Steel Beam Design

A two story storage facility has columns 12-0 long and are fixed at the base and to the rest of the
structures with hinges. The structure is designed to carry the following weights.

Dead Load

Live Load

4 concrete floor (weight of concrete = 150lb/ft3)

Stock loading = 100 psf

Estimated framing & miscellaneous other = 30psf

Wall loads B1, S1, S2 & S3 = 600lbs/ft

25-0
B1
Column B

6-0

Column A
Slab

6-0

B2

25-0

Slab
B3
S2

7-0

S1

B4

Elevator opening
B6

B5

Slab

6-0

Slab

Column C
8-0

9-0

S3
8-0

Column D

Lab Assignment #7 - Solutions

Steel Beam Design


Beam 1

25-0

B1 A50 Steel
LL + DL = TL

6-0

B1

(.33x150)psf + 30psf + 100psf = 180psf


convert to UDL= 180 3 = 540lbs ft
540lbs + 600lbs/ft = 1140lb/ft
ft
W = 1.14k/ft

Slab

25-0

6-0

B2
Slab
B3

S2

7-0

S1

Slab

B4

Elevator opening

wL 1.14 25
=
= 14.25kips
2
2
wl2 1.14 252
=
= 89.06k.ft
M=
8
8
Fb = 0.66x50ksi
R=

B5

Slab

6-0

Slab
Column D

Column C

S3
8-0

9-0

8-0

w =1.14K/ft

25 ft

S=

M 89.06kft 12(in/ft)
=
= 32.39in3
Fb
(0.66 50ksi)

Try W12x26
A = 7.65in2 , d = 12.22in, tw = 0.23in, I = 204in4
Check Shear
Fv = 0.40 50ksi = 20ksi
V
14.25
=
= 5.07ksi < Fv = 20ksi ok
fv =
dtw (12.22)(0.23)

Check Deflection
5wDL +LL l4 5 1.14 1/12 (25 12)4
=
= 1.69in
384 29,000 204
384EI
L
25 12
TL,Code =
=
= 1.25 < 1.67in not Ok
240
240
TL =

Try W14 26
I = 245
Check Deflection
5wDL +LL l4 5 1.14 1/12 (25 12)4 3.85 109
=
=
= 1.41in
384 29,000 245
384EI
2.73 109
L
25 12
TL,Code =
=
= 1.25 < 1.41in Not Ok
240
240
TL =

Try W16 26
I = 301
Check Deflection
5wDL +LL l4 5 1.14 1/12 (25 12)4 3.85 109
=
=
= 1.15in
384 29,000 301
384EI
3.35 109
L
25 12
TL,Code =
=
= 1.25 > 1.15in Ok
240
240

TL =

Use W16 26

Lab Assignment #7
Steel Beam Design
Beam 2

25-0

B2 A50 Steel
LL + DL = TL

6-0

B1
Slab

(.33x150)psf + 30psf + 100psf = 180psf


convert toUDL= 180 6 = 1080lbs ft

25-0

6-0

B2

W = 1.08k/ft

Slab
B3

S2

7-0

S1

Slab

B4

Elevator opening

B5

Slab

wL 1.08 25
=
= 13.5kips
2
2
wl2 1.08 252
=
= 84.38k.ft
M=
8
8
Fb = 0.66x50 = 33ksi
R=

6-0

Slab
Column D

Column C

S3
8-0

9-0

8-0

w =1.08K/ft

25 ft

S=

M 84.38kft 12(in/ft)
= 30.68in3
=
(33ksi)
Fb

Try W12x26
A = 7.65in2 , d = 12.22in, tw = 0.23in, I = 204in4
Check Shear
Fv = 0.40 50ksi = 20ksi
13.5
V
= 4.8ksi < Fv = 20ksi ok
=
fv =
dtw (12.22)(0.23)

Try12 26
Check Deflection
5wDL +LL l4 5 1.08 1/12 (25 12)4
=
= 1.69in
384 29,000 204
384EI
L
25 12
TL,Code =
=
= 1.25 < 1.60in not Ok
240
240
TL =

Try W14 26
I = 245
Check Deflection
5wDL +LL l4 5 1.08 1/12 (25 12)4 3.65 109
=
=
= 1.38in
384 29,000 245
384EI
2.73 109
L
25 12
TL,Code =
=
= 1.25 < 1.45in Not Ok
240
240

