Mr. L. Pawar
Mr. I. Ansari
Mr. Singh
Mr. P. Tari
I.
a.
b.
5) KT/FRP/CH-G/A.3.1
Ground floor layout has been approved. Drg. No. KT/FRP/CH-F/A.1
Mezzanine floor deck slab drawing no. KT/FRP/CH-MZ/A.1 will be a hall. M/s. Knack
suggested using it as admin + QC building.
Justification:
(i)
All non production personnel and visitors not to go beyond this building.
(ii) Admin. and QC people do not have to cover long distance for using toilets
c.
d.
a.
b.
II.
III.
instead of 400kgs/m2
1) Sectional elevation drawing no. KT/FRP/CH.G/A.3.s
i)
Mr. Fredun has requested to plan man material movement between the
buildings (temporary corridor)