You are on page 1of 1

ELECTRONICS CORPORATION OF TAMILNADU LTD

PROPOSED DATA CENTRE AT PERUNGUDI


(1)SITE GRADING-ESTIMATES

S.No.

Description

SITE GRADING WORKS

Clearing & Grubbing the ground, removal and


disposal of small trees( less then 30 cm girth),
bushes etc. including roots, stumps & logs or
anything arising out of the clearing operation.
Collecting and Disposing the same debris
(including loading, unloading & leveling) to out side
the plant premises with contractor's own risk.

Carting out and disposing of the excess


contaminated earth from the proposed site to the
assigned destination any where within the factory
premises including loading, unloading & levelling
etc., complete in all respects
Forming Embankment using Brought out earth
(97% Proctor Density)
Forming embankment by transporting approved
soil with required lead having a CBR value of not
less than 8% and minimum Dry Density not less
than 1750 Kg/cum which has to be compacted
properly and form a stable embankment including
cost and labour for proper setting out, stripping and
storing the top soil, compacting the original ground
by vibratory roller of required -capacity to have a
relative compaction of required proctor density,
spreading the materials uniformly over the entire
width of embankment including over section
margin required for roller passing in layers of not
exceeding 200 mm compacted thickness, breaking
clods, watering with all leads for water, compacting
to 97% proctor density for the soil under optimum
moisture content with moisture content adjusted in
the range of one percent (1%) above and two
percent (2%) below the optimum moisture content
determined as per
IS:2720 (Part VII) with power roller/ vibrator roller
rolling and using other construction equipment
approved by the engineer-in-charge and finishing
the embankment at 97% proctor density including
compaction to specified requirement, working in
narrow width of embankment including hire and
fuel charges for all tools and plants and all other
incidental charges etc. complete as per Standard
Specification for road embankment.
(The
Contractor has to make his own arrangement for
the required quantity of soil and cost and
transportation of earth including loading and
unloading, etc.).

TOTAL Amount (Rs)

Unit

Qty.

sqm

3460

Cum

570

Cu.m

2300

Rate

Amount (Rs)