1,587.96
685.06
300.09
6,339.97
3,525.27
45,983.28
5,688.55
1,606.61
1,398.00
2,029.01
14,280.52
10,687.84
3,815.30
1.00
15.00
15.00
1.00
1.00
1.00
Costo Modulo C.M.
18.88
768.98
3.52
1016.29
1.03
83.04
0.78
67.18
10.90
2077.88
-9.48
-222.87
-0.20
-946.70
-2.14
-91.74
-0.71
-3028.58
-6.84
-0.80
-638.92
-55.93
71.52
85.88
13.45
15.92
9.02
2.00
4.86
1.00
1.00
10.07
71.59
1.00
100.78
132.78
146.04
152.08
65.60
1,681.44
3,497.89
59,873.08
75,357.00
2,604.25
685.06
208.35
6,339.97
3,525.27
42,954.69
5,771.59
1,606.61
1,408.90
4,106.89
13,641.60
10,631.91
3,815.30
28.00
12523.56
28.00
Costo Modulo C.M.
12,523.56
250,233.36
5.00
5.10
845.00
147.96
43.16
104.81
822.00
23.00
845.00
845.00
861.90
6,026.41
1,539.52
2,642.26
44,314.02
4,895.78
169.00
245.05
238,737.46
856.80
20,527.92
6,292.19
8,258.80
38,815.20
25,543.20
82.20
119.19
7,503.94
5,128.65
6,218.25
270.08
1,507.83
87,043.54
107,672.29
102.00
434.00
434.00
-356.04
-133.24
-222.79
-14501.51
-4752.67
-5616.54
-97.00
-20647.42
5498.82
86.8
125.86
1,574.48
4,967.23
549.77
2.00
1.00
0.37
1,574.48
4,967.23
339.03
107,586.98
23.00
Costo Modulo C.M.
4,895.78
72,470.46
4,604.26
631.05
3,735.54
2,177.58
1.00
1.00
1.00
2.00
4,604.26
631.05
3,735.54
2,177.58
11,148.43
11,148.43
Costo C.M.Total
1,921,413.08
-0.23
23.00
1,921,413.16
1/2"
3/4"
9
10
7
10
9
8
18
8
10
12
10
14
10
10
10
10
10
10
10
10
10
10
15
12
12
12
12
3
18
27
10
10
36
18
2
30
27
13
13
13
9
10
30
68
47
24
139
11
7
18
10
10
3
30
8
32
6
13
6
6
12
6
6
7
12
6
12
12
790
PLANILLA DE AVANCE N
Proyecto: AMPL. Y RENOV. SIST. AGUA POTABLE CHARAGUA (CHARAGUA)
Supervisor : EDGAR MORAN FLORES
Empresa: EVISUR S.R.L.
Proyecto: FPS-08-00003382 AMPL. Y RENOV. SIST. AGUA POTABLE CHARAGUA (CHARAGUA)
93CC212
93FA047
93GB70001
93GB70002
93GB70003
96BC0469
S36A389
MCBB0524
17CB001
31BD003
93DB083
93GB012
93GB025
93GB20001
96FC151
MCHQU27
01AB002
02AC001
03BA010
03CA003
40DA035
40DB024
40IA001
40JA001
93FB395
93GB201
96CC185
DESCRIPCION
UNID
CANTIDAD
PRECIO
UNITARIO Bs
MITIGACION AMBIENTAL SB
CINTA PLASTICA DE SEGURIDAD
LETRINA
PASOS PEATONALES
SEALIZACION DE SEGURIDAD DE MADERA
SEALIZACION DE SEGURIDAD DE PVC
LIMPIEZA GENERAL
CONTENEDORES DE BASURA
ML
PZA
PZA
PZA
PZA
GLB
PZA
800.00
1.00
4.00
10.00
15.00
1.00
3.00
1.07
1,479.86
117.67
352.57
229.88
2,194.61
245.39
Costo Modulo
MEJORAMIENTO DE TANQUE
PINTURA AL ACEITE SOBRE CARPINTERIA METALICA
ESCALERA METALICA
ACCESORIOS TANQUE ALMACENAMIENTO
MEDIDOR DE NIVELES TANQUES DE H20
PINTURA LATEX
IMPERMEABILIZACION DE TANQUE C/SIKA TOP
LIMPIEZA DE TANQUE
M2
ML
GLB
GLB
M2
M2
GLB
2.10
3.00
1.00
1.00
360.00
356.50
1.00
134.03
288.72
6,339.97
1,602.86
30.78
93.14
276.18
Costo Modulo
MEJORAMIENTO RED
REPLANTEO Y CONTROL DE TUBERIAS
EXCAVACION DE 0-2 M SUELO SEMIDURO
RELLENO MANUAL CON TIERRA CERNIDA(SIN MATERIAL DE
RELLENO Y COMPACTADO (TIERRA COMUN)
PROV. Y TENDIDO TUBERIA PVC 2 PULG -CLASE 9 (ESPIG
PROV.Y TENDIDO TUBERIA PVC 1 1/2PULG-CLASE 9(JU
PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.
DESINFECCION DE TUBERIAS (HASTA D = 4 PULG )
CONEX. DOM. C/MEDIDOR (INCL. EXC. Y RELL)
ACCESORIOS DE RED SEGUN DISE?O
PROV Y COLOC MEDIDOR DE AGUA
ML
M3
M3
M3
ML
ML
ML
ML
PZA
GLB
PZA
2411.00
1446.60
940.29
506.31
1314.00
1097.00
2411.00
2411.00
54.00
1.00
112.00
1.02
40.73
35.67
25.21
18.53
14.57
0.20
0.29
1,199.30
5,325.87
722.35
Costo Modulo
MLPZ5002
01AB002
02AC001
03BA010
03CA003
40DA003
40DA004
40DA035
40DA036
40DA037
40DA038
40IA001
40JA001
41BC025
42BC008
93BC1007
93BC15000
93CB616
93FB395
93GB309
93GD034
RED DE DISTRIBUCION
REPLANTEO Y CONTROL DE TUBERIAS
EXCAVACION DE 0-2 M SUELO SEMIDURO
RELLENO MANUAL CON TIERRA CERNIDA(SIN MATERIAL DE
RELLENO Y COMPACTADO (TIERRA COMUN)
PROV. Y TENDIDO TUBERIA PVC 1 PULG - ESQ.40 (ESPIG
PROV. Y TENDIDO TUBERIA PVC 1 1/2 PULG -ESQ.40 (ES
PROV. Y TENDIDO TUBERIA PVC 2 PULG -CLASE 9 (ESPIG
ML
M3
M3
M3
ML
ML
ML
ML
ML
ML
ML
ML
PZA
PZA
GLB
GLB
GLB
PZA
PZA
M3
12862.00
6413.30
2309.30
4104.00
3122.00
926.00
2200.00
270.00
3764.00
2580.00
12862.00
12862.00
34.00
8.00
1.00
1.00
1.00
34.00
34.00
0.45
1.02
40.73
35.67
25.21
12.99
19.15
18.94
26.66
35.15
53.91
0.20
0.29
709.55
787.24
5,325.87
29,227.57
38571.72
1185.07
328.76
916.29
Costo Modulo
MSCZ0024
01AB002
02AC001
03BA010
03CA003
40DA038
40IA001
40JA001
42BC008
93GB263
93GD034
MSCZ0138
01AD001
02AC001
03CB002
93AB422
93BC10003
93CA049
93FB163
MSCZ0207
93BC816
93GB055
93GB056
93GB186
96BB0119
96GF70064
MSCZ0250
01AC001
02AC001
06BA011
06BA014
31BD003
93AB407
93AD562
93BC677
93DB104
93DB105
93DB134
ADUCCION
REPLANTEO Y CONTROL DE TUBERIAS
EXCAVACION DE 0-2 M SUELO SEMIDURO
RELLENO MANUAL CON TIERRA CERNIDA(SIN MATERIAL DE
RELLENO Y COMPACTADO (TIERRA COMUN)
PROV. Y TENDIDO TUBERIA PVC 4 PULG - CLASE 9 ( ESP
PRUEBA HIDRAULICA-TUBERIAS HASTA 4 PULG.
