Professional Documents
Culture Documents
Name:
TA:
A two story storage facility has columns 12-0 long and are fixed at the base and to the rest of the
structures with hinges. The structure is designed to carry the following weights.
Dead Load
Live Load
25-0
B1
Column B
6-0
Column A
Slab
6-0
B2
25-0
Slab
B3
S2
7-0
S1
B4
Elevator opening
B6
B5
Slab
6-0
Slab
Column C
8-0
9-0
S3
8-0
Column D
25-0
B1 A50 Steel
LL + DL = TL
6-0
B1
Slab
25-0
6-0
B2
Slab
B3
S2
7-0
S1
Slab
B4
Elevator opening
wL 1.14 25
=
= 14.25kips
2
2
wl2 1.14 252
=
= 89.06k.ft
M=
8
8
Fb = 0.66x50ksi
R=
B5
Slab
6-0
Slab
Column D
Column C
S3
8-0
9-0
8-0
w =1.14K/ft
25 ft
S=
M 89.06kft 12(in/ft)
=
= 32.39in3
Fb
(0.66 50ksi)
Try W12x26
A = 7.65in2 , d = 12.22in, tw = 0.23in, I = 204in4
Check Shear
Fv = 0.40 50ksi = 20ksi
V
14.25
=
= 5.07ksi < Fv = 20ksi ok
fv =
dtw (12.22)(0.23)
Check Deflection
5wDL +LL l4 5 1.14 1/12 (25 12)4
=
= 1.69in
384 29,000 204
384EI
L
25 12
TL,Code =
=
= 1.25 < 1.67in not Ok
240
240
TL =
Try W14 26
I = 245
Check Deflection
5wDL +LL l4 5 1.14 1/12 (25 12)4 3.85 109
=
=
= 1.41in
384 29,000 245
384EI
2.73 109
L
25 12
TL,Code =
=
= 1.25 < 1.41in Not Ok
240
240
TL =
Try W16 26
I = 301
Check Deflection
5wDL +LL l4 5 1.14 1/12 (25 12)4 3.85 109
=
=
= 1.15in
384 29,000 301
384EI
3.35 109
L
25 12
TL,Code =
=
= 1.25 > 1.15in Ok
240
240
TL =
Use W16 26
Lab Assignment #7
Steel Beam Design
Beam 2
25-0
B2 A50 Steel
LL + DL = TL
6-0
B1
Slab
25-0
6-0
B2
W = 1.08k/ft
Slab
B3
S2
7-0
S1
Slab
B4
Elevator opening
B5
Slab
wL 1.08 25
=
= 13.5kips
2
2
wl2 1.08 252
=
= 84.38k.ft
M=
8
8
Fb = 0.66x50 = 33ksi
R=
6-0
Slab
Column D
Column C
S3
8-0
9-0
8-0
w =1.08K/ft
25 ft
S=
M 84.38kft 12(in/ft)
= 30.68in3
=
(33ksi)
Fb
Try W12x26
A = 7.65in2 , d = 12.22in, tw = 0.23in, I = 204in4
Check Shear
Fv = 0.40 50ksi = 20ksi
13.5
V
= 4.8ksi < Fv = 20ksi ok
=
fv =
dtw (12.22)(0.23)
Try12 26
Check Deflection
5wDL +LL l4 5 1.08 1/12 (25 12)4
=
= 1.69in
384 29,000 204
384EI
L
25 12
TL,Code =
=
= 1.25 < 1.60in not Ok
240
240
TL =
Try W14 26
I = 245
Check Deflection
5wDL +LL l4 5 1.08 1/12 (25 12)4 3.65 109
=
=
= 1.38in
384 29,000 245
384EI
2.73 109
L
25 12
TL,Code =
=
= 1.25 < 1.45in Not Ok
240
240
TL =
Try W16 26
Check Deflection
5wDL +LL l4 5 1.08 1/12 (25 12)4 3.65 109
=
=
= 1.08in
384 29,000 301
384EI
3.35 109
L
25 12
TL,Code =
=
= 1.25 > 1.08in Ok
240
240
TL =
Use W16 26
Lab Assignment #7
Steel Design
Beams 4 and 5
25-0
B4 + B5 A50 Steel
