You are on page 1of 1

LIST OF DRAWINGS

SHEET NO.

SHEET TITLE

S-00

COVER SHEET

S-01

GENERAL NOTES

S-02

FLOOR FRAMING PLANS (1 OF 2)

S-03

FLOOR FRAMING PLANS (2 OF 2)

S-04

CONCRETE COLUMN SCHEDULE (1 OF 8)

S-05

CONCRETE COLUMN SCHEDULE (2 OF 8)

S-06

CONCRETE COLUMN SCHEDULE (3 OF 8)

S-07

CONCRETE COLUMN SCHEDULE (4 OF 8)

S-08

CONCRETE COLUMN SCHEDULE (5 OF 8)

S-09

CONCRETE COLUMN SCHEDULE (6 OF 8)

S-10

CONCRETE COLUMN SCHEDULE (7 OF 8)

S-11

CONCRETE COLUMN SCHEDULE (8 OF 8)

S-12

CONCRETE BEAM SCHEDULE (SEISMIC) (1 OF 23)

S-13

CONCRETE BEAM SCHEDULE (SEISMIC) (2 OF 23)

S-14

CONCRETE BEAM SCHEDULE (SEISMIC) (3 OF 23)

S-15

CONCRETE BEAM SCHEDULE (SEISMIC) (4 OF 23)

S-16

CONCRETE BEAM SCHEDULE (SEISMIC) (5 OF 23)

S-17

CONCRETE BEAM SCHEDULE (SEISMIC) (6 OF 23)

S-18

CONCRETE BEAM SCHEDULE (SEISMIC) (7 OF 23)

S-19

CONCRETE BEAM SCHEDULE (SEISMIC) (8 OF 23)

S-20

CONCRETE BEAM SCHEDULE (SEISMIC) (9 OF 23)

S-21

CONCRETE BEAM SCHEDULE (SEISMIC) (10 OF 23)

S-22

CONCRETE BEAM SCHEDULE (SEISMIC) (11 OF 23)

S-23

CONCRETE BEAM SCHEDULE (SEISMIC) (12 OF 23)

S-24

CONCRETE BEAM SCHEDULE (SEISMIC) (13 OF 23)

S-25

CONCRETE BEAM SCHEDULE (SEISMIC) (14 OF 23)

S-26

CONCRETE BEAM SCHEDULE (SEISMIC) (15 OF 23)

S-27

CONCRETE BEAM SCHEDULE (SEISMIC) (16 OF 23)

S-28

CONCRETE BEAM SCHEDULE (SEISMIC) (17 OF 23)

S-29

CONCRETE BEAM SCHEDULE (SEISMIC) (18 OF 23)

S-30

CONCRETE BEAM SCHEDULE (SEISMIC) (19 OF 23)

S-31

CONCRETE BEAM SCHEDULE (SEISMIC) (20 OF 23)

S-32

CONCRETE BEAM SCHEDULE (SEISMIC) (21 OF 23)

S-33

CONCRETE BEAM SCHEDULE (SEISMIC) (22 OF 23)

S-34

CONCRETE BEAM SCHEDULE (SEISMIC) (23 OF 23)

S-35

CONCRETE COLUMN LAYOUT (1 OF 5)

S-36

CONCRETE COLUMN LAYOUT (2 OF 5)

S-37

CONCRETE COLUMN LAYOUT (3 OF 5)

S-38

CONCRETE COLUMN LAYOUT (4 OF 5)

S-39

CONCRETE COLUMN LAYOUT (5 OF 5)

S-40

WALL LAYOUT

S-41

WALL REINFORCEMENT ELEVATIONS (1 OF 6)

S-42

WALL REINFORCEMENT ELEVATIONS (2 OF 6)

S-43

WALL REINFORCEMENT ELEVATIONS (3 OF 6)

S-44

WALL REINFORCEMENT ELEVATIONS (4 OF 6)

S-45

WALL REINFORCEMENT ELEVATIONS (5 OF 6)

S-46

WALL REINFORCEMENT ELEVATIONS (6 OF 6)

S-47

WALL REINFORCEMENT PLANS (1 OF 2)

S-48

WALL REINFORCEMENT PLANS (2 OF 2)

BEAM HEIGHT

ZONE B

TYPICAL LAP
(SEE NOTE 5)
ZONE C

G
ZONE A

L2
D

F
ZONE B

DRAWING

GENERAL NOTES - 1

H
ZONE C

ZONE B

STRUCTURE

ZONE A

SENIOR

Typical Concrete Beam Elevation 1S

PROJECT

Lc2
L1
D

BEAM HEIGHT

H
ZONE B

ZONE A

ZONE A

ZONE B

CLIENT

L2
B

L2

NOTES:
1. SEE BEAM SCHEDULE FOR STIRRUP TYPE AND SPACING.
2. ZONE A LENGTH SHALL BE TWICE THE BEAM HEIGHT, h.
3. THE FIRST STIRRUP IN ZONE A SHALL BE LOCATED 50.8mm MAXIMUM FROM THE FACE OF THE SUPPORT.
4. LAP SPLICES SHALL NOT BE LOCATED WITHIN THE BEAM/COLUMN JOINT, NOR WITHIN A DISTANCE OF 2H.
5. LAP SPLICES SHALL BE ENCLOSED BY HOOP STIRRUPS AT A MAXIMUM SPACING OF D/4 OR 101.6mm, WHICHEVER IS SMALLER.
Typical Concrete Beam Elevation 2S

2/20/2015

G
ZONE A

DATE

NEW DRAWING GENERATED

NOTES:
1. SEE BEAM SCHEDULE FOR STIRRUP TYPE AND SPACING.
2. ZONE A LENGTH SHALL BE TWICE THE BEAM HEIGHT, h.
3. THE FIRST STIRRUP IN ZONE A SHALL BE LOCATED 50.8mm MAXIMUM FROM THE FACE OF THE SUPPORT.
4. LAP SPLICES SHALL NOT BE LOCATED WITHIN THE BEAM/COLUMN JOINT, NOR WITHIN A DISTANCE OF 2H.
5. LAP SPLICES SHALL BE ENCLOSED BY HOOP STIRRUPS AT A MAXIMUM SPACING OF D/4 OR 101.6mm, WHICHEVER IS SMALLER.

BEAM HEIGHT

DESCRIPTION

Lc
L1
B

Lc1
L1
B

NO

TYPICAL LAP
(SEE NOTE 5)
ZONE C

G
ZONE B

CONSULTANT
ZONE A

TOSHIBA
PROJECT NUMBER
DATE

DESIGNED BY
CHECKED BY

SCALE

S-01

You might also like