Professional Documents
Culture Documents
observation sheet
CERTIFICATE
(2014 specification)
Candidates
Student Name:
Student Number:
Place Inspected:
Observation
Hazards and Consequences
Item
01
01
Immediate action:
03
02
Control Measures
Immediate/longer term action
Observation:
00218445
Health surveillance
3 Month
Long Term:
Exposure limit to chemical will decrease
by job rotation.
Immediate action:
1|Page
Immediate
Short term:
Observation
Time
Scale
Short term:
Long Term:
Regularly
Immediate
One week
INTERNATIONAL GENERAL
observation sheet
CERTIFICATE
(2014 specification)
Candidates
Student Name:
Student Number:
Place Inspected:
structure.
Can cause severe injury to pedestrian or
damaging of forklift truck.
Observation
Hazards and Consequences
Item
03
Control Measures
Immediate/longer term action
Observation
Immediate action:
Collision hazard
Personal Injury, pedestrian injury, , property
damage,
Because of one way from main gate to plant
area, collision with pedestrian, vehicles, can
cause injury
04
00218445
Observation
2|Page
Regular
Time Scale
Immediate
Two weeks
Short term:
One month
Long Term:
Provide separate entry & exit routes with
solid partition in between pedestrian and
vehicle.
Immediate action:
Immediate
INTERNATIONAL GENERAL
observation sheet
CERTIFICATE
(2014 specification)
Candidates
Student Name:
Student Number:
Place Inspected:
00218445
Two Week
Short term:
Use natural lights such as roof lights,
Where natural light is not satisfactory.
Use artificial lighting.
Long Term:
Ongoing
Observation
Hazards and Consequences
Item
05
Control Measures
Immediate/longer term action
Observation
Immediate action:
3|Page
Short term:
Fit sound-proof enclosure, Acoustic
shielding. Fit silencers, balance machine,
or mount on anti-vibration mountings.
Time Scale
Immediate
Two Week
INTERNATIONAL GENERAL
observation sheet
CERTIFICATE
(2014 specification)
Candidates
Student Name:
Student Number:
Place Inspected:
06
Long Term:
Observation
Immediate action:
07
00218445
Six Month
Short term:
Replace the lines those are too much
damaged with new lines.
Immediate
Two Week
Regularly
Long Term:
Keep routine monitoring and inspection
of the lines
Observation
Immediate action:
Long Term:
Immediate
One Month
Contact Hazards
Can cause injury to worker
Item
4|Page
Observation
Hazards and Consequences
Control Measures
Immediate/longer term action
Time Scale
INTERNATIONAL GENERAL
observation sheet
CERTIFICATE
(2014 specification)
Candidates
Student Name:
Student Number:
Place Inspected:
08
Observation
Immediate action:
09
Short term:
Provide trolley
Observation
Immediate action:
Observation
Chemical sewage drain system was made of
sanitary and at some points cover was not
installed and light was not good at those
Points.
5|Page
Immediate
One week
Two Month
Long Term:
Manual Handling,
Can cause back bone problem, slip disc
issue, Hernia, can cause musculoskeletal
disorders (MSDs).
10
00218445
Immediate
Short term:
Inform the maintenance staff to do the
pre use check before using electrical
equipments
Weekly
Long Term:
Conduct monthly inspection of all
electrical equipments & repair if needed.
Immediate action:
Immediately barricade the open points.
Short term:
Close the open points by sanitary work
or by keeping covers made of any
material
1 month
Immediate
Two week
INTERNATIONAL GENERAL
observation sheet
CERTIFICATE
(2014 specification)
Candidates
Student Name:
Student Number:
Place Inspected:
Observation
Hazards and Consequences
Item
11
Observation
Long Term:
Control Measures
Immediate/longer term action
Immediate action:
Short term:
Make the assessment of workplace to
provide standard DSE arrangements to
suit the worker.
Long Term:
Observation
Immediate:
6|Page
Two month
12
00218445
Time Scale
Immediate
One month
One month
Immediate
Short Term:
There must be one notice board
containing company policy, Rules &
Regulations and other information.
Long Term:
Conduct inspection and provide training
to employee and keep them update
One week
INTERNATIONAL GENERAL
observation sheet
CERTIFICATE
(2014 specification)
Candidates
Student Name:
Student Number:
Place Inspected:
13
Observation
Immediate:
Biological Hazard.
Biological hazards due to poor personal
hygiene can cause health problems such as
infections and diseases.
Observation
Hazards and Consequences
Item
14
00218445
Control Measures
Immediate/longer term action
7|Page
One week
Long Term:
Immediate:
Immediate
Short Term:
Observation
Ongoing
Short Term:
Install line at top of tank and put the line
in the vessel filled with water so fumes
could absorb in water and water can be
drained. And install new valve.
