OWNER :

LOCATION:
SUBJECT :

DESCRIPTION

QTY

UNIT

UNIT COST
( PHP)

TOTAL COST

I. GENERAL REQUIREMENTS
1.0 Construction Bond
2.0 Mobilization
3.0 Protective coverings
SUB-TOTAL

SUB-TOTAL

SUB-TOTAL

II. TILEWORKS
A. FLOOR
1.0 Kitchen
2.0 Foyer
3.0 Toilet and Bath
3.1 Powder Room
3.2 Maid's Room
3.3 Master's Bedroom
3.4 Guest Room 1
3.5 Guest Room 2
4.0 LIVING ROOM
B. WALL
1.0 Kitchen
2.0 Toilet and Bath
2.1 Maid's Room
2.2 Master's Bedroom
2.3 Guest Room 1
2.4 Guest Room 2

III. CARPENTRY WORKS


A. REFURBISHMENT OF CABINET'S DOOR
DRAWER FACE AND HANDLES
1.0 Master's Bedroom
2.0 Guest Room 1
3.0 Guest Room 2
B. CABINETS / COUNTERS
1.0 Kitchen cabinets and counter
2.0 Master's Bedroom (T&B) counter
3.0 Guest Room 1 ( T&B) counter
4.0 Guest Room 2 (T&B) counter
C. REPLACEMENT OF PARQUET FLOORING
( as per actual required condition.)
E. REFURBISHMENT OF EXISTING DOORS
( including hinges and knobs)

III. PAINTING WORKS


A. WALL
1.0 Kitchen
2.0 Foyer
3.0 Living Room
4.0 Powder Room
5.0 Maid's Room
6.0 Master's Bedroom
7.0 Guest Room 1
8.0 Guest Room 2
9.0 LOFT
B. CEILING
1.0 Kitchen
2.0 Foyer
3.0 Living Room
4.0 Powder Room
5.0 Maid's Room
6.0 Master's Bedroom
7.0 Guest Room 1
8.0 Guest Room 2
9.0 LOFT
C. CABINETS/DRAWERS/COUNTERS
1.0 Kitchen
2.0 Master's Bedroom
3.0 Guest Room 1
4.0 Guest Room 2
5.0 LOFT
SUB-TOTAL

SUB-TOTAL

IV. PLUMBING WORKS


A. REPLACEMENT OF PLUMBING FIXTURES
1.0 Powder Room
2.0 Maid's Room
3.0 Master's Bedroom
4.0 Guest Room 1
5.0 Guest Room 2
6.0 Kitchen sink and faucets
B. INSTALLATION COST
C. REPLACEMENT OF SANITARY,
DRAINAGE LINE ( FROM C.I. TO PVC)
D. TESTING & COMMISSIONING
V. ELECTRICAL WORKS
A. TRACING OF EXISTING ELECTRICAL LINES
B. REPLACEMENT OF EXISTING COVER
PLATES ( Switches, Outlets)
C. REPLACEMENT OF BUSTED BREAKERS
D. PROVISION FOR AIRCON LINE
E. TESTING & COMMISSIONING

SUB-TOTAL

SUB-TOTAL

TOTAL COST

VI. MISCELLANEOUS WORKS


A. WATERPROOFING
1.0 Kitchen,Foyer (Cement base)
2.0 TOILET & BATH (membrane)
B. GRANITE COUNTER TOPS
1.0 Kitchen
2.0 Master's Bd. Room ( T&B)
3.0 Guest Room 1 ( T&B)
4.0 Guest Room 2 ( T&B)
C. MIRROR PANELS @Living Room
D. RELOCATION OF WATER HEATING TANK
E. REPAIR OF WINDOWS AND REPLACEMENT OF SCREEN PANELS
F. Installation of glass partition on master's bathroom, guest bathroom 1 and 2

Prepared by:
Aris R. Alcantara
Civil Engineer
PRC no. 74768
PTR. No. 1651907
Place Issued : Sta. Cruz ,Laguna
Date Issued : 01-02-2014