DESINFECCION DE TUBERIAS (HASTA D = 4 PULG )
CAMARA DE LLAVES
ACCESORIOS DE ADUCCION
HORMIGON CICLOPEO PARA ANCLAJES
ML
M3
M3
M3
ML
ML
ML
PZA
GLB
M3
280.00
168.00
58.80
109.20
280.00
280.00
280.00
2.00
1.00
0.80
ML
M3
M3
M3
M3
ML
M2
100.00
15.70
1.20
14.00
0.60
95.00
11.20
4.73
40.73
42.87
916.29
3283.24
350.49
408.98
Costo Modulo
GLB
HR
HR
GLB
GLB
GLB
1.00
15.00
15.00
1.00
1.00
1.00
7503.94
341.91
414.55
270.08
1507.83
87043.54
Costo Modulo
M2
M3
M3
M3
ML
PZA
M3
GLB
PZA
M3
M2
81.00
67.00
13.45
16.12
5.50
2.00
7.00
1.00
1.00
10.78
70.56
23.51
40.73
4451.53
4733.48
288.72
342.53
42.87
6339.97
3525.27
4265.61
80.62
1.02
40.73
35.67
25.21
53.91
0.2
0.29
787.24
5913.49
916.29
Costo Modulo
93GB012
93GB013
93GB025
93GB20001
96EC258
96FC015
GLB
M3
M2
M2
M2
M2
1.00
100.00
65.60
152.88
152.88
65.60
1606.61
13.98
30.93
93.41
69.91
58.16
Costo Modulo
MSCZ181
01AB001
02AC001
03BA010
03CA003
40DA038
40FA008
40IA001
40JA001
42BC008
93BC961
93GD034
MSCZ645
01FA003
93GB187
93GC013
93GD047
ML
M3
M3
M3
ML
ML
ML
ML
PZA
GLB
M3
840.00
504.00
176.40
327.60
720.00
120.00
411.00
411.00
2.00
1.00
0.60
1.02
40.73
35.67
25.21
53.91
212.86
0.2
0.29
787.24
4967.23
916.29
Costo Modulo
ACTIVIDADES PRELIMINARES
INSTALACION DE FAENAS
PROV. Y COLOC. PLACA DE ENTEGA FPS
MOVILIZACION Y DESMOVILIZACION
LETRERO DE OBRAS
GLB
PZA
GLB
PZA
1.00
1.00
1.00
2.00
4604.26
631.05
3735.54
1088.79
Costo Modulo
Costo Total
Supervisor de Obra
PLANILLA DE AVANCE N2
Periodo
Dias Ejec.
AGUA)
12/1/2015
9.00
E AUTORIZADOS
12/9/2015 Periodo
171.00 Dias Ejec.
PLANILLA N 1
PRECIO TOTAL
Bs
856.00
1,479.86
470.68
3,525.70
3,448.20
2,194.61
736.17
12,711.22
CANTIDAD
P. PARCIAL
PORCENT%
300.00
321.00
37.50%
5.00
1,762.85
50.00%
5.00
1,149.40
33.33%
0.00
0.00
0.00%
3.00
736.17
100.00%
3,969.42
31.23%
CANTIDAD
300.00
1.00
4.00
5.00
5.00
65,011.50
80.36%
65,011.50
21.66%
P. PARCIAL
PORCENT%
321.00
1,479.86
470.68
1,762.85
1,149.40
37.50%
100.00%
100.00%
50.00%
33.33%
5,183.79
40.78%
6,286.82
23,285.00
56.74%
70.13%
29,571.82
55.12%
2,411.00
560.95
186.42
372.12
1,314.00
345.48
2,459.22
22,847.49
6,649.60
9,381.15
24,348.42
5,033.64
100.00%
38.78%
19.83%
73.50%
100.00%
31.49%
0.80
18.00
4,260.70
13,002.30
87,982.52
80.00%
16.07%
29.31%
204.25
250.00
90.00
41.00
1/20/2016
130.00
PLANILLA N 2
281.46
866.16
6,339.97
1,602.86
11,080.80
33,204.41
276.18
53,651.84
2,459.22
58,920.02
33,540.14
12,764.08
24,348.42
15,983.29
482.20
699.19
64,762.20
5,325.87
80,903.20
300,187.83
12/10/2015
41.00
13,119.24
261,213.71
82,372.73
103,461.84
40,554.78
17,732.90
41,668.00
7,198.20
132,304.60
139,087.80
2,572.40
3,729.98
24,124.70
6,297.92
5,325.87
29,227.57
38,571.72
40,292.38
11,177.84
412.33
1,000,446.51
12,841.38
13,098.21
99.84%
5,692.40
231,851.45
88.76%
1,867.76
66,623.00
80.88%
2,028.69
51,143.27
49.43%
3,122.00
40,554.78
100.00%
926.00
17,732.90
100.00%
2,200.00
41,668.00
100.00%
266.00
7,091.56
98.52%
3,689.00
129,668.35
98.01%
441.00
23,774.31
17.09%
623,205.83
62.29%
20.62
720.90
21.03
29,362.26
0.16%
11.24%
2,075.31
52,318.57
50.57%
40.00
2,139.00
1,406.00
115,313.49
1.06%
82.91%
32.00
0.89
0.45
22,705.60
0.00
4,740.02
13,152.41
94.12%
0.00%
89.00%
45.00%
32.00
10,520.32
94.12%
249,539.70
24.94%
285.60
6,842.64
2,097.40
2,752.93
15,094.80
56.00
81.20
1,574.48
5,913.49
733.03
35,431.57
197.00
10,620.27
0.80
4,730.79
70.36%
15,351.06
43.33%
32.14
1,309.06
47.97%
9.36
44,305.37
58.06%
4.86
0.80
208.35
5,071.98
69.43%
473.00
639.46
51.44
12,828.06
1,969.94
33,296.55
4,580.58
53,839.03
7,503.94
5,128.65
6,218.25
270.08
1,507.83
87,043.54
107,672.29
1,904.31
2,728.91
59,873.08
76,303.70
1,587.96
685.06
300.09
6,339.97
3,525.27
45,983.28
5,688.55
71.52
34.86
13.45
67.24
1681.44
1419.85
59873.08
5420.89
88.30%
52.03%
100.00%
95.29%
1,606.61
1,398.00
2,029.01
14,280.52
10,687.84
3,815.30
238,737.46
68395.26
28.65%
50,894.76
21.32%
856.80
20,527.92
6,292.19
8,258.80
38,815.20
25,543.20
82.20
119.19
1,574.48
4,967.23
549.77
107,586.98
4,604.26
631.05
3,735.54
2,177.58
11,148.43
1,921,413.16
0.8
3683.41
80.00%
0.5
2
1867.77
2177.58
7728.76
768,310.77
50.00%
Total
840.00
147.96
43.16
104.81
720.00
23.00
856.80
6,026.41
1,539.52
2,642.26
38,815.20
4,895.78
0.8
3,973.78
58,749.75
54.61%
0.2
920.85
20.00%
2.00
2,177.58
3,098.43
500,371.83
100.00%
27.79%
26.04%
69.33%
39.99%
Total
1,921,413.16
0.00
1,921,413.16
500,371.83
0.00
1,921,413.16 Bs.
0.00 Bs.
1,921,413.16 Bs.
768,310.77 Bs.
500,371.83
768,310.77
s Mil, Cuatrocientos Diez y Ocho 18/100 Bolivianos
Fiscal de obra
G.A.M. Charagua
100.00%
29.36%
24.47%
31.99%
100.00%
19.17%
FPS
G.A.M.CHARAGUA
PROVINCIA:
DEPARTAMENTO:
Unid.
