RIDER HUNT LIACOR, INC.

GUIDELINES FOR SITE INSPECTION


SITE INVESTIGATION
1.0 Accessibility :
1.1 Local transportation, type routes
1.2 Access roads, type, right of ways
1.3 Temporary road, if necessary, for movement of equipment & materials to jobsite
2.0 Area :
2.1 Soil
2.11 Type of soil (Adobe, ordinary soil, clay, swamp) stability
2.12 Clearing & grubbing works to be done
Note : Thickness of top soil to be stripped
2.13 Is area reclaimed , on fill, cut ? Do we have to backfill (determine average
depth) grade or cut. Note also nearest source of filling materials.
2.2 Surrounding
2.21 Security - is area fenced? Note natural boundaries
2.12 Adjoining lots - slum area, commercial, traffic area. Do we talk to owner of
of adjoining land so as to work peacefully.
2.13 Drainage-Is there natural drainage? Where does storm water flow? Is area
easily flooded or becomes muddy during rains? Water table elevation during
rainy or ordinary days. Months of wet and dry seasons.
2.14 Obstructions - excavations, high tension electric wires, clearances,
vegetation growth, and existing boulders or structures.
2.15 Take note of possible or designated area for dumping excess or unsuitable
materials.
2.3 Facilities
2.31 Construction water and electric light, indicate type of source and location.
Note also water natural sources like creeks and rivers.
2.32 Space for mobility of equipment for erection.
2.33 Space for temporary facilities, office, shop for equipment, batching area and
storage area.
2.34 Availability of housing and source of food.
3.0 Political Aspects :
3.1 Interference from local politicians
3.11 Hiring of labor
3.12 Personal business and interest
3.13 Political affiliations
3.2 Community Conditions
3.21 Agrarian situations
3.22 Presence of dissidents

Page 1 of 70

RIDER HUNT LIACOR, INC.

4.0 Local Subcons and Suppliers :


4.1 Labor Subcons
4.11 Availability of skilled and non-skilled labor, number of labor force we can
hire.
4.12 Approximate costs of labor-excavation, concreting, roofing, masonry blocks,
painting.
4.2 Equipment Lessors
4.21 Earth moving - tractors, dozers, graders, loaders, scrapers, rollers
4.22 Concreting - elba mixers, 1-bagger mixers
4.23 Hauling - dump, trailer, cargo trucks
4.24 Pile driving - pile hammers, crane
4.25 Irrigation and dewatering - Pumps (electric or gas driven)
4.26 Generator and motors - light plants ( gas or diesel)
4.3 Material Supplies (determine maximum capacity available)
4.31 Concrete batching Plant
4.32 Carpentry shop - doors, windows, jalousies
4.33 Metal fabricators - doors, windows, railings, etc.
4.34 Construction materials and hardwares (determine capacity and costs)

SIZE OF WOODEN BEAMS


BEAM SPANS
3.0
3.0
3.0
3.5
3.5
3.5
3.5
3.5
4.0
4.0
4.0
4.0
4.0
4.5
4.5
4.5
4.5
4.5
4.5
5.0
5.0
5.0

JOISTS
3.0
3.5
4.0
3.0
3.5
4.0
4.5
5.0
3.0
3.5
4.0
4.5
5.0
2.5
3.0
3.5
4.0
4.5
5.0
3.0
3.5
4.0
Page 2 of 70

SIZE
2-2"
2-2"
2-2"
2-2"
2-2"
2-2"
2-2"
2-2"
2-2"
2-2"
2-2"
2-2"
2-2"
2-2"
2-2"
2-2"
2-2"
2-3"
2-3"
2-3"
2-3"
2-3"

X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X

8"
8"
10"
10"
10"
10"
10"
10"
8"
8"
10"
10"
10"
8"
10"
10"
10"
12"
12"
12"
12"
12"

RIDER HUNT LIACOR, INC.


5.0
5.0
6.0
6.0
6.0
6.0
6.0
6.0
6.0

4.5
5.0
3.0
3.5
4.0
4.5
5.0
5.5
6.0

2-4"
2-4"
2-3"
2-3"
2-4"
2-4"
2-4"
2-4"
2-4"

X
X
X
X
X
X
X
X
X

12"
12"
12"
12"
12"
12"
12"
12"
16"

SIZE OF FLOOR JOIST


SPANS

SIZE

3.0
4.5
5.0

SPACING

2" X 5"
2" X 6"
2" X 8"

0.30m o.c.
0.30m o.c.
0.35m o.c.

CEILING AND PARTITION BOARD


Area in sm / 2.97 = No. of pcs. (4' x 8') board
Area in sm / 1.67 = No. of pcs. (3' x 6') board

WOOD JOISTS
Wood joist (Waste factor and solid bridging considered)
Joist Dimensions
BxD

2"
2"
2"
2"
2"
3"
3"
3"
3"

X
X
X
X
X
X
X
X
X

4"
5"
6"
8"
10"
5"
6"
8"
8"

25cm. (10inch)
bd.ft/sm

12.26
15.08
18.11
24.15
30.18
22.13
27.16
36.22
45.27

On Center Spacings
30 cm. (12 inch)
bd.ft/sm
10.75
13.81
16.10
21.33
26.73
20.12
24.15
32.20
39.00

35cm. (14inch)
bd.ft/sm

9.50
11.74
14.08
18.78
23.47
17.60
21.12
28.17
35.21

Note :
1. In computing for board feet, subtract first all floor openings from gross floor area
and multiply the factors above.
2. Other structural wooden beams such as girders, girts, ties and the like should be
estimated by direct count.

Page 3 of 70

RIDER HUNT LIACOR, INC.

Description
Painting
Metals
Enamel
Zinc White
White Lead

Conversion (Gal. per 100 SF)

% Wastage

0.20
0.20
0.20

10%
10%
10%

0.20
0.20
0.20
0.20
0.20
0.20

10%
10%
10%
10%
10%
10%

0.20
0.30
0.40
0.20
0.30
0.40
0.30
0.40

10%
10%
10%
10%
10%
10%
10%
10%

Wood
Enamel
Zinc White
White Lead
Varnish
Flat
Gloss
Brick, Concrete Plaster
Enamel
Zinc White
Varnish
Flat
Gloss
Silicon
Primer
Calcimine
CONCRETE PAINTS
Materials

Floor paint oil (Base)


Floor sealer (Liquid)
Paste wax
Liquid wax
Cement pigment paint
Case in base paint
Cement base water repellant paint
Sealer colorless
Sealer colored
Asphaltic paint
Interior flat oil paint
Interior framing paint
Lime wash (white wash)

Use

On new concrete floor


On old concrete floor
Colorless
Colored
Waxing concrete floor
Waxing concrete floor
Exterior concrete wall
Exterior concrete wall
Exterior concrete wall
Exterior walls
Exterior walls
Walls and ceilings
Interior wall and ceiling
Interior wall and ceiling
Exterior walls
Interior wall and ceiling
Page 4 of 70

Qty./Coat (sm/gal.)
(Except as noted)
28
18
21
28
18 sm/lb
230
12 sm/lb
28
12 sm/lb
9
65
7
18
46
18
23

RIDER HUNT LIACOR, INC.


Flat oil paint

Exterior concrete wall

* Materials for white wash : 50lbs of hydrated lime plus 6 to 6-1/2 gallon of water = 8 gallon
of white wash.

PAINTS COVERING CAPACITY


Materials

Surface or Use

Exterior Painting
Priming paint
Priming paint
Flat house paint
Flat house paint
Oil paint
Oil paint
Oil paint
Oil paint
Stain
Stain

Wood
Metal
Over Primer
Repainting one coat
Masonry
Concrete
Stucco (smooth)
Stucco (rough)
Wood shingle sliding - 1st coat
Wood shingle sliding - 2nd coat

41
46
46
37
28
23
18
14
14
18

Interior Painting
Priming paint
Metal primer
Undercoat
Flat
Semi gloss enamel
Satin gloss enamel
Floor enamel
Aluminum paint
Aluminum paint
Spar varnish
Clear gloss varnish
Lacquer
Interior stain
Interior stain
Interior stain

Wood
Metal
Over primer
Finish coat
Finish coat
Finish coat
Floor
First coat
Second coat
Finishing wood work
Finishing wood work
Over stain
Wood work 1st coat
Wood work 2nd coat
Wood work 3rd coat

46
55
37
46
42
42
46
55
65
55
55
42
46
55
65

Repaint barn
Metal

42
60

Unpaint furniture

55

Miscellaneous
Barn, red oil paint
Rust inhibitor
(zinc paint)
Furniture sealer
and paint

Page 5 of 70

Covering Capacity
(sm/ gal)

RIDER HUNT LIACOR, INC.

