You are on page 1of 1

KEY PLAN

1BM24- 2000x650

1BM24- 2000x650

1BM24- 2000x650

1BM36- 2000x650
TREN
CH

1BM5a- 600x600

1BM24- 2000x650

MATCH LINE!!!

1BM5a- 600x600

1B

M1

1BM51- 600x600
T.O.B SSL-5.50

- 40
0x

60

BEAM
- 300x

650

TREN

CH

BEAM
- 300x

300

650

1BM56- 600x400
TOB SSL-5.75
1BM52- 600x800
T.O.B SSL-5.50

1BM57- 600x400
TOB SSL-5.75

1BM22- 1250x500
T.O.B SSL-5.50

T.O.B SSL-5.50

1BM57- 600x400
TOB SSL-5.75

NOTES :

1BM57- 600x400
TOB SSL-5.75

1BM57- 600x400
TOB SSL-5.75

1BM8- 500x600

1BM23- 1000x600
T.O.B SSL-5.50

1BM3- 600x800
T.O.B SSL-5.50

150

300

Please refer to the corresponding "User


Information" and "Operating Instructions" for
additional information to that given in the
drawings.

SHAFT

COLUMN TOP AT THE RAMP


LEVEL

300

1BM
38T.O.
2000
B SSL-5 x650
.50
1BM

39-

2000

x650

1BM40- 2000x650
T.O.B SSL-5.50

MATCH LINE!!!

LIMIT OF SLAB
SSL-5.80

1BM58- 600x400
TOB SSL-5.75

RPB1

1BM57- 600x400
TOB SSL-5.75

(350x

800)

300

300

400

STC1
COLUMN STUB

LEGEND:

1BM54- 2500x650
T.O.B SSL-6.15

1BM54- 2500x650
T.O.B SSL-6.15

1BM50- 600x600
T.O.B SSL-5.50

419

1BM54- 2500x650
T.O.B SSL-6.15

300

REFER TO DRAWING NUMBER (C011-SD-03-020-3409~3419)

MATCH LINE!!!

- 340

9~3

LIMIT OF SLAB
SSL-4.55

- 03020
-SD

MANHOLE

NO HEAVY LOADS

CROSS BEAMS

5
4

1
1

GN

300

2 EXTERNAL PLANKS STOPPER


-PROVIDE EXTERNAL PLANKS STOPPER OR
EQUIVALENT TO AVOID PROPS SLIDING OUTSIDE
THE BUILDING. [BY THE CLIENT]

-LUMBER (BY SITE) CAN BE ATTACHED TO THE


FLOOR PROPS AS A DIAGONAL BRACE USING THE
BRACING CLAMP B

WIN

LIMIT OF SLAB

DRA

300

TO

LIMIT OF SLAB
SSL-4.55
SHAFT

SHAFT

D
HH2

SHAFT

HH1

SHAFT

R2

400

S1

LH2

LH1

R3
FL2
300

-CROSS BEAM WITH EDGE FORMS MUST BE


SECURED AGAINST HORIZONTAL PULL-OUT AND
TIPPING OVER. THEREFORE PLYWOOD MUST BE
SECURE BY NAILS OR SCREWS.

HH5

SHAFT

HH4

SHAFT

250

300

FL1
LH3

400

LH4

LIMIT OF SLAB
SSL-4.40

A
300

4 BRACING CLAMP B
-LUMBER (BY SITE) CAN BE ATTACHED TO THE
FLOOR PROPS AS A DIAGONAL BRACE USING THE
BRACING CLAMP B

5 SECURE EDGE FORM


-CROSS BEAM WITH EDGE FORMS MUST BE
SECURED AGAINST HORIZONTAL PULL-OUT AND
TIPPING OVER. THEREFORE PLYWOOD MUST BE
SECURE BY NAILS OR SCREWS.

ALL MEASUREMENTS OF THE STRUCTURE HAVE


TO BE CHECKED!

DOKA MAIN BEAM PERPENDICULAR TO SLAB/BEAM EDGE

MAXIMUM ALLOWABLE
LIVE LOAD:

LEGEND :
DOKA TIMBER BEAM H20 ECO N

REVISION :

1.5

TABLE HEAD 20

TABLE HEAD 30

RISK OF FORMWORK BEAM


TIPPING OVER!