LL + DL = TL
(.33x150)psf + 30psf + 100psf = 180psf
convert to UDL1 (180 4) = 720lb/ft or 0.72k/ft
6-0
B1
Slab
6-0
B2
MA = 0
0 = 9.36(6.5) 4.86(10) + 13By
25-0
Slab
B3
S1
S2
7-0
MB = 0
0 = 4.86(3) + 9.36(6.5) 13A y
13A y = 14.58 + 60.84 A y = 75.42/13 5.8k
Elevator opening
B4
Slab
B5
Slab
(5.8 + 0.76)
7 = 22.96kft
2
Find x = .76/1.53 = 0.5ft
A1 =
6-0
Slab
Column D
Column C
S3
8-0
(0.5 .76)
= 0.19kft
2
(8.42 5.5)
A3 =
= 23.16
2
A2 =
9-0
8-0
w =0.81K/ft
Vmax = 8.42k
From diagram M = 23.15 k ft
Fb = 0.66x50ksi = 33ksi
w =0.72K/ft
S=
7 ft
Try W12 14
A = 4.16in2 , d = 11.91in, tw = 0.2in, I = 88.6in4
6 ft
13 ft
9.36
Check Shear
Fv = 0.40 50ksi = 20ksi
V
8.42
=
= 3.53ksi < Fv = 20ksi ok
fv =
dtw (11.91)(0.2)
4.86
Ax = 0
6.5 ft
6 ft
0.5 ft
Ay = 5.8k
M 23.15kft 12(in/ft)
=
= 8.42in3
Fb
(33ksi)
Check Deflection
By=8.67 k
5.8K
TL =
Use W12 14
+
V (k)
-
0.76
A2
22.96
+
M (k.ft)
-
23.15
8.42
Lab Assignment #7
Steel Beam Design
B3 A50 Steel
LL + DL = TL
wallload = 180psf
Beam 3
25-0
MA = 0
0 = 5.8(8) 13.5(12.5) - 5.8(17) + 25By
6-0
B1
Slab
By = A y
OR
6-0
B2
R=V=
25-0
Slab
5.8k
7-0
5.8k
Elevator
opening
B4
Slab
S2
(12.55 + 8.23)
8 = 83.12kft
2
(2.43 4.5)
= 5.47kft
A2 + A 3 =
2
Vmax = 12.55k
From diagram M = 88.59 kft
Fb = 0.66x50 = 33ksi
Slab
B5
wl
.54 25
+P =
+ 5.8 = 12.55k
2
2
A1 + A 4 =
B3
S1
313.75
= 12.55k
25
6-0
Slab
Column D
Column C
S=
M 88.59kft 12(in/ft)
=
= 32.21in3
Fb
(33ksi)
S3
8-0
9-0
Try W12 26
A = 7.65in2 , d = 12.22in, tw = 0.230in, I = 204in4
8-0
5.8K
5.8 K
w =0.54K/ft
Check Shear
Fv = 0.40 50ksi = 20ksi
V
12.55
fv =
=
= 4.47ksi < Fv = 20ksi ok
d.tw (12.22)(0.230)
Check Deflection
TL =
=
25 ft
5wDL +LL l4
PL3
+
=
384EI
28.2EI
1.57 108
13.5
Ax = 0
2.27 10
Try 14 26
8 ft
9 ft
I = 245
8 ft
Ay = 12.55k
By=12.55k
TL =
=
+
V (lbs)
-
8.23
2.43
A3
A2
2.43
8.23
12.55
83.12
2.73 109
TL =
=
1.57 108
5wDL +LL l4
PL3
+
=
384EI
28.2EI
1.57 108
= (0.54 + 0.64) 1.74in
2.46 108
L
25 12
TL,Code =
=
= 1.25 < 1.18in Ok
240
240
+
M (lbs.ft)
-
1.82 109
Try 16 26
I = 301
A4
86.59
83.12
12.55
A1
5wDL +LL l4
PL3
+
=
384EI
28.2EI
1.82 109
3.35 109
Use 16 26
Lab Assignment #8
Steel Design
Stringer 3
25-0
S3 A50 Steel
6-0
B1
wall load = 600lbs ft W = 0.6k/ft
Slab
MA = 0
0 = 8.67(8) 15(12.5) - 8.67(17) + 25By
6-0
B2
Slab
25-0
By = A y
OR
B3
R=V=
S1
S2
wl
0.6 25
+P =
+ 8.67 = 16.17k
2
2
(16.17 + 11.37)
8 = 110.16kft
2
(2.7 4.5)
= 6.08kft
A2 + A 3 =
2
A1 + A 4 =
Slab
Elevator opening
B4
B5
Slab
8.67k
6-0
Slab
8.67k
7-0