CONCRETE FLOOR TREATING MATERIAL


Materials

Quantity

Curing compound (liquid)


28 sm/gal
Floor hardener (liquid)
28 sm (one coat)
Floor hardener (liquid)
14 sm (two coat)
Floor hardener (liquid)
9 GPSM (three coat)
Metallic floor hardener, light duty
1-1/2 kg/sm
Metallic floor hardener, medium duty
2 kg/sm
Metallic floor hardener, heavy duty
2-1/2 to 3-1/2 kg/sm
Non-slip abrasive aggregates
1.2-3.0 kg/sm
Color admix (integral)
5 lbs/bag of cement
Color admix (integral) for 1" topping (1:1:2)
3/4 kg/sm
Carbon black admix (integral)
10 lbs/bag of cement
Carbon black admix (integral) for 1" topping (1:1:2)
1-12 kg/sm
Floor coloring (dust)
1.25 kg/sm (1 coat)
Floor coloring
2-1/2 kg/sm (2 coats)
Conductive heavy duty iron aggregate
7-1/2 to 9 kg/sm
Floor sealer (liquid brush applied) colored
28 sm/gal
Floor sealer (liquid brush applied) transparent
41 sm/gal
Band coat (for new floor topping over old floor) liquid
28 sm/gal
Band coat (for new floor topping over old floor) powder
1-1/4 kg/sm
Waterproofing admix (powder add to mixing water) concrete 2 lbs / bag of cement
Waterproofing admix (liquid add to mixing water) accelerator 1 qt / bag of cement
Air entraining admix (powder add to mixing and waterproofing1-1/4 lbs/ bag of cement
Air entraining admix (liquid add to mixing and waterproofing) 1 oz.lb/bag of cement
Description

Conversion

Tiling : Floor Tile


Asphalt, vinyl, asbestos primer
Adhesive
Cleaner
Wax

5 gal/1000 sf
10 gal/1000 sf
5 gal/1000 sf
5 gal/1000 sf

10%
20%
20%
20%

Acoustic Tile
Tile
Cement

25 gal/1000 sf

10%
20%

Glass
8" x 12"
10" x 16"
12" x 20"
14" x 24"
16" x 24"

75
45
30
22
16

10%
10%
10%
10%
10%

panes
panes
panes
panes
panes

Page 6 of 70

/
/
/
/
/

box
box
box
box
box

% Wastage

RIDER HUNT LIACOR, INC.

Number of pieces of Masonry per square meter :


6" CHB = 12.5 pcs/sm
4" CHB = 12.5 pcs/sm
2-1/4" x 3-3/4" x 8" Bricks = GT pcs/sm
5" x 16" Stones = 16,667 pcs/sm
Tiles = Number of pcs / sm
12" X 12"
10" X 10"
25cm X 25cm
8' X 8'
6' X 8' x 24
6 X 12
9" X 4"
4-1/2" X 4-1/2"
4" X 4"
3" X 3"
6" Octagonal
3" Octagonal

10.70
16.00
16.00
25.00
8.10
22.20
65.00
86.00
100.00
172.00
65.00
258.00

per
per
per
per

sm
sm
sm
sm

per
per
per
per
per
per

sm
sm
sm
sm
sm
sm

0.34
0.60
0.67
2.70
1.36

per
per
per
per
per

sm
sm
sm
sm
sm

Boards
Typical sizes
4' x 8'
3' x 6'
4' x 4'
2' x 2'
2' x 4'
Description
Glass and Glazing
8" x 10"
10" x 16"
12" x 20"
14" x 24"
16" x 28"
Caulking
Primer
Compound (1/2" x 1/2")

Conversion

0.60
0.80
0.90
1.10
1.40

lb/pane
lb/pane
lb/pane
lb/pane
lb/pane

2.00 gal/1000lf
13.00 gal/1000lf

Page 7 of 70

% Wastage

20%
20%
20%
20%
20%

10%
10%

RIDER HUNT LIACOR, INC.

FENESTRATIONS
A.

Window Sash
1. For sliding type : Add 10% to the total window area
Roundings
100 or less
- 1 sm
over 100
- 5 sm
2. For casement and projected type . Solve only for
100 or less
- 1 sm
over 100
- 5 sm

B.

Door Sash
1. Classify as to type and solve for the total area per type
2. Roundings
100 or less
- 1 sm
over 100
- 5 sm

C.

Window Glass
1. Classify windows as to glass type. General glass type as follows :
Plain
Frosted
Ribbed
Florentine
Plate
2. Solve for total window sash area under each glass type. Note that sliding
window sash area would have to be increased by 10%.
3. Solve for glass area by multiplying respective total sash area by 85%.
Round to 10 sq.ft.

D.

Fenestration Framework
This includes : Door and window heads, jambs, sills, mullions
1. Solve for the actual length.
2. Add 15% for wastage and overlaps.
3. Roundings :
100 or less
- 10 bd.ft.
over 100
- 50 bd.ft.

ROOF PITCH AND PERCENTAGE AREA


Pitch
0.32
0.36
0.40
0.45
0.50
0.55

Addition to that Area


0.02
0.03
0.04
0.05
0.06
0.07
Page 8 of 70

Total Area in %
102
103
102
105
106
107

RIDER HUNT LIACOR, INC.


0.60
0.70
0.80
0.90
1.00

0.08
0.11
0.14
0.18
0.21

108
111
114
118
121

PURLINS FOR STANDARD G.I. ROOFING


Assumptions :
A.
2" Wood Block
Purlin Size
2"
2"
2"
2"
B.

x
x
x
x

3"
4"
5"
6"

Bd.Ft./sm
3.271
4.369
5.321
6.333

2" x 2" Wood Cleats


2"
2"
2"
2"

x
x
x
x

3"
4"
5"
6"

3.440
4.511
5.458
6.500

Procedure : Get sloped area of roof (see table at pitched area). Solve for purlin
quantities by using above factors. Round up estimates to closest 10 board
feet.
TRUSSES AND RAFTERS
1. Estimate these parts by direct count.
2. Check list of components
a. Top chord
b. Bottom chord
c. Collar plate
d. Strut
e. Brace
f. Wing and sway bracing
g. Connectors
3. Lumber over 24 feet long have splices. Use 8-1/2" dia. bolts per splice.
4. Adjust estimates for waste and splicing at end of computations.
5. Round up to the closest 10 board foot for each truss or lumber estimate. For
grand total, round up to closest 50 board feet.
6. Unless otherwise specified, compute bolt for truss as 1/2" dia.
7. Required bolts for a typical how truss
a. Top joint
- 5 bolts
b. End joint
- 2 bolts
Page 9 of 70

RIDER HUNT LIACOR, INC.


c. Intermediate bottom chord
d. Intermediate top chord
CORRUGATED ROOFING SHEETS
(Effective Roof Coverage)

- 1 bolt
- 2 bolts

1. With 10" (25cm) over laps and 2 corrugations side lap


Commercial Size

Dimensions

32"
32"
32"
32"

27"
27"
27"
27"

x
x
x
x

6' - 0"
7' - 0"
8' - 0"
12' - 0"

x
x
x
x

5'-2"
6'-2"
7'-2"
11'-2"

Effective Coverage
(Area SF)
Area (sm)
11.62
1.08
13.88
1.29
16.14
1.50
25.18
2.34

2. With 12" (30cm) over laps and 2 corrugations side lap


32"
32"
32"
32"

x
x
x
x

6' - 0"
7' - 0"
8' - 0"
12' - 0"

27"
27"
27"
27"

x
x
x
x

5'-2"
6'-2"
7'-2"
11'-2"

11.30
13.56
15.71
24.75

1.05
1.26
1.46
2.30

Procedure for estimation :


1. Determine total flat area.
2. Add pitch factor (see table)
3. Sum of (1) and (2) gives sloped area which is the actual covered area.
4. Solve for quantity of roofing sheets.
Breakdown for Galvanized Roofing Hardware
1. Rivets

100 pcs/ kilogram


6 rivets / sheets
9 rivets / sheets
12 rivets / sheets
86 pcs/ kilogram
152 pcs/ kilogram

6'-0"
Corrugated G.I. Roofing
8'-0"
Corrugated G.I. Roofing
12'-0"
Corrugated G.I. Roofing
2. Lead Washers
3. Plate Washer
4. Plain galvanized iron straps.
Purlin Size

Strap Size

2"
2"
2"
2"

1"
1"
1"
1"

x
x
x
x

3"
4"
5"
6"

x
x
x
x

9"
10"
11"
12"

Pcs. of straps per plain G.I. roll


(36" x 8'-0")
380.00
340.00
310.00
285.00

5. Common nail (Add 15% waste factor before rounding)


Size
4d
5d

Length
1-1/2"
1-3/4"
Page 10 of 70

Pcs/kg
690.00
590.00

RIDER HUNT LIACOR, INC.