Long Term:
One Month
Time Scale
Immediate
Three week
One Month
INTERNATIONAL GENERAL
observation sheet
CERTIFICATE
(2014 specification)
Candidates
Student Name:
Student Number:
Place Inspected:
15
Observation
Immediate:
Observation
Hazards and Consequences
Item
16
00218445
Short Term:
One week
Control Measures
Immediate/longer term action
Observation
Immediate:
8|Page
Immediate
Three
Month
Time Scale
Immediate
INTERNATIONAL GENERAL
observation sheet
CERTIFICATE
(2014 specification)
Candidates
Student Name:
Student Number:
00218445
Place Inspected:
Short Term:
Entanglement hazard
Worker can came in entanglement with the
moving parts of the combustion air fan and
can cause sever injury.
Long Term:
Two Day
One Month
17
Observation
Immediate:
Short Term:
Two days
Long Term:
Monitor and check cables. make
employees aware of the hazards by
Providing instructions and supervision.
9|Page
Immediate
7 Days
INTERNATIONAL GENERAL
observation sheet
CERTIFICATE
(2014 specification)
Candidates
Student Name:
Student Number:
Place Inspected:
Observation
Hazards and Consequences
Item
18
Observation
Control Measures
Immediate/longer term action
Immediate:
Inspection of all fire extinguishers,
19
00218445
Short Term:
Replace empty fire extinguisher with new
fire extinguisher.
Long Term:
Discipline Hazards.
Can increase the severity of accident.
Observation
Immediate:
Short Term:
Immediate
Two days
One Month
Immediately
Two Week
Long Term:
10 | P a g e
Time Scale
Regular
INTERNATIONAL GENERAL
observation sheet
CERTIFICATE
(2014 specification)
Candidates
Student Name:
Student Number:
00218445
Place Inspected:
Observation
Hazards and Consequences
Item
20
21
Control Measures
Immediate/longer term action
Observation
Immediate:
Long Term:
Observation:
Immediate:
11 | P a g e
Short Term:
Time Scale
Immediate
One Week
Regular
One week
INTERNATIONAL GENERAL
observation sheet
CERTIFICATE
(2014 specification)
Candidates
Student Name:
Student Number:
Place Inspected:
00218445
Two week
Short Term:
Redesign the workplace and ensure
sufficient ventilation to avoid the danger of
inhaling welding fumes
Long Term:
Two month
Observation
Hazards and Consequences
Item
22
Observation:
During process of drying of calcium chloride
solution to form calcium chloride prills,
problem came inside the prill or drying tower,
there was one way to go and come from inside
prill tower. Worker entered to prill tower to
check nozzle and also fluidized bed checking
was required due to parameters variation.
Inside bed environment was hot and
temperature was too high.
12 | P a g e
Control Measures
Immediate/longer term action
Time Scale
Immediate:
Immediate
Three week
Short Term:
Install strainer in the feed line, if any
INTERNATIONAL GENERAL
observation sheet
CERTIFICATE
(2014 specification)
Candidates
Student Name:
Student Number:
Place Inspected:
00218445
Six Month
Long Term:
Install camera inside the Prill or drying
tower to watch the fluidized bed height
and condition of spoilage or non spoilage.
23
Observation:
Excavation work was carried out for the
installing new ID fan blower in the coal
furnace plant. And area was not barricade.
Immediate:
Immediate
Short Term:
Falling Hazard
Risk of people, material and equipments
falling into the excavations and the possible
results could be fatalities.
Long Term:
Two week
Observation
Hazards and Consequences
Item
24
Observation:
13 | P a g e
Control Measures
Immediate/longer term action
Immediate:
Time Scale
Immediate
INTERNATIONAL GENERAL
observation sheet
CERTIFICATE
(2014 specification)
Candidates
Student Name:
Student Number:
Place Inspected:
25
26
00218445
Observation:
Immediate:
Vibration Hazard
Hand arm vibration syndrome, numbness and
blanching of fingers, reduction in the dexterity
Long Term:
Observation:
Immediate:
14 | P a g e
Short Term:
Immediate
One Week
Regular
Short Term:
Immediate
One Week
INTERNATIONAL GENERAL
observation sheet
CERTIFICATE
(2014 specification)
Candidates
Student Name:
Student Number:
00218445
Place Inspected:
Long Term:
Install smoke detector in the warehouse
Good Practices:
Good Practices
Maintain
Keep it up
Keep up
Keep up
Keep up
Keep up
Keep up
15 | P a g e
INTERNATIONAL GENERAL
observation sheet
CERTIFICATE
(2014 specification)
Candidates
Student Name:
Student Number:
00218445
Place Inspected:
practice.
16 | P a g e
Keep up