You are on page 1of 1

URV-01

3"-G-100-B54A

ENF RIADOR
D E AIRE

AGOTADOR
INTERETAPA
DESCARGA

AGOTADOR

GB-100

COMPRESOR

BOMBA DE
AC EITE
LUBRICANTE

300#

V-101

TABLERO
DE
CONTROL

DREN

T ANQUE
DE DIA
A CE ITE

LLEGADA DE
LIQ. DE EST.
MOJARREAS 4

AJU ST AR A
25.0 PSIG

FOSA DE
PURGAS

2"-GS-107-A54A

NOTA 3

3"
NOTA 2

16"

NOTA 4

4"

TG-700

4"

2"

1/2"

2"

1/2"

2"

6"

2"x6"

1/2"

CAPACIDAD 300 BLS


DIAM.: 12'
ALTURA: 15'

PI
100

2"-GC-103-B54A
3"-GC-102-A54A

LG
100

4"

1.65 M.
4"
5000 mm

NC.
3"

4"

AC

PRV
X

CC

LC
100

DESCARGA DE
LIQUDO DE
COMPRESORAS

3"-GC-100-D54A
NOTA 1

NA FAA NA

2"

2"
NC

AJUSTAR A
3.65 PULG. H2O

EST. MOJARREAS 2 A
EST. MOJARREAS 1
GDO 8" (BAJA)

NC.

8"
ENTRADA A SEPARADOR (DE BAJA)

DESCARGA DE
AUTOTANQUES

16"

8"

LG

AJUSTAR A
2.783 PULG.
H2O
ATM

AJUSTAR A
3.75 PULG.
H2O

1"

4"

NA 2"

PSV
17

PSV
18

4"
16"

NOTA 2

CUBETA DE
12" GDO 8"

AJUSTAR A
2.783 PULG.
H2O
ATM

GASODUCTO
MOJARREAS 2

LG

SUCCIN DE
BOMBA No. 3

1"

8"

3"

TV-503

4"
NOTA 2

CONDENSADO
CAP.: 1000 BLS.

12"x8"

8"

3"

8"

8"

ENTRADA A SEPARADOR (DE BAJA) 8"

3"

TOMA DE
AUTOTANQUE

6"x2"

TOMA DE
AUTOTANQUE

4000 mm
NOTA 6

GASODUCTO
MOJARREAS 3

LG

D=6,096 mm
H=5,486.4 mm

D=6,096 mm
H=5,486.4 mm

GASODUCTO
MOJARREAS 4

8"

8"

AGUA
CAP.: 1000 BLS.

LV

GDO 8" MOJARREAS 2


(VIBORITAS) AL CABEZAL DE
RECOLECCION DE TRAMPAS
12" (DE BAJA)

EM

TV-502

8"

NIV. MIN

PSV
15

AJUSTAR A
1.5 PULG H2O

4"-VR-103-A54A

EM

4"

2517 mm

TRASIEGO FUTURO

4"

NA 2"

PRV
08

8"

MOJARREAS 1
Y 2 (VIBORITAS)

BOMBA
NO. 3

R E V I S I O N E S
REV.:
0

DESCRIPCIN:
APROBADO PARA CONSTRUCCIN

NUM.:
FECHA:

POR:

Vo. Bo.:

DIC. 2011

L.R.R.R.

A.C.S.

12"

12"

TOMA DE
AUTOTANQUE
FECHA:

GDO 8" ESTACIN


MOJARREAS 1 A EST.
DE COMPRESIN
SIERRITA

DIBUJO DE REFERENCIA:

8"

TUBO DE MED.
6" (DATO 117)

12"

DESCARGA DE
BOMBA 4"

GLD 4" ESTACIN


MOJARREAS 1 A
EST. DE COMPRESIN
CUERVITO

GDO 12" ESTACIN


MOJARREAS 1
ENT. MOJARREAS 1

EST. MOJARREAS 1 A CABEZAL DE RECOLECCIN DE TRAMPAS 12"

AJUSTAR A
3.75 PULG.
H2O PSV
16

TL-100
CAP.: 1000 BLS.
D=6,096 mm
H= 5,486.4 mm

6"x8" 8"-VR-102-A54A

SUCCIN DE
BOMBA
BA-700A

6"
NOTA 2

AJUSTAR A
2.3 PULG. H2O
PRESIN
NA

VRV
07

EST. MOJARREAS 1 (DE BAJA) A CABEZAL DE RECOLECCIN DE TRAMPAS 12"

AJUSTAR A
2.783 PULG.
H2O
ATM

AJUSTAR A
1.5 PULG H2O

PRV
07

LINEA DE PATEO

NA

2"-GS-102-A54A

AJUSTAR A
2.3 PULG. H2O
VRV PRESIN
06

DESHIDRATADOR

8"

6"

3"

NOTA 3

4"

TANQUE DE ALMACENAMIENTO
DE AGUA CONGENITA

EST. MOJARREAS
1 A GASODUCTO
MOJARREAS 1A

LINEA DE PATEO

4"

EM

3"

AJUSTAR A
2.3 PULG. H2O
VRV PRESIN NA
08

PSV
09

TV-01

ENVIO 8"

INTERCONECCIN GDO. 8" EST.