TL =

Try W16 26
Check Deflection
5wDL +LL l4 5 1.08 1/12 (25 12)4 3.65 109
=
=
= 1.08in
384 29,000 301
384EI
3.35 109
L
25 12
TL,Code =
=
= 1.25 > 1.08in Ok
240
240

TL =

Use W16 26

Lab Assignment #7
Steel Design

Beams 4 and 5

25-0
B4 + B5 A50 Steel
LL + DL = TL
(.33x150)psf + 30psf + 100psf = 180psf
convert to UDL1 (180 4) = 720lb/ft or 0.72k/ft

6-0

B1
Slab

convert to UDL2 (180 4.5) = 810lb/ft or 0.81k/ft

6-0

B2
MA = 0
0 = 9.36(6.5) 4.86(10) + 13By

25-0

Slab
B3

S1

S2

13By = 64.09 + 48.6 By = 112.69 /13 8.67k

7-0

MB = 0
0 = 4.86(3) + 9.36(6.5) 13A y
13A y = 14.58 + 60.84 A y = 75.42/13 5.8k

Elevator opening

B4

Slab

B5

Slab

(5.8 + 0.76)
7 = 22.96kft
2
Find x = .76/1.53 = 0.5ft
A1 =

6-0

Slab
Column D

Column C

S3
8-0

(0.5 .76)
= 0.19kft
2
(8.42 5.5)
A3 =
= 23.16
2
A2 =

9-0

8-0

w =0.81K/ft

Vmax = 8.42k
From diagram M = 23.15 k ft
Fb = 0.66x50ksi = 33ksi

w =0.72K/ft

S=

7 ft

Try W12 14
A = 4.16in2 , d = 11.91in, tw = 0.2in, I = 88.6in4

6 ft
13 ft

9.36

Check Shear
Fv = 0.40 50ksi = 20ksi
V
8.42
=
= 3.53ksi < Fv = 20ksi ok
fv =
dtw (11.91)(0.2)

4.86

Ax = 0

6.5 ft

6 ft

0.5 ft

Ay = 5.8k

M 23.15kft 12(in/ft)
=
= 8.42in3
Fb
(33ksi)

Check Deflection

By=8.67 k

5.8K

5wDL +LL l4 5 1.53 1/12 (13 12)4 3.78 108


= 0.38in
=
=
384 29,000 88.6
384EI
9.87 108
L
13 12
=
= 0.65 < 0.38in Ok
TL,Code =
240
240

TL =

Use W12 14

+
V (k)
-

0.76

A2
22.96

+
M (k.ft)
-

23.15

8.42

Lab Assignment #7
Steel Beam Design

B3 A50 Steel
LL + DL = TL
wallload = 180psf

Beam 3

convert toUDL= 180 3 = 540lbs ft W = 0.54k/ft

25-0

MA = 0
0 = 5.8(8) 13.5(12.5) - 5.8(17) + 25By

6-0

B1

25By = 46.4 + 168.75 + 98.6 B y =

Slab

By = A y
OR

6-0

B2

R=V=

25-0

Slab

5.8k

7-0

5.8k

Elevator
opening

B4

Slab

S2

(12.55 + 8.23)
8 = 83.12kft
2
(2.43 4.5)
= 5.47kft
A2 + A 3 =
2

Vmax = 12.55k
From diagram M = 88.59 kft
Fb = 0.66x50 = 33ksi

Slab

B5

wl
.54 25
+P =
+ 5.8 = 12.55k
2
2

A1 + A 4 =

B3
S1

313.75
= 12.55k
25

6-0

Slab
Column D

Column C

S=

M 88.59kft 12(in/ft)
=
= 32.21in3
Fb
(33ksi)

S3
8-0

9-0

Try W12 26
A = 7.65in2 , d = 12.22in, tw = 0.230in, I = 204in4

8-0

5.8K

5.8 K

w =0.54K/ft

Check Shear
Fv = 0.40 50ksi = 20ksi
V
12.55
fv =
=
= 4.47ksi < Fv = 20ksi ok
d.tw (12.22)(0.230)
Check Deflection
TL =
=

