2016 STREET PAVING & RECONSTRUCTION BUDGET

POSSIBLE 2016 STREET PROJECTS


STREET RECONSTRUCTIONS
1 Western Ave - Caldwell to Robinson
2 Mitchell St - Bruce to Robins
3 Davis St - Robins to South
4 Davis Street - Robins to Dave Ward
5 Middle Road - Southerland to E. German
6 Blaney Hill Road - Hwy 25 to Stone
7 Stanley Russ Rd - Donaghey to Wasson
8 Stanley Russ Rd - Wasson to Daniel
9 Stanley Russ Rd - Daniel to Bill Bell
10 Nutter Chapel Rd - Catherine Place to Salem
11 Shock Loop
12 Nutter Chapel Rd - Mattison to Pebble Beach (IMPACT FEE ????)
13 Nutter Chapel Rd - Mattison to Pebble Beach
14 Tyler Street - Eve Lane to Sena Drive
15 Favre Lane - Salem to Ellen Smith
16 Clifton Street - Tyler to Fleming
17 Smoking Oaks
18 Van Ronkle - Court To Markham
19 Morningside Dr
20 Timberlane
21 Water Oak - Shady Lane to Pin Oak
22 Water Oak - Pin Oak to Red Oak
23 Water Oak - Red Oak to end
24 College and Salem Roundabout
25 College Ave - Donaghey to Salem
26 Salem Road - College to Dave Ward
27 Center Street - Hardy to Dave Ward
28 Meadowlake Road - Donaghey to Market
29 Meadowlake Road - Market to West
30 Meadowlake Road - West to Washington + ROW
31 Augusta Street - Robinson to Louvenia
32 Sherwood Lane
33 Riviera Drive - West of Country Club
34 South Donaghey - Woodland Springs to Favre
35 Salem Street - Tyler to Prince
36 Hillman Street - Donaghey to Davis
37 Cadron Gap Road - Lakeview Acres to City Limit
STREET OVERALYS
38 TJ - Gertrude to Oak Meadows
39 Raleigh - Sante Fe to Montana
40 Eve Lane
Pavement not too Bad
41 McNutt Road - Dave Ward to Old Military
42 Tyler Street - 300' East Hogan to Eve Lane
43 South German Ln - Dave Ward to Robins
44 Robins Street - Harkrider to Davis
45 Clifton Street - Tyler to Fleming
46 Castlegate
47 Marleigh Drive
48 Mill Pond
49 Prestonwood
50 Park Place Drive - Wescon to Pointe West
51 Rio Grande Road
52 Summerwood Drive
53 Springwood Drive - S. Donaghey to Autumnwood
54 Enderlin Dr - Amso to Woodland Springs
55 Drake Drive
56 Amos Drive - Jaci Ln to Enderlin Dr
57 Adamsbrooke Drive - Farris to bridge
58 Vineyard Drive
59 McCracken Drive
60 Rumker Road
61 Siebenmorgan Road
62 Bob Courtway Drive
63 Keath Circle
64 Goode Lane
SIDEWALKS
65 S. German - Robins to Nabholz Ave - Sidewalk (East Side)
66 Tyler St - Meadowbrook to Washington
67 N. Donaghey - Meadowlake to Washington - North Side
68 Country Club - Prince to Tyler - Both Sides
69 Farris Road - College to Prince
70 College Road - Nottingham to Granite
71 Carl Stuart Road - Salem to Stonebrook

CITY

PRIVATE

FORCES

CONTRACTOR

Construct 27' Street


Reconstruct to 27' Curbed Street
Reconstruct to 27' Curbed Street
Reconstruct to 27' Curbed Street
Reconstr to 36' Curbed
3600'
3000' 36' curbed
2000' 36' curbed
1200' 36' curbed
36' Curbed - 1,800'
Reconstruct to 24' Open Ditch Roadway
Reconstruct to 24' Open Ditch Roadway - 4000'
Reconstruct to 36' C&G Roadway - 4000'
3600' 50% Base Stab+Edge Milling + Overlay + Restripe
4000' 25% Base Stab+Edge Milling + Overlay + Restripe
Reconstruct to 27' Curbed Street - No Sidewalks
Reconstruct to 27' Curbed Street - No Sidewalks

850'
650'
650'
6000'

900'
700'
600'
500'
1100'
4000'
1750'
2800'

3000'
3300'
3300'
4000'
1300'

406,297

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
Reconstruct to 27' Curbed Street - No Sidewalks $
Reconstruct to 27' Curbed Street - No Sidewalks $
Reconstruct to 27' Curbed Street - No Sidewalks $
$
Improve Street & add Sidewalks
$
$
$
Construct 36' Curbed Street & Sidewalk
$
Construct 36' Curbed Street & Sidewalk
$
Construct 36' Curbed Street & Sidewalk
$
Construct 27' Curbed Street & Sidewalk
$
$
Construct 27' Curbed Street & Sidewalk
$
$
Improve Street & add Sidewalks
$
Rebuild 27' roadway
$
Rebuild 21' open ditch roadway
$
TOTAL STREET RECONSTRUCTION $

100,000
180,000
90,000
300,000
610,000
600,000
400,000
250,000
300,000
100,000
300,000
500,000
280,000
220,000
200,000
110,000
90,000
90,000
2,000,000
180,000
130,000
160,000
100,000
80,000
250,000
1,000,000
1,500,000
200,000
150,000
10,470,000

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

220,000
360,000
180,000
610,000
1,100,000
1,000,000
650,000
400,000
610,000
200,000
600,000
1,000,000
330,000
300,000
400,000
230,000
180,000
180,000
4,000,000
360,000
270,000
280,000
200,000
200,000
500,000
2,000,000
3,000,000
500,000
300,000
20,160,000

$
$
$
$
$
$
$
$
$
$

50,000
50,000
100,000
90,000
130,000
130,000
150,000
40,000
25,000
35,000

TOTAL OVERLAYS $

800,000

$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$

60,000
70,000
100,000
100,000
170,000
170,000
200,000
50,000
30,000
42,000
80,000
55,000
35,000
20,000
50,000
20,000
55,000
40,000
45,000
65,000
35,000
30,000
120,000
70,000
20,000
30,000
992,000

$
$
$
$
$
$
$
TOTAL SIDEWALKS $

8,500
-

$
$
$
$
$
$
$
$

20,000
70,000
70,000
100,000
10,000
13,000
50,000
260,000

Overlay 2000'
Edge Milling + Overlay
Asphalt Overlay
Edge Milling + Overlay + Restripe
Edge Milling + Overlay + Restripe
Edge Milling + Overlay + Restripe
Edge Milling + Overlay + Restripe
Edge Milling + Overlay + Restripe