6d
7d

2"
2-1/4"

390.00
350.00

6. Roofing nail

102 pcs/kg

7. G.I. roofing flashing (based on 8'-0" (240cm) long plain galvanized iron sheets)
Effective Length
7'-0"
7'-6"

a.Rideg rolls, ridges and valleys


b. Gutter and downspouts
c. Gutter flashings

M
2.14
2.29

Based on number of gutters , convert into rolls, divide quantity by following


factors.
18" Wide
divide by 2
12" Wide
divide by 3
d. Senepa Flashing
Factor

7-0" or 2.135 meters

1/4 bar per soldered joint


10 cc per nicolite bar

Procedure for estimating flashings :


a. Determine total run in meter
b. Divide by corresponding factor
c. Round up value to next digit.
8. Nicolite bar
9. Muriatic or sulfuric acid
Roofing Metal Sheets :
Corrugated G.I.
32" x 6' sheets
32" x 7' sheet
32" x 8' sheet
32" x 9' sheet
32" x 10' sheet
36" x 8' sheet

Sheets/sm
0.833
0.715
0.625
0.555
0.497
0.563

Plain G.I. Sheets or Aluminum


G.I. or 32" x 8" sheet
Alum. 36" x 8" sheet

0.666 sheets/sm
0.454 sheets/sm

NAILS
1. Ceiling
4"
2-1/2"
2"

0.03 kg/sm of ceiling joist


0.13 kg/sm of nailing strip
0.07 kg/sm of nailing board
Page 11 of 70

RIDER HUNT LIACOR, INC.


2-1/2"

0.02 kg/sm of ceiling area

6"
4"
2"
4"
2-1/2"
Total

0.07
0.06
0.16
0.06
0.02
0.36

kg/sm
kg/sm for girders
kg/sm of 1" x 4" T & G flooring
kg/sm for joist
kg/sm for fascia
kg/sm of floor area

3. Exterior Wall
4"
2-1/2"
2"
Total

0.03
0.08
0.07
0.18

kg/sm of wall for stud for H & V studs


kg/sm of finishing
kg/sm of V-cut siding
kg/sm of wall

4. Interior Wall
4"
2-1/2"
1-1/2"
Total

0.04
0.08
0.08
0.20

kg/sm of wall
kg/sm of wall finishing nails
kg/sm of plywood single wall
kg/sm of wall

2. Floor

5. Roof Framing
4"

0.02 kg/sm of wall using nails and bolts


3.00 kg/sm truss (purlins included)

6. Roofing
1/4" dia. x 1/2" G.I. rivets
150/K
Lead washers (72/K)
G.I. washer (200/K)
G.I. Plain straps
2-1/2" G.I. nails (72K)
Lead washer
For 22" wide sheet
For 31"

- 8' Corrugated G.I.

0.80 kg/sht plus


and cont.
-6' Corrugated G.I.
0.40 k/sheet 6' long
-8' = 0.17K/sheets, 6'
0.085 k/sheet
-8' = 0.12K/sheets, 6'
0.06 k/sheet
-0.055 sheet/8' got corrugated G.I.
-8' = 0.17K/sheets, 6'
0.085 k/sheet
-8' = 0.17K/sheets, 6'
0.085 k/sheet
-0.81M 0.635M effective for 2-1/2 corrugation lap
-0.70 effective for 1-1/2 corrugation lap
-0.79M 0.63M effective for 2-1/2 corrugation lap
-0.70 effective for 1-1/2 corrugation lap

One corrugation equals 3"


Corrugated G.I. roofing only

0.83 sheet/sm of roof area

7. Double Headed Nails :


Size
1-3/4
2-1/4
2-3/4

Length (in.)
3
2-1/2
3-1/16
Page 12 of 70

Approximate No./kg.
344
198
130

RIDER HUNT LIACOR, INC.


3
3-1/2
8. Plastered Board Nails

3-3/8
3-7/8

99
62

1
1-1/8
1-1/4
1-1/2
1-1/8 (3/8" head)

1,030
988
852
748
922

9. Lathing Nails
Size
2d
3d
4d

Gauge
16-1/2
15
16

Approximate No./kg.
2,790
1,660
2,150

10. Flooring Brads


7d
8d
10d
8d

11
9
10
11

307
218
152
271

11. Wire Spikes


6
7
8
9
10
12

1
5/16
9/8
3/8
3/8
3/8

20
13
9
7-1/2
6-1/2
5-1/2

Masonry
1. For every 70 pcs. of 8" x 8" tiles - required one bag of cement.
2. For every 100 pcs. of 6" x 6" tiles - required one bag of cement.
3. For every 1,000 pcs. of adobe 15 sacks of cement, 20 sacks of lime.

Estimate for labor only


1. Electrical - 5.00/C.O. with material - 15.00 pesos - 16 pesos
2. Carpentry - Tinsmith - Masonry - 23 pesos per sm. of floor area
Weight of Metals
1. Aluminum Sheets
Thickness
0.020
0.025
0.032

B & S (Gauge)
24
22
20
Page 13 of 70

Weights (Kgs/sm)
1.38
1.72
2.20

RIDER HUNT LIACOR, INC.


0.040
0.051
0.064
2. Aluminum Plates
0.250
0.375
0.600

18
16
13
1/4
3/8
1/2

2.75
3.51
4.41
17.22
25.81
34.50

Installation of Plumbing Fixtures and Accessories


Fixtures
Lavatory
Water closet
Urinal with stall
Shower with stall
Shower without stall
Bath tub
Bath tub with shower
Foot bath
Laundry tubs, pair
Kitchen sink, small
Kitchen sink, large
Slop sink
Gas laundry stove
Gas kitchen range
Water tank
Water softener

Labor (Hour)
5-9
5 - 10
12 - 20
20 - 30
5 - 10
10 - 20
14 - 30
8 - 15
6 - 10
6 - 12
8 - 15
6 - 10
3-5
3-7
5-9
5 - 12

Plumbing Rough In Fixtures


Urinal with basin
Water closet
Lavatory
Shower with stall
Bath tub
Bath tub with shower
Kitchen sink
Slop sink
Laundry tubs, pair
Floor drain
Grease trap

6 - 16
12 - 24
8 - 20
12 - 20
8 - 16
12 - 24
8 - 14
8 - 12
8 - 14
4-8
6 - 12

Valves, faucets, install with rough plumbing


1-in or less pipe connection each
1 to 2 pipe connection each
2 in and over pipe connection each
Testing plumbing system when required
per fixtures
Page 14 of 70

0.5 - 1.0
0.7 - 1.3
1.0 - 1.5
2-8

RIDER HUNT LIACOR, INC.

CONCRETE WORKS
Concrete mixes, materials
only per BPW specifications

Net Factor per


/ cum..
Considering 94
lbs/bags of cement

Net Factor per /


cum..
Considering 88
lbs/bags of
cement

1. Class AAA. 1:1:2 Mix (3,500 PSI)


Cement
Sand
Gravel

13.30 bags
0.40 cum
0.80 cum

14.20 bags
0.40 cum
0.20 cum

2. Class AA. 1:2:3 Mix (3,000 PSI)


Cement
Sand
Gravel

10.50 bags
0.42 cum
0.84 cum

11.21 bags
0.42 cum
0.84 cum

3. Class A. 1:2:4 Mix (2,500 PSI)


Cement
Sand
Gravel

7.85 bags
0.42 cum
0.84 cum

8.38 bags
0.42 cum
0.84 cum

4. Class B. 1:2-1/2:5 Mix (2,000 PSI)


Cement
Sand
Gravel

6.50 bags
0.44 cum
0.87 cum

6.94 bags
0.44 cum
0.87 cum

5. Class C. 1:3:6 Mix (1,600 PSI)


Cement
Sand
Gravel

5.50 bags
0.44 cum
0.89 cum

5.87 bags
0.44 cum
0.89 cum

6. Class D. 1:3-1/2:7 Mix (Lean Mix)


Cement
Sand
Gravel

4.81 bags
0.45 cum
0.91 cum

5.14 bags
0.45 cum
0.91 cum

7. Special 1:2:3 Mix


Cement
Sand
Gravel

9.47 bags
0.51 cum
0.76 cum

10.11 bags
0.57 cum
0.76 cum

Mortar mixes, materials


only per BPW specifications
1. Type 1, 1:1 (Plaster, retouch)
Page 15 of 70

RIDER HUNT LIACOR, INC.


Cement
Sand

24.20 bags
0.93 cum

25.84 bags
0.65 cum

2. Type 2, 1:2 (Plaster, retouch, scratchcoat)


Cement
17.40 bags
Sand
0.93 cum

18.58 bags
0.93 cum

3. Type 3, 1:3 (CHB filler, topping, scratchcoat)


Cement
13.00 bags
Sand
1.05 cum

13.88 bags
1.05 cum

Considering 88 lbs./bag of cement:


94/88 = 1.068 eg. 13.30 x 1.068
= 14.20 bags / cu.m
1. Type 1, Plain 1:1 (Plaster, retouch)
Cement
Sand
29.30 CF

22.00 bags
0.83 cum

23.49 bags
0.83 cum

2. Type 1, with Lime 1:1:2


Cement
Sand
33.00 CF

12.00 bags
0.93 cum

12.82 bags
0.93 cum

3. Type 2, Plain 1:2 (Plaster, retouch, scratchcoat)


Cement
17.50 bags
Sand
33.00 CF
0.93 cum

18.69 bags
0.93 cum

4. Type 2, with Lime 1:1:4


Cement
Sand
33.00 CF

9.00 bags
0.93 cum

5. Type 3, Plain 1:3 (CHB filler, topping, scratchcoat)


Cement
13.00 bags
Sand
37.20 CF
1.05 cum
6. Type 3, with Lime 1:1:6
Cement
Sand
37.20 CF

7.00 bags
1.05 cum

9.61 bags
0.93 cum

13.88 bags
1.05 cum

7.48 bags
1.05 cum

MASONRY BLOCK WORK


A. Concrete Hollow Blocks
1.) 4" CHB wall (per sm.)
a. Materials
0.1. Mortar T3: 0.0266 cum/sm
Cement : 0.0266 cum/sm (13.88 bags/cum)
Sand : 0.0266 cum/sm (1.05 cum/sm)
0.2. 4" CHB
Page 16 of 70

Net Factor / sm.

