INSPECTION REQUEST

Engineer:

IR No.:

Date:

PROJECT:

PROJECT NO.:

ENGINEER:
Architectural

Structural

MEP

Inspection Requested at:


Location: Bldg.:
Item :

Time :

Works ready for inspection by


Relevant personnel
Name

Time:

Testing

Others (Specify)

Date:

Drawing Ref. No.:

Date:
Signature

Date

Peoject Manager
MEP
QA/QC
Surveyor
Sub-contractor
ENGINEER'S INSPECTION REPORT
A

Approved as Submitted

Aproved as Noted
Incorporate & Proceed

Revise & Re-submit


before work proceed

Rejected

Inspection Carried Out:

Time:

Date:

Engineer's Comments:

Inspected By

Name & Signature

Structural Engineer
MEP Engineer
Architectural Engineer
Inspection Request should be submitted 24 hours prior to inspection
Received by contractor (Please sign below, Retain Original & Return Copy)

Name:

Signature:

Prepared by: www.qualityengineersguide.com

Date: