You are on page 1of 5

TRX Upgrade-Downgrade Guideline

Huawei Confidential

TRX Downgrade Guidance (DONOR LIST)


TRX Downgrade Guidance Criteria 1
1. Each sector have ZERO blocking (SD, TCH or PDCH hard blocking)
2. Each sector have low utilization in TCH
3. After downgrade TCH utilization shall <=50%
4. After downgrade no any TCH block and SD block
5. Sector that has been put as candidate. It has been monitor for 3 weeks period exclude peak season
(Lebaran, New year festive) to ensure we have record of all traffic
6. NPO will Downgrade candidate, and during 1-3 days monitoring found TCH blocking, fallback execution
shall be in place
7. Cells With TRX Configuration <=2 shall not be downgraded
TRX Downgrade Guidance Criteria 2
8. Each sector have ZERO blocking (SD, TCH blocking)
9. Each sector have low utilization in TCH (0-30%)
10. Each sector have low utilization in PDCH (0-30%)
11. Each sector have <=0.5 PDCH hard blocking
12. After downgrade TCH utilization shall <=50%
13. After downgrade no any TCH block and SD block
14. After downgrade no any PDCH hard blocking >= 0.5
15. Sector that has been put as candidate. It has been monitor for 3 weeks period exclude peak season
(Lebaran, New year festive) to ensure we have record of all traffic
16. NPO will Downgrade candidate, and during 1-3 days monitoring found TCH blocking or PDCH hard
blocking >= 0.5, fallback execution shall be in place
17. Cells With TRX Configuration <=2 shall not be downgraded
Huawei Confidential Page 2

Term and Condition - TRX Upgrade Guidance


(RECIPIENT LIST)
TRX Upgrade Guidance
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.

12.
13.

Upgrade TRX only trigger by traffic voice


Threshold for TCH configuration FR:HR = 60:40
Formula of TCH Utilization (Gos2%)=
(Nom) Voice Traffic {FR+HR}
(Denom) 5 TS x N
; N = Configured TRX Nr
TCH blocking >= 0.5%
TCH Utilization >= 70%
Each sector must have network availability >95%, minimum 5 days measurement in 1 week
For Huawei and Nokia equipment FPDCH configure it must be same with TRX configure *)
For Siemens we can accept FPDCH more than TRX configuration but it must be guarantee TCH voice
will be as 1st priority
Initial SDCCH Configuration must be the same with TRX configuration. Whenever SDCCH blocking
occurred, then NPO shall perform parameter adjustment, or additional SDCCH in case required.
TCH blocking to consider must be happen 3 days within 1 week
Before upgrade proposal regional team must ensure followings:
a) No any site problem (site down, or have operational issue in surrounding sites)
b) If surrounding site problem and need upgrade, operational team must confirm that they cant reestablish this site as per their KPI
Before proposal upgrade coming, optimization team must ensure theres no any TS of SD can be
downgraded (in case we found SD util low, the 1st action taken should be reduce TS SD instead of
propose upgrade TRX)
Upgrade will not applied for TRX 6, therefore new site shall be proposed

Huawei Confidential Page 3

TCH Configuration Rules


With 60% : 40% Threshold from FR to HR:
1 TRX = 5 TCH
2 TRX = 10 TCH
3 TRX = 15 TCH
4 TRX = 20 TCH

3 + ((5-3)x2) = 7 TCH
6 + ((10-6)x2) = 14 TCH
9 + ((15-9)x2) = 21 TCH
12 + ((20-12)x2)
= 28 TCH

Huawei Confidential Page 4

Thanks

Huawei Confidential

You might also like