Human Docking Station Parts List / Cut Sheet

PLYWOOD: 1/8” NEED 4 SHEETS OF 4X8'


ITEM L W #
Top 62 1/2” 34 3/4” 1
Under top front 43 3/16” 34 1/4” 1
Under top back 13 7/8” 34 1/4” 1
Back 28 1/8” 34 3/4” 1
Front flap 24 7/8” 34 3/4” 1
Exterior sides Unique Unique 2
Interior sides Unique Unique 2
Sub platform 12 3/4” 34 1/4” 1
Leg rest 26 3/4” 20” 3

LUMBER: 7 2X4s, 1 actual 1x6, 3 1x6s


Front legs (and support arms) 60 5/16” 1 1/2” 2
Back legs 47 15/16” 1 1/2” 2
Back leg supports 31 1/4” 1 1/2” 2
Cross supports 2x4 34 1/4” 1” 4
1x blocking ~400” 1” *1*
2x blocking ~160 1.5” *1*
Seat slats 3/4” 24” 5 1/2” 8
Seat bend up slat 3/4” 20” 3” 1

HARDWARE
Hinges 3” 3” 22
Bolts (pointed end) 3” 3/8” 4
Crown Bolts & Nuts 6” 1/2” 2
Connection bolts 2” 1/4” 8
Eye bolts 1 1/2” 3/16' 12
Collars 2 5/8” In > 1/2” 2
Inner supporting pipe 1 1/2” In > 1/2” 2
Metal plates 1 4” 1 1/2” 2
Metal plates 2 3” 1 1/2” 2
Screws 1/2” >88
Extension Cord 10' 1
Black light 24” 1

UPHOLSTRY
Chair foam ~4 or 5” ~5' 24” 1
Sides foam 6' 30” 2
Graphic fabric 108” 42” 1
Thicker fabric 108” 42” 1
Black fabric 144” 36” 1
White fabric 144” 36” 1
Cord 1/8”
String (Black, White, L. Blue, D. Blue, Brown?)
Pin needles

PAINT
Primer
Black
Light blue
SHANE HARPER
FALL 2009
HUMAN DOCKING STATION
OUTLINE OF BUILDING SCHEDULE
NOVEMBER
SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
8 9 10 11 12 13 14
Finish Legs Cut pipe Build shell Build/form leg rest Attach shell top Place inside walls Day Off
Cut out shell Cut 1” blocking and inside front/back flap,
pieces Nail to ext. sides (perforate) FINISH SHELL

15 16 17 18 19 20 21
1 Day buffer to Assemble chair FINISH CHAIR Prime shell Paint shell Paint shell Day off
have shell done. parts Stain Legs Start chair Chair upholstery
upholstery

22 23 24 25 26 27 28
CHAIR Exterior Exterior Exterior Thanksgiving Exterior Presentation board
UPHOLSTRY upholstery upholstery upholstery upholstery
DONE Attach to shell

29 30 1 2 3 4 5
BE 100% DONE Presentation board Time Buffer Time Buffer Time Buffer FINAL REVIEW
WITH print.
PROJECT
Presentation board
ACTUAL 1” WOOD 1/4” PLYWOOD
BLOCKING
TOP 62.5”

2x4” LUMBER UNDER 43 3/16”

UNDER 13 7/8” BACK 28 1/8”

1” METAL PIPE
1X6” HARDWOOD
SLOT FOR ELEC. CABLE
UPHOLSTERED
CUSHION

BENT PLYWOOD:
TWO LAMINATED
1/4” PLY
2x4” LUMBER

WHOLE SECTIONS AND AERIAL VIEW OF PIECES SCALE: 1” = 1’-0” SHANE HARPER
2X4” LUMBER

METAL PLATE 1 1/2” WIDE

CHANNEL FOR ELEC. CABLE

CONNECTION DETAIL OF THE TWO PARTS SCALE: 4” = 1’-0” SHANE HARPER


CHAIR TO FRAME ATTACHMENT CHAIR SLATS CONNECTION

2x4” LUMBER 1” METAL PIPE

METAL INSERT

BRASS HINGE
6” BOLT

RIGID PLASTIC
COLLAR

1X6” LUMBER EYE BOLT

1X6” LUMBER

FRONT 2X4” LUMBER LEG BACK 2X4” LUMBER LEG


3” BOLT
1” METAL PIPE

FRAME LEG ANGLES METAL PIPE TO SLAT ATTACHMENT

FINE DETAILS AND CONNECTIONS SCALE: 7” = 1’-0” SHANE HARPER


PLYWOOD LAYOUT OF PIECES SCALE: 1” = 1’-0” SHANE HARPER