404.25
= 16.17k
25
Column C
Column D
Vmax = 16.17k
From diagram M = 116.24 kft
Fb = 0.66x50 = 33ksi
S3
8-0
9-0
8-0
S=
Try W16 31
A = 9.12in2 , d = 15.88in, tw = 0.275in, I = 375in4
8.67K
8.67 K
Check Shear
w =0.6K/ft
25 ft
Try 16 31
I = 375
Check Deflection
15
TL =
Ax = 0
8 ft
9 ft
8 ft
Ay = 16.17 k
By=16.17 k
5wDL +LL l4
PL3
+
=
384EI
28.2EI
2.34 108
16.17
4.18 109
Try 18 35
11.37
2.7
+
V (lbs)
-
I = 510
Check Deflection
A3
A2
116.24
110.16
TL =
A4
2.7
11.37
+
M (lbs.ft)
-
M 116.24kft 12(in/ft)
=
= 42.27in3
Fb
(33ksi)
16.17
2.34 108
116.24
5wDL +LL l4
PL3
+
=
384EI
28.2EI
5.68 109
Lab Assignment #8
Steel Beam Design
Stringer 1 and 2
25-0
6-0
B1
MA = 0
0 = 13.5(6) 12.55(12) - 15(12.5) 9.36(18.5) + 25By
Slab
13.5k
6-0
B2
MB = 0
0 = 9.36(6.5) + 15(12.5) + 12.55(13) + 13.5(19) + 25A y
Slab
12.55k
25-0
592.26
= 23.69k
25
B3
S2
667.99
= 26.72k
25
7-0
S1
Elevator opening
B4
Slab
B5
Slab
7.25k
6-0
Slab
Column C
Column D
A1 =
(26.72 + 23.12)
6 = 149.52kft
2
A2 =
(9.62 + 6.02)
6 = 46.92kft
2
A3 =
(6.53 + 23.69)
13 = 196.43kft
2
S3
8-0
9-0
13.5 K
Vmax = 26.72k
From diagram M = 196.44 kft
Fb = 0.66x50 = 33ksi
8-0
12.55K
w =0.72k/ft
w =0.6k/ft
S=
M 196.44kft 12(in/ft)
=
= 71.43in3
Fb
(33ksi)
Try W21 44
A = 13in2 , d = 20.66in, tw = 0.35in, I = 843in4
25 ft
12.55k 15k
13.5k
Check Shear
Fv = 0.40 50ksi = 20ksi
V
26.72
fv =
=
= 3.7ksi < Fv = 20ksi ok
d.tw (20.66)(0.35)
9.36k
Ax = 0
6 ft
6 ft
13 ft
Ay = 26.72 k
By=23.69 k
26.72
TL =
23.12
9.62
6.53
196.44
149.52
+
M (lbs.ft)
-
6.02
A2
+
V (lbs)
-
Try 21 44
I = 843
Check Deflection
5wDL +LL l4
PL3
+
=
384EI
28.2EI
3.65 108
A4
23.69
9.39 109
Use W21 44
Lab Assignment #9
Steel Column Design
Columns
25-0
14.25k
B1
26.72k
6-0
Column A
Column A = B
6-0
Length = 12 ft
Assume Allowable axial stress = Fa = 15ksi
25-0
B3
FA =
P
81.94K
Areq =
= 5.46in2
ARe q
15ksi
7-0
S1
TryW5 19
Elevator opening
A = 5.54in2
B5
Slab
rx = 2.17in
ry = 1.28in
6-0
23.69k
12 12
Kl
= 112.5 Fa = 11.69ksi
=
1.28
r y
Column C
S3
16.17k
8-0
9-0
8-0
ry = 1.50in
Column C = D
Length = 12 ft
Assume allowable axial stress Fa = 15ksi
12 12
Kl
= 96 Fa = 15.62ksi
=
1.50
r y
FA =
P
79.72K
Areq =
= 5.31in2
ARe q
15ksi
TryW5 19
A = 5.54in2
rx = 2.17in ry = 1.28in
12 12
Kl
= 112.5 Fa = 11.69ksi
=
1.28
r y
P = 11.69 5.54 = 64.76k
64.76k < 79.72k not ok try a larger section
Try W6 20
A = 5.87in2
rx = 2.66in ry = 1.50in
12 12
Kl
= 96 Fa = 15.62ksi
=
1.50
r y
P = 15.62 5.87 = 91.69k
91.69k > 79.72k use W6 20