0.37 bags
0.03 cum
11.70 pcs

RIDER HUNT LIACOR, INC.


0.3. Reinforcement
0.3.1. #3 @ 0.80m vert., #3 @ 0.60m hor.
0.3.2. #3 @ 0.60m vert. and hor.
0.4. Tie Wire #16
b. Labor
Installation
1M2H/14 sm/day
Where :
M = Mason
H = Helper

1.64 kg
1.85 kg
0.0005 roll
1.72 MH

Note : Factor for labor can be obtained by :


No. of men (No. of working hours/day)
Area Accomplished per day
=

3 ( 8 hrs./day)
14 sm / day

2.) 6" CHB wall (per sm.)


a. Materials
0.1. Mortar T3: 0.0624 cum/sm
Cement : 0.0624 cum/sm (13.88 bags/cum)
Sand : 0.0624 cum/sm (1.05 cum/sm)
0.2. 6" CHB
0.3. Reinforcement
0.3.1. #3 @ 0.80m vert., #3 @ 0.60m hor.
0.3.2. #4 @ 0.80m vert., #4 @ 0.60m hor.
0.3.3. #4 @ 0.60m vert.and hor.
0.3.4. #3 @ 0.60m vert.and hor.
0.4. Tie Wire #16
b. Labor
Installation
1M2H/12.50 sm/day
3.) 8" CHB wall (per sm.)
a. Materials
0.1. Mortar T3: 0.0984 cum/sm
Cement : 0.0984 cum/sm (13.88 bags/cum)
Sand : 0.0984 cum/sm (1.05 cum/sm)
0.2. 8" CHB
0.3. Reinforcement
0.3.1. #4 @ 0.80m vert., #4 @ 0.60m hor.
0.3.2. #4 @ 0.60m vert.and hor.
0.4. Tie Wire #16
b. Labor
Installation
1M2H/10 sm/day
4.) Inclined 6" CHB Blocks (30 deg. slant)
a. Materials
Page 17 of 70

1.72 MH

0.87 bags
0.07 cum
11.70 pcs
1.64
2.90
3.32
1.85
0.0008

kg
kg
kg
kg
roll

2.00 MH

1.37 bags
0.100 cum
11.70 pcs
2.90 kg
3.32 kg
0.0009 roll
2.40 MH

RIDER HUNT LIACOR, INC.


0.1. Mortar T3: 0.0108 cum/sm
Cement : 0.0108 cum/sm (13.88 bags/cum)
Sand : 0.0108 cum/sm (1.05 cum/sm)
0.2. Reinforcement
0.2.1. #2 @ every 2 blocks e.w.
b. Labor
Installation
1M2H/8 sm/day
ARCHITECTURAL WORKS
1. Floor Finishes
A. Masonry Floor Finishes
1. Plain Cement (per sm)
a. Materials
Cement
1 bag/6 sm
b. Labor
Spread Cement
1M/32 sm / day
Troweling
2M/32 sm / day

0.15 bags
0.012 cum
0.97 kg
3.00 MH

Net Factor / sm

2. Plain cement plaster 5/8" thick ave. (per sm)


a. Materials
01. Topping T3: 5/8" thick
Cement
0.016 cum/sm (13.88 bags/cum)
Sand
0.016 cum/sm (1.05 bags/cum)
02. Finish coat :
1 bag cement / 6 sm
b. Labor
Topping application
Finishing application

2M/21 sm / day
2M/21 sm / day

3. Plain cement plaster with floor hardener


a. Materials
01. Mortar T2: 3/4" thick average (per sm)
Cement
0.0191 cum/sm (18.69 bags/cum)
Sand
0.0191 cum/sm (0.93 bags/cum)
02. Hardener
Light duty
30 lbs/ 9.30 sm
Medium duty
60 lbs/ 9.30 sm
Heavy duty
100 lbs/ 9.30 sm
b. Labor
Mixing topping applic. 2M/21 sm / day
Finishing
2M/21 sm / day
4. Pebble washout floor finish (per sm)
a. Materials
01. Mortar T2: 3/4" thick average (per sm)
Cement
0.0191 cum/sm (18.69 bags/cum)
Sand
0.0191 cum/sm (0.93 bags/cum)
02. Washout mixture :
Cement
0.0191 cum/sm (18.69 bags/cum)
Page 18 of 70

0.17 bag
0.25 MH
0.50 MH

0.23 bag
0.02 cum
0.17 cum

0.70 MH
0.76 MH

0.36 bag
0.02 cum
3.23 lbs
6.46 lbs
10.75 lbs
0.77 MH
0.77 MH

0.35 bag
0.02 cum
0.35 bag

RIDER HUNT LIACOR, INC.


Pebble
1 pail / 1.50 sm
Where : 1 pail = 1 cu.ft.
b. Labor
Mortar bed application 2M/21 sm / day
Finishing application
1M2H/6 sm / day
5. Vitrified unglazed tiles (per sm)
a. Materials
01. Scratchcoat T3: 3/4" thick
Cement
0.0095 cum/sm (13.88 bags/cum)
Sand
0.0095 cum/sm (1.05 bags/cum)
02. Tiles :
2" Hexagon
3" x 3"
4" x 4"
4-1/2" x 4-1/2"
6" x 6"
03. Tile attachment :
03.1. Adhesive CTA-12 or griptile (1gal/75sq.m)
03.2. For attachment of tiles : T2 : 0.00457 cum
Cement
0.00457cum/sm (18.69 bags/cum)
Sand
0.00457cum/sm (0.93 bags/cum)
04. White / colored cement @ joints : 1 bag/ 8 sm
b. Labor
Scratchcoat application 2M/21 sm/day
Tile installation
1M/8 sm/day
6. Vinyl floor tiles (per sm)
a. Materials
01. Scratchcoat T3: 3/8" thick
Cement
0.0095 cum/sm (13.88 bags/cum)
Sand
0.0095 cum/sm (1.05 bags/cum)
02. Adhesive :
.02.1. DALFLEX
1 gal./14 sm
.02.2. N & H
1 gal./23 sm
03. Wax emulsion :
DALFLEX
1 gal//180 sm
04. Tiles :
9" x 9"
10" x 10"
12" x 12"
b. Labor
Scratchcoat application 2M2H/24 sm/day
Adhesive Inst'n tiles
2M/10 sm/day
7. Cement tiles (per sm)
a. Materials
01. Mortar T3: 3/4" thick
Cement
0.0091 cum/sm (13.88 bags/cum)
Page 19 of 70

0.67 pail
10.75 lbs
0.76 MH
4.00 MH

0.132 bag
0.01 cum
10.76
172.00
97.00
86.00
43.00

sf
pcs
pcs
pcs
pcs

0.143 gal
0.085 bag
0.004 cum
0.125 bag
1.52 MH
2.00 MH

0.13 bag
0.01 cum

0.0056 gal
19.50 pcs
16.00 pcs
11.00 pcs
1.52 MH
2.00 MH

0.27 bag

RIDER HUNT LIACOR, INC.


Sand
02. Cement Tiles :
8" x 8"
9" x 9"
10" x 10"
12" x 12"
b. Labor
Mortar application
Installation tiles

0.0091 cum/sm (1.05 bags/cum)

0.02 cum
25.00
19.50
16.00
11.00

2M2H/24 sm/day
1M1H/9 sm/day

B. Carpentry Floor Finishes


1. T & G finish including floor joist (per sm)
A. Materials
a. 1" x 4" KD tanguile
(39.37/3.25) - (1x4x3.28/12)
Nails 2"F
b. 1" x 6" KD tanguile
(39.37/5.187) - (1x6x3.28/12)
Nails 2"F
B. Labor
Installation : 2C2H/ 30 sm / day
2. Parquet flooring (per sm)
2.01. On wooden diagonal flooring 1" x 6"
A. Materials
.01. 1" X 6" diagonal flooring
.02. Nails 2" F
.03. Adhesive, parquet glue (1gal/2.5 sm)
.04. Finish parquet flooring
B. Labor
Installation diagonals 2M2H/24 sm/day
Installation parquet
2C2H/10 sm/day
2.02. On concrete slab
A. Materials
.01. Scratchcoat T3, 1/2" thick
Cement
0.0127 cum/sm (13.88 bag/cum)
Sand
0.0127 cum/sm (1.05 bag/cum)
.02. Adhesive parquet glue (1 gal/2.50 sm)
.03. Finish parquet flooring
B. Labor
Scratchcoat
2M2H/24 sm/day
Adhesive, installation parquet 2C2H/10 sm/day
2. Wall Finishes
A. Masonry Wall Finishes
1. Rubbed concrete (plain cement) finish, retouch
a. Materials
.01. Retouch T2: 1/8" average
Cement
0.003 cum/sm (18.69 bags/cum)
Page 20 of 70

pcs
pcs
pcs
pcs

0.67 MH
1.78 MH

13.30 bf
0.155 kg
12.50 bf
0.10 kg
1.07 mh

12.50
0.10
0.40
10.76

bf
kg
gal
sf

1.07 gal
3.20 mh

0.18
0.014
0.40
10.76

bag
cum
gal
sf

1.34 mh
3.20 mh

0.056 bag

RIDER HUNT LIACOR, INC.