ITEM
DESCRIPCION
ML
PZA
Letrina
PASOS PEATONALES
PZA
Pasos peatonales
PZA
PZA
LIMPIEZA GENERAL
GLB
Limpieza General
CONTENEDORES DE BASURA
7
II
Dimensiones
ancho
Cinta de seguridad
LETRINA
2
CORDILLERA
SANTA CRUZ
PZA
Contenedores de Basura
M2
ESCALERA METALICA
ML
GLB
GLB
10
11
M2
PINTURA LATEX
12
MUROS
9.50
TECHOS
9.50
TOTAL
IMPERMEABILIZACION DE TANQUE C/SIKA TOP
13
M2
13
MUROS
8.90
MUROS
4.45
8.90
PISO
TOTAL
LIMPIEZA DE TANQUE
14
III
15
GLB
INTERIOR DE TANQUE
DE 33 A 35
DE 35 A 36
PARA CAMBIO DE TUBERIA 2" C-9 BARRIO CUPESI
DE 37 A 38
DE 38 A 39
DE 38 A 42
PARA CAMBIO DE TUBERIA 11/ 2" C-9 BARRIO CUPESI
DE 39 A 40
DE 39 A 41
Calles Nuevas Cupesi
Calle Barrio Cotoca
Calle Satelite (Cotoca)
PARA EL BARRIO 1 DE MAYO
TUBERIA DE 2 "
CONEXIN PASO QUEBRADA 1 A PASO QUEBRADA2
ML
M3
0.45
DE 20 A 23
0.45
DE 21 A 22
0.45
DE 22 A 23
0.45
0.45
DE 28 A 20
0.45
DE 28 A 21
0.45
DE 26 A 27
0.45
16
DE 30 A 31
0.45
DE 31 A 32
0.45
DE 32 A 33
0.45
DE 33 A 34
0.45
DE 33 A 35
0.45
DE 35 A 36
0.45
0.45
DE 38 A 39
0.45
DE 38 A 42
0.45
0.45
DE 39 A 41
0.45
0.45
0.45
0.45
0.45
0.45
Total
RELLENO MANUAL CON TIERRA CERNIDA(SIN MATERIAL DE
M3
0.45
DE 20 A 23
0.45
DE 21 A 22
0.45
DE 22 A 23
0.45
0.45
DE 28 A 20
0.45
DE 28 A 21
0.45
DE 26 A 27
0.45
0.45
DE 31 A 32
0.45
DE 32 A 33
0.45
DE 33 A 34
0.45
DE 33 A 35
0.45
DE 35 A 36
0.45
17
0.45
DE 38 A 39
0.45
17
DE 38 A 42
0.45
0.45
DE 39 A 41
0.45
0.45
0.45
0.45
0.45
0.45
Total
RELLENO Y COMPACTADO (TIERRA COMUN)
PARA CAMBIO DE TUBERIA 2" C-9 BARRIO EL CARMEN
M3
DE 20 A 21
0.45
DE 20 A 23
0.45
DE 21 A 22
0.45
DE 22 A 23
0.45
0.45
DE 28 A 20
0.45
DE 28 A 21
0.45
DE 26 A 27
0.45
18
DE 30 A 31
0.45
DE 31 A 32
0.45
DE 32 A 33
0.45
DE 33 A 34
0.45
DE 33 A 35
0.45
DE 35 A 36
0.45
0.45
DE 38 A 39
0.45
DE 38 A 42
0.45
0.45
DE 39 A 41
0.45
0.45
0.45
0.45
0.45
0.45
Total
ML
19
DE 35 A 36
PARA CAMBIO DE TUBERIA 2" C-9 BARRIO CUPESI
DE 37 A 38
DE 38 A 39
DE 38 A 42
PARA EL BARRIO 1 DE MAYO
TUBERIA DE 2 "
CONEXIN PASO QUEBRADA 1 A PASO QUEBRADA2
Total
ML
20
DE 39 A 40
DE 39 A 41
Total
ML
21
DE 33 A 34
DE 33 A 35
DE 35 A 36
PARA CAMBIO DE TUBERIA 2" C-9 BARRIO CUPESI
DE 37 A 38
DE 38 A 39
DE 38 A 42
PARA CAMBIO DE TUBERIA 11/ 2" C-9 BARRIO CUPESI
DE 39 A 40
DE 39 A 41
Calles Nuevas Cupesi
Calle Barrio Cotoca
Calle Satelite (Cotoca)
PARA EL BARRIO 1 DE MAYO
PARA TUBERIA DE 2 "
CONEXIN PASO QUEBRADA 1 A PASO QUEBRADA2
Total
DESINFECCION DE TUBERIAS (HASTA D = 4 PULG )
PARA CAMBIO DE TUBERIA 2" C-9 BARRIO EL CARMEN
DE 20 A 21
DE 20 A 23
DE 21 A 22
DE 22 A 23
PARA CAMBIO DE TUBERIA 11/ 2" C-9 BARRIO EL CARMEN
DE 29 A 28
DE 28 A 20
DE 28 A 21
DE 26 A 27
PARA CAMBIO DE TUBERIA 2" C-9 BARRIO EXT. BARRIO COTOCA
DE 30 A 31
DE 31 A 32
DE 32 A 33
22
DE 33 A 34
DE 33 A 35
ML
22
DE 35 A 36
PARA CAMBIO DE TUBERIA 2" C-9 BARRIO CUPESI
DE 37 A 38
DE 38 A 39
DE 38 A 42
PARA CAMBIO DE TUBERIA 11/ 2" C-9 BARRIO CUPESI
DE 39 A 40
DE 39 A 41
Calles Nuevas Cupesi
Calle Barrio Cotoca
Calle Satelite (Cotoca)
PARA EL BARRIO 1 DE MAYO
PARA TUBERIA DE 2 "
CONEXIN PASO QUEBRADA 1 A PASO QUEBRADA2
Total
23
PZA
Total
24
25
GLB
PZA
ML
PZA
PZA
PZA
ML
ML
GLB
1 DE MAYO
CARMEN
SATELITE
BARRIO EXT. COTOCA
BARRIO CUPESI
OTROS
PASO DE QUEBRADA DE 18 M
GLB
TUBERIA FG 2"
Zona 1 de Mayo
ML
HIPOCLORADOR
PZA
IV
MODULO:RED DE DISTRIBUCION
ML
26
Total
M3
27
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
Total
M3
28
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
Total
RELLENO Y COMPACTADO (TIERRA COMUN)
29
M3
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
29
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
0.45
Total
ML
30
Total
ML
Total
ML
32
Total
33
ML
34
ML
35
ML
ML
36
Total
ML
37
Total
38
PZA
38
CAMARA DE LLAVES
PZA
GLB
PASO DE QUEBRADA DE 50 M
GLB
39
40
41
GLB
PZA
43
PZA
44
M3
45
Total
ITEMS NUEVOS EN EL MODULO
PROV. Y TENDIDO TUBERIA PVC 1/2 PULG - ESQ.40
ML
ML
PZA
PZA
MODULO: ADUCCION
ML
M3
0.45
M3
0.45
M3
0.45
ML
TUBERIA DE A.G. 4
ML
ML
PZA
CAMARA DE LLAVES
53
ACCESORIOS DE ADUCCION
GLB
M3
54
55
VI
0.40
ML
M3
56
57
0.50
2.50
6.80
Total
RELLENO COMPACTADO MANUAL- NO INCLUYE MATERIAL DE R
M3
6.80
58
M3
0.50
59
2.50
15.00
Total
COLUMNAS DE H A (S/D)
60
M3
0.25
60
ML
PERIMETRO ENMALLADO
DESCUENTO DE PORTON
Total
PUERTA DE MALLA OLIMPICA PARA CERCO PERIMETRAL
M2
62
VII
63
64
65
66
67
68
GLB
MOVILIZACION DE EQUIPO
HR
HR
GLB
GLB
GLB
VIII
8.20
CAMARAS
0.80
CASETA DE HIPOCLORADOR
1.20
Total
M3
EXCAVACION DE TANQUE
9.20
EXCAVACION DE CAMARAS
3.10
Total
M3
LOSA DE TANQUE
8.20
M3
MURO
0.20
MURO
0.20
Total
ML
ESCALERA METALICA
73
74
75
76
77
78
ESCALERA EXTERIOR
ESCALERA INTERIOR
PZA
M3
ACCESORIOS DE TANQUE
GLB
HIPOCLORADOR
PZA
M3
0.70
0.30
8.20
TAPA METALICA
0.70
3.10
Total
M2
ZAMPEADO DE PIEDRA
79
TANQUE
8.20
CAMARAS
3.10
CASETA DE HIPOCLORADOR
1.30
Total
80
GLB
M3
7.80
M2
PINTURA LATEX
82
LOSA TAPA
8.40
PAREDES EXTERIORES
8.20
TAPAS METALICAS
0.70
CASETA HIPOCLORADOR
1.20
Total
M2
PISO DE TANQUE
8.20
MUROS DE TANQUE
3.80
MUROS DE TANQUE
8.20
7.80
Total
M2
PISO DE TANQUE
7.80
MUROS DE TANQUE
3.80
MUROS DE TANQUE
7.80
Total
M2
REVOQUE EXTERIOR
85
IX
86
Total
M3
87
0.15
0.15
0.15
0.15
Total
M3
0.15
0.15
0.15
0.15
Total
M3
89
0.15
0.15
0.15
0.15
Total
ML
90
Total
ML
Total
ML
92
Total
ML
93
Total
PZA
CAMARA DE LLAVES
94
SALIDA POZO
LLEGADA POZO
Total
GLB
ACCESORIOS IMPULSION
95
IMPULSION
M3
0.40
Total
X
97
98
99
100
GLB
PZA
MOVILIZACION Y DESMOVILIZACION
GLB
LETRERO DE OBRAS
PZA
PROV. Y TENDIDO
TUBERIA F.G. D=4 PULG_x000D_
MLPZ5002
RED DEDE
DISTRIBUCION
_x000D_
_x000D_
PROG. 0+077 A 0+100 (TUB. FG 23 M)
CONTRATISTA:
SUPERVISOR:
Dimensiones
largo
Volumenes
GRAFICO
alto
EVISUR S.R.L.