DOKA FLOOR PROP

FOR APPROVAL
00 12.04.15
DESCRIPTION
NO.
DATE
PURPOSE OF ISSUE :

4-WAY HEAD H20

RISK OF BREAKING THE


FORMWORK SHEETS!

SUPPORTING HEAD H20 DF

IT IS FORBIDDEN TO FASTEN THE CLAMP-S TO THE


FORMWORK SHEETING ONLY.

REMOVABLE FOLDING TRIPOD

DAPHNE HOTELS COMPANY

PROPS MODEL

Drawn:

Romeo Apolinario Jr.

12.04.2015

Checked:

Lanto Jerico

12.04.2015

Revised:
Dwg-No.:

345-000884-1127

EXTENSION
RANGE

ECO 20 250
ECO 20 300
ECO 20 350
ECO 20 400
EUREX 20 550

152-250 cm
172-300 cm
197-350 cm
227-400 cm
297-550 cm

Rev.: 00

TO AVOID RISKS REGARDING HEALTH & SAFETY OF USERS OR THIRD PERSONS, "USER INFORMATION",
"OPERATING INSTRUCTIONS" AND "FITTING INSTRUCTIONS" HAVE TO BE NOTED IN ADDITION TO THE INFORMATION
GIVEN ON THE DRAWINGS.
IF REQUIRED ASK YOUR DOKA PARTNER FOR THESE DOCUMENTS.

DESIGN CONSULTANT:

ARCHITECTURAL
STRUCTURAL
ELECTROMECHANICAL
SUPERVISION
PROJECT MANAGEMENT
TEL:+974 44 363813-4, 44 360764-5 FAX:+974 44 363812 P.O.B.:5785-QATAR

MZP

SUPERVISED CONSULTANT:

P.O.Box 24071 Doha,Qatar Web: www.ecgsa.com


Tel: +974- 44071444 Fax: +974- 44367771

MAIN CONTRACTOR:
P.O.BOX. 24174, DOHA-QATAR TEL:
4688420 FAX: 4684140 www.ecisa.es

SCAFFOLD BOARDS FOR PLATFORMS AND RAILING ARE TO BE PROVIDED BY SITE AND MUST BE FIXED ACCORDING
TO HEALTH & SAFETY REGULATIONS AND LOCAL LAW!

MATCH LINE!!!

REFER TO DRAWING NUMBER (C011-SD-03-020-3409~3419)


150

SCALE 1 : 125A1

GENERAL NOTES FOR DOKAFLEX


SUB CONTRACTOR:
ALL FLOOR PROPS HAVE TO BE PLACED CENTRALLY UNDER THE MAIN BEAMS.

DOKA QATAR WLL.

ALL FLOOR PROPS HAVE TO BE ERECTED VERTICALLY.

P.O. BOX 23439, DOHA, QATAR


PHONE: +974 44500628, FAX: +974 44500608

DISTANCES BETWEEN BEAMS AND DISTANCES BETWEEN FLOOR PROPS HAVE TO CORRESPOND WITH THE DRAWING.
OVERLAPPING OF THE MAIN BEAM MEASURED FROM THE CENTRE OF THE MAIN BEAM TO THE FLOOR PROPS
WITH TRIPOD MAX. 50 CM.
INTERMEDIATE FLOOR PROPS WITHOUT TRIPOD SHOULD BE PLACED AT EQUAL DISTANCES BETWEEN THE FLOOR
PROPS WITH TRIPOD. THE NUMBER OF INTERMEDIATE FLOOR PROPS HAS TO BE TAKEN FROM THE DRAWING.

MATCH LINE!!!

BASEMENT 1 - PART -A1 @ ELEV. -4.40


BEAM & DROP SLAB FORMWORKS - DOKAFLEX20 SYSTEM
H20 MAIN BEAM + CROSS BEAM ARRANGEMENT PLAN

LIMIT OF SLAB
(150mm)SSL-4.40

JL
WB
CHKD APPD

CLIENT:

NEVER MOUNT GUARD-RAIL BOARDS IN THE


LONGITUDINAL DIRECTION OF THE FORMWORK
BEAMS.

RA
DWN

SHOP DRAWINGS

SHOP DRAWING

MATCH LINE!!!