Sand
b. Labor
Application

0.003 cum/sm (0.93 cum/cum)


1M/10 sm/day

2. Plain cement plaster finish


a. Materials
.01. Plaster T2: 3/4" thick
Cement
0.0191
Sand
0.0191
b. Labor
Interior wall application
Exterior wall application

cum/sm (18.69 bags/cum)


cum/sm (0.93 cum/cum)
2M3H/25 sm/day
2M3H/20 sm/day

3. CHB tool joint finish, flushed or grooved


a. Materials
.01. Mortar T2: 1/8" average
Cement
0.003 cum/sm (18.69 bags/cum)
Sand
0.003 cum/sm (0.93 cum/cum)

b. Labor
Interior wall application
Exterior wall application

1M/10 sm/day
2M/9 sm/day

4. Vitrified glazed tiles (per sm)


a. Materials
.01. Scratchcoat T3: 3/8" thick
Cement
0.009 cum/sm (13.88 bags/cum)
Sand
0.009 cum/sm (1.05 bag/cum)
.02. Tiles
2" hexagon
3" x 3"
4" x 4"
4-1/4" x 4-1/4"
6" x 6"
4" x 8"
.03. Tile attachment
0.3.1. Adhesive CTA-11 or grip tile (1 gal/65 sm)
0.3.2. For attachment of tiles : T2; 0.00457/cum
Cement
0.00457 cum (18.69 bags/cum)
Sand
0.00457 cum (0.93 cum/cum)
.04. White / colored cement @ joints: 1 bag/ 8 sm
b. Labor
Scratchcoat application
2M/21 sm/day
Adhesive installation tiles
1M/7.5 sm/day
Cement adhesive incl.
1M1H
Corner joint, tiles 4-1/4" x 4-1/4"
Page 21 of 70

0.003 cum
0.80 mh

0.360 bag
0.018 cum
1.60 mh
2.00 mh

0.056 bag
0.003 cum

0.80 mh
0.90 mh

0.130 bag
0.010 cum
10.76
172
97
86
43
49

sf
pcs
pcs
pcs
pcs
pcs

0.17 gal
0.085 bag
0.004 cum
0.125 bag
1.55 mh
2.15 mh
5.20 mh

RIDER HUNT LIACOR, INC.

5. Synthetic adobe finish / bush hammered concrete finish Net factor / sm


a. Materials
.01. Scratchcoat T3, 3/8"
Cement
0.009 cum/sm (18.69 bags/cum)
0.13 bag
Sand
0.009 cum/sm (0.93 cum/cum)
0.01 cum
.02. Finish
Synthetic adobe, 1 pail/5 sm (1 pail = 1 cu.ft.)
Cement : 1 bag / 8 sm
b. Labor
Interior wall application :
Scratchcoat
2M2H/21 sm/day
1.55 mh
Finish application
2M1H/12 sm/day
2.00 mh
Exterior wall application :
Scratchcoat
2M2H/18 sm/day
1.80 mh
Finish application
2M1H/10 sm/day
2.40 mh
6. Bush hammered concrete finish (per sm)
a. Materials
.01. Retouch T2: 1/4" average
Cement
0.006cum/sm (18.58 bags/cu
0.11 bag
Sand
0.006cum/sm (0.93 cum/cum) 0.006 cum
b. Labor
Retouch hammer

1M/ 4 sm/day

7. Colored sprayed concrete finish


a. Materials
.01. Scratchcoat T3 : 3/4" thick
Cement
0.019cum/sm (13.88 bags/cu
Sand
0.019cum/sm (1.05 cum/cum)
.02. Waterproof plaster paint
1 gal/ 5 sm
.03. Colored cement
1 bag/ 10 sm
b. Labor
Scratchcoat application
2M2H/12 sm/day
Spraying, retouching
2M/6 sm/day

2.00 mh

0.26
0.02
0.20
0.10

bag
cum
gal
bag

2.67 mh
2.67 mh

8. Shell piqueta finish


a. Materials
.01. Retouch T3 : 3/4" average
Cement
0.019cum/sm (18.58 bags/cu
0.26 bag
Sand
0.019cum/sm (0.93 cum/cum)
0.02 cum
.02. Waterproofing solution ; (silicon solution)(1gal / 16 sm)
0.062 gal
.03. Shell :
1 pail/ 6 sm (1 pail = 6 cu.ft.)
0.17 pail
Page 22 of 70

RIDER HUNT LIACOR, INC.


b. Labor
Retouch application
Hammer spray

2M2H/ 10 sm/day
2M2H/ 5 sm/day

3.20 mh
3.20 mh

9. Riprap stone facing


a. Materials
.01. Concrete class AA, 3" thick
Cement
0.075 cum/sm (18.50 bags/cu
1.04 bag
Sand
0.075 cum/sm (0.93 cum/cum
0.03 cum
Gravel
0.075 cum/sm (0.80 cum/cum
0.06 cum
.02. 6" - 8" stone (6 pcs/400 pcs delivery truck DT
0.015 DT
b. Labor
Mixing concrete
2M2H/10 sm/day
3.20 mh
Stone laying
2H/120 pcs or 20 sm / day
0.80 mh
10. Marble wall finish (per sm)
a. Materials
.01. Scratchcoat T3, 3/4" thick
Cement
0.075 cum/sm(18.58 bags /cu
Sand
0.075 cum/sm(0.93 cum/cum)
.02. Marble
6" x 12" x 3/4" thick
12" x 12" x 3/4" thick
1.0m x 1.0m
Crazy cut marble (mixed)
.03. White / colored cement : 1 bag / 6 sm
b. Labor
Scratchcoat
2M2H/21 sm/day
Installation of tiles
2M2H/8 sm/day
Grinding and waxing
1M1H/8 sm/day
Rental of grinding machine
1 Machine / 8 sm/day
B. Carpentry Wall Finishes
1. Double wall plywood paneling (per sm)
a. Materials
.01. Frames
a) On 2" x 3" frames @ 24" o.c.
b) On 2" x 4" frames @ 24" o.c.
.02. Nails
3-1/2" CW
52 pcs / sheet
1" F
220 pcs /sheet
.03. Plywood panels
a.) 1/4" x 4' x 8'
b.) 1/2" x 4' x 8'
c.) 3/4" x 4' x 8'
b. Labor
Frame installation
2C/20 sm/day
Page 23 of 70

0.26 bag
0.02 cum
22.00
11.00
1.00
1.00
0.17

pcs
pcs
sm
sm.
bag

1.55
2.00
2.00
0.13

mh
mh
mh
m-d

6.56 bf
8.75 bf
0.18 kg
0.028 kg
0.70 sht
0.70 sht
0.70 sht
0.80 mh

RIDER HUNT LIACOR, INC.


Panel installation

2C/15 sm/day

2. Single wall plywood paneling (per sm)


a. Materials
.01. Frames
a) On 1" x 2" frames @ 24" o.c.
b) On 2" x 2" frames @ 24" o.c.
.02. Nails
2-1/2" CW
52 pcs / sheet
1" F
220 pcs /sheet
.03. Plywood panels (4' x 8')
b. Labor
Frame installation
2C/20 sm/day
Panel installation
2C/15 sm/day
3. Stone cut or V-cut wood sidings (per sm)
a. Materials
.01. Sidings
4" width
=
42.00 lf/sm
6" width
=
25.60 lf/sm
8" width
=
18.40 lf/sm
.02. Nails
2" F
45 pcs/650
b. Labor
Installation
2C2H/35 sm/day
4. V-cut sidings 1" thick
a. Materials
.01. Sidings
6" width = 25.60 lf/sm
.02. Nails
2" F
30 pcs. / 650
b. Labor
Installation
2C2H/35 sm/day
3. Ceiling Finishes
A. Carpentry ceiling finishes
1. Plywood / lawanit / asbestos ceiling on wood frame
a. Materials
.01. Frames
a) 2" x 2" @ 16" o.c.
b) 2" x 4" @ 48" o.c.
.02. Nails
3-1/2" cw
65 pcs / sheet
Page 24 of 70

1.10 mh

2.10 bf
4.20 bf
0.075 kg
0.014 kg
0.35 sht
0.67 mh
0.54 mh

14.20 bf
12.80 bf
12.30 bf
0.07 kg
0.92 mh

12.80 bf
0.05 kg
0.92 mh

3.65 bf
4.55 bf
0.15 kg

RIDER HUNT LIACOR, INC.