25 ft

5wDL +LL l4
PL3
+
=
384EI
28.2EI

5 .54 1/12 (25 12)4


5.8 (25 12)3
+
384 29,000 204
28.2 29000 204
1.82 109

1.57 108

= (0.8 + 0.94) 1.74in


1.67 108
L
25 12
TL,Code =
=
= 1.25 < 1.74in Not Ok
240
240

13.5
Ax = 0

2.27 10

Try 14 26

8 ft

9 ft

I = 245

8 ft

Ay = 12.55k

By=12.55k

TL =
=

+
V (lbs)
-

8.23
2.43

A3

A2

2.43
8.23

12.55
83.12

2.73 109

TL =
=

1.57 108

5wDL +LL l4
PL3
+
=
384EI
28.2EI

5 .54 1/12 (25 12)4


5.8 (25 12)3
+
384 29,000 301
28.2 29000 301

1.57 108
= (0.54 + 0.64) 1.74in
2.46 108
L
25 12
TL,Code =
=
= 1.25 < 1.18in Ok
240
240

+
M (lbs.ft)
-

1.82 109

Try 16 26
I = 301

A4

86.59
83.12

5 .54 1/12 (25 12)4


5.8 (25 12)3
+
384 29,000 245
28.2 29000 245

= (0.67 + 0.79) 1.74in


2.0 108
L
25 12
TL,Code =
=
= 1.25 < 1.46in Not Ok
240
240

12.55
A1

5wDL +LL l4
PL3
+
=
384EI
28.2EI

1.82 109

3.35 109

Use 16 26

Lab Assignment #8
Steel Design
Stringer 3

25-0
S3 A50 Steel

6-0

B1
wall load = 600lbs ft W = 0.6k/ft

Slab

MA = 0
0 = 8.67(8) 15(12.5) - 8.67(17) + 25By

6-0

B2

25By = 69.36 187.5 147.39 B y =

Slab

25-0

By = A y
OR

B3

R=V=

S1

S2

wl
0.6 25
+P =
+ 8.67 = 16.17k
2
2

(16.17 + 11.37)
8 = 110.16kft
2
(2.7 4.5)
= 6.08kft
A2 + A 3 =
2
A1 + A 4 =

Slab

Elevator opening

B4

B5

Slab

8.67k

6-0

Slab
8.67k

7-0

404.25
= 16.17k
25

Column C

Column D

Vmax = 16.17k
From diagram M = 116.24 kft
Fb = 0.66x50 = 33ksi

S3
8-0

9-0

8-0

S=

Try W16 31
A = 9.12in2 , d = 15.88in, tw = 0.275in, I = 375in4

8.67K

8.67 K

Check Shear

w =0.6K/ft

Fv = 0.40 50ksi = 20ksi


V
16.17
fv =
=
= 3.7ksi < Fv = 20ksi ok
d.tw (15.88)(0.275)

25 ft

Try 16 31
I = 375
Check Deflection

15

TL =

Ax = 0

8 ft

9 ft

8 ft

Ay = 16.17 k

By=16.17 k

5wDL +LL l4
PL3
+
=
384EI
28.2EI

8.67 (25 12)3


5 .6 1/12 (25 12)4
+
28.2 29000 375
384 29,000 375
2.03 109

2.34 108

= (0.49 + 0.76) 1.08in


3.07 108
25 12
L
= 1.25 > 1.25in Not ok
=
TL,Code =
240
240
=

16.17

4.18 109

Try 18 35

11.37
2.7

+
V (lbs)
-

I = 510
Check Deflection

A3

A2

116.24
110.16

TL =

A4

2.7
11.37

+
M (lbs.ft)
-

M 116.24kft 12(in/ft)
=
= 42.27in3
Fb
(33ksi)