EDGAR MORAN FLORES
N Veces
800.00
Parcial
Total
800.00
800.00
1.00
1.00
1.00
4.00
4.00
4.00
10.00
1.00
10.00
15.00
1.00
15.00
1.00
1.00
1.00
3.00
1.05
1.00
3.00
1.00
2.00
1.00
1.05
2.10
1.00
3.00
1.00
1.00
3.00
1.00
1.00
1.00
1.00
1.00
1.00
3.00
9.50
4.00
28.50
114.00
1.00
90.25
90.25
204.25
8.90
3.50
4.00
31.15
124.60
3.50
4.00
15.58
62.32
1.00
79.21
79.21
266.13
1.00
1.00
1.00
121.61
1.00
121.61
0.00
199.96
1.00
199.96
0.00
199.96
1.00
199.96
0.00
117.90
1.00
117.90
0.00
147.09
1.00
147.09
0.00
159.47
1.00
159.47
0.00
116.17
1.00
116.17
0.00
108.37
1.00
108.37
0.00
89.14
1.00
89.14
89.14
113.54
1.00
113.54
113.54
70.38
1.00
70.38
70.38
82.31
1.00
82.31
82.31
132.94
1.00
132.94
132.94
161.46
1.00
161.46
161.46
58.31
1.00
58.31
58.31
81.15
1.00
81.15
81.15
146.67
1.00
146.67
146.67
293.81
1.00
293.81
293.81
51.67
1.00
51.67
51.67
180.00
1.00
180.00
180.00
120.00
1.00
120.00
120.00
70.00
1.00
70.00
70.00
1,457.30
1.00
1,457.30
1,457.30
370.00
0.00
370.00
0.00
3,108.68
121.61
1.00
0.00
54.72
0.00
199.96
1.00
0.00
89.98
0.00
199.96
1.00
0.00
89.98
0.00
117.90
1.00
0.00
53.06
0.00
147.09
1.00
0.00
66.19
0.00
159.47
1.00
0.00
71.76
0.00
116.17
1.00
0.00
52.28
0.00
108.37
1.00
0.00
48.77
0.00
89.14
1.00
1.00
40.11
40.11
113.54
1.00
1.00
51.09
51.09
70.38
1.00
1.00
31.67
31.67
82.31
1.00
1.00
37.04
37.04
132.94
1.00
1.00
59.82
59.82
161.46
1.00
1.00
72.66
72.66
58.31
1.00
1.00
26.24
26.24
81.15
1.00
1.00
36.52
36.52
146.67
1.00
1.00
66.00
66.00
293.81
1.00
0.00
132.21
0.00
51.67
1.00
1.00
23.25
23.25
180.00
0.70
1.00
56.70
56.70
120.00
0.70
1.00
37.80
37.80
70.00
0.70
1.00
22.05
22.05
1,457.30
0.70
0.00
459.05
0.00
370.00
0.70
0.00
116.55
0.00
560.95
121.61
0.35
0.00
19.15
0.00
199.96
0.35
0.00
31.49
0.00
199.96
0.35
0.00
31.49
0.00
117.90
0.35
0.00
18.57
0.00
147.09
0.35
0.00
23.17
0.00
159.47
0.35
0.00
25.12
0.00
116.17
0.35
0.00
18.30
0.00
108.37
0.35
0.00
17.07
0.00
89.14
0.35
1.00
14.04
14.04
113.54
0.35
1.00
17.88
17.88
70.38
0.35
1.00
11.08
11.08
82.31
0.35
1.00
12.96
12.96
132.94
0.35
1.00
20.94
20.94
161.46
0.35
1.00
25.43
25.43
649.77
0.00
1.00
1.28
-1.28
58.31
0.35
1.00
9.18
9.18
81.15
0.35
1.00
12.78
12.78
146.67
0.35
1.00
23.10
23.10
286.13
0.00
1.00
0.56
-0.56
293.81
0.35
0.00
46.28
0.00
51.67
0.35
1.00
8.14
8.14
345.48
0.00
1.00
0.39
-0.39
180.00
0.20
1.00
16.20
16.20
180.00
0.00
1.00
0.09
-0.09
120.00
0.20
1.00
10.80
10.80
120.00
0.00
1.00
0.06
-0.06
70.00
0.20
1.00
6.30
6.30
70.00
0.00
1.00
0.04
-0.04
1,457.30
0.20
0.00
131.16
0.00
1,457.30
0.00
0.00
2.86
0.00
370.00
0.20
0.00
33.30
0.00
370.00
0.00
0.00
0.73
0.00
186.42
121.61
0.65
0.00
35.57
0.00
199.96
0.65
0.00
58.49
0.00
199.96
0.65
0.00
58.49
0.00
117.90
0.65
0.00
34.49
0.00
147.09
0.65
0.00
43.02
0.00
159.47
0.65
0.00
46.64
0.00
116.17
0.65
0.00
33.98
0.00
108.37
0.65
0.00
31.70
0.00
89.14
0.65
1.00
26.07
26.07
113.54
0.65
1.00
33.21
33.21
70.38
0.65
1.00
20.59
20.59
82.31
0.65
1.00
24.08
24.08
132.94
0.65
1.00
38.88
38.88
161.46
0.65
1.00
47.23
47.23
58.31
0.65
1.00
17.06
17.06
81.15
0.65
1.00
23.74
23.74
146.67
0.65
1.00
42.90
42.90
293.81
0.65
0.00
85.94
0.00
51.67
0.65
1.00
15.11
15.11
180.00
0.50
1.00
40.50
40.50
120.00
0.50
1.00
27.00
27.00
70.00
0.50
1.00
15.75
15.75
1,457.30
0.50
0.00
327.89
0.00
370.00
0.50
0.00
83.25
0.00
372.12
89.14
1.00
89.14
89.14
113.54
1.00
113.54
113.54
70.38
1.00
70.38
70.38
82.31
1.00
82.31
82.31
132.94
1.00
132.94
132.94
161.46
1.00
161.46
161.46
58.31
1.00
58.31
58.31
81.15
1.00
81.15
81.15
146.67
1.00
146.67
146.67
1,457.30
1.00
1,457.30
1,457.30
370.00
1.00
370.00
370.00
2,763.20
293.81
1.00
293.81
293.81
51.67
1.00
51.67
51.67
345.48
121.61
0.00
121.61
0.00
199.96
0.00
199.96
0.00
199.96
0.00
199.96
0.00
117.90
0.00
117.90
0.00
147.09
0.00
147.09
0.00
159.47
0.00
159.47
0.00
116.17
0.00
116.17
0.00
108.37
0.00
108.37
0.00
89.14
1.00
89.14
89.14
113.54
1.00
113.54
113.54
70.38
1.00
70.38
70.38
82.31
1.00
82.31
82.31
132.94
1.00
132.94
132.94
161.46
1.00
161.46
161.46
58.31
1.00
58.31
58.31
81.15
1.00
81.15
81.15
146.67
1.00
146.67
146.67
293.81
1.00
293.81
293.81
51.67
1.00
51.67
51.67
180.00
1.00
180.00
180.00
120.00
1.00
120.00
120.00
70.00
1.00
70.00
70.00
1,457.30
1.00
1,457.30
1,457.30
370.00
1.00
370.00
370.00
3,478.68
121.61
0.00
0.00
0.00
199.96
0.00
0.00
0.00
199.96
0.00
0.00
0.00
117.90
0.00
0.00
0.00
147.09
0.00
0.00
0.00
159.47
0.00
0.00
0.00
116.17
0.00
0.00
0.00
108.37
0.00
0.00
0.00
89.14
1.00
89.14
89.14
113.54
1.00
113.54
113.54
70.38
1.00
70.38
70.38
82.31
1.00
82.31
82.31
132.94
1.00
132.94
132.94
161.46