1" F

130 pcs / sheet

0.016 kg

.03. Hangers
#3 Plain RB @ 48" o.c.
.04. Panels (4' x 8')
b. Labor
Frame installation
2C/18 sm /day
Panel installation
2C/25 sm/day
2. Acoustic tile / board ceiling finish on wood framing
a. Materials
.01. Frames
a) 2" x 2" @ 16" o.c.
b) 2" x 4" @ 48" o.c.
.02. Acoustic tile
.03. Adhesive rugby glue (1 gal/9sq.m)
b. Labor
Frame installation
2C/18 sm /day
Panel installation
2C/25 sm/day
3.

Acoustic tile / board ceiling


system (per sm)
a. Materials
.01. Acoustic tile
.02. Hangers
.03. Aluminum T-runners
12" x 24"
24" x 24"
b. Labor
T-runners installation
Acoustic tile installation

0.75 kg

0.90 mh
0.65 mh

3.65 bf
4.55 bf
10.75 sf
0.11 gal
0.90 mh
1.10 mh

finish on aluminum T-runners suspension

GA #10 wires @ 24" o.c.

10.76 sf
0.014 roll
18.50 lf
13.00 lf

2C/18 sm/day
2C/25 sm/day

4. T & G Wood finishing, excluding frames (per sm)


a. Materials
.01.1" x 4" KD tanguile
(39.4/3.25) - (1 x 4 x 3.28/12)
.02. Nails
2" F
65/650
b. Labor
Installation
2C2H/30 sm/day
5. 1" x 4" T & G ceiling on wood nailers
a. Materials
.01. Frames
a) 2" x 4" @ 0.60m o.c.
b) 2" x 2" @ 0.60m o.c.
.02. T & G (1" x 4")
Effective width = 3.5"
11.24 pcs x 4" x 3.28
.03. Nails
Assorted
Page 25 of 70

0.40 mh
0.16 mh

13.30 bf
0.10 kg
1.04 mh

3.50 bf
5.00 bf
12.50 bf

0.60 kg

RIDER HUNT LIACOR, INC.


b. Labor
Frame installation
T & G installation

2C/10 sm/day
2C/6 sm/day

A. MASONRY WORKS
Mortar Mixes - Materials only (per cm)
1. TYPE 1 - Plain 1:1 (Plaster Retouch)
C (Cement)
SI 29.3 CF
TYPE 1 - With Lime 1:1:2
C (Cement)
SI 33 CF
2. TYPE 2 - Plain 1:2 (Plaster, Retouch, Scratchcoat)
C (Cement)
SI 33 CF
TYPE 2 - With Lime 1:1:4
C (Cement)
SI 33 CF
3. TYPE 3 - Plain 1:3 (CHB Filler, Topping, Scratchcoat)
C (Cement)
SI 33 CF
TYPE 3 - With Lime 1:1:6
C (Cement)
SI 33 CF
4. Mortar Additives
Integral Waterproofing
a. Sika Plaster Weld (Dose-2 Fld.)
0.02 per bag of cement
Per bag of cement
b. Hydrite (Dose-1lb per bag of cement)
0.02 per bag of cement
Per bag of cement
B. HOLLOW BLOCK WORKS (Materials only per sm)
1. CHB : 4" NLB / LB
6" NLB / LB
8" NLB / LB

2.

3.

Mortar T3 : 4"
6"
8"
Rebars :
a. #3H @ 24", #3V @ 32"
b. #3H @ 24", #3V @ 24"
c. #4H @ 24", #4V @ 32"
Page 26 of 70

1.60 mh
2.67 mh

22.00 bags
0.83 cm
12.00 bags
0.93 cm
17.50 bags
0.93 cm
9.00 bags
0.93 cm
13.00 bags
1.05 cm
7.00 bags
1.05 cm

0.0156 gal

1 lb

12.15 blocks
12.15 blocks
12.15 blocks

0.0205 cum
0.0545 cum
0.0890 cum
1.61 kg
1.84 kg
2.86 kg

RIDER HUNT LIACOR, INC.

4.

d. #4H @ 24", #4V @ 24"


Tie Wire
a. 24" - 32"
b. 24"
2% of total rebar weight

C. CONCRETE WORKS
1. Formworks : Substructure (Per Contact Area)
a) Footing (Per sm)
M: Consider 5' x 5' x 12" Eff.A = 5x4x1 = 20 sf
Plywood 1/2" : 2.97 sm/sht
Framings 2" x 3" : (2x3x15)/12x4x1/1.86
Nails 4"C : (80/65)(1/1.86)
1-1/2"C : (92/650)(1/1.86)
Formoil : 1 Gal/24 sm
Braces 2" x 4" : (2x4x6)/12x1/1.86
L: Forms for above :
Fabrication : 2C / 1.86 sm/3 hrs
Installation : 2C,1H/1.86 sm/2 hrs
Stripping : 1H/1.86 sm/1-1/2 hrs
b) Pedestal (Per sm)
M: Consider 12" x 18" x 4'
Eff.A = 2(1+1.5)x4 = 20 sf
Plywood 1/2" : 2.97 sm/sht
Framings 2" x 3" : (2x3x52)/12x1/1.86
Nails 4"C : (64/65)(1/1.86)
1-1/2"C : (104/650)(1/1.86)
Formoil : 1 Gal/24 sm
Braces 2" x 4" : (2x4x56)/12x1/1.86
L: Forms for above :
Fabrication : 2C / 1.86 sm/3 hrs
Installation : 2C,1H/1.86 sm/2 hrs
Stripping : 1H/1.86 sm/1-1/2 hrs
c) Tie Beams (Per sm)
M: Consider 12" x 16" x 19' Beam
Eff.A = (1.33 x 19')x 2 = 51 sf
Plywood 1/2" : 2.97 sm/sht
Framings 2" x 3" : (2x3x66)/12x2x1/4.72
Nails 4"C : (144/65)(1/4.72)
1-1/2"C : (352/650)(1/4.72)
Formoil : 1 Gal/24 sm
Braces 2" x 4" : (2x4x20)/12x1/4.72
L: Forms for above :
Fabrication : 2C / 1.86 sm/3 hrs
Installation : 2C,1H/1.86 sm/2 hrs
Stripping : 1H/1.86 sm/1-1/2 hrs
Page 27 of 70

3.27 kg
2.10 lf
2.80 lf

1.86
0.34
16.20
0.66
0.08
0.045
23.00

sm
sht/sm
bf/sm
kg/sm
kg/sm
gal/sm
bf/sm

3.25 mh/sm
3.25 mh/sm
0.80 mh/sm

1.86
0.34
14.00
0.53
0.09
0.045
20.00

sm
sht/sm
bf/sm
kg/sm
kg/sm
gal/sm
bf/sm

3.25 mh/sm
3.25 mh/sm
0.80 mh/sm

4.72
0.34
13.80
0.47
0.08
0.045
3.00

sm
sht/sm
bf/sm
kg/sm
kg/sm
gal/sm
bf/sm

3.25 mh/sm
3.25 mh/sm
0.80 mh/sm

RIDER HUNT LIACOR, INC.

d) Slabs on fill : 4" Thick slabs (per lm)


M: Sides 2" x 4" (2x4x3.28)/12
2.20 bf/lm
Stakes 2" x 4" (2x4x1.50)/12(3.28/1.60)
2.20 bf/lm
Key 2" x 2" (2x2x3.28)/12
1.10 bf/lm
Nails 3-1/2"C : (10/100)
0.10 kg/lm
Formoil : (1/24)(0.102)
0.005 gal/sm
L: Forms for above :
Installation : 2C/40 lm/day
0.40 mh/lm
Stripping : 1C/45lm/day
0.18 mh/lm
e) Slabs on fill : 6" Thick slabs (per lm)
M: Sides 2" x 6" (2x6x3.28)/12
3.30 bf/lm
Stakes 2" x 4" (2x4x1.50)/12(3.28/1.50)
2.20 bf/lm
Key 2" x 2" (2x2x3.28)/12
1.10 bf/lm
Nails 3-1/2"C : (10/100)
0.10 kg/lm
Formoil : (1/24)(0.152)
0.007 gal/sm
L: Forms for above :
Installation : 2C/40 lm/day
0.40 mh/lm
Stripping : 1C/45lm/day
0.18 mh/lm
f) Columns (Per sm)
M: Consider 12" x 12" x 9'
Eff.A = (1 x 9)x 4 = 36 sf
3.35 sm
Plywood 1/2" : 2.97 sm/sht
0.34 sht/sm
Framings 2" x 4" : (2x4x100)/12x1/3.35
20.00 bf/sm
Nails 4"C : (128/65)(1/3.35)
0.60 kg/sm
1"C : (212/1800)(1/3.35)
0.035 kg/sm
Formoil : 1 Gal/24 sm
0.045 gal/sm
Braces 2" x 6" : (2x6x100)/12x1/3.35
36.00 bf/sm
L: Forms for above :
Fabrication : 2C / 3.35 sm/5 hrs
3.00 mh/sm
Installation : 2C,1H/3.35 sm/3 hrs
2.70 mh/sm
Stripping : 2H/3.35 sm/2 hrs
1.20 mh/sm
g) Suspended slab including beams and girders (Per sm)
M: Consider 10' x 20' slab with 12" x 18" Beams
Eff.A = (10 x 20)+(18+38)1.17 = 254 sf
23.70 sm
Plywood 1/2" : 2.97 sm/sht
0.34 sht/sm
Joist : 2" x 6" @ 10"
(2x6x10)/12(24)(1/23.70)
10.13 bf/lm
Frames : 2" x 4"
(2x8x20)/12(4)(1/23.70)
2.40 bf/lm
Beams : 2-2" x 8"
(2x8x20)/12(4)(1/23.70)
4.50 bf/lm
Braces : 2" x 6"
Page 28 of 70

RIDER HUNT LIACOR, INC.


