Task

Rapdrp
RAPDRP GIS CONNECTION SETUP
Kownledge Transfer on RAPDRP GIS
Requirment gathering from TCS
RAPDRP application tools study
RAPDRP application tools discussion
R-APDRP GIS tranning session conducted by TCS

Starting date
18-May-15
5-Jun-15
6-Jun-15
8-Jun-15
9-Jun-15
10-Jun-15
16-Jun-15

Implementation of job and assiging job in Rapdrp gis


application
Rapdrp studying the project
GIS MOBILE APP FEASIBILITY REPORT STUDY
CHECKING AVAILABILITY OF GIS JOBS IN MAPS.

22-Jun-15
24-Jun-15
25-Jun-15
30-Jun-15

Rapdrp - Verifying compliance of summary report with


map data

6-Jul-15

comparison of summary report of LT connection with


manual report of LT connection

20-Jul-15

verification of intranet all module and preparing report


Preparing sheet of Rapdrp Estimate cost of project

25-Jul-15
28-Jul-15

Verification of each intranet module and preparing


report
Updation of excel format of intranet Module

30-Jul-15
31-Jul-15

Verification of each intranet module and preparing


report

1-Aug-15

Working on gis rapdrp project document preparation

GIS poc (proof of concepts)


studying on collector gis moblie apps

Ending date
4-Jun-15
5-Jun-15
6-Jun-15
8-Jun-15
10-Jun-15
11-Jun-15
20-Jun-15
23-Jun-15
24-Jun-15
29-Jun-15
5-Jul-15
17-Jul-15
24-Jul-15
27-Jul-15
29-Jul-15
30-Jul-15
31-Jul-15
11-Aug-15

Remark
system not alloted