Inspection Dates:
1. Feature Inspection Monday, April 11th
2. Electrical Inspection Monday, April 18th.
The Grade 4/5 contractors union (you guys) will provide the materials that are needed for
designing and constructing your house. You will need to start with a frame (a cardboard box) that
you will choose following the signing of this contract. Learning opportunities for certain parts of
your houses will take place throughout the building process.
Good luck,
Mr. Guyler Beckerson
Investor
Date: __________________
Date: __________________
Investor: ___________________
Date: __________________
1. 2 switches. One must control all of the power in the house. One must control
only one device.
2. TWO 9 volt batteries, or ONE 9 volt battery, and ONE 1.5 volt battery.
3. Your batteries must be on the outside of the house.
4. Every room must have a light.
5. You must have a ceiling fan.
6. You must make use of one motor it needs to do something.
7. ALL WIRES IN THE HOUSE MUST BE COVERED.
BRAINSTORMING SHEET
Use this space to jot down ideas for your house design with your partner
Check
Total:
/10
After Electricity
Feature
1. House has TWO SWITCHES. One controls all electricity, one controls one
device
2. Power source is TWO 9 volt batteries, or ONE 9 volt battery and ONE 1.5 volt
battery
3. All wires in the house are covered
4. Batteries are outside of the house
5. Every room has a light
6. There is a ceiling fan
7. There is motor it does something
Total:
/7
Check
Contractors: ______________________________________________________
Date: ___________________
The inspection is being completed on time: Yes: ___ No: ___
Feature
1. The house has at least FOUR rooms and no more than SIX rooms
(1 Mark)
Check
Total:
/11
Comments:
Signatures:
Contractor One: _________________________
Date: _____________
Date: _____________
Inspector: _________________________
Date: _____________
Contractors: ______________________________________________________
Date: ___________________
The inspection is being completed on time: Yes: ___ No: ___
(1 Mark)
After Electricity
Feature
1. House has TWO SWITCHES. One controls all electricity, one controls one
device
2. Power source is TWO 9 volt batteries, or ONE 9 volt battery and ONE 1.5 volt
battery
3. All wires in the house are covered
4. Batteries are outside of the house
5. Every room has a light
6. There is a ceiling fan
7. There is motor it does something
Total:
Check
/7
Comments:
Signatures:
Contractor One: _________________________
Date: _____________
Date: _____________
Inspector: _________________________
Date: _____________
Contractors: ______________________________________________________
Date: ___________________
Inspection one on time: Yes: ___ No: ___
Inspection two on time: Yes: ___ No: ___
(1 Mark)
(1 Mark)
Feature
1. The house has at least FOUR rooms and no more than SIX rooms
Check
Check
Signatures:
Contractor One: _________________________
Date: _____________
Date: _____________
Inspector: _________________________
Date: _____________