(2x6x18)/12(8)(1/23.70)
5" x 5"
(5x5x10)/12(8)(1/23.70)
Nails 4"C : (416/65)(1/23.70)
1-1/2"C : (750/650)(1/23.70)
Formoil : 1 Gal/24 sm
L: Forms for above :
Fabrication : 2C / 7.77 sm/10 hrs
Installation : Joist and Frames
2C,2H/5.95 sm/4 hrs
Stripping : 2H/5.95 sm/3 hrs
h) Beams and Girders (Per sm)
M: Consider 12" x 18" x 19' Beam
Eff.A = (1+1.17+1.17)(19) = 64 sf
Plywood 1/2" : 2.97 sm/sht
Frames : 2" x 4"
(2x4x175)/12(1/5.95)
Braces : 2" x 6"
(2x6x64)/12(4)(1/5.95)
Nails 4"C : (368/65)(1/5.95)
1-1/2"C : (180/650)(1/5.95)
Formoil : 1 Gal/24 sm
L: Forms for above :
Fabrication : 2C / 5.95 sm/8 hrs
Installation : Joist and Frames
2C,2H/5.95 sm/4 hrs
Stripping : 2H/5.95 sm/3 hrs
i) Suspended (Per sm)
M: Consider 9' x 19' = 17.10 sf
Eff.A = 17.10 sf
Plywood 1/2" : 2.97 sm/sht
Joist : 2" x 6" @ 10"
(2x6x10)/12(24)(1/16)
Beams : 2" x 8"
(2x8x20)/12(4)(1/16)
Braces : 2" x 6"
(2x6x100)/12(1/16)
5" x 5"
(5x5x10)/12(1/16)
Nails 4"C : (144/65)(1/16)
1-1/2"C : (560/650)(1/16)
Formoil : 1 Gal/24 sm
L: Forms for above :
Fabrication : 2C,2H/16 sm/12 hrs
Stripping : 2H/16 sm/6 hrs
Page 29 of 70

6.10 bf/lm
7.00
0.27
0.050
0.045

bf/lm
kg/sm
kg/sm
gal/sm

2.70 mh/sm
2.70 mh/sm
1.00 mh/sm
6.40 mh/sm

5.95 sm
0.34 sht/sm
19.60 bf/lm
43.00
0.27
0.050
0.045

bf/lm
kg/sm
kg/sm
gal/sm

2.70 mh/sm
2.70 mh/sm
1.00 mh/sm
6.40 mh/sm

16.00 sm
0.34 sht/sm
15.00 bf/lm
6.70 bf/lm
6.30 bf/lm
5.20
0.14
0.055
0.045

bf/lm
kg/sm
kg/sm
gal/sm

3.00 mh/sm
0.75 mh/sm

RIDER HUNT LIACOR, INC.


3.75 mh/sm

D. MASONRY BLOCK WORKS


a. Concrete Hollow Blocks : 4" CHB Wall (per sm)
M : 4" CHB , Non-load bearing
Mortar T3: 0.0266 cm/sm
Cement : 0.0266(13)
Sand : 0.0266 (1.05)
Reinforcement :
a.1) #3 @ 0.80V, #3 @ 0.60H
a.2) #3 @ 0.60V, #3 @ 0.60H
Tie Wires
L : Installation : 1M,2H/14 sm/day
b.

c.

d.

Concrete Hollow Blocks : 6" CHB Wall (per sm)


M : 6" CHB , Non-load bearing
6" CHB , Load bearing
Mortar T3: 0.0624 cm/sm
Cement : 0.0624(13)
Sand : 0.0624 (1.05)
Reinforcement :
a.1) #3 @ 0.80V, #3 @ 0.60H
a.2) #4 @ 0.80V, #4 @ 0.60H
a.3) #4 @ 0.60V, #4 @ 0.60H
Tie Wires
L : Installation : 1M,2H/12 sm/day
Concrete Hollow Blocks : 8" CHB Wall (per sm)
M : 8" CHB , Non-load bearing
8" CHB , Load bearing
Mortar T3: 0.0984 cm/sm
Cement : 0.0984(13)
Sand : 0.0984 (1.05)
Reinforcement :
a.1) #4 @ 0.80V, #4 @ 0.60H
a.2) #4 @ 0.60V, #4 @ 0.60H
Tie Wires
L : Installation : 1M,2H/10 sm/day
Concrete Hollow Blocks : 8" CHB Wall (per sm)
M : 8" CHB , Non-Load bearing
Mortar T3: 0.0108 cm/sm
Cement : 0.0108(13)
Sand : 0.0108 (1.05)
Reinforcement :
Page 30 of 70

12.50 CHB/sm
0.35 bag/sm
0.028 cm/sm
1.64
1.85
0.0005
1.72
7.26

kg/sm
kg/sm
roll/sm
mh/sm
pcs/mh

12.50 CHB/sm
12.50 CHB/sm
0.82 bag/sm
0.066 cm/sm
1.64
2.90
3.32
0.0008
2.00
6.25

kg/sm
kg/sm
roll/sm
mh/sm
pcs/mh

12.50 CHB/sm
12.50 CHB/sm
1.29 bag/sm
0.105 cm/sm
2.90
3.32
0.0009
2.40

kg/sm
kg/sm
roll/sm
mh/sm

12.80 CHB/sm
0.14 bag/sm
0.0115 cm/sm

RIDER HUNT LIACOR, INC.


a.1) #2 @ every 2 blocks E.W.
Tie Wires
L : Installation : 1M,2H/8 sm/day

0.97 kg/sm
0.0009 roll/sm
3.00 mh/sm

E. FLOOR FINISHES (MASONRY FLOOR FINISHES)


a. Plain Cement
0.17 bag/sm
M : Cement 1 bag/6 sm
0.25 mh/sm
L : Spread Cement : 1M/32 sm/day
0.50 mh/sm
Trowelling : 2M/32 sm/day
b. Plain cement plaster : 5/8" Thick Ave. (Per sm)
M : Topping T3 :
0.21 bag/sm
Cement : (0.016)(13)
0.017 cm/sm
Sand : (0.016)(1.05)
0.017 bag/sm
Finish Coat : (1 bag/6 sm
0.67 mh/sm
L : Topping Application : 2M/24 sm/day
0.77 mh/sm
Finishing : 2M/21 sm/day
c. Plain cement plaster with floor hardener, 3/4" thick ave. (per sm)
M : Mortar T2 :
Cement : (0.0191)(17.50)
0.34 bag/sm
Sand : (0.0191)(0.93)
0.018 cm/sm
Hardener : Light duty 30 lbs/9.30 sm
3.23 lbs/sm
Medium duty 60 lbs/9.30 sm
6.46 lbs/sm
Heavy duty 100 lbs/9.30 sm
10.75 lbs/sm
L : Mixing, Topping Application :
2M/21 sm/day
0.77 mh/sm
Finishing : 2M/21 sm/day
0.77 mh/sm

MATERIAL
PAINTING
A. Metal
Enamel
Zinc White
White Lead
B. Wood
Enamel
Zinc White
White Lead
Varnish
Flat
Gloss
C. Brick, Concrete, Plaster
Enamel
Zinc White
Varnish

% WASTAGE

CONVERSION

10
10
10

0.2 gal / 100 sf


0.2 gal / 100 sf
0.2 gal / 100 sf

10
10
10
10
10
10

0.2
0.2
0.2
0.2
0.2
0.2

10
10
10

0.2 gal / 100 sf


0.2 gal / 100 sf
0.2 gal / 100 sf

Page 31 of 70

gal
gal
gal
gal
gal
gal

/
/
/
/
/
/

100
100
100
100
100
100

sf
sf
sf
sf
sf
sf

RIDER HUNT LIACOR, INC.


Flat
Gloss
Size
Primer
Calcimine

10
10
10
10
10

0.2
0.3
0.4
0.3
0.4

gal
gal
gal
gal
gal

CONCRETE WORKS (Concrete Mixes Only ) ( Per sm)


1.

2.

3.

4.

5.

6.

