You are on page 1of 7

SITE INSPECTION REPORT

Test Report No: AMT/HAT/.

Date:

Name of the project: Project Building (2B+G+9 Floors) On Plot No. 37, at Bausher (40 SE)
For H.E Lt. Col. Said Salem Al Wahaibi (Hattat House Phase-II)
Client

: M/s. ASSRAIN INTERNATIONAL CONTRACTING

Consultant

: M/s. AL WAHA ENGINEERING CONSULTANTS

Main Contractor

: M/s. ASSRAIN INTERNATIONAL CONTRACTING

M & E Contractor

: M/s. AL MAJADEEF TRADING LLC

Inspection Required
On
Date:

Time:

Hrs:

Location:
Floor :..
SANITARYWARE
INSTALLATION:

Flat No:-

EWC, Cistern, Flushing unit,Seat&Cover,WC Connector with all accessories.


Bidit, Fixing Bolts, P-Trap and spray nozzle unit Complete with all accessories.
Bath tup with waste,P-Trap, Over flow system with all accessories.
Water Heater Fixing
Kitchen Sink with mixer

Remarks:

Testing-OK and found no leaks.

Signature
M/S. AL MAJADEEF TRADING

Date..

Signature
M/s. ASSRAIN INTERNATIONAL CONTRACTING

Date..

Signature .
M/s. AL WAHA ENGINEERING CONSULTANTS

Date..

PRESSURE TEST REPORT


Test Report No: AMT/HAT/.

Date:

Project no:
Name of the project: Project Building (2B+G+9 Floors) On Plot No. 37, at Bausher (40 SE)
For H.E Lt. Col. Said Salem Al Wahaibi (Hattat House Phase-II)
Client

: M/s. ASSRAIN INTERNATIONAL CONTRACTING

Consultant

: M/s. AL WAHA ENGINEERING CONSULTANTS

Main Contractor

: M/s. ASSRAIN INTERNATIONAL CONTRACTING

M & E Contractor

: M/s. AL MAJADEEF TRADING LLC

Water tank Size :

6m x 4m x 2m High, Insulated
This is to inform you that we have conducted leak test the above
mentioned water tank filled with water

Location:
Floor :..

Flat No:-

Leak test:
1.6 Mtr WATER COLUMN
Duration of Test:
24 Hour ( From . To ..)

Remarks:

Testing-OK and found no leaks.

Signature
M/S. AL MAJADEEF TRADING

Date..

Signature
M/s. ASSRAIN INTERNATIONAL CONTRACTING

Date..

Signature .
M/s. AL WAHA ENGINEERING CONSULTANTS

Date..

SITE INSPECTION / PRESSURE TEST REPORT


Test Report No: AMT/HAT/.

Date:

Name of the project: Project Building (2B+G+9 Floors) On Plot No. 37, at Bausher (40 SE)
For H.E Lt. Col. Said Salem Al Wahaibi (Hattat House Phase-II)
Client

: M/s. ASSRAIN INTERNATIONAL CONTRACTING

Consultant

: M/s. AL WAHA ENGINEERING CONSULTANTS

Main Contractor

: M/s. ASSRAIN INTERNATIONAL CONTRACTING

M & E Contractor

: M/s. AL MAJADEEF TRADING LLC

Inspection Required
On
Date:

Time:

Hrs:

Location:
Floor :..
Type of Services :

Type of Pipes:

Flat No:-

Hot & Cold Water Services


Soil & Waste Water Services
Fire Services
This is to inform you that we have pressure tested the above mentioned
service pipeline as per standard and specification details are given
below.
Polypropylene pipes & Fittings.(1"(32mm), 3/4"(25mm) & 1/2"(20mm) Dia.)
uPVC pipes & Fittings.(200mm, 160mm,110mm, 82mm, 55mm & 42 mm Dia.)
GI & MS Pipes & Fittings (Grooved & Threaded)
( 150mm, 100mm, 75mm, 50mm, 40mm, 32mm, 25mm Dia.)

Tested pressure:

. Bar
1.5 Mtr WATER COLUMN

Duration of Test:
24 Hour ( From . To ..)
SANITARYWARE
INSTALLATION:

EWC, Cistern, Flushing unit,Seat&Cover,WC Connector with all accessories.


Bidit, Fixing Bolts, P-Trap and spray nozzle unit Complete with all accessories.
Bath tup with waste,P-Trap, Over flow system with all accessories.
Water Heater Fixing
Kitchen Sink with mixer

Remarks:

Testing-OK and found no leaks.

Signature
M/S. AL MAJADEEF TRADING

Date..

Signature
M/s. ASSRAIN INTERNATIONAL CONTRACTING

Date..

Signature .
M/s. AL WAHA ENGINEERING CONSULTANTS

Date..

PRESSURE TEST REPORT


Test Report No: AMT/HAT/.

Date:

Project no:
Name of the project: Project Building (2B+G+9 Floors) On Plot No. 37, at Bausher (40 SE)
For H.E Lt. Col. Said Salem Al Wahaibi (Hattat House Phase-II)
Client

: M/s. ASSRAIN INTERNATIONAL CONTRACTING

Consultant

: M/s. AL WAHA ENGINEERING CONSULTANTS

Main Contractor

: M/s. ASSRAIN INTERNATIONAL CONTRACTING

M & E Contractor

: M/s. AL MAJADEEF TRADING LLC

Type of Services :

Type of Pipes

Hot & Cold Water Services


Soil & Waste Water Services
Fire Services
This is to inform you that we have pressure tested the above mentioned
service pipeline as per standard and specification details are given
below.
Polypropylene pipes & Fittings.(1"(32mm), 3/4"(25mm) & 1/2"(20mm) Dia.)
uPVC pipes & Fittings.(200mm, 160mm,110mm, 82mm, 55mm & 42 mm Dia.)
GI & MS Pipes & Fittings (Grooved & Threaded)
( 150mm, 100mm, 75mm, 50mm, 40mm, 32mm, 25mm Dia.)

Location:
Floor :..

Tested pressure:

Flat No:-

. Bar
1.5 Mtr WATER COLUMN

Duration of Test:
24 Hour ( From . To ..)

Remarks:

Testing-OK and found no leaks.

Signature
M/S. AL MAJADEEF TRADING

Date..

Signature
M/s. ASSRAIN INTERNATIONAL CONTRACTING

Date..

Signature .
M/s. AL WAHA ENGINEERING CONSULTANTS

Date..

RETURN MATERIAL
MAT.RETURN No: AMT/MOD/2004/506/.
PROJECT No:

DATE : .

MOD/2004/506.

PROJECT : Refurbishment of water supply network and sewage pumping station,IBRI


CLIENT : MINISTRY OF DEFENCE Engineering services
CONTRACTOR : AL MAJADEEF TRADING LLC
This is to inform you that we have returned the following materials to the concerned
authority,details as follows;
ITEM RETURNED:-

Sl.no

Description

Unit

Qty

Remarks

Location :
Building name:

Building No..

Signature
M/S. AL MAJADEEF TRADING LLC

Date..

Signature
Maerial - Receiver (MODES)

Date..

Signature .
APE - MODES

Date..

..

..

..

You might also like