1.00
161.46
161.46
58.31
1.00
58.31
58.31
81.15
1.00
81.15
81.15
146.67
1.00
146.67
146.67
293.81
1.00
293.81
293.81
51.67
1.00
51.67
51.67
180.00
1.00
180.00
180.00
120.00
1.00
120.00
120.00
70.00
1.00
70.00
70.00
1,457.30
1.00
1,457.30
1,457.30
370.00
1.00
370.00
370.00
3,478.68
27.00
0.00
27.00
14.00
0.00
14.00
0.00
0.00
0.00
1.00
1.00
1.00
112.00
1.00
112.00
112.00
180.00
1.00
180.00
180.00
120.00
1.00
120.00
120.00
70.00
1.00
70.00
70.00
370.00
1.00
1.00
1.00
3.00
1.00
3.00
5.00
1.00
5.00
1.00
608.00
608.00
21.00
12.00
252.00
860.00
1.00
139.00
139.00
1.00
65.00
65.00
1.00
18.00
18.00
1.00
3.00
3.00
1.00
27.00
27.00
1.00
14.00
14.00
1.00
2.00
1.00
128.00
1.00
1.00
1.00
1.00
32.00
32.00
1.00
1.00
1.00
77.00
1.00
77.00
23.00
1.00
23.00
23.00
2,579.00
1.00
2,579.00
2,579.00
688.00
1.00
688.00
688.00
1,053.00
1.00
1,053.00
1,053.00
953.00
1.00
953.00
953.00
1,470.50
1.00
1,470.50
1,470.50
77.00
35.00
1.00
35.00
35.00
1,348.50
1.00
1,348.50
1,348.50
50.00
1.00
50.00
50.00
222.00
1.00
222.00
222.00
266.00
1.00
266.00
266.00
1,208.00
1.00
1,208.00
1,208.00
550.00
1.00
550.00
550.00
2,500.00
1.00
2,500.00
2,500.00
251.92
1.00
251.92
251.92
463.33
1.00
463.33
463.33
924.54
1.00
924.54
924.54
14,662.79
77.00
1.20
1.00
41.58
23.00
1.20
0.00
0.00
0.00
2,579.00
1.20
1.00
1,392.66
1,392.66
41.58
688.00
1.20
1.00
371.52
371.52
1,053.00
1.20
1.00
568.62
568.62
953.00
1.20
1.00
514.62
514.62
1,470.50
1.20
1.00
794.07
794.07
60.00
1.20
1.00
32.40
32.40
1,348.50
1.20
1.00
728.19
728.19
75.00
1.20
0.00
0.00
0.00
222.00
1.20
1.00
119.88
119.88
266.00
1.20
1.00
143.64
143.64
1,208.00
0.80
1.00
434.88
434.88
550.00
0.80
1.00
198.00
198.00
200.00
1.00
1.00
90.00
90.00
2,300.00
0.80
1.00
828.00
828.00
251.92
1.00
1.00
113.36
113.36
463.33
0.80
1.00
166.80
166.80
924.54
0.80
1.00
332.83
332.83
6,871.05
77.00
0.35
1.00
12.13
23.00
0.35
0.00
0.00
0.00
2,579.00
0.35
1.00
406.19
406.19
688.00
0.35
1.00
108.36
108.36
1,053.00
0.35
1.00
165.85
165.85
953.00
0.35
1.00
150.10
150.10
1,470.50
0.35
1.00
231.60
231.60
60.00
0.35
1.00
9.45
9.45
1,348.50
0.35
1.00
212.39
212.39
75.00
0.35
0.00
0.00
0.00
222.00
0.35
1.00
34.97
34.97
266.00
0.35
1.00
41.90
41.90
1,208.00
0.20
1.00
108.72
108.72
12.13
550.00
0.20
1.00
49.50
49.50
2,500.00
0.20
1.00
225.00
225.00
251.92
0.20
1.00
22.67
22.67
463.33
0.20
1.00
41.70
41.70
924.54
0.20
1.00
83.21
83.21
105.50
0.20
1.00
9.50
9.50
2,579.00
0.01
1.00
20.26
-20.26
3,729.00
0.00
1.00
16.47
-16.47
266.00
0.00
1.00
0.84
-0.84
2,261.00
0.00
1.00
4.44
-4.44
953.00
0.00
1.00
1.09
-1.09
4,689.79
0.00
1.00
2.38
-2.38
1,867.76
77.00
0.85
1.00
29.45
23.00
0.85
0.00
0.00
0.00
2,579.00
0.85
1.00
986.47
986.47
688.00
0.85
1.00
263.16
263.16
1,053.00
0.85
1.00
402.77
402.77
953.00
0.85
1.00
364.52
364.52
1,470.50
0.85
1.00
562.47
562.47
60.00
0.85
1.00
22.95
22.95
29.45
1,348.50
0.85
1.00
75.00
0.85
0.00
0.00
0.00
222.00
0.85
1.00
84.92
84.92
515.80
515.80
266.00
0.85
1.00
101.75
101.75
1,208.00
0.60
1.00
326.16
326.16
550.00
0.60
1.00
148.50
148.50
2,500.00
0.60
1.00
675.00
675.00
251.92
0.60
1.00
68.02
68.02
463.33
0.60
1.00
125.10
125.10
924.54
0.60
1.00
249.63
249.63
4,926.67
550.00
1.00
550.00
550.00
2,500.00
1.00
2,500.00
2,500.00
251.92
1.00
251.92
251.92
463.33
1.00
463.33
463.33
924.54
1.00
924.54
924.54
4,689.79
953.00
1.00
953.00
953.00
953.00
1,053.00
1.00
1,053.00
1,053.00
1,208.00
1.00
1,208.00
1,208.00
60.00
1.00
60.00
60.00
2,321.00
266.00
1.00
266.00
266.00
688.00
1.00
688.00
688.00
1,470.50
1.00
1,470.50
1,470.50
1,348.50
1.00
1,348.50
1,348.50
222.00
1.00
222.00
222.00
3,729.00
77.00
1.00
77.00
77.00
2,579.00
1.00
2,579.00
2,579.00
2,656.00
77.00
1.00
23.00
1.00
23.00
23.00
2,579.00
1.00
2,579.00
2,579.00
77.00
77.00
688.00
1.00
688.00
688.00
1,053.00
1.00
1,053.00
1,053.00
953.00
1.00
953.00
953.00
1,430.50
1.00
1,430.50
1,430.50
60.00
1.00
60.00
60.00
1,348.50
1.00
1,348.50
1,348.50
75.00
1.00
75.00
75.00
222.00
1.00
222.00
222.00
266.00
1.00
266.00
266.00
1,208.00
1.00
1,208.00
1,208.00
550.00
1.00
550.00
550.00
2,500.00
2,500.00
251.92
251.92
463.33
463.33
2,500.00
251.92
463.33
924.54
1.00
1.00
1.00
1.00
924.54
924.54
14,672.79
77.00
1.00
77.00
23.00
1.00
23.00
23.00
2,579.00
1.00
2,579.00
2,579.00
688.00
1.00
688.00
688.00
1,053.00
1.00
1,053.00
1,053.00
953.00
1.00
953.00
953.00
1,430.50
1.00
1,430.50
1,430.50
77.00
60.00
1.00
60.00
60.00
1,348.50
1.00
1,348.50
1,348.50
75.00
1.00
75.00
75.00
222.00
1.00
222.00
222.00
266.00
1.00
266.00
266.00
1,208.00
1.00
1,208.00
1,208.00
550.00
1.00
550.00
550.00
2,500.00
2,500.00
251.92
251.92
463.33
463.33
2,500.00
251.92
463.33
924.54
1.00
1.00
1.00
1.00
924.54
924.54
14,672.79
34.00
1.00
34.00
2.00
1.00
2.00
1.00
1.00
1.00
1.00
1.00
1.00
0.00
0.00
0.00
34.00
1.00
34.00
34.00
1.00
34.00
0.00
0.45
0.45
1.00
755.74
755.74
1.00
600.00
600.00
34.00
1.00
34.00
1.00
23.00
23.00
220.00
0.00
220.00
0.00
220.00
1.00
0.00
99.00
0.00
220.00
0.25
0.00
24.75
0.00
220.00
0.75
0.00
74.25
0.00
220.00
1.00
220.00
220.00
-23.00
1.00
-23.00
-23.00
197.00
220.00
1.00
220.00
220.00
220.00
1.00
220.00
220.00
2.00
1.00
2.00
1.00
1.00
1.00
0.00
0.11
0.00
4.00
60.00
60.00
0.15
3.00
0.40
0.70
15.00
0.50
0.60
20.00
0.25
0.15
20.00
0.09
1.80
6.80
0.25
1.00
11.56
11.56
16.36
6.80
0.10
1.00
4.62
4.62
0.50
0.60
20.00
0.15
3.00
0.25
0.15
20.00
0.09
1.88
0.15
0.20
4.00
0.45
1.80
6.68
0.25
2.60
2.00
0.16
0.33
15.00
4.00
60.00
4.00
-1.00
-4.00
60.00
-4.00
56.00
4.00
15.00
2.00
1.00
8.00
8.00
1.00
1.00
1.00
1.00
1.00
15.00
15.00
1.00
15.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
8.20
1.00
67.24
67.24
3.10
1.00
2.48
2.48
1.50
1.00
1.80
1.80
71.52
9.20
1.00
1.00
84.64
0.80
0.50
1.00
1.24
84.64
1.24
85.88
8.20
0.20
1.00
13.45
13.45
8.20
2.00
2.00
3.28
6.56
7.80
2.00
3.00
3.12
9.36
15.92
4.22
1.00
4.22
4.22
2.40
2.00
2.40
4.80
9.02
0.70
32.40
0.50
2.00
1.00
2.00
1.00
4.86
4.86
1.00
1.00
1.00
1.00
1.00
1.00
8.20
0.15
1.00
10.09
10.09
0.70
0.15
2.00
-0.07
-0.14
0.80
0.05
1.00
0.12
0.12
10.07
8.20
1.00
67.24
67.24
0.90
1.00
2.79
2.79
1.20
1.00
1.56
1.56
71.59
3.80
1.70
8.40
2.00
0.70
2.00
1.00
1.00
1.00
2.00
100.78
100.78
1.00
70.56
70.56
4.00
16.40
65.60
-2.00
0.49
-0.98
-1.00
2.40
-2.40
132.78
1.00
67.24
67.24
2.00
4.00
7.60
30.40
2.00
2.00
16.40
32.80
2.00
1.00
15.60
8.20
15.60
146.04
2.00
29.64
59.28
2.00
4.00
7.60
30.40
2.00
4.00
15.60
3.80
62.40
152.08
4.00
16.40
65.60
120.00
1.00
120.00
120.00
625.00
1.00
625.00
625.00
23.00
1.00
23.00
23.00
77.00
1.00
77.00
8.20
2.00
77.00
845.00
120.00
1.20
1.00
21.60
21.60
625.00
1.20
1.00
112.50
112.50
23.00
0.00
1.00
0.00
0.00
77.00
1.20
1.00
13.86
13.86
147.96
120.00
0.35
1.00
6.30
6.30
625.00
0.35
1.00
32.81
32.81
23.00
0.00
1.00
0.00
0.00
77.00
0.35
1.00
4.04
4.04
43.16
120.00
0.85
1.00
15.30
15.30
625.00
0.85
1.00
79.69
79.69
23.00
0.00
1.00
0.00
0.00
77.00
0.85
1.00
9.82
9.82
104.81
625.00
1.00
625.00
625.00
77.00
1.00
77.00
77.00
120.00
1.00
120.00
120.00
822.00
120.00
0.00
120.00
0.00
23.00
1.00
23.00
23.00
23.00
120.00
1.00
120.00
120.00
625.00
1.00
625.00
625.00
23.00
1.00
23.00
23.00
77.00
1.00
77.00
77.00
845.00
120.00
1.00
120.00
120.00
625.00
1.00
625.00
625.00
23.00
1.00
23.00
23.00
77.00
1.00
77.00
77.00
845.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
0.40
0.58
1.00
1.00
1.00
4.00
0.37
0.37
0.37
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
2.00
1.00
2.00
23.00
1.00
23.00
23.00
Precio
Improductivo
TOTAL MATERIALES
2.-
MANO DE OBRA
AYUDANTE PLOMERO
PLOMERO
ALBAIL
AYUDANTE DE ALBAIL
HR.
HR.
HR.
HR.
10.00000
5.00000
16.00000
16.00000
SUBTOTAL MANO DE OBRA
0.00%
0.00
RECARGOS
BENEFICIOS SOCIALES - % DE MANO DE OBRA DIRECTA
IMPUESTO AL VALOR AGREGADO - % DE LA MANO DE OBRA DIRECTA
5.-
6.-
UTILIDAD
UTILIDAD - % DE 1+2+3
7.-
TOTAL RECARGOS
Precio
Improductivo
TOTAL MATERIALES
2.-
MANO DE OBRA
AYUDANTE PLOMERO
PLOMERO
ALBAIL
AYUDANTE DE ALBAIL
HR.
HR.
HR.
HR.
8.00000
5.00000
16.00000
16.00000
SUBTOTAL MANO DE OBRA
0.00%
0.00
RECARGOS
BENEFICIOS SOCIALES - % DE MANO DE OBRA DIRECTA
IMPUESTO AL VALOR AGREGADO - % DE LA MANO DE OBRA DIRECTA
5.-
6.-
UTILIDAD
UTILIDAD - % DE 1+2+3
7.-
TOTAL RECARGOS
Precio
Improductivo
TOTAL MATERIALES
2.-
MANO DE OBRA
AYUDANTE PLOMERO
PLOMERO
ALBAIL
AYUDANTE DE ALBAIL
HR.
HR.
HR.
HR.
7.00000
5.00000
16.00000
16.00000
SUBTOTAL MANO DE OBRA
0.00%
0.00
RECARGOS
BENEFICIOS SOCIALES - % DE MANO DE OBRA DIRECTA
IMPUESTO AL VALOR AGREGADO - % DE LA MANO DE OBRA DIRECTA
5.-
6.-
UTILIDAD
UTILIDAD - % DE 1+2+3
7.-
TOTAL RECARGOS
RIO
Precio
Productiv.
Costo
Total
1,223.00
667.00
230.00
150.00
55.00
9.95
1.35
150.06
55.68
7.80
12.00
12.04
TOTAL MATERIALES
1,223.00
1,334.00
460.00
300.00
110.00
250.42
121.50
40.52
20.04
194.93
2.40
3.61
4,060.42
11.25
10.00
14.99
11.25
SUBTOTAL MANO DE OBRA
0.00%
TOTAL MANO DE OBRA
112.54
49.98
239.84
179.95
582.31
0.00
582.31
0.00
5.00%
AQUINARIA Y HERRAMIENTAS
0.00
29.12
29.12
54.45%
14.94%
TOTAL RECARGOS
317.07
87.00
404.06
7.00%
0.00%
NERALES Y ADMINISTRATIVOS
327.03
0.00
327.03
7.00%
TOTAL UTILIDAD
327.03
327.03
3.04%
STOS A LAS TRANSACCIONES
TOTAL PRECIO UNITARIO
177.06
177.06
5,907.02
RIO
Precio
Productiv.