Lean Concrete, Class D : 1:3-1/2:7 Mix


M:
C:
4.75
SI :
15.90
GI :
32.10
1600 PSI, Class C : 1:3:6, Mix
M:
C:
5.50
SI :
15.50
GI :
32.40
2000 PSI, Class B : 1:2-1/2:5, Mix
M:
C:
6.50
SI :
15.50
GI :
30.70
2500 PSI, Class A : 1:2:4, Mix
M:
C:
7.50
SI :
14.80
GI :
30.00
2500 PSI, Class A : 3/4
M:
C:
8.40
SI :
19.40
GI :
23.70

3000 PSI,
M:
C:
SI :
GI :
7. 3000 PSI,
M:
C:
SI :
GI :
8. 3000 PSI,
M:
C:
SI :
GI :
9. 3500 PSI,
M:
C:
SI :
GI :
10. 3500 PSI,
M:
C:

bags
cf
cf

0.45 cum
0.91 cum

bags
cf
cf

0.44 cum
0.89 cum

bags
cf
cf

0.44 cum
0.87 cum

bags
cf
cf

0.42 cum
0.85 cum

bags
cf
cf

0.55 cum
0.67 cum

8.50 bags
14.80 cf
29.30 cf

0.42 cum
0.83 cum

9.50 bags
19.10 cf
23.30 cf

0.54 cum
0.66 cum

9.00 bags
19.40 cf
23.70 cf

0.55 cum
0.67 cum

9.50 bags
14.80 cf
28.80 cf

0.42 cum
0.81 cum

Class AA : 1:1-1/2:3, Mix

Class AA : 3/4

Special : 1:2:3: Mix

Special :

Special : 3/4
10.50 bags
Page 32 of 70

/
/
/
/
/

100
100
100
100
100

sf
sf
sf
sf
sf

RIDER HUNT LIACOR, INC.


SI :
GI :
11. 4000 PSI
M:
C:
SI :
GI :
12. 4500 PSI
M:
C:
SI :
GI :
13. 5000 PSI
M:
C:
SI :
GI :
14. Additives / Admixtures
Early Strength
Pozzolith (HE) 10L
15. Retarders
Pozzolith 8

19.40 cf
20.90 cf

0.55 cum
0.65 cum

10.75 bags
14.80 cf
27.60 cf

0.42 cum
0.78 cum

12.00 bags
14.80 cf
26.50 cf

0.42 cum
0.75 cum

13.00 bags
14.50 cf
25.40 cf

0.41 cum
0.72 cum

0.47 lb/bag cement


0.235 lb/bag cement

CONCRETE WORKS (Concrete Materials Only)


Per BPW Specifications
1.

2.

3.

4.

5.

6.

7.

Class AAA : 1:1:2 Mix (3500 PSI)


M : Cement :
13.30
Sand SI :
0.40
Gravel GI :
0.80
Class AAA : 1:1-1/2:3 Mix (3000 PSI)
M : Cement :
10.50
Sand SI :
0.42
Gravel GI :
0.84
Class A : 1:2:4 Mix (2500 PSI)
M : Cement :
7.85
Sand SI :
0.42
Gravel GI :
0.84
Class B : 1:2-1/2:5 Mix (2000 PSI)
M : Cement :
6.50
Sand SI :
0.44
Gravel GI :
0.87
Class C : 1:3:6 Mix (1600 PSI)
M : Cement :
5.50
Sand SI :
0.44
Gravel GI :
0.89
Class D : 1:3-1/2:7 Mix (Lean Concrete)
M : Cement :
4.81
Sand SI :
0.45
Gravel GI :
0.91
Special Mix : 1:2:3 Mix
Page 33 of 70

bags/cum
cum/cum
cum/cum
bags/cum
cum/cum
cum/cum
bags/cum
cum/cum
cum/cum
bags/cum
cum/cum
cum/cum
bags/cum
cum/cum
cum/cum
bags/cum
cum/cum
cum/cum

RIDER HUNT LIACOR, INC.


M : Cement :
Sand SI :
Gravel GI :

8.

9.47 bags/cum
0.51 cum/cum
0.76 cum/cum

Mortar Mixes - Materials Only


Per BPW Specifications
a. Type 1 - 1:1 (Plaster Retouch)
M : Cement :
24.20 bags/cum
Sand SI :
0.65 cum/cum
b. Type 2 - 1:2 (Plaster, Retouch, Scratchcoat)
M : Cement :
17.40 bags/cum
Sand SI :
0.93 cum/cum
c. Type 3 - 1:3 (CHB Filler, Topping, Scratchcoat)
M : Cement :
13.00 bags/cum
Sand SI :
1.05 cum/cum

9.

Lean Concrete Class D : 1 : 3-1/2 : 7


M : Cement :
4.75 bags/cum
Sand SI :
0.45 cum/cum
Gravel GI :
0.91 cum/cum

10. 1600 PSI, Class C : 1 : 3 : 6


M : Cement :
Sand SI :
Gravel GI :

5.50 bags/cum
0.44 cum/cum
0.89 cum/cum

11. 2000 PSI, Class B : 1 : 2-1/2 : 5


M : Cement :
Sand SI :
Gravel GI :

6.50 bags/cum
0.44 cum/cum
0.87 cum/cum

12. 2500 PSI, Class A : 1 : 2 : 4


M : Cement :
Sand SI :
Gravel GI :

7.50 bags/cum
0.42 cum/cum
0.85 cum/cum

13. 2500 PSI, Class A : 3/4


M : Cement :
Sand SI :
Gravel GI :

8.40 bags/cum
0.55 cum/cum
0.67 cum/cum

14. 3000 PSI, Class AA : 1 : 1 : 1-1/2 : 3


M : Cement :
8.50 bags/cum
Sand SI :
0.42 cum/cum
Page 34 of 70

RIDER HUNT LIACOR, INC.


Gravel GI :

0.83 cum/cum

15. 3000 PSI, Class AA : 3/4


M : Cement :
Sand SI :
Gravel GI :

9.50 bags/cum
0.54 cum/cum
0.66 cum/cum

16. 3000 PSI, Special : 1 : 2 : 3


M : Cement :
Sand SI :
Gravel GI :

9.00 bags/cum
0.55 cum/cum
0.67 cum/cum

17. 3500 PSI, Special


M : Cement :
Sand SI :
Gravel GI :

9.50 bags/cum
0.42 cum/cum
0.81 cum/cum

18. 3500 PSI, Special : 3/4


M : Cement :
Sand SI :
Gravel GI :

10.50 bags/cum
0.55 cum/cum
0.65 cum/cum

19. 4000 PSI


M : Cement :
Sand SI :
Gravel GI :

10.75 bags/cum
0.42 cum/cum
0.78 cum/cum

20. 4500 PSI


M : Cement :
Sand SI :
Gravel GI :

12.00 bags/cum
0.42 cum/cum
0.75 cum/cum

21. 5000 PSI


M : Cement :
Sand SI :
Gravel GI :

13.00 bags/cum
0.42 cum/cum
0.72 cum/cum

Page 35 of 70

RIDER HUNT LIACOR, INC.

Page 36 of 70

RIDER HUNT LIACOR, INC.

Page 37 of 70

RIDER HUNT LIACOR, INC.

Page 38 of 70

RIDER HUNT LIACOR, INC.

Page 39 of 70

RIDER HUNT LIACOR, INC.

Page 40 of 70

RIDER HUNT LIACOR, INC.

Page 41 of 70

RIDER HUNT LIACOR, INC.

Page 42 of 70

RIDER HUNT LIACOR, INC.

Page 43 of 70

RIDER HUNT LIACOR, INC.

Page 44 of 70

RIDER HUNT LIACOR, INC.

Page 45 of 70

RIDER HUNT LIACOR, INC.

Page 46 of 70

RIDER HUNT LIACOR, INC.

Page 47 of 70

RIDER HUNT LIACOR, INC.

Page 48 of 70

RIDER HUNT LIACOR, INC.

Page 49 of 70

RIDER HUNT LIACOR, INC.

Page 50 of 70

RIDER HUNT LIACOR, INC.

Page 51 of 70

RIDER HUNT LIACOR, INC.

0.214286

for Mason 0.571429 MH


for helper 1.142857 MH
1.714286

Page 52 of 70

RIDER HUNT LIACOR, INC.

Page 53 of 70

RIDER HUNT LIACOR, INC.

Page 54 of 70

RIDER HUNT LIACOR, INC.

Page 55 of 70

RIDER HUNT LIACOR, INC.

Page 56 of 70

RIDER HUNT LIACOR, INC.

1.52381
2
1.777778
2.4

2.666667
2.666667

Page 57 of 70

RIDER HUNT LIACOR, INC.

3.2
0.8

1.52381
4
2
1.04

Page 58 of 70

RIDER HUNT LIACOR, INC.

Page 59 of 70

RIDER HUNT LIACOR, INC.

Page 60 of 70

RIDER HUNT LIACOR, INC.

Page 61 of 70

RIDER HUNT LIACOR, INC.

Page 62 of 70

RIDER HUNT LIACOR, INC.

Page 63 of 70

RIDER HUNT LIACOR, INC.

Page 64 of 70

RIDER HUNT LIACOR, INC.

Page 65 of 70

RIDER HUNT LIACOR, INC.

Page 66 of 70

RIDER HUNT LIACOR, INC.

Page 67 of 70

RIDER HUNT LIACOR, INC.

Page 68 of 70

RIDER HUNT LIACOR, INC.

Page 69 of 70

RIDER HUNT LIACOR, INC.

Page 70 of 70