16.17

8.67 (25 12)3


5 .6 1/12 (25 12)4
+
28.2 29000 510
384 29,000 510
2.03 109

2.34 108

= (0.36 + 0.56) 0.92in


4.17 108
L
25 12
=
= 1.25 > 0.92in Ok
TL,Code =
240
240
Use W18 35
=

116.24

5wDL +LL l4
PL3
+
=
384EI
28.2EI

5.68 109

Lab Assignment #8
Steel Beam Design

S1 and S2 A50 Steel

Stringer 1 and 2

wall load = 600lbs ft W = 0.6k/ft

25-0

Total Load = (180 4) = 720lb/ft or 0.72k/ft

6-0

B1

MA = 0
0 = 13.5(6) 12.55(12) - 15(12.5) 9.36(18.5) + 25By

Slab

25By = 81 150.6 187.5 - 173.16 By =

13.5k
6-0

B2

MB = 0
0 = 9.36(6.5) + 15(12.5) + 12.55(13) + 13.5(19) + 25A y

Slab

25A y = 60.84 + 187.5 + 163.15 + 256.5 A y =

12.55k

25-0

592.26
= 23.69k
25

B3

S2

667.99
= 26.72k
25

Fy = 26.72 + 23.69 13.5 12.55 15 9.36 = 0

7-0

S1

Elevator opening

B4

Slab

B5

Slab

7.25k

6-0

Slab
Column C

Column D

A1 =

(26.72 + 23.12)
6 = 149.52kft
2

A2 =

(9.62 + 6.02)
6 = 46.92kft
2

A3 =

(6.53 + 23.69)
13 = 196.43kft
2

S3
8-0

9-0

13.5 K

Vmax = 26.72k
From diagram M = 196.44 kft
Fb = 0.66x50 = 33ksi

8-0

12.55K

w =0.72k/ft

w =0.6k/ft
S=

M 196.44kft 12(in/ft)
=
= 71.43in3
Fb
(33ksi)

Try W21 44
A = 13in2 , d = 20.66in, tw = 0.35in, I = 843in4

25 ft
12.55k 15k

13.5k

Check Shear
Fv = 0.40 50ksi = 20ksi
V
26.72
fv =
=
= 3.7ksi < Fv = 20ksi ok
d.tw (20.66)(0.35)

9.36k

Ax = 0

6 ft

6 ft

13 ft

Ay = 26.72 k

By=23.69 k

26.72

TL =

23.12
9.62

6.53

196.44
149.52
+
M (lbs.ft)
-

6.02

A2

+
V (lbs)
-

Try 21 44
I = 843
Check Deflection
5wDL +LL l4
PL3
+
=
384EI
28.2EI

5 1.32 1/12 (25 12)4


13.5 (25 12)3
+
28.2 29000 843
384 29,000 843
4.46 109

3.65 108

= (0.47 + 0.53) 1in


6.9 108
L
25 12
=
= 1.25 > 1in Ok
TL,Code =
240
240

A4
23.69

9.39 109

Use W21 44

Lab Assignment #9
Steel Column Design
Columns

25-0

14.25k
B1

26.72k

6-0

Column A

Column A = B

6-0

Length = 12 ft
Assume Allowable axial stress = Fa = 15ksi

25-0

TotalLoad = (14.25 + 26.72)2 = 81.94k

B3

FA =

P
81.94K
Areq =
= 5.46in2
ARe q
15ksi

7-0

S1

TryW5 19
Elevator opening

A = 5.54in2
B5

Slab

rx = 2.17in

ry = 1.28in

6-0
23.69k

12 12
Kl
= 112.5 Fa = 11.69ksi
=
1.28
r y
Column C

S3

16.17k
8-0

9-0

8-0

P = 11.69 5.54 = 64.76k


64.76k < 81.94k , not good try a larger section
TryW6 20
A = 5.87in2
rx = 2.66in

ry = 1.50in

Column C = D
Length = 12 ft
Assume allowable axial stress Fa = 15ksi

12 12
Kl
= 96 Fa = 15.62ksi
=
1.50
r y

TotalLoad = (16.17 + 23.69)2 = 79.72k

91.69k > 81.94k Use W6 20

FA =

P = 15.62 5.87 = 91.69k

P
79.72K
Areq =
= 5.31in2
ARe q
15ksi

TryW5 19
A = 5.54in2
rx = 2.17in ry = 1.28in
12 12
Kl
= 112.5 Fa = 11.69ksi
=
1.28
r y
P = 11.69 5.54 = 64.76k
64.76k < 79.72k not ok try a larger section
Try W6 20
A = 5.87in2
rx = 2.66in ry = 1.50in
12 12
Kl
= 96 Fa = 15.62ksi
=
1.50
r y
P = 15.62 5.87 = 91.69k
91.69k > 79.72k use W6 20

***This solution was based on the


interpretation that the connections
were both hinges which would make
K=1. However, the correct K is 0.7
because it was stated that the columns
are fixed at the base and to the rest of the
structures with hinges