You are on page 1of 5
2206 ‘hoprocedures: TANK ERECTION PROCEDURE c D)eaj 0 Plus Bog suivants Crtor un blog Connexion theprocedures engineering procedure south HugeDomains..; — ‘Shop for Over 200,000 Premium Domains * decanter) ato hcg cn oer Anchorage for PROCEDURE neering » oreo a » sheetpiling >) oe INSPECTION Safe tie rods for 3 Sppucane coe wore quaywalls in 3. Founoarion sor ports and. 1 coamucron mocenne seen rts ‘Storronnare acca varbors “4.2, SHELL PLATE wetoInG <4, ROOF PLATE ‘CONTROL 13 citer sarrexemcrion oceoune oct Socio ‘ arracont saree rea taserone 2. arnucsau cone fear oe, irra Vn Desc Tesi Sue octne ©. BS 2654 : Vertical Steel Welded Non-refrigerated Storage Tank with Butt welds for 2010 2) PTS-20.156A :Standard Tank Vol. 1 - Part 1 theprocedure@engineer.ci Field Inspection Procedure Specification Qi powcr coment A a hiip:theengineeringprocedureblogspot.com/2008/12tark-erecion-procecure im! 16 2206 ‘hoprocedures: TANK ERECTION PROCEDURE 1h Camber and flatness of foundation surface 4. CONSTRUCTION PROCEDURE (Refer 2 PTS-20.1568- 10.00.00 Erection & 10.02.00 Erection Procedure) 4.1 20TTOMPLATE (1) Arrangement and weling of the Bottom pate shal conducted as per Bottom Plate Wilding Sequence in Attachment 1 and detal procedure as follow; J. Marking of centre tne 1, Bottom plate arrangement as per welding sequence and applicable drawing. ti, ting Between sll and bottom plate (2) To prevent welding orton, restraint jigs or reinforcing beams shall be aed (1) Prior to erection of shell plate, following marking shall be performed on the bottom plate as hown in Fig. 1 € Fi. 2 |. Narang of radius for shell erection. (The marking shall be larger than the ameter shown inthe érawing, considering weld shrinkage of shel plate fi Radius for cbecking the rouncnes of shell pint shal be marked il, The marking allotment of 18 course of she plate shal be creed out (2) Level, roundness and verticality shal be inspected after completion of erection of ‘course of shal plate, (2) Sha plat fam second to fifth course and top angle shall be erected (4) Welding of shell plate sali be perfarmes from lower course, and vertical joint Shall be welded prior to the horizontal joint ‘4.2.1 DETAIL ERECTION PROCEDURE OF SHELL PLATE. he sequence of eration and welding are as follow: 1) Erection of tt course 2) Check eve, verticality and roundness of 1st cours. 3) I) Etection of 2nd couse, After completion of erection of Second course, the {h Vertical Joint of 2nd course shall be allgnec {i Local departure, tolerance cut horizontal ang vertical shall seams shall be chackea, 14)1) Erection of re course, Aftarcomplation of erection of thiré course, the vertical jit of 2né course stall be welded fllow by herizontal joint between 15 course and 2nd course {i Local departure, tolerance cut horizontal and vertical shel seams shall be checkes, 5) Erection of 4th course, After completion of erection of fourth curs, the vertiat Jot of 3rd couse shal be welded follow by horizontal Joint between 2nd couse and 2s course. ii) soi between sel plate and bottom plate shall be welded ti Local departure, eolerance et horizontal ane vertical sal seams shall be check, 6) Erection of 5th course. After completion of erection of fifth course, the vertical Joint of 4th and Sth course shall be welded follow by harzonal joint etween 3rd and 44 course, ane between at course to fifth course {i Local departure, tolerance cut horizontal and vertical shell seams shall be checked. 7) 9) Installation of tap angle. Dimensional shall be checkes prior welding the top angle to the top (last) course. i) Local departure, tolerance cut horzontal and vertical shel seams shall be chckee, 14. ROOF STRUCTURE |. Root structure shall be assemble on the ground in section or completes depencing on size and welant. i Assembled roof structure shall be erectec inside the tank after completion of bottom plate and annular pat, 44 ROOF PLATE hiip:theengineeringprocedureblogspot.com/2008/12tark-erecion-procecure im! Bara Find Crueness Type ‘ation 2206 ‘hoprocedures: TANK ERECTION PROCEDURE Roof plate shall be arranged on the roof structure and welding to be carried out according to welding sequence considering the astortion or warping of plates. 4 OUTER RAFTER ERECTION PROCEDURE Roof of outer rafter shall be assemble on the ground in section or completed depending on size and weight. The sequence ef assembly areas follow; 1. Assemble the rot plate onthe 2. assemble and welding the center ring and center plate complete with stiffener and rib pate 3. Fite rng on the roof plat. 4. Install the rafter ad girder on the roof plate 5. Erect the outer rafter on the temporary support after completion of bottom plate And annular plate, 46 WND PROTECTION OF SHELL PLATE AND ROOF STRUCTURE Shell plate and roof strucures sall be protected by heavy wind during the erection lung guy wire rope method. A detailed execution procedure and/or plan incusing the detaitce dimensions of the vic shall be prepared and submitted to CLIENT ste for approval, prir to commencement of shell construction Work 4a Test ‘After completion of the entie tank test shal be performed in aceardance with WH FIELD INSPECTION & TEST PROCEDURE SPECIFICATION 4.8 CALIBRATION ‘After completion of the required test, the tank shall be calibrated in accordance to ‘Wit FIELD INSPECTION & TEST PROCEDURE SPECIFICATION. 4.9 ATTACHMENT: 1. Fig 1 AN Fig? 2. Welding Sequence For Bottom Plat. hiip:theengineeringprocedureblogspot.com/2008/12tark-erecion-procecure im! 2206 ‘hoprocedures: TANK ERECTION PROCEDURE Posted by theprocedure@engineer.com at 12:49 PM. sam Sonawane October 28,20 Sam Sonawane October 28, 2015 at 9:56 Pi Nice information .You have given some detailed formation on s sk erection. Veame across anothe it that gave sitar inf bu twas more graphical and generic while you's is mere detalled and hands on, ‘Thank fr theif Thank you for nice info hiip:theengineeringprocedureblogspot.com/2008/12tark-erecion-procecure im! 2206 ‘hoprocedures: TANK ERECTION PROCEDURE ‘Comment as: Unknown (Soc ¥ Preview Netty me Newer Post Home Older Post Subscribe to: Post Comments (torn) a a ‘thoprocedureengincer.com. Travel template. Template images by evct-poloskun, Powered by Blogger. ipstheengineeringprocedre blogspot.com 2008/12tark-erection-pracedure tm

You might also like