Costo
Total
689.00
288.00
62.70
100.00
47.00
9.95
1.35
150.06
55.68
7.80
12.00
12.04
TOTAL MATERIALES
689.00
576.00
125.40
200.00
94.00
250.42
121.50
40.52
20.04
194.93
2.40
3.61
2,317.82
11.25
10.00
14.99
11.25
SUBTOTAL MANO DE OBRA
0.00%
TOTAL MANO DE OBRA
90.03
49.98
239.84
179.95
559.80
0.00
559.80
0.00
5.00%
AQUINARIA Y HERRAMIENTAS
0.00
27.99
27.99
54.45%
14.94%
TOTAL RECARGOS
304.81
83.63
388.45
7.00%
0.00%
NERALES Y ADMINISTRATIVOS
203.39
0.00
203.39
7.00%
TOTAL UTILIDAD
203.39
203.39
3.04%
STOS A LAS TRANSACCIONES
TOTAL PRECIO UNITARIO
114.36
114.36
3,815.20
RIO
Precio
Productiv.
Costo
Total
337.50
89.70
31.00
80.00
8.20
9.95
1.35
150.06
55.68
7.80
12.00
12.04
TOTAL MATERIALES
337.50
179.40
62.00
160.00
16.40
250.42
121.50
40.52
20.04
194.93
2.40
3.61
1,388.72
11.25
10.00
14.99
11.25
SUBTOTAL MANO DE OBRA
0.00%
TOTAL MANO DE OBRA
78.78
49.98
239.84
179.95
548.55
0.00
548.55
0.00
5.00%
AQUINARIA Y HERRAMIENTAS
0.00
27.43
27.43
54.45%
14.94%
TOTAL RECARGOS
298.69
81.95
380.64
7.00%
0.00%
NERALES Y ADMINISTRATIVOS
137.53
0.00
137.53
7.00%
TOTAL UTILIDAD
137.53
137.53
3.04%
STOS A LAS TRANSACCIONES
TOTAL PRECIO UNITARIO
80.97
80.97
2,701.36
ML
2.00
CODO 90 FG 1/2"
PZA
6.00
PZA
1.00
COPLA FG 1/2"
PZA
1.00
PZA
2.00
PZA
1.00
PZA
1.00
PZA
1.00
PZA
1.00
PZA
1.00
NIPLE HEXAGONAL FG
1/2"
TOTAL MATERIALES
2.-
MANO DE OBRA
AYUDANTE PLOMERO
HR.
PLOMERO
HR.
0.00%
0.00
RECARGOS
BENEFICIOS SOCIALES - % DE MANO DE OBRA DIRECTA
IMPUESTO AL VALOR AGREGADO - % DE LA MANO DE OBRA DIRECTA
5.-
6.-
UTILIDAD
UTILIDAD - % DE 1+2+3
7.-
TOTAL RECARGOS
RIO
Precio
Productiv.
Costo
Total
20.00
40.00
4.037
24.22
5.846
5.85
3.410
3.41
3.132
6.26
35.000
35.00
69.600
69.60
90.480
90.48
59.995
60.00
280.000
280.00
TOTAL MATERIALES
614.82
9.995
19.99
11.254
22.51
42.50
0.00
42.50
0.00
5.00%
AQUINARIA Y HERRAMIENTAS
0.00
2.13
2.13
54.45%
14.94%
TOTAL RECARGOS
23.14
6.35
29.49
7.00%
0.00%
NERALES Y ADMINISTRATIVOS
46.16
0.00
46.16
7.00%
TOTAL UTILIDAD
46.16
46.16
3.04%
STOS A LAS TRANSACCIONES
TOTAL PRECIO UNITARIO
24.14
24.14
805.40
Unitario:
ML
Cantidad:
Moneda: BOLIVIANOS
Descripcin
1.-
Und.
Cantidad
Precio
Productiv.
Improductivo
MATERIALES
TUBERIA PVC 1/2 " ESC40
ML
1.02000
TOTAL MATERIALES
2.-
MANO DE OBRA
AYUDANTE PLOMERO
HR.
0.1
PLOMERO
HR.
0.1
SUBTOTAL MANO DE OBRA
4.-
RECARGOS
BENEFICIOS SOCIALES - % DE MANO DE OBRA DIRECTA
IMPUESTO AL VALOR AGREGADO - % DE LA MANO DE OBRA DIRECTA
TOTAL RECARGOS
5.-
6.-
UTILIDAD
UTILIDAD - % DE 1+2+3
TOTAL UTILIDAD
7.-
IO
Precio
Costo
Productiv.
Total
4.67
4.76
TOTAL MATERIALES
4.76
9.995
1.00
11.254
1.13
2.13
0.00%
0.00
2.13
5.00%
0.11
QUINARIA Y HERRAMIENTAS
0.11
54.45%
1.16
14.94%
0.32
TOTAL RECARGOS
1.48
7.00%
0.49
0.00%
0.00
RALES Y ADMINISTRATIVOS
0.49
7.00%
0.49
TOTAL UTILIDAD
0.49
3.04%
0.29
0.29
9.75
Unitario:
ML
Cantidad:
Moneda: BOLIVIANOS
Descripcin
1.-
Und.
Cantidad
Precio
Productiv.
Improductivo
MATERIALES
TUBERIA PVC 3/4" ESC40
ML
1.02000
TOTAL MATERIALES
2.-
MANO DE OBRA
AYUDANTE PLOMERO
HR.
0.1
PLOMERO
HR.
0.1
SUBTOTAL MANO DE OBRA
4.-
RECARGOS
BENEFICIOS SOCIALES - % DE MANO DE OBRA DIRECTA
IMPUESTO AL VALOR AGREGADO - % DE LA MANO DE OBRA DIRECTA
TOTAL RECARGOS
5.-
6.-
UTILIDAD
UTILIDAD - % DE 1+2+3
TOTAL UTILIDAD
7.-
IO
Precio
Costo
Productiv.
Total
5.84
5.96
TOTAL MATERIALES
5.96
9.995
1.00
11.254
1.13
2.13
0.00%
0.00
2.13
5.00%
0.11
QUINARIA Y HERRAMIENTAS
0.11
54.45%
1.16
14.94%
0.32
TOTAL RECARGOS
1.48
7.00%
0.57
0.00%
0.00
RALES Y ADMINISTRATIVOS
0.57
7.00%
0.57
TOTAL UTILIDAD
0.57
3.04%
0.33
0.33
11.16
Precio
Improductivo
TOTAL MATERIALES
2.-
MANO DE OBRA
ALBAIL
AYUDANTE
PEON
SOLDADOR
HR.
HR.
HR.
HR.
60.00000
15.00000
60.00000
50.00000
SUBTOTAL MANO DE OBRA
0.00%
0.00
RECARGOS
BENEFICIOS SOCIALES - % DE MANO DE OBRA DIRECTA
IMPUESTO AL VALOR AGREGADO - % DE LA MANO DE OBRA DIRECTA
5.-
6.-
UTILIDAD
UTILIDAD - % DE 1+2+3
7.-
TOTAL RECARGOS
Precio
Improductivo
TOTAL MATERIALES
2.-
MANO DE OBRA
ALBAIL
AYUDANTE
PEON
SOLDADOR
HR.
HR.
HR.
HR.
60.00000
15.00000
60.00000
50.00000
SUBTOTAL MANO DE OBRA
0.00%
0.00
RECARGOS
BENEFICIOS SOCIALES - % DE MANO DE OBRA DIRECTA
IMPUESTO AL VALOR AGREGADO - % DE LA MANO DE OBRA DIRECTA
5.-
6.-
UTILIDAD
UTILIDAD - % DE 1+2+3
7.-
TOTAL RECARGOS
Precio
Improductivo
TOTAL MATERIALES
2.-
MANO DE OBRA
ALBAIL
AYUDANTE
PEON
SOLDADOR
HR.
HR.
HR.
HR.
60.00000
15.00000
60.00000
50.00000
SUBTOTAL MANO DE OBRA
0.00%
0.00
RECARGOS
BENEFICIOS SOCIALES - % DE MANO DE OBRA DIRECTA
IMPUESTO AL VALOR AGREGADO - % DE LA MANO DE OBRA DIRECTA
5.-
6.-
UTILIDAD
UTILIDAD - % DE 1+2+3
7.-
TOTAL RECARGOS
RIO
Precio
Productiv.