MOJARREAS No. 2 CON TED. GDO. 12" A
A ENT. MOJARREAS

4"

16" 1"

AJUSTAR A
2.783 PULG. H2O

PSV
10

115 PSIG
PI

DESGASIFICADOR
DG-151
F/O.

2"-GS-101-A54A

2"-GS-103-A54A

EM

NA

NA

CUBETA DE

EST. DE REC.
MOJARREAS 2

PSV
14

AJUSTAR A
2.3 PULG. H2O
PRESIN

VRV
05

2"-GS-108-A54A

6"-VR-104-A54A

AJUSTAR A
3.65 PULG.
H2O

TRAMPA DE
RECOLECCIN 4"

16"

PSV
13

2"

2"

2"-AC-101-A54A

CABEZAL DE RECOLECCIN DE TRAMPAS 12"

NA 2"

2"

A SUCCION DE
COMPRESORES

NC
AJUSTAR
A 25 PSIG.
SEAL
LCV
3-15 PSIG 100 PRV B54A A54A
X

PI

AJUSTAR A
PRV 1.5 PULG H2O
05

PROYECTO

1.5 PULG H2O

8"

DE DESCARGA DE
COMPRESORES

NA
NA
2"
2"X 3"
2"X 3"

NC

OTRO PROY.

C.P.:

2"

2 PSIG

4"

FILTRO

NC

NC.

PRV
06

4"

TRAMPA DE
RECOLECCIN 4"

2"-AC-100-A54A

NOTA 5

2"

PI

DESCARGA
DE BOMBAS

AJUSTAR A
250 PSIG.

3"-GC-101-B54A

2"

4"x6"

RETORNO
CONDENSADO
BOMBAS No.1 Y 2

8"

10.5 PSIG

3"x2"

CONDENSADO

SEP. DE GAS
(DESINSTALADO)

4"

2"

3"

DESCARGA
DE BOMBAS

LG

B54A D54A

AC
1"

GLD 4" EST.


CULEBRA SUR
MOJARREAS 1

Pop = 4.57 - 11.95 Kg/cm^2

SEPARADOR VERTICAL
12.75" 0.D. x 5.65' S-S
PRESIN DE DIS.: 275.0 PSIG.
TEMP. DE DIS.: 59.0 C.

1"x2"

1/2"
1/2"
NC.

DESCARGA DE

DESCARGA DE
AUTOTANQUES
AGUA CONGENITA
/ CONDENSADO

GLD 4" EST.


CULEBRA 4
MOJARREAS 1

NC.

GLD. CULEBRA

4"

RETORNO DE
BOMBA No. 3

4"

TANQUE DE ALMACENAMIENTO
DE AGUA CONGENITA

LV

6"

4"

NOTA 3

TV-06
6"

LSH/L

DIAM.: 15'
ALTURA: 10'

2"

3"

6"

16"

DESHIDRATADOR
CAP.: 300 BLS.

2"

EM

SEPARADOR DE BAJA

LG

SV-100

2"-D-102-A54A

6"

AJUSTAR A
2.783 PULG.
H2O

1"-D-101-B54A

PSV
01

N. MIN. 152 mm

EM
6"

N. MAX. 457 mm

2"

PSV
11
V

NC.

PSV
02

AJUSTAR A
1"
50 PSIG.
X
PRV
2"
X
B54A A54A PSV
100
"F"
B54A A54A

AJUSTAR A
3.65 PULG. H2O

AGUA DE
TANQUE
TV-502

PSV
08
AJUSTAR A
3.65 PULG. H2O

NC.

AGUA CONGENITA
3"-GS-100-A54A

AJUSTAR A
2.783 PULG. H2O PSV
07
P
V

2"X 3"
NA

NA
8"-VR-106-A54A

SHBP-1

NA

4"-VR-108-A54A

2"

VRV
01

3"

PRV
04

NC

AJUSTAR A
PRV 1.5 PULG H2O
01

3"

2"x4"

2"X 3"

BA-700A

4"x6"

AJUSTAR A
1.5 PULG H2O

VRV
04

CONDENSADO

8"

AJUSTAR A
2.3 PULG. H2O
PRESIN
AJUSTAR A
2.3 PULG. H2O
PRESIN

LG

Pop = 11.95 - 17.58 Kg/cm^2

2"
2"

NA

6"x4"

8"

2"-GS-105-A54A
2"-GS-104-A54A

SEPARADOR DE PRUEBA

AGUA CONGENITA
LC LG NOTA 1

Pop = 100 PSIG

BY-PASS 8"

4"x6"

LG

SHAP-3

SEPARADOR

LG LC

CABEZAL DE 6"
DE BAJA PRESIN

SHP-1

1/2"