LIMIT OF SLAB
SSL-5.50

-PROVIDE EXTERNAL RAILINGS,


PIPE OR EQUIVALENT. [BY THE CLIENT]

ONLY ATTACH THE HANDRAIL CLAMP-S TO


FORMWORK BEAMS IF THESE CANNOT TIP OVER.

C
350

-PROVIDE EXTERNAL PLANKS STOPPER OR


EQUIVALENT TO AVOID PROPS SLIDING OUTSIDE
THE BUILDING. [BY THE CLIENT]

DOKA MAIN BEAM PARALLEL


TO SLAB/BEAM EDGE

!
MATCH LINE!!!

300

5 SECURE EDGE FORM

ALL MEASUREMENTS IN MM!

R1

300

SHAFT

MATCH LINE!!!

ER

SHAFT

MATCH LINE!!!

300

DRAWING TITLE

3 EXTERNAL RAILINGS

4 BRACING CLAMP B

SSL-4.40 & 4.55

Rev.
01
01
01
01
01

2 EXTERNAL PLANKS STOPPER

3 EXTERNAL RAILINGS
-PROVIDE EXTERNAL RAILINGS,
PIPE OR EQUIVALENT. [BY THE CLIENT]

Dwg Ref #
C011-SD-03-020-0076
C011-SD-03-020-0077
C011-SD-03-020-0078
C011-SD-03-020-0079
C011-SD-03-020-0080

-PROVIDE BRACING CHAIN OR CABLE WIRE FOR


ALL PRIMARY BEAMS AND TO BE FIXED TO THE
EXISTING CONCRETE SLAB. [BY THE CLIENT]

maximum
(range)

UMB

300

1 BRACING CHAIN OR CABLE WIRE

minimum

RPB1
(350

-PROVIDE BRACING CHAIN OR CABLE WIRE FOR


ALL CROSS BEAMS (@2.40m MAX.)
AND TO BE FIXED TO THE EXISTING CONCRETE
SLAB. [BY THE CLIENT]

REFERENCE DRAWINGS

1 BRACING CHAIN OR CABLE WIRE

x800
)

011

NO HEAVY LOADS

CROSS BEAMS

MANHOLE

REF

Do not weld or heat tie rods!

PRIMARY BEAMS

400

Safety instruction:

PRIMARY BEAMS

MATCH LINE!!!

ER
(C

Safety Advice

MATCH LINE!!!

COLUMN TOP AT THE


RAMP LEVEL

NOTES :

KEY PLAN

USE OF INTERMEDIATE FLOOR PROPS BY COSTUMER: THE DESIGN CONSIDERS PROPS WITH A LOAD CAPACITY
OF 20kN. THE NUMBER OF PROPS HAS TO BE INCREASED IN THE RATIO OF ITS ALLOWABLE LOAD CAPACITY.
ALL INTERMEDIATE FLOOR PROPS HAVE TO BE SECURED
AGAINST TIPPING OVER.
ALL HORIZONTAL FORCES MUST BE BORNE WITH APPLIANCES.
BEFORE PLACING LOADS ON THE SLAB FORMWORK (PLYWOOD,
TIMBER BEAMS, REINFORCEMENT ETC.( INTERMEDIATE FLOOR
PROPS HAVE TO BE PLACED.
IF FLOOR PROPS WITH MOUNTED LOWERING HEADS, 4-WAY HEADS
OR SUPPORTING HEADS ARE MOVED, THEY HAVE TO BE SECURED
AGAINST FALLING OUT WITH SPRING LOCKED CONNECTING PINS 16 MM.

EMAIL: qatar@doka.com

PROJECT
JW MARRIOTT HOTEL TOWER
(3B+G+1+M+51)
PIN NO. 61070120 WEST BAY, DOHA, QATAR
HEIGHT: 0+215.30 M.

DRAWING TITLE :

BASEMENT 1, PART - A1
BEAM FORMWORKS @ ELEV. -4.40
DOKAFLEX20 SYSTEM

C011-SD-03-020-3446
DATE

TO PROTECT THE FORMWORK SHEET AGAINST DAMAGING USE VIBRATORS WITH PROTECTIVE CAPS.

REV:

DRAWING NUMBER

12-04-2015

FORMAT SCALE

A1

As Shown

FLOOR

00

00

DRAWN CHECKED APPROVED

RA

JL

WB