Costo
Total
1.350
55.680
150.058
111.729
17.400
9.118
83.311
121.800
86.930
696.000
25.752
48.720
20.890
TOTAL MATERIALES
1,749.60
216.48
777.30
362.00
174.00
191.48
4,498.79
4,872.00
869.30
696.00
1,364.86
97.44
151.74
16,020.99
14.999
11.247
10.997
14.999
SUBTOTAL MANO DE OBRA
0.00%
TOTAL MANO DE OBRA
899.94
168.71
659.82
749.95
2,478.42
0.00
2,478.42
0.00
5.00%
AQUINARIA Y HERRAMIENTAS
0.00
123.92
123.92
54.45%
14.94%
TOTAL RECARGOS
1,349.50
370.28
1,719.77
7.00%
0.00%
NERALES Y ADMINISTRATIVOS
1,303.63
0.00
1,303.63
7.00%
TOTAL UTILIDAD
1,303.63
1,303.63
3.04%
STOS A LAS TRANSACCIONES
TOTAL PRECIO UNITARIO
709.17
709.17
23,659.53
RIO
Precio
Productiv.
Costo
Total
1.350
55.680
150.058
111.729
17.400
9.118
83.311
121.800
86.930
696.000
25.752
48.720
TOTAL MATERIALES
2,997.00
370.83
1,332.52
620.10
261.00
657.23
6,664.88
6,699.00
869.30
696.00
2,137.42
97.44
23,402.72
14.999
11.247
10.997
14.999
SUBTOTAL MANO DE OBRA
0.00%
TOTAL MANO DE OBRA
899.94
168.71
659.82
749.95
2,478.42
0.00
2,478.42
0.00
5.00%
AQUINARIA Y HERRAMIENTAS
0.00
123.92
123.92
54.45%
14.94%
TOTAL RECARGOS
1,349.50
370.28
1,719.77
7.00%
0.00%
NERALES Y ADMINISTRATIVOS
1,820.35
0.00
1,820.35
7.00%
TOTAL UTILIDAD
1,820.35
1,820.35
3.04%
STOS A LAS TRANSACCIONES
TOTAL PRECIO UNITARIO
969.20
969.20
32,334.73
RIO
Precio
Productiv.
Costo
Total
1.350
55.680
150.058
111.729
17.400
9.118
121.800
86.930
696.000
25.752
48.720
TOTAL MATERIALES
1,231.20
152.56
547.71
254.74
121.80
42.22
828.24
521.58
696.00
813.76
97.44
5,307.25
14.999
11.247
10.997
14.999
SUBTOTAL MANO DE OBRA
0.00%
TOTAL MANO DE OBRA
899.94
168.71
659.82
749.95
2,478.42
0.00
2,478.42
0.00
5.00%
AQUINARIA Y HERRAMIENTAS
0.00
123.92
123.92
54.45%
14.94%
TOTAL RECARGOS
1,349.50
370.28
1,719.77
7.00%
0.00%
NERALES Y ADMINISTRATIVOS
553.67
0.00
553.67
7.00%
TOTAL UTILIDAD
553.67
553.67
3.04%
STOS A LAS TRANSACCIONES
TOTAL PRECIO UNITARIO
331.76
331.76
11,068.46
FG
18.0
1.8
2.0
0.31
3.0
2.0
2.3
m
m
m
m
m
pulg
m
2.0
1.5
213
426.0
Kg
Kg =
Dimetro
Peso
TR efectiva
Numero de Pndolas (Np)
DERECHA
Pndol
a (i)
Centro
1
2
Centro
IZQUIERDA
1
2
Distancia del
centro a la
pendola i
0.0
3.0
6.0
0.31
0.53
1.20
0.0
-3.0
-6.0
-9.0
0.25
0.25
0.25
0.53
1.20
2.31
0.25
0.25
0.25
Longitud
Total (m)
0.37
0.61
1.31
0.37
0.61
1.31
ALMA DE FIBRA
Dimetro
1/ 4
Peso
0.15
TR efectiva
2.47
4.21
2.3
5.
0
4.50
n=
Longitud del Cable Principal (Lc)
xi
f
2.0
L
H
0.3
T
L1
0.1111111111
18.5750342936 m
9m
2.0 m
18.0 m
23.96
2.3 m
4.50
m
5.06
m
28.69
m
31.5607
1437.75
21.56625
12.15
Dimetro
Peso (Wc)
Dimetro
Especificacionesde las
Pndolas
Kg
Kg
Kg
1/2 pulg
0.6 Kg/m
0.76 Kg
1/ 4 pulg
Especificacionesde las
Pndolas
Peso (Wp)
HMx
cos
0.037 Kg/m
1472.22
Kg
23.9624889746
0.9138115486
1611.08
Kg
2417
Kg =
Dimetro
Peso
TR efectiva
Largo (l)
Ancho (a)
Alto (h)
1
1
1
m
m
m
l
1.00
1611.08003
1472.22354
654.321573
2300
23.9625
Kg
Kg
Kg
Kg
Q
l/2
Estabilidad al Deslizamiento
Cf =
Fv =
Hmx
FSD
1.0
1645.7
Kg
1472.2
Kg
1.117818 OK
l/2
Estabilidad al Volteo
Mr =
Mv =
FSV =
1150
Kg-m
1472.22354 Kg-m
0.78 Aumentar l y disminuir a y h
e=
0.6957998193 m
t =
1.5
Kg/cm2
1 =
8516.054940934 Kg/m2
1 =
0.8516054941 Kg/cm2
2 = -5224.6980863938 Kg/m2
2 =
-0.5224698086 Kg/cm2
2417
Kg
Calculos
Area del Macizo
Dimetro del Macizo
A=
D=
F.S
fs
2
2000
D=
usar Macizo de Anclaje
D=
1.00
Kg/cm
Tmx
F.S
fs
Macizo de
anclaje
a 1.00
l
1.00 m
N
ACT
D ES C R I PC I O N
UNID
ANCHO
(m)
LARGO
(m)
ALTO
(m)
N VECES
M3
M3
0.8
0.8
HC para anclaje
M3
HC para torre
M3
0.8
0.8
PARA TUBERIA
LE PRINCIPAL
BERIA
BLE PRINCIPAL
RAS
e grado 5 (A-325)
Kg/cm2
Kg/cm2
LGANTE
Kg =
0.426
Tn
olas (Np)
1/ 4
0.15
2.47
pulg
Kg/m
Tn
ok
5
DE DISEO DE PENDOLA
de Pndolas
ndolas (Np)
Pndolas
as por longitud
4.63
5
1
0.0374
m
kg
kg/m
DE PENDOLA
CABLE
A DE FIBRA
1/ 4
0.15
2.47
pulg
Kg/m
Tn
(longitud horizontal)
(diagonal)
pulg
Kg/m
pulg
Kg/m
Kg
Kg =
2.42
Tn
1/ 2
pulg
0.6
Kg/m
8.74
Tn
ok
o)
1.00 m
Kg/m
Kg/cm2
Kg/m2
Kg/cm2
2
ok
ok
os
A=
D=
2.41662005 cm2
1.75411978 cm
D=
0.7
acizo de Anclaje
1.00
pulg
1.00
pulg
N VECES
SUBTOTAL
TOTAL
0.64
2.56
0.64
2.56
Unitario:
HR
Cantidad:
Moneda: BOLIVIANOS
Descripcin
1.-
MATERIALES
2.-
MANO DE OBRA
Und.
Cantidad
Precio
Productiv.
Improductivo
TOTAL MATERIALES
AYUDANTE (LIMPIEZA Y DESBROCE)
HR.
1.00000
SUBTOTAL MANO DE OBRA
HR.
1.00000
0.00%
0.00
RECARGOS
BENEFICIOS SOCIALES - % DE MANO DE OBRA DIRECTA
IMPUESTO AL VALOR AGREGADO - % DE LA MANO DE OBRA DIRECTA
TOTAL RECARGOS
5.-
6.-
UTILIDAD
UTILIDAD - % DE 1+2+3
TOTAL UTILIDAD
7.-
IO
Precio
Costo
Productiv.
Total
TOTAL MATERIALES
0.00
11.25
11.25
11.25
0.00%
0.00
11.25
361.92
361.92
5.00%
0.56
QUINARIA Y HERRAMIENTAS
362.48
54.45%
6.13
14.94%
1.68
TOTAL RECARGOS
7.81
7.00%
26.16
0.00%
0.00
RALES Y ADMINISTRATIVOS
26.16
7.00%
26.16
TOTAL UTILIDAD
26.16
3.04%
13.41
13.41
447.27