Professional Documents
Culture Documents
BUREAU
Owner
Ships
Name
BASEL S5
GENERAL CARGO SHIP
BTF141101
(Egypt). L.T.D.
FREEBOARD
CALCULATIONS INCLUDING
TIMBER FREEBOARDS
According to International Convention on Load
Lines, 1966 as modified by the protocol of 1988
relating thereto.
Class
Approval Stamp:
Prepared by
Eng. Basem E. Tewfik
M/V BASEL S5
(A)PRINCIPAL PARTICULARS
M/V BASEL S5
DEFINITIONS
The following definitions for the purpose of freeboard calculation are detailed in Regulation 3.
1. Length (L):
This is taken as 96% of the total length on a waterline at 85% of the least moulded depth, or, as the
length from the fore side of the stem to the axis of the rudder stock on that waterline, if greater.
2. Perpendiculars (FP, AP):
The forward and after perpendiculars are taken as being at the forward and after ends of the length
(L). The forward perpendicular shall coincide with the foreside of the stem on the waterline on which
the length (L) is measured.
3. Amidships:
Amidships is at the middle of the length (L).
4. Breadth (B):
Unless expressly provided otherwise, the breadth (B) is the maximum breadth of the ship, measured
amidships to the moulded line of the frame in a ship with a metal shell and to the outer surface of the
hull in a ship with a shell of any other material.
5. Moulded depth:
This is the vertical distance measured from the top of the keel to the top of the freeboard deck beam
at side.
In ships having rounded gunwales, the moulded depth shall be measured at the point of intersection
of the moulded lines of the deck and side shell plating, the lines extending as though the gunwale
were of angular design.
Where the freeboard deck is stepped and the raised part of the deck extends over the point at which
the moulded depth is to be determined, the moulded depth shall be measured to a line of reference
extending from the lower part of the deck along a line parallel with the raised part.
M/V BASEL S5
M/V BASEL S5
DMLD+t
= 7.013
Ch I/Reg. 3(5&6)
0.013
Ch I/Reg. 3(1)
0.85*DMLD
FBT=
V/(LF*B*d1)
C B=
0.7822
5.95
1134
mm
Ch I/Reg. 3(7)
V=
5840.98
M3
up to d1
draught
Superstructures
Standard height of superstructure (HS) =
Forecastle
M/V BASEL S5
Ch III/Reg. 33-36
1.9796
L of s/s
9.000
B of s/s
13.300
Symbol
Value
h (m)
2.259
h of s/s
2.259
hs (m)
1.980
Bs
B of ship
at S/S
13.300
9.000
b/Bs=
9.00
Hatchway Trunk
1.00
L of s/s
61.559
B of s/s
10.560
Symbol
Value
h (m)
2.337
h of s/s
2.350
hs (m)
1.980
Bs
B of ship
at S/S
13.300
48.877
b/Bs=
61.559
0.79
Etotal = 57.877 m
Sheer
Ch III/Reg. 38
Sheer
AFT
Amidship
M/V BASEL S5
Standard
SM
Product
AP
1024.667
1024.667
0.000
0.000
1/6L
454.952
1364.856
0.000
0.000
1/3L
114.763
344.288
0.000
0.000
0.000
0.000
0.000
0.000
Total
Actual
2733.811
Product
0.000
Amidship
0.000
0.000
0.000
0.000
FORE
1/3L
229.525
688.576
0.000
0.000
1/6L
909.904
2729.712
0.000
0.000
FP
2049.333
2049.333
0.000
0.000
Total
5467.621
-341.726
-683.453
0.000
SS Sheer Credit
S=
y*L'/3L
M/V BASEL S5
0.28
mm
9.00
S=
0.01
mm
Poop Credit
No Poop
0.00
mm
0.00
S=
0.00
m
m
Since h<hs
-683.444
-341.726
Yes
-512.585
M/V BASEL S5
Freeboard Corrections
Correction to the freeboard for ships under 100 m in length
35 % of Length =
[CH.III/Reg. 29]
32.536
57.87652
Correction =
=
0.00
mm
Ch III/Reg. 30
Correction is Applicable
Ch III/Reg. 31(1)
L/15 = 6.197
DF = 7.013
Since DF > L/15 a correction must be applied
M/V BASEL S5
Correction =
157.97
mm
Ch III/Reg. 32-1
0.623
Ch III/Reg. 33-37
0.6 L
=
55.78
0.7 L=
65.07
Length
85.00
Correction
860.00
Length
122.00
Correction
1070.00
Length
92.96
Correction
905.178
E/L
0.60
Percentage
52.00
E/L
0.70
Percentage
63.00
E/L
0.623
Percentage
54.486
0.07 L =
6.51
M/V BASEL S5
Value
Units
905.178
mm
E=
57.877
E/L=
0.623
Percentage of reduction
54.486
493.2
mm
Ch III/Reg. 45
E/L
0.60
Percentage
76.00
E/L
0.70
Percentage
82.00
E/L
0.623
Percentage
77.356
0.07 L =
6.51
Value
Units
905.178
mm
E=
57.877
E/L=
0.62
Percentage of reduction
77.356
700.208
mm
10
M/V BASEL S5
Ch III/Reg. 38(13-15)
Description Of Sheer
Y-Dist.
Units
SSA
Standard Aft
2733.81
mm
SSF
Standard Fore
5467.62
mm
SAA
Actual Aft
0.00
mm
SAF
Actual Fore
0.00
mm
DA or EA
-341.726
mm
DF or EF
-683.444
mm
-512.585
mm
(-) DS * (0.75-(S/2L))
=
189.91
Summer Freeboard
The Minimum Summer Freeboard According to This Regulation
FBSUMMER =
1074.189
mm
11
M/V BASEL S5
= -1045
D-ds>= Fb ?
mm
Yes
Ch III/Reg. 39-5
A1+A2+A3
>=
0.15*L =
13.94
A1 =
16.56
A2 =
0.00
A3 =
34.21
Fmin
1377.47
Pass ?
Yes
No Corrections needed
12
M/V BASEL S5
DK L Depth-DF = 0.00
mm
13
M/V BASEL S5
1193 mm
Assigned Freeboards
Tropical Freeboard
Ch III/Reg. 40(3)
T=
1072
mm
Winter Freeboard
Ch III/Reg. 40(5)
W=
1314
mm
1364
mm
5830.7
TPC. =
11.96
F=
122
mm
14
M/V BASEL S5
867
mm
1193
mm
Assigned Freeboards
LT=
1072
mm
LW=
1314
mm
LWNA=
1364
mm
15