2"

ESTACIN
DE COMPRESIN
CUERVITO 1

4"
6"x4"

LG

1/2"

CAPACIDAD 300 BLS


DIAM.: 12'
ALTURA: 15'

CAPACIDAD 2000 BLS


DIAM.: 25'
ALTURA: 24'

6"

NOTA 1

QUEMADOR

TANQUE DE ALMACENAMIENTO
DE AGUA CONGENITA

6"

TANQUE DE ALMACENAMIENTO
DE CONDENSADO
4"

TV-05

6"

4"

NOTA 3

4"

4"-VR-101-A54A

4"

3"

6"

16"

CABEZAL DE 6"
DE BAJA PRESIN

PI

IGUALADOR

P
NOTA 3

3"
NOTA 4

TV-700

EM

2"

PROYECTO
EXISTENTE

DESCARGA A TANQUE TV-700

20"

NOTA 2

PSV
AJUSTAR A
05
2.783 PULG. H2O
P

IGUALADOR

3"

2"-D-100-A54A

NA

ATMOSFERA

EM
4"

AJUSTAR A
2.783 PULG. H2O

PSV
P 03

2"x3"

CABEZAL DE 3"
A LA ATM.

LINEA DE BAJA 6"

PSV
04

AGUA / CONDENSADO A TV-01 3"


2"

QUEMADOR

AJUSTAR A
3.65 PULG. H2O PSV
06

NA

4"-VR-101-A54A
NA

4"-VR-107-A54A

4"-VR-105-A54A

PSV
12

NA

AJUSTAR A
3.65 PULG. H2O

AGUA CONGENITA 3"

PRV
03

2"-AC-101-A54A

VRV
02

FP-100

AJUSTAR A
1.5 PULG H2O

VRV
03

SUCCIN DE
COMPRESORAS

AJUSTAR A
PRV 1.5 PULG H2O
02

AJUSTAR A
2.3 PULG. H2O
PRESIN

AJUSTAR A
2.3 PULG. H2O
PRESIN

3"

CONDENSADO 3"

2"

2"-GS-106-A54A

2"-DG-100-A54A

2"

ATMOSFERA

2"-GS-108-A54A

EA-100

V-100

150#

VENTEO

10"-VR-100-A54A

DESCARGA DE
AUTOTANQUES
AGUA CONGENITA

CAPACIDAD 1000 BLS


DIAM.: 20'
ALTURA: 18'

3"

1.- ESTA CONEXIN SE HARA MEDIANTE UN TRABAJO DE HOT TAPPING.


LA VLVULA SER DE COMPUERTA DE PASO COMPLETO
Y CONTINUADO.
2.- VLVULA PRESIN-VACIO DE PROYECTO.

PROYECTO

3.- VLVULA EXISTENTE (DEBE SER RECALIBRADA A 2.783 IN H2O).


4.- LA PSV-11 (DE PROYECTO) Y PSV-01 (EXISTENTE)
SE COMPLEMENTAN EN CAPACIDAD DE FLUJO.
LA PSV-12 (DE PROYECTO) Y PSV-03 (EXISTENTE)
SE COMPLEMENTAN EN CAPACIDAD DE FLUJO.
5.- SE RECOMIENDA INSTALAR UNA VLVULA CHECK.

EXISTENTE
OTRO PROY.
EQUIPO DE
PROYECTO

6.- ALTURA A CORROBORAR POR OTRO PROYECTO.

Vo. Bo.
COORDINACIN DE OPERACIN DE POZOS
E INSTALACIONES DE EXPLOTACIN.
DEPARTAMENTO DE OPERACIN DE POZOS.
COORDINACIN DE DISEO DE EXPLOTACIN.
EQUIPO DE INSTALACIONES SUPERFICIALES.
COORDINACIN DE SEGURIDAD INDUSTRIAL Y
PROTECCIN AMBIENTAL.
DEPARTAMENTO DE PROCESO DE SIPA.

APROBADO POR:
ING. ALFREDO TAPIA AZUARA
JEFE DE DEPTO. DE
INGENIERA DE PROYECTOS

DIRECCIN REGIONAL ZONA NORTE


GERENCIA DE INGENIERIA
PROY. IMP. F.40275.06

ING. JUAN MANUEL FLORES B


JEFE DE SECCIN DE
INSTALACIONES DE PROCESO

MONTERREY 411 COL. RODRIGUEZ.


REYNOSA, TAM. TEL (899) 9 23 02 59
MICRO 5 21 72 Y 5 21 73

ESC.:

SIN

ACOT. EN:

-----

ING. VICTOR H. LARIOS S.


SUPERVISOR DEL PROYECTO

DIAGRAMA DE TUBERA E INSTRUMENTACIN


No. PROY.:
LUGAR DEL PROYECTO: NUEVO LEN

A-300

REV.

No. IMP N-F.40275.06-13-A-300-MOJ

You might also like